Program Management

Infrastructure and Public Realm

Riyadh City Development

Material Approval –
Split Air Conditioning Units for Irrigation Reservoir Pumping
Station

Reference No.: RN-02-00001-06-11-IR-WBG-MI-0000074 [00]


Prepared by:
Western Bainoona Group for General Contracting LLC.
PO Box 44252,
Abu Dhabi United Arab Emirates
www.wbg.ae

Prepared for:
Parsons international limited.
PO Box 5498
Abu Dhabi, United Arab Emirates

This document is the property of KBR and Aldar.

All rights reserved. No section or element of this document may


be removed from this document, reproduced, electronically
stored or transmitted in any form without the written permission
of KBR and Aldar.

This document contains confidential or proprietary information


which may be subject to export control and should not be copied,
reproduced, republished, uploaded, transmitted, printed or
distributed in any way without prior written authorization as
required

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 2 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
Contractor Engineer/Lead Consultant PMC Employer

Internal Approval Summary Checklist for Pre-Qualification & Material Submittal


Project Name Riyadh City Development
Project Description Riyadh City Development (Riyadh City North -Streetscape Phase 7A)
Document Ref. no. RN-02-00001-06-11-IR-WBG-MI-000074 Date 11-May-22 Rev. 0
Submittal Title Split AC Units to be used for Irrigation Reservoir Pumping Station
Discipline Electrical

Sr No. Item Description Yes No N/A Remarks


1 List of Vendor approvals √

2 Country of Origin details √

3 Source Declaration forms √


4 Estidama Material Questionnaire & Compliance √
5 Project Specification, BoQ, Specification √
6 Specification compliance Statement √
7 Product data / Catalogue √

8 Recent test reports √


9 Company Profile √
10 Trade License / Compliance statement √

11 Previous Approvals √

12 Equipment Schedule √
13 Sequence of Operation √
14 Authority Requirement Compliance √
15 Warranties and Guarantees √
16 Previous completed projects and details √

Engineer/Lead Consultants' Comments


Authority Approved

Code A - Approved

Code B - Approved with Comments

Code C - Revise and Resubmit

Code D - Rejected

Reviewed By Date
Consultants RE Date

Aldar PMC Comments (Optional)

Reviewed By Date
Aldar Comments (Optional)

Reviewed By Date

Template Ref. no.: RN-02-00001-00-19-OA-KBR-FO-000088 | Rev. 03 Page 1 of 1


Contractor Engineer/Lead Consultant PMC Employer
Riyadh City North
MATERIAL APPROVAL REQUEST FORM
Project Name Riyadh City Development
Project Description Riyadh City North - Infrastructure & Streetscape Phase 7A
MAR Ref. no. RN-02-00001-06-11-IR-WBG-MI-000074 Date 12-May-22 Rev.

Submittal Title Split AC Units to be used for Irrigation Reservoir Pumping Station

Submitted By Binu Mon Joykutty (Material Engineer) WBG Signature


Architectural Mechanical Electrical Structural Civil Landscape Road Work
Discipline
Potable Water Telecommunications Sewer Stormwater Irrigation Others _________

Material Details
Drawing Reference As per attached Drawings in section 2 Documents Attached

Specification Reference Adwea Specification W-H-SS-001 Clause No. 5.3 Technical Data Sheets

BOQ Reference 14.187-14.188


Compliance Statement
Split AC Units to be used for Irrigation Reservoir Pumping
Material Specified Specifications Extract
Station
Split AC Units to be used for Irrigation Reservoir Pumping
Material Proposed
Station Samples with Sample Tag
Manufacturer/Supplier M/s. Mitsubishi Electric/M/s. United Electronics Co. L.L.C.
Others
Remarks

The Contractor certifies that the material submitted herewith has been reviewed in detail and is in compliance with the contract drawings and specifications.

Akram Hijazi (Project Director)


Authorised Signatory Date 12-May-22

Received Signature Date


Engineer/Lead Consultants' Comments Authority Approved

Code A - Approved

Code B - Approved with Comments

Code C - Revise and Resubmit

Code D - Rejected

Reviewed By Date
Consultants RE Date

ALDAR PMC Comments (optional)

Sign Date
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the contract requirements and specifications. Any changes
from previous revisions of the submittal or contract documents, unless specifically highlighted are not necessarily reveiwed and hence not necessarily approved.

Template Ref. no.: RN-02-00001-00-19-OA-KBR-FO-000021 | Rev. 03 Page 1 of 1


REVISION HISTORY

00 12/05/2022 Issued for Approval

REV. NO DATE DESCRIPTION

APPROVALS
Printed initials in the boxes confirms that the document has been reviewed and approved. Approved records
are saved on Aconex.

Author Binumon Joykutty 12/05/2022

Checked By Aleksandar Jankovic 12/05/2022

Reviewed By Jaya Prakash 12/05/2022

Reviewed By Khaled Sayed 12/05/2022

Approved By Akram Hijazi 12/05/2022

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 3 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
NAME SIGNATURE DATE

DESCRIPTION PAGE NO.

Table of Contents

Table of Contents.................................................................................................................................. 4

1 ADDC Form ....................................................................................................................................... 5

2 Copies of relevant parts of Specs, BOQ & Drawings ..................................................................... 6

3 Technical Comparison Table / Compliance Statement .................................................................. 7

4 Manufacturers Technical Data / Original Catalogues ................................................................... 8

5 Recent Test report / Certificates ...................................................................................................... 9

6 Commercial License / Registration Documents ............................................................................ 10

7 Warranty Certificate ....................................................................................................................... 13

8 Previous Approvals ......................................................................................................................... 14

9 Estidama Forms ............................................................................................................................... 16

10 Manufacturer Quality Certificates .............................................................................................. 17

11 Company Profile ............................................................................................................................ 18

ATTACHMENTS ............................................................................................................................... 19

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 4 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
1 ADDC Form

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 5 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
Split AC Units to be used for Irrigation Reservoir
Material Description
Riyadh City Development Pumping Station
Project Title &
Riyadh City North - Infrastructure & Streetscape
Contract No.
Phase 7A
Supplier Name M/s. United Electronics Co. L.L.C.

Place of Origin Abu Dhabi, UAE

Client M/s Aldar Projects LLC, Abu Dhabi, UAE

Consultant M/s Parsons International Ltd. Abu Dhabi, UAE Manufacturer


M/s. Mitsubishi Electric/Thailand
Name/Place of Origin
M/s Western Bainoona Group for General
Contractor
Contracting -LLC, Abu Dhabi, UAE

Model / Type MS-GK24VA / MU-GK24VA

Submittal Ref.No. RN-02-00001-06-11-IR-WBG-MI-000074 00

Specification Clause No. Adwea Specification W-H-SS-001clause No. 5.3

Date 12/May/2022 B.O.Q Item No. 14.187-14.188

Attachments(in separators):
Material Data Sheets Yes.  No.
A Any Deviation from the Project's Specification
Yes. No.
(If yes, please attach Deviation Form)

B Catalogue/Brochure Yes.  No.

Manufacturer Quality Certificate (ISO or Other) Yes. No.


C
Copy of Certificates ( Non-Toxicity or Other ) Yes. No.

Copy of Related Page of B.O.Q. Yes. No.

Copy of Related Approved Vendor List. Yes.  No.


D Copy of Related Contract Specification Clause & Contract Technical Data
Sheet
Yes.  No.

Copy of Contract Drawing/Sketch Yes. No. 08/03/2022

E Copy of Previous Approvals Yes.  No.


Contractor's Stamp, Signature & Date
Other Enclosure ( if any )/Design Yes.  No.
F
For Use of Consultant:
Status : Recommended for Approval Not Recommended
Recommended for Approval as commended
Comments :

Stamp, Signature & Date


For Use of ADDC :

Status : Approved Not approved

Approved Except As Noted

Comments :
E-873.66.003A, rev 0,MAR, dated 5.01.2003

Stamp, Signature & Date


Note:-
The above Comments and/or approvals do not relieve the Contractor from his obligation under the Contract to ensure conformance to the specification. Any specification deviations found
subsequent to approval shall be corrected by the CONTRACTOR to the satisfaction of ADDC/ENGINEER.
Project Title and Riyadh City Development
Contract No. Riyadh City North - Infrastructure & Streetscape Phase 7A

RN-02-00001-06-11-IR-WBG-MI-
Specification Clause
Submittal Ref. No. & Date 000074 00 Adwea Specification W-H-SS-001clause No. 5.3
No.
12-5-2022

Split AC Units to be used for Irrigation Reservoir


Material Description B.O.Q Item No. 14.187-14.188
Pumping Station

Material's Technical
Sl. No. Description Unit
Specification / Data

MS-GK24VA /
1 Split AC Units to As per Drawing Model
MU-GK24VA

Dimensions –
IU(325X1100X238), OU(880X840X330)
LxWxH (mm)

Weight: IU(16), OU(58)

Cooling Capacity
2
(Tr):

Noise Level(dBA) IU(53), OU(54)

EER(Btu/hrW) 7.86

Air Flow(Lo-Me-Hi-
12.4-15.5-18.7-22.0
SHi)
Electric Power
(220-230-240)-1-50
Supply (V/Ph/Hz)
E-873.66.003B, rev 0,MAR, dated 5.01.2003

8/03/2022
Contractor Consultant ADDC
Stamp, Signature & Date Stamp, Signature & Date Stamp, Signature & Date
Note : In case of discrepancy between the Technical Data Sheet and Brochure, the Technical Data Sheet shall prevail
Riyadh City Development
Project Title & Split AC Units to be used for Irrigation
Riyadh City North - Infrastructure & Streetscape Material Description
Contract No. Reservoir Pumping Station
Phase 7A

Client M/s Aldar Projects LLC, Abu Dhabi, UAE Supplier Name M/s. United Electronics Co. L.L.C.

Consultant M/s Parsons International Ltd. Abu Dhabi, UAE Place of Origin Abu Dhabi, UAE

M/s Western Bainoona Group for General Manufacturer Name/Place


Contractor M/s. Mitsubishi Electric/Thailand
Contracting -LLC, Abu Dhabi, UAE of Origin

MS-GK24VA /
Model / Type
MU-GK24VA
Submittal Ref.No. RN-02-00001-06-11-IR-WBG-MI-000074 00

Specification Clause No. Adwea Specification W-H-SS-001clause No. 5.3

Date 12/May/2022 B.O.Q Item No. 14.187-14.188

Deviation Description :

Reasons/Justifications :
E-873.66.003C, rev 0,MAR, dated 5.01.2003.

8/03/2022

Contractor's Stamp ,Signature & Date


2 Copies of relevant parts of Specs, BOQ & Drawings

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 6 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
SPECIFICATION FOR

AIRCONDITIONING AND VENTILATION

SYSTEMS

0 02-02-2002 Approved Issue


rev. date Description/issued for prepared authorised
client: ADWEA
project: STANDARD SPECIFICATIONS FOR WATER WORKS
title: SPECIFICATION FOR AIRCONDITIONING AND VENTILATION SYSTEM

tender: project: document: W-H-SS-001 rev: 0 sheet: 1 of: 34


Operating Characteristics

The unit shall be capable of operating at an ambient temperature of 52ºC.Unless stated


otherwise, unit performance shall be rated at an ambient temperature of 52ºC dry bulb
temperature.

Testing and Inspection

Complete factory tests shall be performed prior to shipment to demonstrate to


ADWEA/ENGINEER that that units meet the requirements of this specification. The
airconditioning units shall not be shipped unless results of test show compliance with all
requirements of this specification.

5.3 Decorative Type Split Air Conditioning Unit

Contractor shall select units specifically designed for installation of indoor wall mounted fan
coil unit and outdoor floor / roof mounted condensing unit. The units shall be factory
assembled including direct expansion type coil, condensate drain pan, fans, fan motors, filters
and controls all in an insulated casing. Unit shall be rated in accordance with ARI standards
210/240 and 340/360.

Indoor Fan Coil Unit

The unit casing shall be constructed of heavy gauge galvanized steel powder coated with a
full covering to all edges and a uniform paint thickness. The casing shall be completely
insulated with at least 15 mm thick fire retardant insulation.

Evaporator coil and drain pan

The aluminium fin surface shall be mechanically bonded to 3/8" copper tubing. The coil shall
be pressure and leak tested at 400 psig, be arranged for draw-through airflow and includes an
L-shaped drain pan constructed of galvanized steel and insulated.

Evaporator fans and motors

It shall be dynamically balanced, double inlet, double width, forward curved, three speed
permanent split capacitor direct drive. Fan motors shall be protected against overload. Fan
and motor bearings shall be permanently lubricated and be easily accessible.

Filters

It shall be washable, reusable type installed by the factory and be easily accessed by
removing the unit front panel.

Electrical controls

Magnetic evaporator fan relay and low voltage terminal board shall be factory wired and
installed.

Client ADWEA
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: SPECIFICATION FOR AIRCONDITIONING AND VENTILATION SYSTEM

tender: project: document: W-H-SS-001 rev: 0 sheet: 13 of: 34


Controls

Factory wired microprocessor type thermostat shall be provided and include an LED display
indicator, thermostat, room temperature indicator and 3-speed fan control.

Outdoor condensing unit

The condensing units shall be fully charged from the factory for 7.5m of piping. The unit shall
be suitable for outdoor installation. Compressor shall be either reciprocating or rotary type.
Condensing unit shall be mounted on vibration isolation pads of minimum 50 mm thickness.

Casing

Unit casing shall be constructed of heavy gauge galvanized steel and painted with a weather
resistant powder coating.

Refrigerant Controls

Refrigerant system controls shall include condensor fan and compressor contactor.
Compressor shall be protected against high and low pressure. A factory installed liquid line
drier and low pressure switch shall be provided. Field braze connections shall be externally
accessible multi-use liquid and gas line valves with service pressure gauge ports.

Compressor

The compressor shall be either reciprocating or rotary type. The compressor shall include
internal over temperature and pressure protection, total epoxy dipped hermetic motor
windings, thermostatically controlled sump heater, roto lock suction and discharge refrigerant
connections, centrifugal oil pump, steel alloy valves in valve plate assembly, and internal
spring mounts.

Condensor coil

The coil shall be continuously wrapped, corrosion resistant all aluminium with brazed joints.
The coil shall be 3/8" O.D. seamless aluminium glued to a continuous aluminium fin. The coil
shall be protected on all four sides by louvered panels. The coils shall be coated with air dry
"phenolic", thermally set "heresite", or approved equal coating suitable for salty seacoast with
SO2 environment.

Electrical Requirements

The unit shall operate on a 415 V / 3 Ph / 50 Hz or 240 V / 1 Ph / 50 Hz power supply as


applicable. All electrical wiring shall enter the unit cabinet at a single point.

Operating Characteristics

The unit shall be capable of operating at an ambient temperature of 52ºC.Unless stated


otherwise, unit performance shall be rated at an ambient temperature of 52ºC dry bulb

Client ADWEA
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: SPECIFICATION FOR AIRCONDITIONING AND VENTILATION SYSTEM

tender: project: document: W-H-SS-001 rev: 0 sheet: 14 of: 34


temperature. Decorative type A/C units selected shall not be less than 2 Tons cooling
capacity.

Testing and Inspection

Complete factory tests shall be performed prior to shipment to demonstrate to


ADWEA/ENGINEER that that units meet the requirements of this specification. The split
airconditioning units shall not be shipped unless results of test show compliance with all
requirements of this specification.

5.4 Selection Criteria

The Contractor shall select the Ducted Split Air Conditioning units as specified in para
5.2,while the Package Air Conditioning units or Decorative type Split units only if deemed
necessary for particular area.

5.5 Extract Ventilation Units

General

The Contractor shall supply and install where shown on the Drawings, fans as described
hereinafter and of capacities indicated in the Capacity Schedule on the Drawings.

The fan motors and starters shall be in accordance with the Electrical division of these
specifications.

Test and rate all fans in accordance with the standards of the AMCA. All fans must bear the
AMCA certified rating seal.

Make appropriate allowance for the effects on fan performance of all installation conditions
including plenum enclosures and inlet and discharge arrangements so that actual installed fan
performance equals that specified.

Balance all fan wheels and all other moving components statically and dynamically. Where
coating is specified and it affects the balance of the fan wheel, perform balancing after the
coating has been applied.

Drill all fan shafts on the center line to receive a tachometer.

Belt driven fans shall be connected to the driving motor by means of an approved V-belt drive,
with adjustable sheaves, unless otherwise designated. V-belt drives shall be designed for
50% overload capacity and the motors for such drives shall be equipped with adjustable
bases or slide rails.

Bearings shall be self-aligning, grease lubricated, ball-bearing type, and shall be complete
with grease fittings, extended for easy access where necessary.

Weather proof hoods should be provided for all motors and drives exposed to weather to the
approval of ADWEA/ENGINEER.

Client ADWEA
Project: STANDARD SPECIFICATIONS FOR WATER WORKS
Title: SPECIFICATION FOR AIRCONDITIONING AND VENTILATION SYSTEM

tender: project: document: W-H-SS-001 rev: 0 sheet: 15 of: 34


BILL SECTION - D 0
IRRIGATION PUMP STATION (IPS-1)

CESMM3
ITEM ITEM DESCRIPTION UNIT QUANTITY
Ref.

PART 14 - IRRIGATION PUMP STATION (IPS-1)


(CONT'D…)

MECHANICAL WORKS (CONT'D..)

Equipment (Cont'd)

Bulk Fuel Storage Tank, capacity=12,000Ltr,


including pipes, fittings, valves, connection to engine,
14.183 Z524.1 nr 1
concrete base, wall, cover and other accessories as
per drawing details and specifications

Fuel day tank of capacity 2600L including all pumps,


14.183A Z524.2 nr 1
pipe works,fittings etc.

Motorized penstock including all necessary fittings


14.184 Z524.3 nr 2
and accessories as per standards and details

4Ton Single girder overhead crane including all


14.185 necessary fittings and accessories as per standard Z524.4 nr 1
and as required

Air Conditioning

Air supply duct including accessories change in size,


14.186 bends, grilles, plenum box, supports and other items Z620 Sum 1
to complete as per details and specifications

Supply and install split type air conditioning unit


including ducts, support and other associated
works complete as per specification and
drawings.

14.187 FCU (2Ton capacity) Z631.1 nr 4

Air conditioner condenser unit, ACCU, with all piping,


14.188 Z631.2 nr 4
fittings etc.

Roof mounted centrifugal dual speed extract fan,


14.189 Z631.3 nr 5
(flow rate=6300CFM) including accessories

Supply Air Fan, roof mounted DIDW centrifugal


14.190 blower type including all accessories as per Z631.4 nr 2
specifications. (flow rate=15100CFM)

Supply pressurized fan including all accessories as


14.191 Z631.5 nr 1
per details and specifications (flow rate=9100CFM)

Wall mounted exhaust Fan, including, accessories


14.192 Z631.6 nr 1
(100CFM)

Testing and commissioning of all mechanical


14.193 Z782.4 Sum 1
equipments

Carried to Part Summary


NOTE:
1. ALL DIMENSIONS ARE IN MILLIMETERS AND LEVELS IN METERS
UNLESS OTHERWISE STATED.

2. ALL DUCTWORK SHALL BE PROVIDED WITH PROPER SUPPORTS.

3. THE CONTRACTOR SHALL DO THE PRESSURE LOSS CALCULATION


009-MCC ROOM-A/C EQUIPMENT SCHEDULE FOR FANS AS PART OF SHOP DRAWINGS AND SUBMIT TO
ENGINEER FOR APPROVAL AND SELECTION OF FAN ESP SHALL
ELEMENT EQUIPMENT BE DONE ACCORDINGLY.
ID TAG TYPE COUNT CAPACITY OPERATION
88 FCU-1 WALL MOUNTED DECORATIVE SPLIT TYPE 1 2 TON DUTY
88 FCU-2 WALL MOUNTED DECORATIVE SPLIT TYPE 1 2 TON DUTY
88 FCU-3 WALL MOUNTED DECORATIVE SPLIT TYPE 1 2 TON DUTY
88 FCU-4 WALL MOUNTED DECORATIVE SPLIT TYPE 1 2 TON STANDBY

LEGEND
SYMBOL DESCRIPTION
PARTIALLY UNDERGROUND
PARTIALLY UNDERGROUND FCU FAN COIL UNIT
RW TANK-2
RW TANK-1
SSL +46.13 ACCU AIR COOLED CONDENSING UNIT
SSL +46.13 SUPPLY AIR GRILL
FRESH AIR DUCT (FAD)
SUMP SUMP
SSL +45.23 SSL +45.23 VCD VOLUME CONTROL DAMPER

FAD FRESH AIR DUCT


C
2500

1500x1200 FAD
FROM SAF

D D

VCD
ACCU-1 ACCU-4
700x550 FAD 900x700 FAD
3770

VCD
VCD
N1
GENERATOR ROOM
FCU-1 FCU-4
600x500 SUPPLY 600x500 SUPPLY 600x500 SUPPLY 600x500 SUPPLY 600x500 SUPPLY 600x500 SUPPLY MCC PANEL
O AIR GRILL AIR GRILL AIR GRILL AIR GRILL AIR GRILL AIR GRILL

STAIR CASE
TOILET
2180

1000x600 SUPPLY
AIR GRILL DB-MOV

900x700 FAD
MCC ROOM
SSL +50.60
P VCD
(TYP) DB-AC
DB-L&SP

P1
4300

FCU-3
FCU-2
RW STATION-1 FACP FM-200 TC
1000x600 SUPPLY
SSL +46.13 AIR GRILL
P2
DESIGN NOC
Q ACCU-2 ACCU-3

SSL +50.60
A3 18-JAN-21
25-MAR-21 ISSUED FOR APPROVAL MB
BC
A2 24-NOV-20 ISSUED FOR APPROVAL MB
A1 28-SEP-20 ISSUED FOR APPROVAL MB
Q1 A0 09-FEB-20 ISSUED FOR APPROVAL MB
5100

RAMP UP
1000x600 SUPPLY REV DATE DESCRIPTION APPR'D
AIR GRILL Client

R
PMC
RAMP UP

LOADING BAY
5150

SSL +50.70 RAMP UP Consultant

Project / Contract

S
RIYADH CITY NORTH
PHASE 7
NEIGHBOURHOOD 7A
Drawing Title
PROPOSED RECYCLED WATER
2050 2875 4300 4300 4300 4300 4300 4250 4200 4200 5900 PUMP STATION ( IPS-1)
HVAC LAYOUT PLAN
CONTRACT No: JOB No:
3A 3B 4A 5A 6A 7A 8A 9A 9B 10A 11A 12A
P3
DRAWN DESIGNED CHECKED APPROVED
MBM NJ SG MB

RW PUMP STATION -HVAC PLAN PLAN DATE 09-FEB-2020 ACTUAL SIZE A1


1 1 : 75
Drawing Scale.
0 50 100
1 : 75
200 300 400 500mm

1:5
Drawing No:

ISSUED FOR CONSTRUCTION_Rev-00 RN-02-00001-06-07-MP- PIL-DG-000120 A3


NOTES:
1. LV MAIN DISTRIBUTION PANEL AND FURTHER DOWN
NOTES:CONT. STREAM DISTRIBUTION SHALL BE SUPPLIED AND
15. CONTRACTOR HAS TO PROVIDE A FOUNDATION FOR INSTALLED BY THE CONTRACTOR.
GENERATOR SET AS PER MANUFACTURER 2. FINAL DB's WITHIN SUBSTATION, LV ROOM AND PUMP
REQUIREMENTS. ROOM SHALL BE PROVIDED WITH ELCB's STRICTLY TO
SS TCL = 798.4KW 16. ALL THE BREAKERS SIZE,CABLE,CONTROL OF FIRE ADWEA REQUIREMENTS.
MDL = 586.4KW FIGHTING SYSTEM SHALL BE AS PER NFPA & LOCAL 3. CABLE SIZES ARE INDICATIVE AND BASED ON DESIGN
BY ADDC 22 kV (SF6 RMU)
22kV, 630 A, 20 kA , 3sec.
AUTHORITY / CIVIL DEFENSE REQUIREMENT. STAGE CALCULATIONS THEY SHALL BE FINALISED
ACCORDING TO THE ACTUAL CABLE ROUTES AND LOAD
630 A 630 A 200 A 17. THE OVER ALL POWER FACTOR SHALL BE DETAILS, CONTRACTOR TO SUBMIT CABLE SIZING BASED
Self-Powered 3 x O/C &
E/F RELAY
MAINTAINED BETWEEN 0.9 (LAGGING) AND UNITY ON BS 7671 AT SHOP DRAWING STAGE.
3x50/51 (RECOMMENDED VALUE 0.95 LAGGING) 4. ALL EXPOSED WIRING SHALL BE IN HEAVY GUAGE G.I.
100-50/1 A 50N/51N
18. FOR DETAILS OF CABLES TO THERMISTOR AND ANTI-
100-50/1 A
Self-Powered 50N/51N CONDUITS AND CONCEALED WIRING SHALL BE IN UPVC
SB E/F RELAY CONDENSATION HEATER REFER TO MOTOR
CONDUIT.
MANUFACTURER'S RECOMMENDATION.
19.TH-DENOTES THERMISTORS FITTED TO MOTORS 5. CABLES SHALL BE RUN ON HEAVY GAUGE G.I CABLE
RATED 5.5kW, AND ABOVE. A SEPARATE CABLE IS TRAYS ONLY. NO CABLES SHALL BE ALLOWED TO RUN
REQUIRED FOR SUCH MOTORS FOR TEMPERATURE DIRECTLY CLIPPED SURFACE TO STRUCTURES.
PROTECTION. 6. ALL VOLT METER AND SELECTOR SWITCH WIRING WILL
INCOMING N°. 1 INCOMING N°. 2 20.TH-B-INDICATES BEARING THERMISTORS. FOR MOTORS BE CONTAINED WITH A SEGREGATED COMPARTMENT
(CABLE FEEDER) (CABLE FEEDER)
TP RMU RATED 30kW AND ABOVE THERMISTORS SHALL BE WITH WIRING LABELS FITTED.
22kV SUPPLY PROVIDED FOR BEARING TEMPERATURE MONITORING. 7. EARTH LEAKAGE RELAYS / CIRCUIT BREAKERS SHALL BE
BY ADWEA A SEPARATE CABLE IS REQUIRED FOR SUCH MOTORS. PROVIDED AS PER REGULATIONS EVEN IF NOT INDICATED.
TRANSFORMER 8. ALL NON CURRENT CARRYING METAL PARTS SHALL BE
1000kVA 21.PROVIDE SEPARATE CIRCUIT FROM MOTOR CONTROL EARTHED / GROUNDED AS RECOMMENDED BY ADWEA &
(22/0.4kV) UNIT FOR ANTI CONDENSATION HEATER OF RESPECTIVE OR BS 7671.
MOTOR. 9. ALL EARTH PITS SHALL BE CO-ORDINATED WITH
TR-DB-1 22.THE CONTRACTOR SHALL PROVIDE THE DETAILS OF THE
STRUCTURES AND SHALL PROVIDED WITH MDE HEAVY
INSTRUMENTATION AND CONTROL PANEL
DUTY PURPOSE MADE COVER.
10. EARTH PITS SHALL BE SPACED MIN. AT 7m INTERVALS.
11. CONTROLS FOR MCC SHALL BE PROVIDED AS PER THE
SUBSTATION DB PROJECT REQUIREMENTS.
12. ALL NECESSARY CONTROLS, INTERLOCKS,
1 1800A, 4P INTERFACING, ie FOR PRESSURE SWITCHES, MOTOR
ACB,
50 KA PROTECTION DEVICES, INTER CONNECTION BETWEEN
PUMPS, VOLT FREE CONTACTS FOR OTHER SERVICES
ETC. FOR RELATED MOTORS, PUMPS ETC. SHALL BE
2x3+1 630mm2 Cu, XLPE/AWA/PVC CONSIDERED UNDER THIS SCOPE OF WORKS.
+1C 630mm2 Cu as ECC 13. ALL MOTORS & ELECTRICAL EQUIPMENT SHALL BE
CONNECTED TO RING EARTH.
14. CAPACITORS SHALL REMAIN OFF DURING SUPPLY FROM
METER GENERATOR.
CABINET

kWH 1800 / 5A

GENERATOR
1000kVA FROM MCB1
400V, 50Hz STANDBY ADWEA CHECK
METER

2x3+1 630mm2 Cu, XLPE/AWA/PVC


+1C 630mm2 Cu as ECC

MATCH LINE ON DRAWING NO: RN-02-00001-06-07-MP-PIL-DG-000137


IPS-01-MCC
MCC ROOM TOTAL CONNECTED LOAD 798.4kW MECHANICAL/ELECTRICAL INTERLOCK WITH ATS RYB
CONSTRUCTION - SHEET STEEL PANEL I/L 2x3+1 630mm2 Cu, XLPE/AWA/PVC
INGRESS RATING - IP 54 RUNNING LOAD 586.4kW +1C 630mm2 Cu as ECC
RY B
SEGREGATION - FORM 4 2000/1800A 2000/1800A CB-ON
CB-ON ACB
LOCATION : MCC-ROOM ACB CB-OFF CB-OFF
4P, 50KA CB-TRIP 4P, 50KA CB-TRIP
1800/ 5A 1800 / 5A
3I>>3I>,t1Ie>,t 3I>>3I>,t1Ie>,t
(CLASS X)
3CTs 50 51 51N
(CLASS X)
3CTs 50 51 51N DESIGN NOC
TO kWHM
MCB2 A4 21-APR-21 ISSUED FOR APPROVAL BC
VSS V 0-500V VSS V 0-500V
MCB1 A3 25-MAR-21 ISSUED FOR APPROVAL BC
1800/ 5A (CLASS 1.0) A A A 0-1800A 1800/ 5A (CLASS 1.0) A A A 0-1800A A2 24-NOV-20 ISSUED FOR APPROVAL MB
3CTs 3CTs
400V, 50Hz, TPN+E 1800A RATED BUS BARS, 50kA FOR 1 Sec. A1 28-SEP-20 ISSUED FOR APPROVAL MB
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 A0 09-FEB-20 ISSUED FOR APPROVAL MB
REV. DATE DESCRIPTION APPR'D

20A, 3P 20A, 3P 20A, 3P 20A, 3P 40A, 3P Client


250A, 3P 250A, 3P 250A, 3P 250A, 3P 250A, 3P 63A, 3P 63A, 3P MCCB MCCB 40A,3P+N 80A, 4P 125A, 4P
MCCB MCCB MCCB MCCB MCCB MCCB
MCCB 50 KA MCCB 50 KA MCCB 50 KA MCCB 50 KA MCCB 50 KA MCCB 50 KA MCCB 50 KA 50 KA 50 KA
50 KA 50 KA 50 KA 50 KA 50 KA
50 KA

100mA 100mA 100mA 100mA


ELR ELR ELR ELR
250 / 5A 3CTs A A A 250 / 5A 3CTs A A A 250 / 5A 3CTs A A A 250 / 5A 3CTs A A A 250 / 5A 3CTs A A A 63 / 5A 3CTs A A A 63 / 5A 3CTs A A A
(CLASS 1.0) (0-250A) (CLASS 1.0) (0-250A) (CLASS 1.0) (0-250A) (CLASS 1.0) (0-250A) (CLASS 1.0) (0-250A) (CLASS 1.0) (0-200A) (CLASS 1.0) (0-200A) PMC

VFD VFD VFD VFD VFD VFD VFD

Consultant

EARTH IP65,20A,3P IP65,20A,3P IP65,20A,3P IP65,20A,3P


RESISTANCE NON FUSIBLE NON FUSIBLE NON FUSIBLE NON FUSIBLE Project / Contract
1 OHMS (MAX) DISCONNECT DISCONNECT DISCONNECT DISCONNECT
TYPICAL SWITCH SWITCH SWITCH SWITCH CONTROL PANEL
PUMP
CONTROL PANEL
SUMP PUMP
DB-MOV
20 kW
DB-PUMP ROOM
54 kW
RIYADH CITY NORTH
AF-1 AF-2 AF-3 AF-4
10 kW 10 kW PHASE 7
TH TH-B TH TH-B TH TH-B TH TH-B TH TH-B TH TH AUTOMATIC AUTOMATIC AUTOMATIC AUTOMATIC
PWP1 PWP2 SP1 SP2
NEIGHBOURHOOD 7A
M M M M M M FILTER FILTER FILTER FILTER Drawing Title
M 3~ 3~ 3~ 3~ 3~ 3~ 0.6kW 0.6kW 0.6kW 0.6kW
3~
BOOSTER BOOSTER SUMP SUMP
IP-01 EMERGENCY IP-02 EMERGENCY IP-03
110 kW
EMERGENCY IP-04
110 kW
EMERGENCY IP-05
110 kW
EMERGENCY JP-01
22kW
EMERGENCY JP-02
22 kW
EMERGENCY PUMP PUMP PUMP PUMP PROPOSED RECYCLED WATER
110 kW STOP PB. 110 kW STOP PB. STOP PB. STOP PB. STOP PB. STOP PB. STOP PB.
PUMP STATION (IPS-1)
4 NOS. DUTY + 1 NO. STANDBY 1 NO. DUTY + 1 NO. STANDBY 3 NOS. DUTY + 1 NO. STANDBY 1 NO. DUTY + 1 NO. DUTY + SINGLE LINE DIAGRAM SHEET 1 OF 2
1 NO. STANDBY 1 NO. STANDBY
CONTRACT No: JOB No:

DRAWN DESIGNED CHECKED APPROVED


SL CA MSA MB

DATE 09-FEB-2020 ACTUAL SIZE A1


Drawing Scale. N.T.S.
ELECTRICAL SINGLE LINE DIAGRAM
Drawing No.
ISSUED FOR CONSTRUCTION_Rev-00 RN-02-00001-06-07-MP-PIL-DG-000136 A4
C:\pw_working\dxb\client\p003220d\d0397762\RN-02-00001-06-07-MP-PIL-DG-000136-DD.dwg
Last Saved By: P003220D Last Saved Date: 4/15/2021 9:46 AM Printed Date: 4/21/2021 9:39 AM Printed By: Balachandran, Mohan
NOTES:
1. LV MAIN DISTRIBUTION PANEL AND FURTHER DOWN
NOTES:CONT. STREAM DISTRIBUTION SHALL BE SUPPLIED AND
15. CONTRACTOR HAS TO PROVIDE A FOUNDATION FOR INSTALLED BY THE CONTRACTOR.
GENERATOR SET AS PER MANUFACTURER 2. FINAL DB's WITHIN SUBSTATION, LV ROOM AND PUMP
REQUIREMENTS. ROOM SHALL BE PROVIDED WITH ELCB's STRICTLY TO
16. ALL THE BREAKERS SIZE,CABLE,CONTROL OF FIRE ADWEA REQUIREMENTS.
FIGHTING SYSTEM SHALL BE AS PER NFPA & LOCAL 3. CABLE SIZES ARE INDICATIVE AND BASED ON DESIGN
AUTHORITY / CIVIL DEFENSE REQUIREMENT. STAGE CALCULATIONS THEY SHALL BE FINALISED
ACCORDING TO THE ACTUAL CABLE ROUTES AND LOAD
17. THE OVER ALL POWER FACTOR SHALL BE DETAILS, CONTRACTOR TO SUBMIT CABLE SIZING BASED
MAINTAINED BETWEEN 0.9 (LAGGING) AND UNITY ON BS 7671 AT SHOP DRAWING STAGE.
(RECOMMENDED VALUE 0.95 LAGGING) 4. ALL EXPOSED WIRING SHALL BE IN HEAVY GUAGE G.I.
18. FOR DETAILS OF CABLES TO THERMISTOR AND ANTI-
CONDUITS AND CONCEALED WIRING SHALL BE IN UPVC
CONDENSATION HEATER REFER TO MOTOR
CONDUIT.
MANUFACTURER'S RECOMMENDATION.
19.TH-DENOTES THERMISTORS FITTED TO MOTORS 5. CABLES SHALL BE RUN ON HEAVY GAUGE G.I CABLE
RATED 5.5kW, AND ABOVE. A SEPARATE CABLE IS TRAYS ONLY. NO CABLES SHALL BE ALLOWED TO RUN
REQUIRED FOR SUCH MOTORS FOR TEMPERATURE DIRECTLY CLIPPED SURFACE TO STRUCTURES.
PROTECTION. 6. ALL VOLT METER AND SELECTOR SWITCH WIRING WILL
20.TH-B-INDICATES BEARING THERMISTORS. FOR MOTORS BE CONTAINED WITH A SEGREGATED COMPARTMENT
RATED 30kW AND ABOVE THERMISTORS SHALL BE WITH WIRING LABELS FITTED.
PROVIDED FOR BEARING TEMPERATURE MONITORING. 7. EARTH LEAKAGE RELAYS / CIRCUIT BREAKERS SHALL BE
A SEPARATE CABLE IS REQUIRED FOR SUCH MOTORS. PROVIDED AS PER REGULATIONS EVEN IF NOT INDICATED.
8. ALL NON CURRENT CARRYING METAL PARTS SHALL BE
21.PROVIDE SEPARATE CIRCUIT FROM MOTOR CONTROL EARTHED / GROUNDED AS RECOMMENDED BY ADWEA &
UNIT FOR ANTI CONDENSATION HEATER OF RESPECTIVE OR BS 7671.
MOTOR. 9. ALL EARTH PITS SHALL BE CO-ORDINATED WITH
22.THE CONTRACTOR SHALL PROVIDE THE DETAILS OF THE
STRUCTURES AND SHALL PROVIDED WITH MDE HEAVY
INSTRUMENTATION AND CONTROL PANEL
DUTY PURPOSE MADE COVER.
10. EARTH PITS SHALL BE SPACED MIN. AT 7m INTERVALS.
11. CONTROLS FOR MCC SHALL BE PROVIDED AS PER THE
PROJECT REQUIREMENTS.
12. ALL NECESSARY CONTROLS, INTERLOCKS,
INTERFACING, ie FOR PRESSURE SWITCHES, MOTOR
PROTECTION DEVICES, INTER CONNECTION BETWEEN
PUMPS, VOLT FREE CONTACTS FOR OTHER SERVICES
ETC. FOR RELATED MOTORS, PUMPS ETC. SHALL BE
MATCH LINE ON DRAWING NO: RN-02-00001-06-07-MP-PIL-DG-000136

CONSIDERED UNDER THIS SCOPE OF WORKS.


13. ALL MOTORS & ELECTRICAL EQUIPMENT SHALL BE
CONNECTED TO RING EARTH.
14. CAPACITORS SHALL REMAIN OFF DURING SUPPLY FROM
GENERATOR.

16 17 18 19 20 21

80A, 4P 40A, 3P 20A, 4P 100A, 3P 63A, 3P


MCCB MCCB MCCB MCCB MCCB 400A, 4P
50 KA 50 KA 50 KA 50 KA 50 KA MCCB
50 KA
100mA
ELR

DESIGN NOC
SPARE SPARE A4 21-APR-21 ISSUED FOR APPROVAL BC
40 kW 30 kW EARTH A3 25-MAR-21 ISSUED FOR APPROVAL BC
RESISTANCE
1 OHMS (MAX) A2 24-NOV-20 ISSUED FOR APPROVAL MB
DB - L & SP EOT CRANE
30 kW 5 kW TYPICAL A1 28-SEP-20 ISSUED FOR APPROVAL MB
UPS A0 09-FEB-20 ISSUED FOR APPROVAL MB
REV. DATE DESCRIPTION APPR'D
Client

AUTOMATIC POWER FACTOR


CORRECTION PANEL
3kVA 200KVAR PMC
3 HRS
BACKUP

INSTRUMENTATION AND
CONTROL PANEL Consultant

Project / Contract
RIYADH CITY NORTH
PHASE 7
NEIGHBOURHOOD 7A
Drawing Title

PROPOSED RECYCLED WATER


PUMP STATION (IPS-1)
SINGLE LINE DIAGRAM SHEET 2 OF 2
CONTRACT No: JOB No:

DRAWN DESIGNED CHECKED APPROVED


SL CA MSA MB

DATE 09-FEB-2020 ACTUAL SIZE A1


Drawing Scale. N.T.S.

ELECTRICAL SINGLE LINE DIAGRAM


Drawing No.
ISSUED FOR CONSTRUCTION_Rev-00 RN-02-00001-06-07-MP-PIL-DG-000137 A4
C:\pw_working\dxb\client\p003220d\d0397762\RN-02-00001-06-07-MP-PIL-DG-000137-DD.dwg
Last Saved By: P003220D Last Saved Date: 4/14/2021 2:47 PM Printed Date: 4/21/2021 9:39 AM Printed By: Balachandran, Mohan
DESIGN NOC

A3 25-MAR-21 ISSUED FOR APPROVAL BC


A2 24-NOV-20 ISSUED FOR APPROVAL MB
A1 28-SEP-20 ISSUED FOR APPROVAL MB
A0 09-FEB-20 ISSUED FOR APPROVAL MB
REV. DATE DESCRIPTION APPR'D
Client

PMC

Consultant

Project / Contract
RIYADH CITY NORTH
PHASE 7
NEIGHBOURHOOD 7A
Drawing Title

PROPOSED RECYCLED WATER


PUMP STATION (IPS-1)
POWER LOAD SCHEDULE SHEET 2 OF 3
CONTRACT No: JOB No:
DRAWN DESIGNED CHECKED APPROVED
SL CA MSA MB

DATE 09-FEB-20 ACTUAL SIZE A1


Drawing Scale. N.T.S.

Drawing No.
ISSUED FOR CONSTRUCTION_Rev-00 RN-02-00001-06-07-MP-PIL-DG-000139 A3
C:\pw_working\dxb\client\p003220d\d0397762\RN-02-00001-06-07-MP-PIL-DG-000139-DD.dwg
Last Saved By: P003220D Last Saved Date: 3/29/2021 4:43 PM Printed Date: 3/30/2021 9:42 AM Printed By: Balachandran, Mohan
3 Technical Comparison Table / Compliance Statement

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 7 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
COMPLIANCE STATEMENT
AIRCONDITIONING AND VENTILATION SYSTEM INSTALLATION WORKS

Sl.No. Required Specifications Offered proposed

ADWEA Standard Specifications for AIRCONDITIONING Installation Works - W-E-SS-013 Rev. 0


5.3 Decorative Type Split Air Conditioning Unit
Contractor shall select units specifically designed for installation of indoor Not applicable
wall mounted fan coil unit and outdoor floor / roof mounted condensing
unit. The units shall be factory assembled including direct expansion type Comply Split AC Units
coil, condensate drain pan, fans, fan motors, filters and controls all in an Units are rated with ISO 5151
insulated casing. Unit shall be rated in accordance with ARI standards
210/240 and 340/360
Indoor Fan Coil Unit Not applicable
The unit casing shall be constructed of heavy gauge galvanized steel Unit casing is constructed by hard plastic with plastic
powder coated with a full covering to all edges and a uniform paint Comply as proposed powder coated with a full covering to all edges and
thickness. The casing shall be completely insulated with at least 15 mm uniform paint thickness.
thick fire retardant insulation.
Evaporator coil and drain pan Not applicable
Split AC Units with Gas pipe size 15.88 mm , Liquid
The aluminium fin surface shall be mechanically bonded to 3/8" copper Pipe size 6.35 mm. Copper Pipes will be Pressure
tubing. The coil shall be pressure and leak tested at 400 psig, be Comply as proposed Leak tested to 400 psi. Condensate drain pipe shall
arranged for draw-through airflow and includes an L-shaped drain pan be connected to suitable drain / soak away
constructed of galvanized steel and insulated.
Evaporator fans and motors Not applicable
It shall be dynamically balanced, double inlet, double width, forward
curved, three speed permanent split capacitor direct drive. Fan motors Comply
shall be protected against overload. Fan and motor bearings shall be
permanently lubricated and be easily accessible.
Filters Not applicable
It shall be washable, reusable type installed by the factory and be easily Comply
accessed by removing the unit front panel.
Electrical controls Not applicable
Magnetic evaporator fan relay and low voltage terminal board shall be Comply
factory wired and installed.
Not applicable

Page 1 of 3
COMPLIANCE STATEMENT
AIRCONDITIONING AND VENTILATION SYSTEM INSTALLATION WORKS

Sl.No. Required Specifications Offered proposed

ADWEA Standard Specifications for AIRCONDITIONING Installation Works - W-E-SS-013 Rev. 0


Controls Not applicable
Factory wired microprocessor type thermostat shall be provided and
Comply
include an LED display indicator, thermostat, room temperature indicator
and 3-speed fan control.
Not applicable
Outdoor condensing unit
The condensing units shall be fully charged from the factory for 7.5m of
piping. The unit shall be suitable for outdoor installation. Compressor Comply Rotary Inverter compressor
shall be either reciprocating or rotary type. Condensing unit shall be
mounted on vibration isolation pads of minimum 50 mm thickness.
Casing Not applicable
Unit casing shall be constructed of heavy gauge galvanized steel and Comply
painted with a weather resistant powder coating.
Not applicable
Refrigerant Controls
Refrigerant system controls shall include condensor fan and compressor Refrigerant system controls are include condensor
contactor. fan and compressor contactor.
Compressor shall be protected against high and low pressure. A factory Comply as proposed Strainer provided instead of filter drier. The units are
installed liquid line drier and low pressure switch shall be provided. Field protected with necessary controls by manufacturer
braze connections shall be externally accessible multi-use liquid and gas recommended.
line valves with service pressure gauge ports.
Compressor Not applicable
The compressor shall be either reciprocating or rotary type. The
compressor shall include internal over temperature and pressure
Manufacturer recommended rotary/scroll type
protection, total epoxy dipped hermetic motor windings, thermostatically
Comply as proposed hermetic compressor with necessary controls to
controlled sump heater, roto lock suction and discharge refrigerant
protect the compressor.
connections, centrifugal oil pump, steel alloy valves in valve plate
assembly, and internal
spring mounts.
Not applicable

Page 2 of 3
COMPLIANCE STATEMENT
AIRCONDITIONING AND VENTILATION SYSTEM INSTALLATION WORKS

Sl.No. Required Specifications Offered proposed

ADWEA Standard Specifications for AIRCONDITIONING Installation Works - W-E-SS-013 Rev. 0


Not applicable
Condensor coil
The coil shall be continuously wrapped, corrosion resistant all aluminium
with brazed joints. The coil shall be 3/8" O.D. seamless aluminium glued
Aluminum fins, mechanically bonded to copper tubes.
to a continuous aluminium fin. The coil Comply with deviation
Locally Applied Heresite Coating
shall be protected on all four sides by louvered panels. The coils shall be
coated with air dry "phenolic", thermally set "heresite", or approved equal
coating suitable for salty seacoast with SO2 environment.
Electrical Requirements Not applicable Operating Voltage 230V / 1Ph / 50Hz
The unit shall operate on a 415 V / 3 Ph / 50 Hz or 240 V / 1 Ph / 50 Hz
Comply as proposed
power supply as applicable. All electrical wiring shall enter the unit
cabinet at a single point.
Operating Characteristics Not applicable
The unit shall be capable of operating at an ambient temperature of
52ºC.Unless stated otherwise, unit performance shall be rated at an Comply
ambient temperature of 52ºC dry bulb temperature. Decorative type A/C
units selected shall not be less than 2 Tons cooling capacity.
Testing and Inspection Not applicable
Complete factory tests shall be performed prior to shipment to
demonstrate to ADWEA/ENGINEER that that units meet the
Comply
requirements of this specification. The split airconditioning units shall not
be shipped unless results of test show compliance with all requirements
of this specification.
5.4 Selection Criteria
Not applicable
The Contractor shall select the Ducted Split Air Conditioning units as
specified in para 5.2,while the Package Air Conditioning units or Comply Decorative Split Air Conditioners
Decorative type Split units only if deemed necessary for particular area.

Page 3 of 3
4 Manufacturers Technical Data / Original Catalogues

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 8 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
‫ﻫﺫﺍ ﺍﻟﻔﻠﺗﺭ ﻟﻪ ﺍﻟﻘﺩﺭﺓ ﻋﻠﻰ ﺇﺯﺍﻟﺔ ﺍﻟﺭﻭﺍﺋﺢ ﺍﻟﻛﻬﺭﻳﻬﺔ ﻭﻣﺿﺎﺩ ﻟﻠﺟﺭﺍﺛﻳﻡ‬
MITSUBISHI ELECTRIC AIR CONDITIONERS
EXPANDED RATING DATA SHEET
TYPE :DECORATIVE ‐WALL MOUNTED TYPE (R410A)

FIXED SPEED ( COOLING ONLY )


REFRIGERANT
COOLING CAPACITY @ RATED NET
AMB. AIR FLOW DIMENSIONS (HXWXD) PIPE SOUND LEVEL
EAT CONDITION RATED WEIGHT
MODEL No. TEMP. INPUT ELECTRICAL DETAILS DIAMETER ORIGIN
DB/WB POWER COP
(DB) Sensibl
Total Sensible Total LOW MED HIGH S.HIGH LOW MED HIGH S.HIGH (kW) IU CU IU CU GAS LIQ. IU CU
e
IU / CU (°F) (°F) (MBH) (MBH) (kW) (kW) (CFM) (LPS) V‐Ph‐Hz KW/KW (mm) (mm) (kg) (kg) (in) (in) (dBA) (dBA) IU CU

95 80/67 12.00 9.10 3.51 2.67 1.12


MS-GH13VA /
115 80/66 10.59 8.05 3.11 2.36 170 233 328 367 80 110 155 173 1.20 (220-230-240)-1-50 3.17 295X798X232 525X718X255 9 34 3/8 1/4 44 49 Thailand Thailand
MU-GH13VA
115 76/63 9.42 7.16 2.76 2.10 1.15

95 80/67 18.00 14.22 5.28 4.17 1.49


MS-GH18VA /
115 80/66 15.35 12.13 4.50 3.56 378 449 512 639 178 212 242 302 1.60 (220-230-240)-1-50 3.43 325X1100X238 550X800X285 16 38 1/2 1/4 45 52 Thailand Thailand
MU-GH18VA
115 76/63 13.65 10.78 4.00 3.16 1.53

95 80/67 24.00 17.76 7.03 5.21 2.16


MS-GK24VA /
115 80/66 20.57 15.23 6.03 4.46 438 547 660 777 207 258 311 367 2.32 (220-230-240)-1-50 3.16 325X1100X238 880X840X330 16 58 5/8 1/4 53 54 Thailand Thailand
MU-GK24VA
115 76/63 18.29 13.53 5.36 3.97 2.21

95 80/67 30.00 22.20 8.79 6.51 2.75


MS-GK30VAT /
115 80/66 25.18 18.63 7.38 5.46 487 572 668 763 230 270 315 360 2.96 (220-230-240)-1-50 3.00 325X1100X238 880X840X330 16 72 5/8 3/8 53 55 Thailand Thailand
MU-GK30VAT
115 76/63 22.38 16.56 6.56 4.85 2.82

95 80/67 36.00 28.80 10.55 8.44 3.55


MS-GK36VAT /
115 80/66 31.02 24.81 9.09 7.27 544 675 819 - 257 319 387 - 3.82 (220-230-240)-1-50 2.89 365X1170X295 1258X870X295 18 88 3/4 3/8 50 55 Thailand Thailand
MU-GK36VAT
115 76/63 27.57 22.06 8.08 6.46 3.64
MS‐GH(K)/KSF/MAR2016
Notes:
1* Refrigerant suction & discharge pipes to be insulated separately minimum 3/8" thickness each.
2* Amb. Temp. : Ambient Temperature, EAT: Entering Air Temperature, DB: Dry Bulb, WB: Wet Bulb, IU: Indoor unit, CU: Outdoor unit, HXWXD: Height X Width X Depth
3* Controller : Wireless Remote 
5 Recent Test report / Certificates

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 9 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
6 Commercial License / Registration Documents

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 10 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
‫‪Commercial License‬‬ ‫ﺭﺧـﺼــــــﺔ ﺗﺠﺎﺭﻳﺔ‬

‫‪License No‬‬ ‫‪:‬‬ ‫‪CN-1029858‬‬ ‫‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ‬


‫‪ADCCI No‬‬ ‫‪:‬‬ ‫‪5324‬‬ ‫‪:‬‬ ‫ﻋﻀﻮﻳﺔ ﺍﻟﻐﺮﻓﺔ‬
‫‪Establishment Card‬‬ ‫‪:‬‬ ‫ﻭﺯﺍﺭﺓ ﺍﻟﻤﻮﺍﺭﺩ ﺍﻟﺒﺸﺮﻳﺔ ﻭﺍﻟﺘﻮﻃﻴﻦ ‪:‬‬
‫‪MOHRE‬‬ ‫ﺑﻄﺎﻗﺔ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪Establishment Card‬‬ ‫‪:‬‬ ‫‪:‬‬ ‫ﺍﻻﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻺﻗﺎﻣﺔ ﻭﺷﺆﻭﻥ‬
‫‪GDRFA‬‬ ‫ﺍﻷﺟﺎﻧﺐ ‪ -‬ﺑﻄﺎﻗﺔ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪Legal Form‬‬ ‫‪: Limited Liability Company‬‬ ‫‪ :‬ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺆﻭﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ‬ ‫ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻲ‬
‫‪ :‬ﺍﻟﺸﺮﻛﺔ ﺍﻟﻤﺘﺤﺪﺓ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﺔ ـ ﺫ ﻡ ﻡ‬ ‫ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ‬
‫‪Trade Name‬‬ ‫‪: UNITED ELECTRONICS COMPANY - L L C‬‬
‫‪Establishment Date‬‬ ‫‪:‬‬ ‫‪29/03/1993‬‬ ‫‪:‬‬ ‫ﺗﺎﺭﻳﺦ ﺗﺄﺳﻴﺲ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪Issue Date‬‬ ‫‪:‬‬ ‫‪11/07/2021‬‬ ‫‪:‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻹﺻﺪﺍﺭ‬
‫‪Expiry Date‬‬ ‫‪:‬‬ ‫‪23/07/2022‬‬ ‫‪:‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ‬

‫ﺍﻟﺼﻠﺔ‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺍﻟﻤﻼﻙ ‪ /‬ﺍﻟﺸﺮﻛﺎﺀ‬ ‫ﺍﻟﺮﻣﺰ‬


‫‪Role‬‬ ‫‪Nationality‬‬ ‫‪Owners / Partners‬‬ ‫‪No.‬‬
‫ﺷﺮﻳﻚ‬ ‫ﺍﻹﻣﺎﺭﺍﺕ ﺍﻟﻌﺮﺑﻴﺔ ﺍﻟﻤﺘﺤﺪﺓ‬ ‫ﺳﻴﻒ ﺩﺭﻭﻳﺶ ﺍﺣﻤﺪ ﺍﻟﻜﺘﺒﻰ‬ ‫‪20001124‬‬
‫‪Partner‬‬ ‫‪United Arab Emirates‬‬ ‫‪SAIF DARWISH AHMED ALKTEBI‬‬
‫ﺷﺮﻳﻚ‬ ‫ﺍﻟﺒﺮﺗﻐﺎﻝ‬ ‫ﺟﺎﺳﻢ ﺣﺎﺟﻰ ﻣﺤﻤﺪ ﺍﻟﺒﺎﻗﺮ‬ ‫‪41519030‬‬
‫‪Partner‬‬ ‫‪Portugal‬‬ ‫‪JASEM HAJI MOHAMED ALBAKER‬‬
‫ﺷﺮﻳﻚ‬ ‫ﺍﻟﺒﺮﺗﻐﺎﻝ‬ ‫ﻋﺒﺪﺍﻻﻣﻴﺮ ﻣﺤﻤﺪ ﺍﻟﺒﺎﻗﺮ‬ ‫‪20071977‬‬
‫‪Partner‬‬ ‫‪Portugal‬‬ ‫‪ABDUL AMIR MOHAMAD AL BAKER‬‬
‫‪Commercial Activities‬‬ ‫‪:‬‬ ‫‪:‬‬ ‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬
‫‪- Retai Sale of House Refrigerators, Wash Machines and Electrical Apparatuses‬‬ ‫‪ -‬ﺑﻴﻊ ﺍﻟﺜﻼﺟﺎﺕ ﻭ ﺍﻟﻐﺴﺎﻻﺕ ﻭ ﺍﻷﺟﻬﺰﺓ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﻤﻨﺰﻟﻴﺔ ‪ -‬ﺑﺎﻟﺘﺠﺰﺋﺔ‬
‫‪- House Electronic Apparatuses Repairing‬‬ ‫‪ -‬ﺇﺻﻼﺡ ﺍﻷﺟﻬﺰﺓ ﺍﻷﻟﻜﺘﺮﻭﻧﻴﺔ ﺍﻟﻤﻨﺰﻟﻴﺔ‬
‫‪- Retail Sale of Unit Air-Conditioner‬‬ ‫‪ -‬ﺑﻴﻊ ﺍﺟﻬﺰﺓ ﺍﻟﺘﺒﺮﻳﺪ ﺍﻟﺘﻜﻴﻴﻒ ‪ -‬ﻭﺣﺪﺍﺕ ‪ -‬ﺑﺎﻟﺘﺠﺰﺋﺔ‬
‫‪- Wholesale of Central Air-Conditioner Trading‬‬ ‫‪ -‬ﺗﺠﺎﺭﺓ ﺍﺟﻬﺰﺓ ﺍﻟﺘﺒﺮﻳﺪ ﺍﻟﺘﻜﻴﻴﻒ ‪ -‬ﺍﻟﻤﺮﻛﺰﻳﺔ ‪ -‬ﺑﺎﻟﺠﻤﻠﺔ‬
‫‪- Onshore And Offshore Oil And Gas Fields And Facilities Services‬‬ ‫‪ -‬ﺧﺪﻣﺎﺕ ﺣﻘﻮﻝ ﻭﻣﻨﺸﺄﺕ ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ ﺍﻟﺒﺮﻳﺔ ﻭﺍﻟﺒﺤﺮﻳﺔ‬
‫‪- Importing‬‬ ‫‪ -‬ﺍﺳﺘﻴﺮﺍﺩ‬
‫‪Address‬‬ ‫‪:‬‬ ‫‪ :‬ﺃﺑﻮ ﻇﺒﻲ ‪ -‬ﺷﺎﺭﻉ ﺣﻤﺪﺍﻥ ﺑﻦ ﻣﺤﻤﺪ ‪ -‬ﺑﻨﺎﻳﺔ ﺳﻴﻒ ﺑﻦ ﺩﺭﻭﻳﺶ‪,‬‬ ‫ﺍﻟﻌﻨﻮﺍﻥ‬
‫‪Remarks‬‬ ‫‪:‬‬ ‫ﻋﺪﻡ ﺍﺳﺘﻴﺮﺍﺩ ﺍﺟﻬﺰﻩ ﺗﺤﺘﻮﻱ ﻋﻠﻰ ﻣﺮﻛﺒﺎﺕ ﻛﻠﻮﺭﻭﻓﻠﻮﺭﻭﻛﺎﺭﺑﻮﻧﻴﻪ ‪CFC - Free‬‬ ‫‪:‬‬ ‫ﺍﻟﻤﻼﺣﻈﺎﺕ‬

‫) ﺗﻢ ﺗﺤﺼﻴﻞ ﺭﺳﻮﻡ ﺧﺪﻣﺎﺕ ﺍﻟﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ (‬

‫ﻭﺛﻴﻘﺔ ﻣﻌﺘﻤﺪﺓ ﻭﺻﺎﺩﺭﺓ ﺑﺪﻭﻥ ﺗﻮﻗﻴﻊ ﺃﻭ ﺧﺘﻢ ﻣﻦ ﺩﺍﺋﺮﺓ ﺍﻟﺘﻨﻤﻴﺔ ﺍﻹﻗﺘﺼﺎﺩﻳﺔ ‪ -‬ﺃﺑﻮﻇﺒﻲ‪ .‬ﻟﻠﺘﺤﻘﻖ ﻣﻦ ﺻﺤﺔ ﺍﻟﺒﻴﺎﻧﺎﺕ ﺍﻟﻮﺍﺭﺩﺓ ﻓﻲ ﺍﻟﺮﺧﺼﺔ ﺑﺮﺟﺎﺀ ﺯﻳﺎﺭﺓ ﺍﻟﻤﻮﻗﻊ ‪http://www.ded.abudhabi.ae‬‬
‫‪Approved document issued without signature or stamp by the Department of Economic Development - Abu Dhabi. To verify the license kindly‬‬
‫‪visit http://www.ded.abudhabi.ae‬‬
‫‪Official Email‬‬ ‫‪:‬‬ ‫‪[email protected]‬‬ ‫ﺍﻟﺒﺮﻳﺪ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ ﺍﻟﺮﺳﻤﻲ ‪:‬‬
‫‪Official Mobile‬‬ ‫‪:‬‬ ‫‪971505246129‬‬ ‫‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﻮﺍﺻﻞ ﺍﻟﺮﺳﻤﻲ‬

‫*‪*CR-4070348‬‬
‫‪http://ded.abudhabi.ae‬‬
7 Warranty Certificate

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 11 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
18th March 2021

Dear Sir,

SUB.: WARRANTY LETTER


Project Name : Riyadh City Development - Phase 7A Infrastructure and Streetscape
Client : M/s. Aldar
Consultant : M/s. Parsons International Limited
Main Contractor : M/s. Western Bainoona Group
Sub Contractor : M/s. Arabic Engineer Control And Electro Mechanical Systems Co. L.L.C.

We hereby confirm that below mentioned Mitsubishi Air-Conditioners:

Supplied by us through Invoice is Waranteed for One years complete system and the factory installed
original compressors for five years from the last date of delivery against any manufacturing defects
approved by our Engineer providing that units run under normal conditions and maintained by
professional staff.

Compressor guarantee is for parts replacement is one time only and should not cause by the involvement
of Third party for the repair or mishandling. Labor and fixing charge to be paid.

Hope this will meet with your requirement and assuring our service at all times.

For and on behalf of


UNITED ELECTRONICS CO. (LLC)
8 Previous Approvals

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 12 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
ADSSC/JAA/2020/1421
13/07/2020

Engineer Ahmed Al Mazrouei


Area Manager for Al Ain Projects
Abu Dhabi General Services (Musanada)

Subject: Material Submittal for Split AC (3 Tons) for Pump Station’s MCC Room
Model No (MS-GK36/MUGK36)
Project: Construction of 306 Villas at Al Saad - Al Ain
Further to your letter reference MRID OUT 2020-08692 received on 29 June 2020, regarding the
above-mentioned subject. Please be informed that the consultant’s recommendation can be
accepted as code B subject to the following:

 Engineer’s enclosed comments.


 Full compliance with ADSSC specifications’ requirements.
 Handling, storing and installing shall be as per manufacturer recommendation and ADSSC
specification and the approved method statement.

Moreover, please note that ADSSC acceptance is based on expectations that consultant has
reviewed/evaluated their recommendation in order to confirm satisfaction/achievement of the
contract and system requirements and has ensured that it is fit for purpose. The consultant’s
issuance of approval to the contractor will be considered as confirmation.
The acceptance does not relieve the consultant or the contractor of any obligations and does not
waive any requirement missed from the subject material submittal or entitle the contractor of any
additional cost or time.

This is for your kind information and action.

Yours sincerely,

Mohammed Al Harrasi
Al Ain Projects Management
Department Manager

CC: CEO Office


Projects Division
Attach: As noted
9 Estidama Forms

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 13 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
10 Manufacturer Quality Certificates

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 14 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
11 Company Profile

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 15 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
(. . . )
Authorized Agent UNITED ELECTRONICS CO.(L.L.C.)

Contents:-
1) Organization Chart
2) General
3) History
4) Facilities
a) Abu Dhabi
b) Dubai
c) Al Ain
d) Sharjah
e) Qatar
5) Engineering Strength
6) Important project picture -

7) Quality of Installation Works


8) Projects List

In UAE’s business
since 1982
GENERAL

MANAGER
SALESMAN
SHARJAH

SECRETARY

MARKETING

MANAGER
ACCOUNTANT &
A/C TECHNICIAN

SALES ENGINEER
ABU DHABI

SALES ENGINEERS

QATAR BRANCH
HELPERS : 9
DRIVERS : 3
A/C TECH : 27
The UNITED ELECTRONICS COMPANY was established in 1982 at Abu Dhabi

AL -AIN
as the sole distributor of Mitsubishi Electric Air conditioners and Home appli-

AL AIN
DRIVERS : 1
HELPERS : 8

A/C TECH : 14

STOREKEEPER

SALES EXECUTIVE

SALES ENGINEERS
W/SHOP IN CHARGE
ances.

FOREMAN

MANAGER
UNITCO’s DELOLW\ WR SURYLGH ORFDOL]HG VROXWLRQV LV D UHVXOW RI ¿YH IXOOÀHGJHG

SECRETARY

GENERAL FOREMAN

DUBAI

DUBAI
WORKSHOP/ ABU DHABI
branches that include showrooms, service centers, warehouse and teams of

DRIVERS : 2
HELPERS : 3

A/C TECH : 14

A/C FOREMEN

A/C DIVISION MANAGER


DESIGN & EST.

SALES ENGINEERS
dedicated technicians and back-up relationship with customers in government
GHSDUWPHQWVFRQWUDFWLQJFRPSDQLHVFRQVXOWDQF\RI¿FHVWUDGLQJDJHQFLHVDQG
other entities.

MANAGER
ENGINEER.
Snr. SALES

TECH.SALES
DOCUMENT

ABU DHABI
DRAUGHTSMEN

CONTROLLER
SALES ENGINEERS
SALES EXECUTIVES
DESIGN ENGINEERS

SALES IN CHARGE

TECH.SECRETARY
Unitco ’s value-added services:

SECRETARY

ACCOUNTANT
Analyzing requirements, recommending appropriate systems, budgeting

AL – AIN BRANCH MANAGER


SHOWROOM SALES
Consultancy:

SECRETARY
and planning.

SALESMAN
ACCOUNTANT

SECRETARY
Determining air conditioning requirements, load calculation, equipment size,

GENERAL MANAGER
SHARJAH BRANCH MANAGER
Design: layout, air flow - calculation, ventilation, acoustic study and coordination with
environment designers.

SENIOR EXECUTIVE
P.R.O

A/C CLERK
SECRETARY
STORE KEEPERS
A/C units and Maintaining constant stock of all A/C models and spare parts to meet all

ORGANIZATIONAL CHART
IT
Spare Parts: customer's immediate requirements.

IT ENGINEERS

DEPARTMENT

RE- EXPORT

DUBAI BRANCH MANAGER


SHOW ROOM
DUBAI SHOWROOM

CONSUMER SALES
Undertaking turnkey assignments, including duct fabrication, installation and
Installation:
coordination with main contractors and clients.

P.R.O.

SALES

SALES

SALES
COSTLESS

ABU DHABI
RECEPTIONIST

ABU DHABI
SHOWROOM

MANAGER
AUH. CONSUMER

ABU DHABI BRANCH


CONSUMER PRODUCTS
State of the art workshops backed by highly qualified service engineers and
Service:
well trained technicians.

CASHIER

ACCOUNTANT
Maintenance: Preventative maintenance contracts to suit specific client requirements.

SALES

FINANCE MANAGER
SPARE PARTS

STORE KEEPERS

STORE INCHARGE
STORE CONTROLLER
-1- -2-
HISTORY OF COMPANY 2000:
Started sale of PE (Residential Split Ducted Units) Mr. Slim range
from MELCO Thailand factory.
1983:
Introduced W indow type Air -conditioners from S hizuoka factory in 2001:
J apan . Introduced MS-30SV, 2.5 TR Decorative Wall mounted Split unit
from MELCO Thailand factory.
1984:
Introduced P ackaged Air conditioners from W akayama factory in 2001:
J apan and S plit A/c units from S hizuoka factory (RAC & M r. S lim ) Introduced SE - range (Low Static Split Ducted units) from MELCO
Thailand factory.
1986:
2002:
A/c D ivision established . Introduced PRC - range as new designed Roof-top packaged units
from Malaysian factory
1987:
Introduced MS -24 the 2.0 TR W all mounted S plit unit to the market 2002:
besides MS -18 (1.5 TR) and other M r. S lim D ecorative S plit units . Introduced SE-range (Low static Split ducted units) from MELCO
Achieve the target of 1000 sets of MS - series . Thailand factory

1988: 2003:
E xpanded A/c D ivision with new S ales S taffs and T echnicians . VRF-variable refrigerant Àow system City-Multi range project
R emarkable change in the company activity towards the A/ c sales improved.
with high increase in market share
2004:
1990:
Opened “Sharjah Branch”.
O pened “D ubai B ranch ”

1994: 2005:
Increased number of S ales E ngineers in Abu D habi VRF-variable refrigerant Àow system with Refrigerant R410A
introduced.
1995:
Increased number of S ales E ngineers in D ubai B ranch . E xpanded 2006:
Abu D habi A/c W orkshop . Opened “Qatar Branch”.

1996: 2007:
O pened “Al Ain ” B ranch . 1. Introduced MS-A30 2.5 TR
2. City Multi new series YHM introduced
1997:
E xpanded D ubai B ranch A/ c W orkshop .
2008:
1. City Multi business/ awareness strengthened.
1998:
2. Introduced MS - D36 3.0 TR from MELCO Thailand factory
S igned agency agreement with M/ s .M aytag I nternational for “M agic
C hef ” home appliances 3. Dealer network improved.

1999: 2009:
Introduced “C ity M ulti”, V ariable R efrigerant F low (VRF) S ystem from New PE-5&6 Hi static ducted type is introduced.
M itsubishi E lectric , W akayama , J apan . New centralized controller AG - A150 for VRF City Multi is introduced

1999:
2010:
Started sale of Hi Static Split Duct units and Large Floor standing
Introduced MS-G series: Decorative wall mounted split unit 1 TR to
units and Roof top Package units from MELCO Malaysia .
2.5 TR with sustainable refrigerant (R-410A)

-3- -4-
F$&,/,7,(6
$EX'KDEL%UDQFK
2011: The United Electronics Company established in Abu Dhabi in 1982 as the sole distributor of Mitsubishi
Full products range with sustainable refrigerant (R -410A) registered Electric Air Conditioners and Home appliances.
with ESTIDAMA. Refer: product data base web site:
http://estidama.org/estidama-villa-products-database/air-conditioning-.aspx Address: Hamdan Street, Saif Bin Darwish Building, Suite M-1, P.O.Box 25751, Abu Dhabi, UAE
Tel. No. : 02/6777701
Control interface introduced to connect CITY MULTI outdoor units to Fax No. : 02/6728940
other manufacturers Air Handling or Fresh Air Handling units E-mail : [email protected], [email protected]
Al Ain store and workshop shifted to new building AICAD area.

2012:
VRF marketing and application Engineering Department strengthened.
Introduced new technologies with more features to the VRF range.
Registered OSHAS 18001-2007

2013:
CITY MULTI Controllers range widened with additional features.

2014:
Cooling only VRF range launched.
Jabel Ali warehouse area expanded and new facilities opened. +HDG2I¿FH 6KRZ5RRP
+DPGDQ6W
Registered ISO 9001:2008 and ISO 14001:2008

2015:
Dubai branch opened its new expanded of¿ce and showroom.
New “ESMA” approved range launched.

6WRUH0LQD=D\HG 6Tr0Wr

WRUNVKRS0LQD=D\HG
6Tr0Wr

TraLQLQJCeQWUH - 0LQD=D\HG

-5- -6-
'XEDL%UDQFK Al Ain B ranch
The United Electronics Company expanded to Al Ain branch oI¿Fe in 1996 for improve our business
The United Electronics Company expanded to Dubai branch oI¿Fe in 1990 due to heavy demands of (Especialy Air Conditioner) in those region.
Mitsubishi Electric products.
Address: Al Sanaiya Street, Al Ain, P.O.Box 20029, UAE
Address : Near Cargo Village - Airport Road, P.O.Box 13751, Dubai, UAE Tel. No. : 03/7556404
Tel. No. : 04/2277401 Fax No. : 03/7556401
Fax No. : 04/2230529 E-mail : [email protected]
E-mail : [email protected]

+HDG2I¿FH 6KRZ5RRP
$O*DUKRXG $LU3RUW5G Show Room - Al Ain Mall

6DOHV2I¿FH Al Sanaiya
WRUNVKRS $O4XVDLV
,QGXVWULDO1R

6WRUH$O4XVDLV Store - I CAD


,QGXVWULDO1R 6T0Wr Near Compost Plant
(3400 Sqr. Mtr.)

6WRUH-DEHO $OL-DI]D Workshop - I CAD


6T0Wr  Near Compost Plant
-7- -8-
ACTIVITY & CAPABILITY
6KDUMDK%UDQFK
The United Electronics Company expanded to Sharjah branch oI¿Fe in 2004.
Activity
Address : Al Majas Street, Sharjah,
P.O.Box 31367, UAE
Tel. No. : 06/551119 0,768%,6+,(/(&75,&)XOOOLQHXS$LUFRQGLWLRQHUVYDOXH$('110,000,000/-
Fax No. : 06/5591212 6WRFNRI6SDUH3DUWVRIIXOOUDQJHYDOXH$('
E-mail : [email protected]
6XSSO\DQG6DOHVRI$LUFRQGLWLRQHUVWRSURMHFWVWKURXJK'HDOers network
6XSSRUWLQJDQG6SRQVRULQJ)XQFWLRQV([KLELWLRQVDQG&RQIHUHQFHIRUSURPRWLQJ95)V\VWHP
&RQGXFWLQJ(GXFDWLRQDO6HPLQDUVIRU*UHHQ%XLOGLQJ95)7HFKQRORJ\
7UDLQLQJWR&RQWUDFWRU¶V(QJLQHHUV 7HFKQLFLDQVIRU95)LQVWDOODWLRQDQGVHUYLFHV
6XSSRUWLQJ&RQWUDFWRUVDWVLWHIRU95)LQVWDOODWLRQDQGDVVLVWIRU7HVWLQJ &RPPLVVLRQLQJ

4DWDU%UDQFK &DSDEOLWLHV
The United Electronics Company expanded to Qatar branch oI¿Fe in 2006.
+HDW/RDG&DOFXODWLRQ
Address : Ahamed Bin Mohammed Bin Thani
street, Qatar, P.O.Box No.37945 6\VWHP'HVLJQIRU5HVLGHQWLDODQG&RPPHUFLDOSURMHFW
Tel. No. : 974 4370011
Fax No. : 974 4376385 6SHFLDOQHHGV'HVLJQIRU+RVSLWDO&OHDQ5RRPV6FKRROVDQG/DEV
E-mail : [email protected] (QJLQHHULQJ3DFNDJH6ROXWLRQVIRUDQ\VSHFLDOUHTXLUHPHQW
,QVWDOODWLRQ7HVWLQJ &RPPLVVLRQLQJ

Experience

Please refer to the Project Dossier (List of Projects) for summaries anG Gescriptions of
the projects executeG Ey the company

ENGINEERING STRENGTH
Application Engineer & Service Engineers : 17
2I¿FH4DWDU Draftsmans : 12
+LJKO\4XDOL¿HG7HFKQLFLDQV

6WRUH4DWDU
-10-
-9-
Villas/Complex
PRODUCTS

CITY MULTI - VRF Air Conditioner


1* Y-Series (Cooling only & Heat Pump)
2* S-Series ( Heat Pump)

Mr.Slim - Room Air Conditioner (R-410A & R-22)


1* M-Series
Wall Mounted Type
2* S-Series
Ceiling Concealed Type
Ceiling Cassette Type
3* P-Series
50 Villas - Al Shmaha
Ceiling Concealed Type
Ceiling Cassette Type
Ceiling Suspended Type
Wall Mounted Type
Floor Standing Type

New Inverter - Room Air Conditioner (R-410A )


3* P-Series
Ceiling Concealed Type
Ceiling Cassette Type
Ceiling Suspended Type
5 Typical Villas - Abu Dhabi 173 villas Jumeirah gulf state - Dubai
Ventilation System
Window Type
Ceiling Type

Air Curtain
Hand Dryer (Jet Towel)

Refrigerator

SAMET -Freezers

FERRE - Microwave Ovens Al Muwaiji Village - Al Ain Housing Complex - Al Ain

-11- -12-
5HVLGHQWLDO2I¿FHBuildings Important Projects - Buildings

23 Bulding -Dubai
Private Comm. Bldg. - Al Ain
Private Comm. Bldg. - Mussafah

Landmark tower - Abu Dhabi Khalij Hospital Staff Accomodation


Building - Al Ain

Private Comm. Bldg. - Mussafah Office Building - Qatar


Gulf Precast Office Building- Mussaffah Bookshop Building - Al Ain
-13- -14-
Important Projects - Mosque Health Care Facilities

German Medical Center


Abu Dhabi

Mosque in Khalidiya - Abu Dhabi

Private Hospital
Al Ain

Mosque - Al Ain

Al Magrabi Eye & Ear Center


Abu Dhabi

Mosque - Al Ain Mosque - Al Ain


-15-
-16-
Schools / University’s Hotels

British School- Abu Dhabi Al Tarawat School-Abu Dhabi

Mirfa Hotel - Abu Dhabi


Bareem Private School-Al Ain Liwa International School For Girls - Al Ain

Liwa International School-Al Ain Private School-Al Ain

Medical Health University American University - Dubai


- Ras Al Khaimah Dune Hotel - Qatar Chalets Hilton Hotel - Al Ain
-17- -18 -
Malls & Commercial Trading Center Industrial Applications

Al Safa Commercial Centre - Al Ain Al Yahar Mall - Al Ain

ADNIP Factory Abu Dhabi

Extra Mall - Al Ain

Safeer Mall - Al Ain Industrial Office - Qatar


-19 - -20 -
LIST OF IMPORTANT PROJECTS LIST OF IMPORTANT PROJECTS
DATE OF DATE OF
Sl No. PROJECT NAME OWNER / CLIENT CONSULTANT MAIN CONTRACTOR Sl No. PROJECT NAME OWNER / CLIENT CONSULTANT MAIN CONTRACTOR
COMMISSIONING COMMISSIONING

1 55 VILLAS DARWISH BIN AHMAD N.E.B SAIF BIN DARWISH J u n -0 1 47 G+M+7 TYP COMM. BUILDING SABIKA KHALIFA W /O FARAJ AL QUBAISI SAHIL ENGG CONS. DISCOVERY GEN. CONT. Nov-11

2 23 VILLAS SH. FOURIA BINT HANDSA SYR CONSULTANT COMMODORE Sep-02 48 D.O.P.A LAND MARK PLAZA-AUH BUROHAPP LTD. AL HABTOOR (JV) CCIC Oct-11

3 G+M+5 TYP. GROUP RASHID ALFAHIM ALSAHEL AL FAHIM GROUP MR. WASSEM MERHEBI & MR. HASHIM
49 CONTEMPERARY VILLAS A+B BEAD AC C Mar-11
AL QUDSI
4 5 VILLAS-ABU DHABI MR.SULTAN BIN HILAL AL QUBEISI A.E.C ARAB UNION ABU DHABI Mar-03
50 DIFFERENT PURCHASES ADW EA, TRANSCO

5 RENNOVATION OF OLD VILLA ABU DHABI SH.HAMDAN BIN TAHNOON A.E.C Aug-03 JUMAIRAH GOLF ESTATE – 13 VILLAS FOR
51 PARSON AMCDE ANC J a n -1 3
ISTITHMAR LEISURE GROUP-DXB
6 50 VILLAS RASHID ALKUTBI R.D.K GULF PRECAST J u n -0 3 52 B+G+6TYP BLDG. Mr. MOHD SALMEEN - SHJ INT’L CONS. ENGG. ENGINEERING CONTRACTING May-13

7 MW-325/2005, BIDA ZAYED THE CONTRACTORS CO, Jun-03 53 G+M+7 TYP COMM. BUILDING MR. FARAJ AL QUBAISI SAHIL ENGG CONS. BAREK ENGINEERING CO. Dec-11

8 MINA MARKET ABU DHABI MUNICIPALITY Jul-03 MR.RASHID DARWISH SAIF AL KETBI)-
54 BRAZILIAN DEV. CO. (OFFICE BUILDING) EMIRATES INNOVATION ENG. CONSULT JIANGSU NANTONG LIV JIAN Jul-13
DXB
9 BLDG. AT AL MUROOR- ABU DHABI MR.MOHD. ABDUL JALIL AL-FAHIM PLANNER BIN HARMAL Dec-03
55 G+M+7 TYP COMM.BUILDING AL TASHEED AL SHUW EHAT CONT. MADA CENTRAL A/C Nov-12
10 MERCEDES BENZ CAR SHOWROOM EMIRATES MOTORS Dec-03
56 COMM. BUILDING Mr. HASHEM MOHD. SHAREEF AMERI SULTAN ENGINEERING AL BUSHRA GEN. CONTRACTING Sep-11
11 BAHRAIN INTERNATIONAL CIRCUIT FORMULA -1 TILKE CYBARCO Dec-03
57 RESIDENTIAL VILLA Mr. HESSAM AL KATHEEB AMYAL CONSULTANT CITY GEN. CONSTRUCTION Sep-11
12 48 VILLAS SH. MANSOUR BIN MOHAMMED BUNIYAN Jan-04
DURABLE WORKS GEN. MAINT. &
58 W ATER VILLAS – NURAI ISLAND ZAYA Sep-11
CONSTRUCTION GEN. CONT.
13 PRIVATE VILLA MR. SAEED AL GHAFLY Mar-04
CONTRACTING
59 PRIVATE VIALLA MR. SULTAN SALIM AL MUHAIRBI LINES & DIMENSIONS AL SHADEN GEN. CONT. Sep-11
14 BUILDING NO. 7 NEW OFFICES CONSOLIDATED CONTRACTORS Aug-04
60 LABRIOCHE RESTAURANT IN KHALIFA CITY AUH GREENCO DURABLE W ORKS Dec-11
15 86 VILLAS SH. MANSOUR BIN TAHNOON CATIC May-05
61 CJ-190 – EXTENSION OF PRIVATE VILLA MR. FAYSAL AW AD E-TAN COMMODORE CONT. CO. Jan-12
16 96 VILLAS OLIVE POINT TULIP DEVELOPMENT ATKINS ALNABOODHA J u n -0 7
62 THE BRITISH SCHOOL- ALKHUBAIRAT. MOTT MACDONALD AL FARA`A GEN. CONTRACTING Jun-12
17 73 VILLAS FIRE LAKE TULIP DEVELOPMENT ATKINS ALNABOODHA Dec-08
63 COMMAND OF MILITARY W ORK TAW EELAH STRIDE TRESLOW N ALI & SONS CONTRACTING Sep-12
18 MOSQUE SHK.SALAMA ABU DHABI DEW AN ENGG. CONSULTANT THE CONTRACTORS Feb-07
64 PARK HAYYAT LAUNDRY – SADIYAT ISLAND EHALF AL JABER Sep-12
19 PRIVATE SCHOOL SH. ABDULLAH IN RAS AL KHAIMA E.E.C ALMAWAKIS CONT. May-07
MR. HILAL MOHD. RASHED AL ARCHITECTURAL DESIGNING &
65 PRIVATE VILLA MASCOT GEN. CONTRACTING Oct-12
ADNOC, ADCO, ADGAS, ADMA, GASCO, MANSOORI DECORATION
20 DIFFERENT PURCHASES
ZADCO,
GULF PRECAST CONCRETE CO. OFFICE ABU 66 AL W ATHBA FARMS MR. ALI AL JASEM AMIAL CONSULTANT ALI AL JASEM AL W ATHBA FARMS Oct-12
21 TAMEER GULF PRECAST J a n -0 7
DHABI
67 PRIVATE VILLA DR. SHEIKHA WINNER CONSULTANT ENGINEERS TRICON OPERATORS Nov-12
DIFFERENT PURCHASES (REMOTE SHELTERS &
22 ETISALAT
OTHER PREMISES IN ALL UAE)
Mr. SUHAIL MOHD. RASHED AL SHAMSI IETC INTL. ENGINEERS FOR TECHNICAL
68 PRIVATE VILLA PROMPT STEEL BLDG. & CONT. Nov-12
23 EXTENSION SHJ AIR PORT FREEZONE AREA-SHJ SHJ MUNICIPALITY ALBADER GEN. CONT. Mar-09 ABU DHABI CONS.

69 GOLMAN SACS – DIFC HOARE LEA ISG Apr-13


24 GERMAN HOSPITAL ABU DHABI GERMAN CONSULTANT AUTOMAC Jun-09

70 CMW-11064 CMW AL FALAH CONSTRUCTION Jan-14


25 GARY GOLF ACADEMY-AUH HYDER CONSULTING LEIGHTON CONT. J u n -0 9

26 MR. MASAOOD AHMED AL MUHEIRY-DUBAI ISLAMIC ARCHITECTS FAMILY STAR Dec-08 71 CMW-13045-FUJAIRAH CMW MECHANO TECHNICAL SERVICES F e b -1 4

27 DIFFERENT PURCHASES NDC, NPCC, ESNAAD 72 CMW -11064 CMW CMW AL FALAH CONSTRUCTION Jan-14

28 80 VILLAS SHK. WADEMA ALSAHEL NAEL GEN.CON Aug-09 73 AL THARW ATH NATIONAL PRIVATE SCHOOL DR. ALMANAAI LINES & DIMENSIONS THROUGH OW NER Se p - 1 4

CONST. OF LECTURE HALL & OBSERVATION


APR-09/JUN-09/OCT- 74 CMW AL JARW AN GEN. CONT. EST. J a n -1 5
TOWER
AL TASHEED/TAMEER/MIMAR/ASQALAN BIN SAED GEN. CONT. / GULF 09/JUN-10/OCT-09/JAN-
29 17 Nos. G+7 BUILDING ADCB
Etc….. PRECAST/AL ATTAS ETC…. 11/NOV-11/OCT-10/FEB- 75 AL QURM VILLA M.Z CONSULTANT ICCC May-15
11/SEP-11/
76 AL GURM RESORT VILLA H KA AL NAEEM A/C May-15
30 PVT VILLA - ABU DHABI EXCELL. DXB KHANSAB CONTRACTING CO .DXB J u l -0 9
77 COMPANY FACILITY DEVELOPMENT PAN EMIRATES SHIRYAN GEN. CONT. J u n -1 5
31 G+M+7 TYP.+ROOF BUILDING Mr. RASHED AL MANSOORI-AUH MIMAR AL WAST GEN. CONT Au g -0 9
SHAMSA HAZEEM TARISH AL MEHARI
Mr.OBAID MOBARAK AL MANSOORI – ABDULLAH, MARIAM ,SHEIKHA,
32 COMM. BLDG. G+7 AL AMARA AL CHARQUIA ASQALAN CONST. Aug-09 78 PRIVATE VILLA AL BATEEN ASQALAN CONSTRUCTION Sep-15
AUH FATIMA,MAHA,ASMAA & AISHA KHALIFA
AHMED SAIF AL SUWEIDI
33 NEY YORK UNIVERSITY – AUH PREKONS-TURKY Sep-09
79 AL MANARA SCHOOL (MBZ) FINE ARTS CONSULTANT AL ETLALA GEN. CONT Jul-15
34 G+M+7 TYP.+ROOF BUILDING Mr. JUMA RASHID AL MANSOORI-AUH ROOTS IDEAL DESIGN Oct-09
80 AL MANARA SCHOOL (AL SHAMKHA) FINE ARTS CONSULTANT AL ETLALA GEN. CONT J u l -1 5
35 MASDAR NEW FACILITIES 6 BLOCK MASDAR MASDAR Nov-09
81 50 VILLAS IN KZED NATIONAL HOUSING DEVELOPMENT KEO NAEL GEN.CON
36 DIFFERENT PURCHASES ADAC, ADAT, ETIHAD
82 TOYOTA SHOWROOM M AK AN AL FUTTAIM GROUP
37 G+M+ROOF+7 TYP COMMERCIAL BUILDING Mr. MOHD JUMA AL OTAIBA-AUH AL SAHIL AL ATTAS CONT. CO J u n -1 0
83 SHARJAH UNIVERSITY
38 PRIVATE VILLA Mr. ABDULLA AL MASAOOD LINES & DIMENSIONS AL MASAOOD PRIVATE PROPERTIES Oct-12
84 BANIYAS VILLA COMPLEX
39 G+M+7 TYP COMM. BUILDING Mr. SAEED MOHD AL MANSOORI-AUH AL AMARA AL SHARKIA TRIPOLI GEN. CONT. CO. Nov-10 FAMILY ACCOMODATION (G+4) 23 AT
85 AL W ASSEL PROPERTIES BELYOHA ENGG. CONSULTANT AL AIRF Dec-15
MUHAISHNAH
CONSTRUCTION OF H.H.CROWN PRINCE DIWAN CONSTRUCTION OF H.H.CROWN PRINCE
40 A.E.C. AL DARMAKI Feb-10 86 AL SALAMA HOSPITAL AL SALAMA HOSPITAL
STORE-MUSAFFAH DIWAN STORE-MUSAFFAH

41 AL GURM RESORT - BACK OF HOUSE BLDG. DAR AL HANDASAH / PARSONS INT’L SIX CONSTRUCT May-10 87 MIRFA HOTEL APARTMENT AUH NATIONAL HOTEL CO. AEC AL GHAFLY CONTRACTING. CO.

42 YACHT CLUB, YAS ISLAND ORBIT DESIGN AMBB INTERIORS Nov-10 88 PRESIDENTIAL COMPOUND SHARJAH GOVERNMENT PW D TIGER GEN. CONTRACTING J a n -1 6

43 BRITISH EMBASSY BEAD ARCHITECTS ENGINEERS SHIELS GEN. CONT. Apr-11 89 REHABILITATION OF THE GEN. ADMINISTRATION SAHIL AL BURAQ ALLAMEA CENTRAL A/C Feb-16

DIFFERENT PURCHASES (REMOTE SHELTERS & 90 RESIDENTIAL VILLA MR. ISMAIL YUSSEF AL SAADI AL AJMI AL BAW ADI CONS. BLDG Feb-16
44 DU
OTHER PREMISES IN ALL UAE)
91 PRIVATE VILLA MR. KHALIFA SALEM SOHAIL AL KHAILI AL HOW ER AL HUR GEN. CONT. Mar-16
JIANGSU NANTONG LIU JAN
45 AL MARFA HOTEL R.D.K May-11 92 UNION CHLORINE FACTORY AL SAHIL ORION CONT. Mar-16
CONSTN. GROUP CO.

46 SULTAN SALIM AL MUHAIRBI LINES & DIMENSIONS AL SHADEN GEN. CONT. Sep-11 93 CMW -11053-C002 CMW CMW FORCE 10 GEN. CONT. Apr-16

-22- -23-
LIST OF IMPORTANT PROJECTS
Sports
DATE OF
Sl No. PROJECT NAME OWNER / CLIENT CONSULTANT MAIN CONTRACTOR
COMMISSIONING
ATAR

1
NEW DOHA INT L AIRPORT CP-11 (QTR) BECHTEL ADCC

2
NEW DOHA INT L AIRPORT (QTR) BECHTEL HOW UNITED

3
NEW DOHA INT L AIRPORT CP-26 (QTR) BECHTEL ADCC

4
NEW DOHA INT L AIRPORT CP-16 (QTR) BECHTEL PUNJ LOYD

5
INDIA CP-15 (QTR) BECHTEL DRAKE AND SKULL

6
INDIA CP-11 (QTR) BECHTEL ADCC

7
INDIA CP-66 (QTR) BECHTEL AL-JABER

LED Screen - Dubai

Equestrian Club - Al Ain

LED Screen - Dubai Stables in a Sports Club - Al Ain

-2 - -21-
ATTACHMENTS

DOCUMENT NO. DESCRIPTION

1 ADDC Vendor list

RN-02-00001-06-11-IR-WBG-MI-0000074 Rev.00
Split Air Conditioning Units for Irrigation Reservoir Pump Station Page 16 of 16

All Paper copies of this document are UNCONTROLLED.


Please refer to Aconex for the current version.
Template Ref. No.: RN-02-00001-00-19-OA-KBR-FO-000002 | Rev. 06
COMMERCIAL DIRECTORY VENDORS LIST
Product Group : 0101010
Description : A/C UNITS, DUCTED SPLIT/ DECORATIVE/ /WINDOW TYPES
Manufacturer Name Country Agent Name SEC decision Models Conditions Remarks Validation date
Principal Plant Address Evaluated by Approval date
9902050 Mitsubishi, Japan Japan MPQC/ Decorative Units App. by MPQC/07/1143/2014 01-Jan-2015
PRJ 07/1143/2014 dated 13/04/14
13-Apr-2014
9904360 TRANE CO, US United States MPQC/ App. by MPQC/07/1143/2014 01-Jan-2015
PRJ 07/1143/2014
13-Apr-2014
9905393 CARRIER INTERNATIONAL CORP United States U.T.S CARRIER L.L.C. MPQC/ App. by MPQC/07/1143/2014 01-Jan-2015
HOUSTON PRJ 07/1143/2014 dated 13/04/14
13-Apr-2014
9908448 JOHNSON CONTROLS INC., United Kingdom MPQC/ 13-Apr-2019
SLOUGH, UK Slough PRJ 07/1143/2014
13-Apr-2014
9908615 TRANE CO, FRANCE France MPQC/ 13-Apr-2019
Dardilly PRJ 07/1143/2014
13-Apr-2014
9909630 CARRIER AIR CONDITIONING United Kingdom U.T.S CARRIER L.L.C. MPQC/ App. by MPQC/07/1143/2014 01-Jan-2015
SURREY PRJ 07/1143/2014 dated 13/04/14
13-Apr-2014
99103095 REFRIGERATION INDUSTRIES Kuwait AL TAYER ENGINEERING LLC - 115/G/RPQC/ DUCTED SPLIT & 20-Feb-2025
COMPANY SULAIBIYA BRANCH OF ABU DHABI 1 03/2020 DECORATIVE,
RPQSC 20-Feb-2020 COOLEX BRAND
9910326 JOHNSON CONTROLS, USA United States JOHNSON CONTROLS MPQC/ 01-Jan-2015
(FORMERLY YORK) INTERNATIONAL - L L C - ABU DHABI 07/1143/2014
PRJ 13-Apr-2014
9922799 SKM AIR CONDITIONING United Arab RPQSC/ 03-May-2023
EQUIPMENT Emirates RPQSC 08/4580/2018
Sharjah 03-May-2018
9935539 PETRA INTERNATIONAL EXPORT Jordan PETRA AIR CONDITIONING COMPANY 434/G/RPQSC/ 16-Jul-2023
CO. AMMAN -LLC 13/18
RPQSC 16-Jul-2018
9967709 SKM Saudi Arabia MPQC/ Not for industerial App. by MPQC/07/1143/2014 01-Jan-2015
Al-Khobar MPQC 07/1143/2014 use dated 13/04/14
13-Apr-2014
9967740 MITSUBISHI, THAILAND Thailand UNITED ELECTRONICS COMPANY - L 147/G/RPQC/ INDUSTRIAL AND 08-Mar-2025
CHONBURI LC 04/2020 NON-INDUSTRIAL
RPQSC 08-Mar-2020 PRODUCTS
9967746 CARRIER Saudi Arabia MPQC/ Not for industerial App. by MPQC/07/1143/2014 01-Jan-2015
JEDDAH MPQC 07/1143/2014 use dated 13/04/14
13-Apr-2014

Report Managed By : ADWEA - Companies Registration Section E-mail : [email protected] Tel : 80023932
5 / 313 Report Generated On : 12-May-2022 3:00:04 AM