Inspection Release Note (General) : Verification of Completion Yes No N/A Comments
Inspection Release Note (General) : Verification of Completion Yes No N/A Comments
Inspection Release Note (General) : Verification of Completion Yes No N/A Comments
ITEM INSPECTED : J-4 UPPER JACKET LEG-A (BAY-3) ALONG WITH NODES & NODE TKY STUBS.
20-2101-EN-S-SD-CL1-1108 SH 01 OF 01
Leg Node TKY Joint Nos: 21,50 20-2101-EN-S-WD-CL1-6002 SH 03 OF 03 REV 1 REV 2, 20-2101-EN-S-SD-CL1-1109 SH 01
(C1U-4-BR-2-2, C1U-4-BR-1-1) OF 02, 2 OF 2 REV1
n Additional NDT such as Hardness, PMI, Ferrite testing completed and accepted. ✘
n Final Preservation Completed (Lay up, Nitrogen Purging, Covering Protection etc.) ✘
Released for :
✘
Painting Testing Released for Erection Transfer to Other facility
REMARKS :
Punch Comments:-
CONTRACTOR EMPLOYER
LEL PRODUCTION LEL QC
(Seaway 7) (Seagreen)
NAME : JESWIN JOHN
DESIGNATION : QC Inspector
SIGNATURE :
Joint No: 2, Item No: C2U-3-LG-1-Node can, along with Leg Stubs & Ring Plate to
CN/20/2101- 20-201-HAM-IRN-
1 be installed at erection Weld Map No: 20-2101-EN-S-WD-CL2-6008 Sheet 01 0f QC B
EXT005602 0902
03
Form : 20/2101/LGQCF021
Rev. : 0
Date : June. 2020