DID F SV 39 Form Pre Test Commissioning1
DID F SV 39 Form Pre Test Commissioning1
DID F SV 39 Form Pre Test Commissioning1
Yes No As Built Drawing (Must show all unit position, refrigerant pipeline, and drain pipe)
Yes No Equipment schedule from consultant
Yes No VRV Express Data
Yes No
Delivered equipment list (Include: model and serial number)
Yes No Name and Model of every System (Include: Indoor & Outdoor Type and Model, Controller)
Yes No All Schematic Drawing (Piping & Control Wiring)
Yes No Pipe Test Press Report (Already checked & approved at site)
SECTION 7 : Approval
Prepared by, Approved by, Accepted by,