Ashna Habeeb: Electrical Engineer

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

ASHNA HABEEB

ELECTRICAL ENGINEER

CONTACT ME AT OBJECTIVE

To be associated with a leading and progressive


+971557873346
organization, which would give me the best opportunities to
[email protected] improve and utilize my skills and knowledge.

SKILLS SUMMARY WORK EXPERIENCE

Autocad Electrical Designer


Tools: MATLAB, SIMULINK, Visual Planners Group, Kerala | Jan 2020 – Nov 2020
Basic, AutoCAD, Microsoft Vision &
Office. Create, edit and design electrical, structural and/or
control drawings to meet specifications utilizing CAD
Programming Language: Basics of
C, Assembly Language. Create original drawings from hand sketches
Review drawings to ensure adherence to established
Microprocessors: PIC specifications and standards
Microcontroller, Intel 8085,LPC
Assist Engineer with parts lists, cost estimating, and
2138
plans & specifications development
Protocol: UART, SCI Accurately complete paperwork for project tracking costs
Classify and file engineering drawings
CERTIFICATION
Ensure that all work is carried out in a safe and efficient
AutoDesk manner

PERSONAL Electrical Design Engineer


INFORMATION
Powercraft Electrical Contractors | Feb 2019 - Dec 2019
DOB: 16-06-1993
Define design approach for new product and platforms
Nationality: Indian
and generate design specifications
Visa Status: Dependant VIsa
Execute new product designs personally, and oversee
Languages: English, Hindi outsourced resources where appropriate
and Malayalam
Designing and laying out new electrical systems
Address: Flat 205 Eissa Creating system models and simulations
Building Al baraha Dubai Support current platforms with enhancements and
improvements where needed
Producing necessary design reports and documentation
Assisting in the manufacture of new electrical systems
Adhere to best practices for documentation and version
control
EXTRA CURRICULAR
ACTIVITIES& Buyer
ACHIEVEMENTS Rashid Trading & Contracting Est | Mar 2018 – Dec 2018
Best project in Electrical Maintain records of goods ordered and received.
Engineering department in Locate vendors of materials, equipment or supplies, and
2015.
interview them in order to
Finalist of National level determine product availability and terms of sales.
project competition in 2015. Prepare and process requisitions and purchase orders for
(SRISHTI )
supplies and equipment.
Achieved first price for state Control purchasing department budgets.
level seminar presentation Review purchase order claims and contracts for
2015(KSEB)
conformance to company policy.
Worked as inter collage Analyze market and delivery systems in order to assess
competition decoration head
present and future material availability.
and administration member
Develop and implement purchasing and contract
management instructions, policies, and procedures.
COURSE WORK

Systems and Control Substation Operator


Theory Kerala State Electricity Board | Jul 2017 - Feb 2018
Digital Control Theory Controls equipments, such as current converters, voltage
transformers, and circuit breakers that regulate flow of
VHDL
electricity through substation of electric power system
Engineering Applications and over distribution lines to consumers: Records
for Vector Analysis
readings of switchboard instruments to compile data
Nanotechnology concerning quantities of electric power used for
substation operation and amounts distributed from
Embedded System.
station.
Communicates with LOAD DISPATCHER to report amount
of electricity received into substation and to receive
switching instructions
Records temperature of transformers at specified
intervals

Electrical Engineer Intern


Keltron Limited, INDIA | May 2014 - Sep 2014

Worked as an intern in a multi-product multi-centric


organization producing a wide range of products starting
from discrete electronic components to complex equipment
and systems

Electrical Engineer Intern


Kerala Electricals Limited, INDIA | May 2013 - Sep 2013

Worked as an intern in the manufacturing of high voltage


machines such as transformers of 300KVA which includes
the production stages like Diagnostic, Winding Testing, Core
building, Insulation and Assembly.

You might also like