Insert Pump Anchor
Insert Pump Anchor
Insert Pump Anchor
Applications
• As a casing packer in slimhole completions or as a removable
packoff in subsurface hydraulic-pump installations
• 2 3/8-, 2 7/8-, and 3 1/2-in. tubing strings
Options
• Furnished with a standard 24-in. setting stroke in all sizes
• Available with a long 48-in. stroke in the 2 3/8-in. and 2 7/8-in. sizes
• For high-temperature applications, Viton® packing element is available
Specifications
Operating Sequence
1. Record pump stroke and the setting stroke #6. Lifting
(24 in. or 48 in.) of the anchor. These two figures Position: #1. Starting
represent the upward movement of the rod string Pin returns Position:
here as tool is Pin is here as
necessary to transfer the dowel pin from the unseated, where tool is made
running slot to the setting slot. it remains as up on string.
tool is lifted
2. Attach the anchor to the pump and start installing into up tubing.
#2. Lowering
the tubing with the dowel pin in the starting position. Position:
#5. Setting
Pin moves
3. Run the pump to the desired depth, attach the Position:
here as tool
Approximate pin
polished rod, and lower to the point established enters tubing.
location when
for bottom of the stroke. tool is “set.”
#3. Running
4. Raise the polished rod the distance established in Slot:
Step 1 and then lower the full weight of the rods #4. Setting Pin travels up
Slot: and down the
onto the anchor to set and preload the packoff. “running slot”
Pin moves to
presetting position as connections
To reset the anchor, unseat with a straight pull on the
in “setting slot” are made.
rod string, raise or lower to the desired setting position, as rods are lifted
and then reset as in Step 3. for setting. Tool is
then lowered to
set position.
Viton a registered trademark of DuPont Dow Elastomers L.L.C.