1 Schedule Grade One Ward Block
1 Schedule Grade One Ward Block
1 Schedule Grade One Ward Block
PRESIDENT’S OFFICE
REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT
PROJECT AREA
TANZANIA MAINLAND
MATERIALS
A SUBSTRUCTURE - PROVISIONAL
2 Foundation Walls
B. SUPERSTRUCTURE
3 Gutter's
Upvc 125mm half round (6m long)-5'' 16 PC'S
Upvc 75mm diameter down pipe; Class B 6 PC'S
PVC outlet 4 PC'S
PVC bend 90' 4 PC'S
PVC bend 45' 8 PC'S
Gutter support bracket 96 PC'S
Gutter Clamp 3'' 12 PC'S
Connector/reducer 16 PC'S
Corner outlet 4 PC'S
SUB-TOTAL ROOF STRUCTURE & COVERING
D. CEILING
Gypsum board -9mm thick 106 PC'S
Plain Cornice (8ft) 116 PC'S
Screw 1.25'' 500pcs/box 34 Box
Gypsum powder 17 Bags
Fiber tape 5 Pcs
Treated soft wood timber 2'' X 2'' 3,356 FT
Nails 4'' 30 Kgs
Nails 3'' 20 Kgs
SUB-TOTAL FOR CEILING
E. DOOR
1 40mm thick solid core flush door shutter
1500 x 2100 mm high 3 PC'S
1200 x 2100 mm high 10 PC'S
1000 x 2100 mm high 3 PC'S
900 x 2100 mm high 16 PC'S
3 Ironmongeries - Union
Mortice lock - Three lever 32 No
Brass hinges - 100mm 43.5 Pairs
Barrel bolt - 150mm 12 No
Wood Screw 5 Box
Kick- plate; 750 x 200mm 12 No
Kick- plate; 600 x 200mm 40 No
Kick- plate; 1000 x 200mm 6 No
Kick- plate; 900 x 200mm 32 No
Hinges double swing -150mm 9 Pairs
Pushing plate 12 No
SUB-TOTAL FOR DOORS
F. WINDOWS
Supply and fix Aluminium Windows 2mm thick
1 frame with 5mm thick glass, Mosquitor gauze
ironmongeries and all necessary accessories
1600 X 1500mm high 12 PC'S
3000 X 1500mm high 1 PC'S
1500 X 750mm high 8 PC'S
1200 X 750mm high 11 PC'S
1000 X 750mm high 11 PC'S
SUB-TOTAL FOR WINDOWS
G. FINISHING
1 Floor finishing -(ratio 1:4)
3
Sand 26 M
Cement-50kgs 162 Bags
450 X 450 X 8 mm thick - Non-slippery porcelain
215 Box
floor tiles -(1.42 sqm/Box)
Epoxy - Grout (1kg/packet) 46 Bucket
Spacer 25 Packet
Skirting (600mm long; 25/Box) 18 Box
2 Wall Finishing
3
Sand 37 M
Cement-50kgs 231 Bags
White cement - 50kg 12 Bags
Gypsum powder 46 Bags
Sand pepar No.120 (msasa) 2 Roll
200 X 300 x 9mm thick Wall tiles to toilets full
height -0.96 sqm/Box) 225 Box
Epoxy - Grout (1kg/packet) 33 Packet
Spacer 18 Packet
WORK TOPS
25mm thick granite to work tops 6 PC'S
SUB-TOTAL FOR FINISHING
C/F
A. SUBSTRUCTURE - PROVISIONAL
B. SUPERSTRUCTURE
D. CEILING
E. DOOR
F. WINDOWS
G. FINISHING
Kufunga mbao
5 Pembezoni mwa jamvi
6 Pembezoni mwa nguzo
7 Kuondoa mbao
Kumwaga zege
8 Chini kwenye msingi wa tofali
9 Chini kwenye msingi wa nguzo
10 katika nguzo ya awali
11 kwenye jamvi
Mawe
13 Upangaji wa mawe na utandazaji wa DPM
14 Umwagiliaji wa maji
Jumla ndogo msingi wa jengo
D. Milango
1 Kufitisha fremu za milango
2 Kufitisha shata za milango pamoja na vitasa
3 Upakaji wa Varnishi katika milango na fremu
E. Umaliziaji (Finishing)
Upigaji wa lipu pamoja na kutengeneza koplo:
1 Nje ya jengo
2 Ndani ya jengo
Sakafu
3 Uwekaji wa sakafu ya kupokea vigae (beds)
4 Uwekaji wa vigae pamoja na grauti katika sakafu (floor tiles) -
Dali:
6 Ufungaji wa mbao za dali (Brandering)
7 Uwekaji wa dali na mikanda ya gypsum
8 Uwekaji wa dali ya pvc kuzunguka nyumba kwa nje
MAJUMUISHO (SUMMARY)
Shs
A. Msingi wa Jengo (Sub-structure)
D. Milango
E. Umaliziaji (Finishing)
ANGALIZO:
Fundi anatakiwa kujaza hii fomu kwa kupitia mchoro wa jengo husika