03 - 1 Volume - III - Data Sheet - (3) Addmas
03 - 1 Volume - III - Data Sheet - (3) Addmas
03 - 1 Volume - III - Data Sheet - (3) Addmas
CONTRACT NO.
VOLUME – III
DATA SHEETS
Chief Engineer
Gujarat Water Supply & Sewerage Board
Zone –I
Vadodara
Volume – III: Data Sheet GWSSB
INDEX
5 Drawings -
1. The Levels given in the Appendix to Bid details are as per the Data available with GWSSB. As the
working survey work is included in tender and the agency has to carry out work as per the
survey and as per document given by the local body for fixing the site.
2. The Agency should confirm levels and layout of the Head Works as per the requirement of
the inter-related Structures and design accordingly. No Extra payment shall be made by the
department to the agency for the extra excavation or for the raised structure above Ground
Level.
3. The agency has to carry out fresh working survey and leveling for confirmation of data
given. In case of shifting of the Head Works is to be carried out due to any reason, the
agency shall be bound to carry out all the Structures of the Head Works at the new site and
the design is to be carried out accordingly without any extra claims.
4. The sizes of the Pump Houses given in the Price Bid are as per the experience of GWSSB to
accommodate the Pumping Machinery and other relevant accessories or any other requirement
of the Employer. The Pump House should be designed accordingly and any changes in size shall
be measured on Square Meter basis of built up area only and the payment will be made
accordingly. Agency shall be bound to carry out the work as per the re-designed structures.
There is chance that the Area of Pump House may increase or decrease and the payment shall
be made to the Agency as per the actual Area in Square Meters.
5. The erection & installing of Pumping Machinery includes the Piping and Cabling considering the
Pump House size mentioned in the Tender. Any change in the pump house size shall not affect
the Pumping Machinery Cost. No extra payment shall be made to the Agency due to increase in
the Piping, Cabling or any other accessories related to the Pumping Machinery due to the
increase in the Pump House.
6. All the sumps should be designed in such a way that minimum 3 meters Residual Head is
available at Ground Level near Sump. The Depth of Excavation can be considered accordingly (if
applicable).
8. The Pump House shall be provided with the Electric fittings with minimum required illumination
with the lighting fixtures, Piping, wiring and other accessories.
9. For RCC ESR & RCC Sump all the data are to be obtained by the agency and accordingly the
design has to make & to be confirmed with GWSSB.
SECTION- 1:
The main scope of works / services to be done / provided by the contractor under this bid shall
be as under.
Nil
a) Raw water Pumping Main pipeline from Off-take structure to WTP / RWR and Intake
well to WTP with valves, accessories etc. as per price bid.
b) Rising Main pipe line from Main head works to Sub head works with valves,
accessories etc. as per price bid.
c) Rising mains from U/G sumps at Head works/ Sub head works to ESRs located in head
works premises with valves, accessories etc. as per price bid.
d) Distribution / Express Gravity pipelines from ESRs to Sub HWs / village level sumps
with valves, accessories etc. as per price bid.
Designing and constructing the following civil structures as per Contractor’s own design. The
designs shall be carried out as per design criteria given in tender & as per GWSSB and
Irrigation department norms. The agency shall obtain approval of design of civil structures
from GWSSB before construction of structures.
Designing and constructing the following civil structures as per Contractor’s own design. The
designs shall be carried out as per design criteria given in tender & as per GWSSB and
E ELECTRO-MECHANICAL WORKS
Designing, procuring, erection & Commissioning of Pumping machinery & allied works
SECTION- 2:
CIVIL WORKS
Canal Offtake Structure with Screen channel, Baffled chamber, Stilling chamber, Raw water sump
& Pump House on Top.
(1) Screen channel, Baffled chamber, Stilling chamber and Raw water sump :
Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Canal Off-take Structure
RCC (M-30) Rectangle Canal Offtake Structure
1.2 Type /components with Screen channel, Baffled chamber, stilling
chamber & Raw water sump
1.3 Location First pool of Sankheda Branch Canal
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Drawing)
Schedule - B- 3: Data Sheet for Intake Well (To be constructed within RWR) with Pump
House on Top
1. Intake Structure
Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Intake Well (To be constructed within RWR to
facilitate pumping)
1.2 Type 4 m dia. RCC (M-30) Circular Intake Structure
with Pump House on Top
1.3 Location Within RWR to be constructed at Main HW
Tandalja
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
b)Bottom of Well (Top of Outlet pipe) (As per contractors design)
c)F.S.L. (As per design)
d)Minimum Water Level (As per design)
e)Pump House Floor Level (As per design)
2.2 SBC at site Contractor has to carry out SBC for design
purpose.
2.3 Seismic Zone As per latest IS Code
2.4 Water Density 9.81 KN/cu.m.
3 DESIGN REQUIREMENTS
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised.
(6) I.S. 13920 - 1993 or latest revised.
3.2 Grade of concrete M-30 (Minimum)
3.3 Grade of Steel Only TMT Fe-415 steel to be
3.4 Foundation - The foundation shall be designed for
actual S.B.C. of strata confirmed by plate
load bearing test.
- The total depth shall
Schedule - B-4: Data Sheet for Diversion Chamber with operating room on top:
1. Chamber
Sr. No. PARTICULARS PARAMETER / REQUIREMENT
1. GENERAL
1.1 Item Diversion Chamber
1.2 Type RCC (M-20) Rectangular structure with operating
room on top.
1.3 Inside Dimension 4.5 m X 3.5 m
1.4 Depth of chamber As per drawing
1.5 Location As per Price Bid
2 DESIGN DATA
2.1 Control Levels
a) Average ground level (GL) (As per Network Diagram)
b) Bottom of Chamber (As per contractors design)
c) operating room floor Level 0.6 m above GL
2.2 SBC at site Contractor has to carry out SBC for design
purpose.
Contractor has to carry out investigation for design
2.3 Water Table purpose during monsoon season, retrieve data of
last five years from concern EE and as per actual
Aug. to Sankheda Part-I RWSS Page No.- 13
Volume – III: Data Sheet GWSSB
2. Operating Room:
Sr. No. PARTICULARS PARAMETER/ REQUIREMENT
1. GENERAL
1.1 Item Operating room over Diversion Chamber
1.2 Type Brick Masonry operating room with RCC top slab
& gantry girder
1.3 Inside Dimension 4.5 m X 3.5 m
1.4 Height Minimum of 3 m from floor level to ceiling level
2 DESIGN DATA
3 DESIGN REQUIREMENT
3.1 Standard Codes (1) I.S. 3370, Part-1 to 4, 1965 or latest revised.
(2) I.S. 456-2000 or latest revised.
(3) I.S. 1893-2002, Part-1 to 5 or latest revised.
(4) I.S. 875, Part - 1 to 5, 1987 or latest revised.
(5) I.S. 10262 - 2009 or latest revised
(6) I.S. 13920 - 1993 or latest revised
(7) I.S. 11682-1985 or latest revised
(8) I.S. 11089-1987 or latest revised
3.2 Grade of concrete M-30 (Minimum)
SECTION- 3:
WATER TREATMENT PLANT (WTP)
Schedule - B- 5: Data Sheet for Water Treatment Plant (WTP):
1) All water retaining structure should be in M-35 and 20 mm thick water proof plaster in
C.M.1:2 inside of all water retaining structure to be provided.
2) Contractor has to carry out SBC for design purpose and Water table to be considered as
per actual site condition.
Note: S.B.C. & Water table given in below table for estimation purpose. Contractor shall
carry out the S.B.C. test before designing the WTP. No extra payment shall be
given for variation in SBC.
Raw water channel-from Cascade Aerator to Flash Mixer (with Parshall Flume as Flow
3.3 measuring Device designed as per CPHEEO Manual and 1 m x 1 m Float Chamber with
fixed calibrated flow measuring device )
3.3.2 Dimensions
a) Total Length of channel 10.0 m (minimum)
b) Width As per design requirement
c) Freeboard Minimum 0.5 m
Velocity in outlet from distribution Max 0.9 m/s (if channel provide 0.5 m Free
3.5.6
chamber Board)
3.5.7 MOC of outlet As per specifications
3.6 Flash Mixer
3.6.1 Number of units 1 No.per Each Clarriflocculator
3.6.2 Design Flow As per Sr. No 3.1.1 above
3.6.3 Detention time 60 seconds (minimum)
3.6.4 Mixing Mechanism Mechanical as per IS 7090-1985
3.6.5 Velocity Gradient Minimum 300 S -1
3.6.6 Ratio of Tank Height to Diameter 1:1 to 3:1
3.6.7 Ratio of Impeller Diameter to tank 0.2 to 0.4
diameter
3.6.8 Shaft Speed of propeller 100 rpm
3.6.9 Power Requirements 1 to 3 watts/m3/hr of flow
3.6.10 Tangential velocity >=3 m/s at the tip of the blade
3.6.11 Baffles to reduce vortex formation Projecting 1/10 to 1/12 tank diameter, at
minimum of 4 places
3.6.12 Tank (Shape & Construction) Circular/Square RCC Tank open at top (As per
Bidder’s design)
3.6.13 Free Board 0.5 m
3.6.14 Agitator MOC SS 316
3.6.15 Minimum Shaft Diameter 200 mm
3.6.16 Washout / Drain Pipe with Chamber / 150 mm dia. (Minimum)
Valve arrangement for Flash mixer
bottom above FGL
d) Ratio of Total area of perforations <=0.5 for 12 mm orifice <= 0.25 for 5 mm
to total CS area of lateral orifice
EOT 3 MT
A Ground Floor
B First Floor
Note- The offered areas are indicative and minimum; the contractor should provide calculations for
arriving at these areas & provide this as minimum area or else provide higher area if required
as per the calculations & as per the approved Mechanical/ GA drawings for respective
equipments.
Staircase should be provided at a location from where all areas/rooms are easily accessible.
Normal storage required for chemicals is : 90 days for alum storage +10% extra for other
sundry storage, 30 days for Chlorine tonners.
Laboratory Instruments
6 Spectrophotometer 1 No. √ √
12 1 No. √
Demineraliser ×
13 Refrigerator 1 No. √ √
17 ½ HP motor 1 No. √ ×
21 Centrifuge 1 No. √ √
Laboratory Instruments
Sr. Details Specs & requirement utput Capacity Output
No. of the plant Capacity of
more than 7.5 the plant up
MLD. to 7.5 MLD
Minimum Equipments needed for Bacteriological Examination
4 Binocular microscope √ √
5 pH Meter √ √
7 Wooden Racks/Aluminium √ √
Racks
8 Wire Baskets √ √
12 Suction Pump √ √
Bacteriological Media
The equipment shall be supplied with all the accessories that are necessary to make the equipment
functional for analyzing parameters. Contractor can offer additional equipment if necessary.
Readout modes shall include transmittance, absorbance, concentration, optional wavelength scan
and time course graphs. Spectrophotometer should come along with the following reagents and
accessories: Power supply, Operators manual, one pair 10mm rectangular path length cells and
reagents for common drinking water parameters like residual free chlorine, Iron, sulfate, silica Low
range and Fluoride for 1000 tests.
Technical Specifications
Colorimeter/Photometer
The instrument shall be capable of colorimeter tests for more than 90 parameters, from aluminum
to zinc for testing natural waters. The instrument should be designed specifically for field testing.
The instrument shall be water proof, dust proof and should have a chemical resistant housing. The
instrument should have simple, push-button program selection and step-by-step prompts that guide
users through each testing procedure.
Technical Specifications:
Photometric Range : 0 to 2 A
Power : 4 AA alkaline
Laboratory p H Meter
Instrument should able to give quick and easy pH measurements. Instrument should have large LCD
display. Instrument should have RS232 interface with data logging facility.
Technical Specifications
Range: pH: -6.00 to 20.00, mV: -2000 to 2000 mV, Temp: -10.0 to 120.0°C
Accuracy: pH: ±0.01 pH, mV: ±0.05 % full scale ± 1LSD, Temp: ±0.5°C
Bench top Multi parameter meter: A multi parameter instrument capable of analysis of pH, ORP,
dissolved oxygen, conductivity, TDS, salinity and temperature shall be provided. The instrument
shall be capable of a quick response and have a intuitive user interface. The instrument shall have
automatic temperature correction/compensation. Downloading and storage of data should be easy
and convenient .It shall provide RS-232 interface and shall have a minimum of 150 points recall
feature.
Technical Specifications:
Range: pH : - 2.00 to 19.999
ORP: ± 2000 mV mV: ± 2000 mV
Conductivity : 0 to 199.9 µS/cm;
200 to 19,999 µS/cm;
2 to 199.9 mS/cm;
20 to 199.9 mS/cm.
Aug. to Sankheda Part-I RWSS Page No.- 39
Volume – III: Data Sheet GWSSB
Turbidity meter shall have pre-programmed features for measurement of turbidity with ratio color
correction covering the range from 0 to 10,000 NTU with auto signal averaging. Turbidity meter
should come along with the following accessories: A complete set of calibration standards (0.02,
10, 100, 1750 NTU), Two measuring corvettes with light shield caps, Operators’nd
plugmanual,inpoweradaptor
Technical specifications
- 2,450 EBC 0
- 10,000 FNU 0
- 10,000 FAU
Sample size: 30 ml
Portable Turbidimeter
The instrument should have microprocessor-control operation and Ratio optics to bring greater
accuracy, sensitivity and reliability to field testing. The instrument shall compensate for color in
the sample, light fluctuation and stray light, allowing analyst to achieve laboratory-grade
performance on a wide range of samples, under a wide range of conditions.
Technical Specifications
Sample required : 15 ml
Meter should be microprocessor based hand held type instrument with rugged & field proven design
and should be easy to operate with less maintenance. Dissolved Oxygen meter should come along
with the following:
Temperature - 5 to 45o C
Accuracy: Dissolved Oxygen ±0.3 mg/L, 2%.
Temperature ±0.4o C
Resolution: Dissolved Oxygen 0.01 mg/L, 0.1% air
Temperature 0.1 o C
Dissolved Oxygen Sensor: Steady-state polarographic
Salinity compensation: Desired
Altitude compensation: Desired
Temperature Compensation: Automatic
Power: Battery operation
Cables: 12 feet or more
Other features: Backlit Display
Built-in calibration chamber Waterproof, IP 65
Alkalinity 0 –500 ppm In addition, Instrument should include the following: In transclam packing
with reagents for 100 free chlorine tests, Crushing rod and 2 test cells. The instrument should be
provided with a operations & instructions manual.
Sterilizer, Autoclave
Purpose: For sterilization of glassware and culture media for bacteriological analysis.
Double wall construction with inner & outer chamber made of Aluminum. Electrically heated by
means of superior quality emersion heaters with working pressure 15 PSI. Inner Chamber Size:
550X750mm. Rating: 6.0 KW, Volume: 175litre.
Incubator Bacteriological:
Purpose: For incubation in bacteriological analysis
Double walled cabinet. Outer wall should be made of mild steel, inner wall of stainless steel,
lagged with a special insulating material. The inside door should be made of glass panel set in a
metal frame fitted with a felt gasket and be fastened by a ball catch.
Temperature range: 5°C above ambient to maximum 60°C. Accuracy: ±2°C
Size: 600 X 600 X 600cm
Rating: 1000 Watts.
Refrigerator:
Purpose: For cooling and storage of (standard) solution in a laboratory
Specifications:
c) Clariflocculator (RCC)
Minimum Thickness 200 mm with Ring
Central hollow column
Beam at Top.
Opening Flocculator wall
Minimum Thickness 150 mm
(Partition wall)
Clarifier outer wall Min. thickness 150mm
Launder Min. thickness 100mm
Channel–Clariflocculator to filter
Min. thickness 100mm
inlet channel
Floor slab Min. thickness 200mm
Inlet pipe to Clariflocculator and wash out
To be embedded in M 150 concrete.
pipe.
Walkway with railing Min. Width 1000 mm
Precast blocks covering channel Min. thickness 7 5 mm & Max. gap 100mm
MS ladders/stairs shall be provided to climb up/reach top of all units from G L Independently.
Note: Door size should be such that truck can be taken in side for unloading the Tonners
/chlorine cylinders).
Parapet wall Min. height750 mm
Door window Approx. 25%asper std. practice/as per
opening sizes. site condition.
Rain water drain
Adequate size from terras to GL.
pipes
Separate space should be provided for installation of pumps for filling wash water tank in time as
per design.
h) Recirculation sump
Vertical Minimum Thickness 150 mm
Bottom/Floor slab Minimum Thickness 150 mm
Proper Drainage arrangement/pipe line shall be provided to drain the sludge in to nearby Nalla.
Signature of Bidder
Executive Engineer
Public Health Works Division,
Chhotaudepur.
1.8 Equipment List for Civil, Mechanical, Electrical & Instrumentation works
2.2 Clariflocculator
2.4 Valves
3.0 Piping
3.1 Fault Level & Sizing calculations for Incomer Breakers, Capacitors & Power Cables etc.
3.2 Switchyard
3.3 Transformer
3.9 Layout drawings for Electrical Rooms, Cabling, Lighting, Earthing & Lightning Systems.
4.1 Flow, Level, Pressure & Temperature Measuring/ Indicating Instruments (as applicable)
CIVIL GA drawings
4.0
Process Units
4.4 Clariflocculator
Filter House incl. Annex building, air blower room, filtered water channel, Post
4.5
Chlorination chamber etc.
6 STRUCTURAL DRAWINGS
6 Process Units
6.4 Clariflocculator
Filter House incl. Annex building, air blower room, filtered water channel, Post
6.5
Chlorination chamber etc.
Note-
• The list is indicative and may vary or require additional documents/Drawings as per the
tender requirement.
• All the drawings should be To the Scale , unless otherwise specified.
• All the drawings should be as per the specified paper size.
SECTION- 4:
Liquid Data
Particulars by
Sr. No. Description Particulars
Bidders
1. Make of pumpset As per GWSSB approved make
___mm² x ___Core
Power
19. Cable size & MOC x___ Runs ___mm²
cables
x ___Core
HORIZONTAL/VERTICAL/
SHAFT ORIENTATION
HOLLOW VERTICAL
STARTING TORUE
FULL LOAD (RATED) TORQUE
PULL OUT TORQUE
PULL UP TORQUE
TEMPERATURE
19
DETECTORS/INDICATOR
EMBEDDED TEMPERATURE
Nos 6 nos. Duplex
DETECTORS FOR WINDING REQUIRED
EMBEDDED TEMPERATURE
DETECTORS FOR BEARINGS Nos 2 nos. Duplex
REQUIRED
BEARING THERMOMETERS FOR
DRIVING END & NON DRIVING ENDS Nos 2 nos.
REQUIRED
SPACE HEATERS FOR MOTORS
20 YES/NO Yes
REQUIRED
SL. Particulars by
Description Particulars
NO. bidder
1 General
As per GWSSB approved
1.1 Make
make
1.2 Type Double flanged
3 Material of Construction
3 Material of Construction
Body,cover,door,bearing
3.1 Grey CI, IS-210,FG 260
holder
Hinge pin,door pin &
3.2 SS,IS-6603,12Cr12
door/suspension pin
Departmental
Particulars Bidder's Data
Requirement
Sr.
No. Component Material
1.0 Type D/F SS Expansion bellow
1.1 Rating of valves PN 1.0
1.2 Sizes and quantity As per price bid
1.3
Bellows / Collar / Internal sleeve SS 304
1.4
CS IS :1367, CL-4.6 (Hot
Limit Rods
Dipped Galvanised)
1.5
CS IS :1367, CL-4.0 (Hot
Nut & lock nut
Dipped Galvanised)
1.6 Flanges IS: 2062 Gr. B
1.7 Seal EPDM RUBBER
Sr.
Description Particulars Particulars by Bidders
No.
1.1 Bidder to furnish. (It shall be as
Make
per approved vendor list)
1.2 M-5 ( Class II) duty, indoor
Applicable Standards operation conforming to IS: 807,
IS: 3177, IS: 3938 and IS 13834.
1.3
Capacity (Tones) 3T
1.4
Safe working load (Tones) Bidder to furnish
1.5
Recommended Rail To be Furnished By Bidders.
1.6
Quantity 1 no. at Pump-house
1.7
Class / Duty To be furnished by Bidders
1.8
Lifting Height(m) 15 (Minium)
1.9 Span (m) (FOR Pump
Bidder to furnish
House )
1.10
Type of Girder Single Girder , Circular
1.11 Floor Operated, Through Down
Method of operation
Pendant P. B. Station
1.12
Hook Approach(Mtr.) 0.5 m
2.0
Operating speed (loaded)
2.1
Main Hoist (m / min.) To be Furnished By Bidders
2.2
Cross Travel m / min. To be Furnished By Bidders
2.3
Long Travel m / min. To be Furnished By Bidders
3.0
Type of hook Solid forged steel, IS: 3815
4.0
Hoisting Rope To be Furnished By Bidders
4.1 Diameter (mm)
4.2 Construction
4.3 Core
6.1 Hoisting
6.2 Cross travel motion
6.3 Long travel motion
7.0 Motor for hoisting To be Furnished By Bidders
7.1 Make
7.2 Type
7.3 Rating
8.1 Make
8.2 Type
8.3 Rating
9.1 Make
9.2 Type
9.3 Rating
9.4 Drive
Details of brakes for
10.0 To be Furnished By Bidders
hoist motion
Make of electro magnetic
10.1
brake
10.2 Make of electro hydraulic
4 Flow Sensor
h) Protection category IP 68
5 Flow Transmitter/Converter
Microprocessor based,
a) Type Modular Design, remote
mounting
2 Model No
3 Type Bourdon
5 Accuracy ± 1 % or better
Micrometer type
16 Pointer
adjustable pointer
19 Snubber Required
GENERAL
Design and Manufacturing
1 AWWA C512
Code
Size \Qty\Pressure Rating
2 As per Price Bid
(PN)
3 Ends Flanged
7. Gasket EPDM
VOLUME- IIIB
TECHNICAL DATA SHEET
(ELECTRICAL & INSTRUMENTATION WORKS)
ELECTRICAL WORKS
TABLE OF CONTENTS
a) For installed (1W+1S) transformers cumulative rating ≤ 800 KVA, Four Pole Structure/ 2
Nos. of DP structure complete with all accessories as per requirement.
b) b) For installed (1W+1S) transformers cumulative rating > 800 KVA, single Two Pole
Structure complete with all accessories. Point of Supply Breaker Panel/RMU as per
requirement.
To be confirmed
Sr. No. Description Unit Particulars
by Bidder
1.0 General
Designation Lightning Arrester
1.1
Make As per approved
1.2
make list
1.3 Applicable Standards As per Tender
Specification
1.4 Type Station Class type
1.5 Quantity (Min. 3 nos. per Nos. As Per
D.P.Structure) Requirement
1.6 Installation Outdoor
1.7 System voltage, No of Phases & kV 11kV, 3 Phase & 50
Frequency Hz
2.0 Ratings
Rated arrester voltage kV 9
2.1
Rated frequency Hz 50
2.2
2.3 Nominal discharge current of 8/20 KA 10
microwave shape (Station class)
2.0 Rating
2.1 Rated Current *A Bidder to Furnish
2.2 Insulator Rating Insulator 12 kV Porcelain 25
Creepage Distance Insulator mm / kV As per
Impulse withstanding relevant IS
2.3 Fuse Carrier Bakelite Tube
2.4 Contacts Spring Loaded
Phosphor Bronze
3.0 Operating Mechanism 12 KV 4 element
type operating rod
4.0 Connection Details ACSR Conductor
6.
Method of Connection HV Winding
Delta Star
LV Winding
7. Rated Frequency Hz 50
8.
Two Winding /
Type Of Winding / Material
Copper
As Per IS 1180-2014
Percentage Impedance at Principal
13. % & Its latest
Tap & Without Negative Tolerance
amendment
(Uniformly
16. Winding Insulation (HV & LV)
Insulated)
b) Oil Kg
d) Total Kg
e) Un-tanking Weight Kg
a) HV A/Cm2
b) LV A/Cm2
GUARANTEED LOAD LOSSES AT
Minimum 3 Star
RATED CURRENT AT 75ºc WINDING
Rated Transformer
24. TEMPERATURE (WITHOUT IS KW
As Per IS 1180-
POSITIVE TOLERANCE) i) 100%
2014
LOAD ii) 75% LOAD iii) 50% LOAD
Guaranteed No Load Losses (Core Minimum 3 Star
Loss And Dielectric Loss) At 100% Rated Transformer
25. Kw
Rated Voltage And Frequency As Per IS 1180-
(Without Is Positive Tolerance) 2014
Aug. to Sankheda Part-I RWSS Page No.- 73
Volume – III: Data Sheet GWSSB
29. Core:
30. Winding
b) Material Copper
31. Tapping
Reqd./
Voltage Tap For Use With
h) Not Bidder To Furnish
Potential Device
Reqd.
Reqd./
34. Bushing CT, If Required Not Not Required
Reqd.
a) BCT Core No.
b) CT Ratio
c) Class
d) VA Burden VA
Cu. / Al suitable
for Max.SC rating
for 1 sec)
To be filled By
Sr. No Description Unit Particulars
Bidder
As per approved
1 Make
list
As per Tender
2 Applicable Standards
Specification
Overall dimensions of 415V Metal
3 Enclosed Switchgear panel (Length mm Bidder to Furnish
x Depth x Height)
As per
Specification
4 Quantity Nos
Requirement &
ref. SLD.
415 V Switchgear and Bus bar
5
Ratings
Rated voltage phase and
a) 415 V, 3 Ph 50 Hz
frequency
GI suitable for
Earthing conductor (Main grid) -
f) Max.SC rating for 1
Material -Size
sec)
To be filled By
Sr. No Description Unit Particulars
Bidder
1 Capacitor Bank Panel Particulars
As per approved
a) Make
make list
As per Tender
b) Applicable Standards
Specification
c) Quantity As per BOQ
* Bidder to furnish
d) Rated Capacity KVAR as per design
requirement.
Capacitor losses (i) For complete Watts 0.5W/ kVAr 0.2W/
e)
bank (ii) For individual units Watts kVAr
f) Rated voltage V 415
g) Rated frequency and phases 50 Hz, 3 Phase
h) Ambient temperature oC 50
2 Distribution Board/Panels
(a) Make As per approved
list
(b) Applicable Standards As per Tender
Specification
(c) Main, floor mounted distribution
boards
(i) Main LDB (A.C.)
As per requirement
Bus bars Al
Bus bar current rating A As per requirement
Incoming
As per requirement
Outgoing As per requirement
(With Minimum 2
spare feeders)
5 Conduits
(a) Make
(b) Material Galvanized steel
(c) Size mm 20
6 Street Light Poles And Flood Light
Poles
(a) Make As per Approved
list
(b) Street Light Pole
i) Enclosed dwg. No.: Ref. Typical
Drawing attached
with Specs.
ii) Total Height: m 8.5/10/12
iii) Quantity: Nos.
As per requirement
(c) Junction Box with Pole
i) Enclosed dwg. No.: Pl. furnish.
ii) No. of cable entries: Nos. Two
iii) Cable entry suitable for : 4C-10/16 mm2 Al.
Conductor, PVC
insulated,
armoured cable
iv) Earthing terminal suitable for 25x3 mm GS Flat
9.0 MAINTENANCE FREE SEALED LEAD ACID / Ni-Cd BATTERY (As Applicable)
Sr. No. Description Unit Particulars To be filed by
Bidder
1 Application Control &
annunciation
2 Type of battery Maintenance free
sealed lead acid
3 Number of battery banks required No. * As per design
(for 110V DC) requirement.
4 Ambient conditions Min. Temp. -20 C
Automatic Voltage
1.8
Regulator (Separate Device)
Microprocessor Based
1.9
Battery Charger Controller
As Per Approved
2.1 ACB Above 630A
Make List
As Per Approved
2.2 MCCB Up to 630 A Minimum As
Make List
Per BOQ &
Specification
As Per Approved
2.3 MCB Requirement
Make List
s
As Per Approved
2.3 Fuse
Make List
Application
Type -2 Co-
(Provide
Starters (Including All Ordination
Feeder
3. Components For Type-2 Co- Make (With MCCB) Yes
Range For
Ordination) Ensured –
Which It Is
Yes/No
Applicable
Up to 5.5
3.1 D.O.L. Yes
Kw
For 5.5 Kw
3.2 Star-Delta Yes
To 15 Kw As Per Approved
Make List
Auto Transformer Starter For 15 Kw
3.3 --
(ATS) To 75 Kw
4.1 Ammeter
Minimum As As Per Approved
Per SLD & Make List
4.2 Voltmeter
Specificatio
n
Requireme As Per Approved
4.3 MFM
nts Make List
Indication Lamp
5. Annunciators Quantity Make & Model No.
Type
5.1 8 Window
5.2 16 Window