The publication provides construction price and cost indices for Sri Lanka updated monthly, to track inflation in the construction industry.

The publication provides statistics for the national construction industry of Sri Lanka, including price indices for materials, labor, and equipment/fuel as well as cost indices for different types of construction work.

The price indices are calculated based on data collected from designated sources and suppliers on a monthly basis, tracking the prices of 61 material items, 3 labor categories, and 3 equipment/fuel categories.

Ministry of Urban Development & Housing

State Ministry of Rural Housing and Construction & Building Materials Industries Promotion

C I D A
BULLETIN OF

CONSTRUCTION STATISTICS

Publication No : ID/05

Volume 31 No. 02
.

February - 2021

A PUBLICATION OF
CONSTRUCTION INDUSTRY DEVELOPMENT AUTHORITY
Savsiripaya, No. 123, Wijerama Mawatha, Colombo 07.
CIDA BULLETIN OF CONSTRUCTION STATISTICS

CONTENTS

Page No
Preambles 1

Notes to Tables 2 -7

TABLE 1 : Price Indices for Construction Materials 8– 21

TABLE 2 : Price Indices for Labor Wages 22

TABLE 3 : Price Indices for Dry Hire Rate for Plant and Equipment and Fuel 23

TABLE 4 : Cost Indices for Various Types of Construction and All Construction 24

TABLE 5 : Monthly Cost Indices for Various Types of Construction work 25

Variations in Price Indices 26 – 27


STATISTICS FOR THE NATIONAL CONSTRUCTION INDUSTRY OF SRI LANKA

1.1 PREAMBLE

The vision of CIDA is “To create a reliable and competent Construction Industry for Sri Lanka on par
with global standards”. As such providing information and statistics for the stakeholders of the industry
is a necessity for the sustenance of the industry and has National importance. CIDA introduced a
bulletin of Price and Cost Indices in the year 1990, capitalized it as the base year. Indices can be defined
as indicators of inflation in construction inputs such as materials, labour and fuel. Currently, Price
Indices of 61 items are published including 55 Materials (M indices), 03 Labour (L indices) and 03 Dry
Hire Rates for Plant & Equipment (P indices). Various Types of construction works are computed
quarterly including “All Housing” (average of Modern Housing and Semi-Permanent Housing), “Non-
Residential Building”, “All Civil Works” (average of Irrigation Major and Minor, Road Works, Water
Supply and Drainage and other Civil Works) and “All Construction” (average of main 03 types). Cost
Indices including Modern housing, Non-Residential Building and Water supply and Drainage are also
published using the monthly variables. Updated monthly with the details collected from designated
places and suppliers, and online data collection system has also been planned to be introduced soon.

Currently, the indices published in the Bulletin are applied in the Price Fluctuation formula in the
monthly Bill for making claims inappropriate manner as given in the section “Adjustments for Changes
in Costs” in the Standard Bidding Document published by CIDA. The Government has approved the
adoption of the formula method for the reimbursement of price escalation, following CIDA publication
No.ID/07, which is mandatory for the state sector construction projects, with effect from 1st January
1993. Base Index and the Current Index is the two vital parameters used in the Price Fluctuation The
formula as monthly variables.

1.2 SIGNIFICANT PRICE CHANGES OF THE CURRENT MONTH

FEBRUARY 2021

Compared with January 2021, the Indices of the following Materials have changed in February
2021 due to the reasons as described.

Construction costs have risen steadily over the past decade, as demand has grown and the prices of
building materials have increased. Growth of the construction projects of highways, roads and water
supply has induced the high demand for materials.

Therefore, the indices of M6-Rubble, M7-Metal, M48-Aggregate Base Course (ABC), and M52-
Quarry Dust have increased over 5% due to high demand.

Also, the high cost and scarcity of river sand are some of the main problem faced by the construction
industry today. Since quarry dust is used as a substitute to sand, the indices of quarry dust has increased.

The indices of M26 Electrical Wires have gone up due to the increase of LME copper price.

M15-GI sheet, M46- Zinc Aluminium sheets - Indices are still increasing due to the delays in import
consignments/shipments and Dollar fluctuations.

Page 1
NOTES TO TABLES
Source of information used for deriving of price indices given in Table 1 – 4 are
explained in pages from 02 to 07.

Table 1

1. M1 Cement – Local (Ex factory)


Based on the ex factory price of a 50kg bag (Puttalam)

2. M2 Cement - Imported
Based on the average price of a 50kg bag sold by public and private
importers

3. M3 Cement – Local ( Market Price)


Based on the average price of a 50kg bag sold by public and private
dealers

4. M4 Cement – Weighted Average


Based on the weighted average price of a 50kg bag calculated as per
consumption ratio of above categories (M1, M2 &M3).

5. M5 Cement Blocks
Based on the average price of a 400 x 200 x 100 mm (solid) size block
sold by public and private dealers.

6. M6 Rubble
Based on the average price of a cube (100 cubic feet) of 6” – 9” size
rubble delivered to site by private dealers.

7. M7 Metal
Based on the average price of a cube (100 cubic feet) of 20 mm size
aggregate delivered to site by private dealers.

8. M8 Sand
Based on the average price of a cube (100 cubic feet) of river sand
delivered to site by private dealers.

9. M9 Bricks – Hand Cut


Based on the average price of 1000 Nos of bricks delivered to site by
private dealers.

Page 2
10. M10 Bricks – Machine Cut
Based on the average price of 1000 Nos of bricks delivered to site by
private dealers.
11. M11 Calicut Tiles
Based on the average price of 1000 Nos of Calicut tiles (Grade 1)
delivered to site by private producers.

12. M12 Lime


Based on the average price of a metric ton of slaked lime sold by private
dealers.

13. M13 Reinforcement Steel


Based on the average price of a hundreds weight of 12mm diameter Tor
Steel bar sold by private dealers.

14. M14 Structural Steel


Based on the average price of a linear foot of 50 x 50 x 5 mm Angle Iron
sold by private dealers.

15. M15 GI Sheets


Based on the average price expressed in square foot rate of a Gauge 26
corrugated sheet 30” x 84” sold by private dealers.

16. M16 Asbestos Roofing Sheets


Based on the average price of a 10’ long corrugated sheet sold by
public and private dealers.
17. M17 Asbestos Ceiling Sheets
Based on the average price of a 4’ x 4’ plain sheet sold by public and
private dealers.

18. M18 Sanitary Ware (Local)


Based on the average total price of a white wash basin and a water closet
including accessories sold by private dealers.

19. M19 Sanitary Ware (Imported)


Based on the average price of an imported wash basin including
accessories sold by private dealers.

20. M20 PVC Pipes


Based on the average price of a linear meter of 20 mm diameter PVC
water pipe sold by private dealers.

21. M21 Formwork Timber


Based on the average price of a linear foot of Class 3, 1” thick, 6” wide
timber plank sold by private dealers.

Page 3
22. M22 General Timber
Based on the average price of a linear foot of Class 1 timber (100x75 mm
size) sold by private dealers.

23. M23 Timber Products


Based on the average price of a standard ordinary plywood door (11/4”
thick, 2’9” x 6’9”) sold by private dealers.

24. M24 Glass


Based on the average price of a square foot of 3mm plain glass sold by
private dealers.

25. M25 Door and Window Fittings


Based on the average price of a pair of 100x75 mm brass butt hinges sold
by public and private dealers.

26. M26 Electrical Wires


Based on the average price of a 100 meter wire coil (1/044) sold by
private dealers .

27. M27 Wall Paint


Based on the average price of a liter emulsion paint sold by private
dealers.

28. M28 Wood Paint


Based on the average price of a liter enamel paint sold by private dealers.

29. M29 Cadjan


Based on the price of 100 pairs obtained from the District Price Fixing
Committee, Colombo.
30. M30 Bitumen 80/100 (Drum Form)
Based on the price of a liter of Bitumen 80/100 (Drum form) sold by
Ceylon Petroleum Corporation.

30A. M30A Bitumen 80/100 (Bulk Form)


Based on the weighted average prices of a liter of Bitumen 80/100 (Bulk
form) sold by Ceylon Petroleum Corporation & price of a liter of
decanted Bitumen 80/100 sold by private dealers.

30B. M30B Bitumen 60/70 (Drum Form)


Based on the price of a liter of Bitumen 60/70 for (Drum Form) sold by
Ceylon Petroleum Corporation.

30C. M30C Bitumen 60/70 ( Bulk Form)


Based on the weighted average prices of a liter of Bitumen 60/70 (Bulk
Form) sold by Ceylon Petroleum Corporation & price of a liter of
decanted Bitumen 60/70 sold by private dealer.
Page 4
31. M31 Terrazzo
Based on the average price of a square foot of in-situ terrazzo (dark
colours) laid by contractors.

32. M32 Floor Tiles


Based on the price of a 300 mm x 300 mm homogeneous white floor tile
supplied by local manufacturer.

33. M33 Wall Tiles


Based on the price of a 300 mm x 300 mm white wall tiles manufactured
by local manufacturer.

34. M34 Granite Tiles


Based on the average price of a 300 mm x 300 mm tile sold by private
dealers.

35. M35 Colour Pigment


Based on the average price of a Kilogram of Red Cement (imported) sold
by private dealers.

36. M36 Aluminium Doors, Windows & Partitions


Based on the average price of a square foot of Aluminum door installed
by contractors.

37. M37 Aluminum Suspended Ceiling


Based on the average price of a square foot of Aluminum framed acoustic
paneling ceiling installed by contractors.

38. M38 Electrical Fittings


Based on the weighted average price of Ceiling Fan, Plug Base, Trip
Switch sold by private dealers.

39. M39 Ready Mixed Concrete


Based on the average price of a cubic meter of Grade 20 ready mixed
concrete sold by private dealers.

40. M40 High Tensile Steel Wire


Based on the average price of a metric ton of imported 5 mm diameter
high tensile steel wires.

41. M41 Pre-stressed Bridge Beams


Based on average price of a 40’0” long bridge beam manufactured by
SEC and SD & CC.

42. M42 Concrete Lamp Post (Pre-stressed)


Based on average price of a 30’ 0” long lamp post manufactured by SEC
and SD & CC.

Page 5
43. M43 Precast Concrete Components for Bridges , Roads and Building

Based on weighted average price of Fence Posts , Paving Slabs, Kerbs


Uprights , Handrails manufactured by SEC and SD & CC.

44. M44 Hume Pipes


Based on average price of a 3’ 0” diameter 8’ 0” long hume pipe
manufactured by SEC and SD & CC.

45. M45 Earth


Based on average price of a cube (100 cubic feet) of Type II earth
delivered to site by private supplier within 10 km distance.

46. M46 Zink Aluminum Sheets


Based on average price of a square foot of 0.47mm coloured roofing
sheets manufactured by private producer.

47 . M47 Ductile Iron Pipe


Based on average price of a meter of 80mm – 300mm diameter pipe
imported from different countries.

48 . M48 Aggregate Base Course (ABC)


Based on average price of a cube (100cu.m) of ABC delivered to site by
private dealers within 10km.

49 . M49 Chain Link


Based on average price of a linear foot of 4’0” high, Gauge 10 PVC
coated chain link (green) sold by private dealers.

50 . M50 Stainless Steel


Based on the average price of a linear foot of a 3 ft high standard hand
rail.

51 . M51 Cement Roof Tiles


Based on average price of a standard type roof tile supplied by private
dealers.

52 .M52 Quarry Dust


Based on the average price of a cube (100cubic feet) of quarry dust
supplied to the site by private dealers.

53 .M53 Gabion Box


Based on average price of a box made with 2.7mm diameter Zinc coated
and PVC coated wires (hexagonal type) supplied by private dealers.
Page 6
54 .M54 Geo-Textile
Based on average price of a square meter of 280 g/m2 (2.5mm gauge)
polypropylene Geo-textile sold by private dealers.

55 .M55 Road Marking Paint


Based on the average price of a kilogram of white and yellow colour
reflectorized thermoplastic Road Marking powder sold by private dealers.

Table 2
1. L1 Skilled Labour
Based on average daily wage rate paid to masons , carpenters,
plumbers, bar benders , electrician and plant operator by public and
private contractors.

2. L2 Semi – Skilled Labour


Based on average daily wage rate paid to mechanic helper by public
and private contractors.

3. L3 Unskilled Labour
Based on average daily wage rate paid to unskilled labourers by public
and private contractors.

Table 3
1. P1 Small Equipment
Based on average of percentage increased in daily dry hire rates of
Concrete mixer, Bob cat ,Air Compressor, Tractor with Trailer ,
Tractor with Bowser, Poker Vibrator, Generator, Water Pump, Boom
Truck, Small Truck, Double Drum Roller & Rammer.

2. P2 Heavy Equipment
Based on average of percentage increased in daily dry hire rates of
Front end loader, Motor grader, Backhoe loader, Vibratory roller,
Tipper, Water bowser, Crawler excavator, Crawler tractor, Mobile
crane, Crawler crane, Asphalt paver, Pneumatic tyred roller, Bitumen
distributer & Chip spreader.

3. P3 Fuel
Based on dealer’s price of a liter of auto diesel. (Information from
Ceylon petroleum Corporation)
Table 4 Cost indices of various types of construction work computed quarterly.

Table 5 Monthly cost indices of various type of construction work.

Page 7
TABLE 1 : PRICE INDICES FOR CONSTRUCTION MATERIALS

Base Year - 1990 (AVG)

M1 CEMENT - Local (Ex-factory Price )


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 93.4 93.4 93.4 93.4 93.4 93.4 93.4 103.7 103.7 103.7 117.6 117.6 100.0
1991 , 1992 . 1993 , ……………… , 2010, 2011,2012,2013,2014,2015,2016
2017 620.9 620.9 620.9 620.9 620.9 620.9 620.9 620.9 620.9 620.9 620.9 620.9 620.9
2018 620.9 620.9 640.9 640.9 640.9 640.9 640.9 640.9 640.9 640.9 657.6 657.6 640.3
2019 657.6 700.0 731.0 731.0 731.0 731.0 731.0 731.0 731.0 731.0 731.0 696.6 719.4
2020 696.6 696.6 696.6 696.6 696.6 696.6 696.6 696.6 696.6 696.6 696.6 696.6 696.6
2021 696.6 696.6

M2 CEMENT - Imported
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 91.3 91.3 88.2 90.0 94.9 100.2 100.7 103.3 118.8 113.4 104.3 103.6 100.0
1991 , 1992 . 1993 , ……………… ,2010, 2011,2012,2013,2014, 2015,2016
2017 479.8 479.8 479.8 479.8 479.8 479.8 479.8 479.8 479.8 479.8 479.8 479.8 479.8
2018 479.8 479.8 495.3 495.3 495.3 495.3 495.3 495.3 495.3 495.3 508.2 508.2 494.9
2019 508.2 541.0 565.0 565.0 565.0 565.0 565.0 565.0 565.0 565.0 565.0 548.0 556.8
2020 548.0 548.0 548.0 548.0 548.0 548.0 548.0 548.0 548.0 548.0 548.0 548.0 548.0
2021 548.0 548.0

M3 CEMENT - Local (Market Prices)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 93.2 93.2 88.8 93.2 93.2 87.7 98.7 104.2 120.6 115.1 106.9 105.3 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 492.1 492.1 492.1 492.1 492.1 492.1 492.1 492.1 492.1 492.1 492.1 492.1 492.1
2018 492.1 492.1 508.0 508.0 508.0 508.0 508.0 508.0 508.0 508.0 521.2 521.2 507.5
2019 521.2 554.8 579.4 579.4 579.4 579.4 579.4 579.4 579.4 579.4 579.4 568.0 571.5
2020 568.0 568.0 568.0 568.0 568.0 568.0 568.0 568.0 568.0 568.0 568.0 568.0 568.0
2021 568.0 568.0

M4 CEMENT - (Weighted Average Prices)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 92.1 92.1 89.4 91.4 94.2 96.1 98.7 103.6 116.0 111.7 107.7 106.9 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014 ,2015,2016
2017 512.2 512.2 512.2 512.2 512.2 512.2 512.2 512.2 512.2 512.2 512.2 512.2 512.2
2018 512.2 512.2 528.7 528.7 528.7 528.7 528.7 528.7 528.7 528.7 542.5 542.5 528.3
2019 542.5 577.5 603.1 603.1 603.1 603.1 603.1 603.1 603.1 603.1 603.1 581.8 594.1
2020 581.8 581.8 581.8 581.8 581.8 581.8 581.8 581.8 581.8 581.8 581.8 581.8 581.8
2021 581.8 581.8

Page 8
Table 1 Continues.....

Base Year - 1990 (AVG)

M5 CEMENT BLOCKS
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 96.0 99.2 99.2 96.0 96.0 96.0 97.9 97.9 97.7 100.0 112.4 111.9 100.0
1991 , 1992 . 1993 , ………………,2010 ,2011,2012,2013,2014 ,2015 ,2016
2017 632.3 632.3 632.3 632.3 632.3 632.3 643.4 643.4 643.4 643.4 643.4 643.4 637.8
2018 661.3 661.3 674.9 674.9 674.9 674.9 674.9 683.4 683.4 683.4 683.4 683.4 676.2
2019 683.4 683.4 683.4 683.4 683.4 683.4 683.4 683.4 683.4 683.4 683.4 683.4 683.4
2020 683.4 683.4 683.4 683.4 683.4 683.4 683.4 683.4 716.9 716.9 716.9 716.9 694.6
2021 716.9 716.9

M6 RUBBLE
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 94.3 95.4 96.1 98.5 99.0 99.2 99.2 100.9 101.1 103.6 104.5 108.1 100.0
1991 , 1992 . 1993 , ………………, 2010 ,2011,2012,2013,2014 ,2015,2016
2017 687.3 687.3 687.3 687.3 693.7 693.7 693.7 693.7 704.7 704.7 704.7 704.7 695.2
2018 720.8 720.8 720.8 720.8 733.0 733.0 751.7 751.7 751.7 751.7 751.7 751.7 738.3
2019 751.7 751.7 751.7 751.7 770.6 770.6 770.6 770.6 770.6 770.6 770.6 770.6 764.3
2020 770.6 770.6 770.6 770.6 746.7 746.7 746.7 746.7 746.7 746.7 746.7 746.7 754.6
2021 746.7 843.3

M7 METAL
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 97.7 99.0 97.7 101.9 96.9 94.4 99.5 100.8 101.7 101.1 103.0 106.3 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014 ,2015,2016
2017 378.2 378.2 378.2 378.2 382.0 382.0 382.0 382.0 388.0 388.0 388.0 388.0 382.7
2018 394.7 394.7 394.7 394.7 399.7 399.7 404.0 404.0 404.0 404.0 404.0 404.0 400.2
2019 404.0 404.0 404.0 404.0 410.3 410.3 410.3 410.3 410.3 410.3 410.3 410.3 408.2
2020 410.3 410.3 410.3 410.3 380.2 380.2 380.2 380.2 380.2 380.2 380.2 380.2 390.2
2021 380.2 405.2

M8 SAND `
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 96.5 96.5 94.8 96.5 93.1 93.1 100.3 100.3 104.7 102.5 107.9 113.8 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2015 ,2016
2017 3100.4 3135.5 3160.2 3160.2 3232.5 3275.8 3300.5 3340.9 3413.7 3437.4 3487.1 3502.4 3295.6
2018 3502.4 3502.4 3516.2 3516.2 3547.6 3552.6 3592.1 3592.1 3592.1 3612.8 3612.8 3612.8 3562.7
2019 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8 3612.8
2020 3612.8 3612.8 3454.0 3454.0 3454.0 3454.0 3454.0 3454.0 3511.1 3511.1 3511.1 3631.1 3509.5
2021 3631.1 3631.1

Page 9
Table 1 Continues.....

Base Year - 1990 (AVG)

M9 BRICKS (Hand Cut)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 90.1 92.2 103.5 102.4 102.4 100.3 101.3 101.1 101.4 102.9 100.5 101.8 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 1698.7 1698.7 1698.7 1698.7 1715.6 1715.6 1715.6 1730.0 1730.0 1751.2 1771.8 1771.8 1724.7
2018 1771.8 1771.8 1771.8 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1781.7
2019 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1785.0 1840.8 1840.8 1857.4 1800.3
2020 1857.4 1810.6 1810.6 1810.6 1810.6 1810.6 1810.6 1810.6 1810.6 1810.6 1810.6 1810.6 1814.5
2021 1810.6 1810.6

M10 BRICKS (Machine Cut)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 94.2 94.2 100.6 100.6 100.6 100.6 100.6 100.6 101.1 101.6 102.6 102.6 100.0
1991 , 1992 . 1993 , …………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 482.4 482.4 482.4 482.4 494.6 494.6 494.6 494.6 494.6 494.6 497.9 497.9 491.1
2018 497.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 536.4
2019 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 539.9 629.0 547.3
2020 629.0 629.0 629.0 629.0 629.0 629.0 629.0 629.0 629.0 629.0 629.0 629.0 629.0
2021 629.0 629.0

M11 CALICUT TILES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 89.2 89.2 103.0 103.0 103.5 99.0 103.5 102.8 98.1 101.1 105.3 102.2 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 813.2 813.2 813.2 813.2 852.8 852.8 852.8 852.8 852.8 852.8 875.3 875.3 843.4
2018 875.3 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 925.4
2019 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0 930.0
2020 930.0 930.0 930.0 930.0 976.5 976.5 976.5 976.5 976.5 976.5 976.5 976.5 961.0
2021 976.5 976.5

M12 LIME
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.1 95.1 95.1 95.1 95.1 95.1 95.1 95.1 119.9 99.6 100.8 119.1 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014 ,2015,2016
2017 512.9 512.9 512.9 518.2 518.2 518.2 518.2 518.2 531.9 531.9 531.9 531.9 521.4
2018 543.7 543.7 543.7 543.7 550.1 550.1 550.1 550.1 550.1 550.1 550.1 550.1 548.0
2019 550.1 550.1 550.1 550.1 550.1 577.1 577.1 577.1 577.1 577.1 577.1 577.1 565.9
2020 577.1 590.9 590.9 590.9 590.9 590.9 590.9 590.9 590.9 590.9 590.9 590.9 589.8
2021 590.9 590.9
Page 10
Base Year - 1990 (AVG)

M13 REINFORCEMENT STEEL `


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 99.4 99.4 99.4 99.4 99.4 99.4 98.4 99.4 97.8 103.4 101.9 102.8 100.0
1991 , 1992 . 1993 , …………… ,2010 ,2011,2012,2013,2014 ,2015,2016
2017 560.4 560.4 574.0 574.0 574.0 574.0 574.0 643.0 643.0 643.0 643.0 643.0 600.4
2018 643.0 643.0 643.0 643.0 643.0 643.0 643.0 643.0 652.2 710.6 710.6 714.8 607.4
2019 714.8 714.8 714.8 714.8 714.8 714.8 714.8 714.8 714.8 714.8 714.8 714.8 714.8
2020 714.8 714.8 714.8 714.8 714.8 783.1 783.1 783.1 783.1 783.1 783.1 787.4 755.0
2021 827.0 837.4
`
M14 STRUCTURAL STEEL
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 86.0 ` 94.6 94.6 100.4 98.5 98.5 98.5 98.5 110.2 116.9 117.4 100.0
1991 , 1992 . 1993 , …………… ,2010 ,2011,2012,2013,2014 ,2015 ,2016
2017 515.4 515.4 515.4 515.4 515.4 517.2 517.2 517.2 517.2 517.2 517.2 517.2 516.4
2018 520.0 520.0 520.0 520.0 520.0 520.0 520.0 520.0 520.0 520.0 520.0 520.0 520.0
2019 555.9 562.0 562.0 562.0 562.0 562.0 562.0 562.0 562.0 562.0 562.0 562.0 561.5
2020 562.0 562.0 562.0 562.0 562.0 584.5 584.5 584.5 584.5 584.5 584.5 584.5 575.1
2021 617.6 617.6

M15 GI SHEETS
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.3 94.3 98.3 99.8 99.8 99.8 99.8 99.3 99.9 101.5 104.9 107.2 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 512.6 512.6 512.6 512.6 512.6 512.6 535.2 535.2 535.2 535.2 535.2 535.2 523.9
2018 566.0 566.0 566.0 566.0 566.0 566.0 566.0 566.0 566.0 566.0 566.0 566.0 566.0
2019 566.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 578.9
2020 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 580.0 688.3 589.1
2021 718.7 790.3

M16 ASBESTOS ROOFING SHEETS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.6 95.6 95.6 95.6 95.6 95.6 95.7 95.7 108.0 108.4 109.1 109.7 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9
2018 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9 469.9 482.0 492.6 492.6 474.7
2019 492.6 495.4 495.4 495.4 495.4 495.4 495.4 495.4 512.9 512.9 512.9 512.9 501.0
2020 512.9 512.9 512.9 512.9 512.9 512.9 512.9 512.9 512.9 512.9 512.9 512.9 512.9
2021 512.9 512.9

Page 11
Table 1 Continues.....

Base Year - 1990 (AVG)

M17 ASBESTOS CEILING SHEETS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.5 95.5 95.5 95.5 95.5 95.5 95.5 95.5 107.2 109.0 108.7 111.4 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8
2018 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8 452.8 456.6 459.8 459.8 454.3
2019 459.8 459.8 459.8 459.8 459.8 459.8 459.8 459.8 460.6 460.6 460.6 460.6 460.1
2020 460.6 460.6 460.6 460.6 460.6 460.6 460.6 460.6 460.6 460.6 460.6 460.6 460.6
2021 460.6 460.6

M18 SANITARY WARE (Local)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 97.4 97.4 97.4 98.5 97.4 98.5 95.2 87.5 101.9 98.2 109.6 121.4 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014 ,2015 ,2016
2017 369.3 369.3 369.3 369.3 372.8 372.8 372.8 372.8 372.8 372.8 372.8 372.8 335.6
2018 372.8 372.8 372.8 372.8 372.8 372.8 372.8 372.8 372.8 372.8 372.8 372.8 335.6
2019 372.8 372.8 372.8 372.8 372.8 372.8 391.5 391.5 391.5 391.5 391.5 391.5 382.2
2020 391.5 391.5 391.5 391.5 391.5 391.5 409.7 409.7 409.7 409.7 409.7 409.7 400.6
2021 409.7 409.7

M19 SANITARY WARE (Imported)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.3 103.6 98.2 102.9 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 569.1 569.1 569.1 569.1 569.1 569.1 590.6 590.6 590.6 590.6 590.6 590.6 579.8
2018 590.6 614.5 614.5 614.5 614.5 614.5 614.5 614.5 614.5 614.5 614.5 614.5 612.5
2019 614.5 614.5 614.5 614.5 614.5 614.5 625.5 625.5 625.5 625.5 625.5 625.5 620.0
2020 625.5 625.5 625.5 625.5 625.5 638.0 638.0 638.0 638.0 638.0 638.0 638.0 632.8
2021 638.0 638.0

M20 PVC PIPES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.6 99.4 97.6 99.7 98.5 91.8 100.9 100.8 105.1 102.0 100.7 108.1 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2016
2017 811.5 811.5 811.5 811.5 811.5 811.5 811.5 811.5 811.5 811.5 811.5 811.5 811.5
2018 836.8 836.8 836.8 836.8 859.7 859.7 859.7 859.7 859.7 859.7 859.7 859.7 852.1
2019 859.7 915.7 893.7 893.7 893.7 893.7 893.7 933.2 933.2 933.2 933.2 859.0 903.0
2020 859.0 859.0 859.0 859.0 859.0 859.0 859.0 859.0 859.0 859.0 859.0 1017.4 872.2
2021 1017.4 1017.4

Page 12
Table 1 Continues.....

Base Year - 1990 (AVG)

M21 FORMWORK TIMBER


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 83.6 83.6 83.6 83.6 83.6 83.6 83.6 121.2 121.2 123.6 124.4 124.4 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014 ,2015,2016
2017 996.3 996.3 996.3 996.3 996.3 996.3 1025.3 1025.3 1025.3 1025.3 1025.3 1046.3 1012.5
2018 1046.3 1046.3 1046.3 1046.3 1046.3 1046.3 1046.3 1084.2 1084.2 1084.2 1084.2 1084.2 1062.1
2019 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2 1084.2
2020 1084.2 1084.2 1084.2 1084.2 1084.2 1145.1 1145.1 1145.1 1145.1 1145.1 1145.1 1145.1 1119.7
2021 1145.1 1145.1

Note : Unit conversion printing error for Indices of Form work timber in February 1731.0 shall read as 1084.2

M22 GENERAL TIMBER


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 77.3 77.3 77.3 77.3 77.3 113.4 114.4 114.4 114.5 117.5 117.2 122.2 100.0
1991 , 1992 . 1993 , ………………,2010 ,2011,2012,2013,2014 ,2015,2016
2017 1047.4 1047.4 1063.0 1063.0 1063.0 1095.2 1095.2 1095.2 1095.2 1095.2 1104.1 1104.1 1080.7
2018 1104.1 1104.1 1104.1 1104.1 1104.1 1104.1 1104.1 1108.6 1108.6 1108.6 1108.6 1108.6 1106.0
2019 1108.6 1337.1 1337.1 1337.1 1337.1 1352.0 1352.0 1352.0 1352.0 1352.0 1352.0 1352.0 1326.8
2020 1352.0 1352.0 1352.0 1352.0 1352.0 1419.6 1419.6 1419.6 1419.6 1419.6 1419.6 1419.6 1391.4
2021 1419.6 1419.6

M23 TIMBER PRODUCTS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.0 95.0 95.0 95.0 95.0 103.6 103.6 103.6 103.6 103.6 103.6 103.6 100.0
1991 , 1992 . 1993 , ……………… ,2011,2012,2013,2014 ,2015,2016
2017 546.2 546.2 546.2 546.2 546.2 562.4 562.4 562.4 562.4 562.4 562.4 589.9 558.0
2018 589.9 589.9 589.9 589.9 589.9 589.9 589.9 589.9 589.9 589.9 589.9 589.9 589.9
2019 589.9 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 600.1
2020 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0 601.0
2021 601.0 601.0

M24 GLASS
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 98.3 98.3 99.2 99.2 97.4 95.6 96.5 97.2 107.5 102.2 104.0 104.4 100.0
1991 , 1992 . 1993 , ………………,2011,2012,2013,2014 ,2015,2016
2017 366.5 366.5 366.5 366.5 366.5 366.5 369.1 369.1 369.1 369.1 369.1 369.1 367.8
2018 369.1 369.1 379.8 379.8 379.8 379.8 379.8 379.8 379.8 379.8 379.8 379.8 378.0
2019 379.8 397.6 397.6 411.9 411.9 431.4 431.4 431.4 431.4 431.4 431.4 431.4 418.2
2020 431.4 431.4 431.4 431.4 431.4 431.4 431.4 457.8 457.8 457.8 457.8 457.8 442.4
2021 457.8 457.8

Page 13
Table 1 Continues.....

Base Year- 1990 (AVG)

M25 DOOR & WINDOW FITTINGS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 84.0 90.3 103.9 103.9 103.9 103.9 103.9 103.9 103.0 99.8 99.8 99.8 100.0
1991 , 1992 . 1993 , ………………,2010 ,2011,2012,2013,2014 ,2015,2016
2017 1032.8 1032.8 1032.8 1032.8 1032.8 1032.8 1032.8 1032.8 1051.7 1051.7 1051.7 1051.7 1039.1
2018 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7
2019 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7
2020 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7 1051.7
2021 1051.7 1051.7

M26 ELECTRICAL WIRES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 96.8 96.1 97.1 97.8 99.0 99.0 100.9 101.0 106.5 101.4 102.6 101.8 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 453.8 453.8 453.8 453.8 453.8 453.8 453.8 453.8 453.8 453.8 453.8 453.8 453.8
2018 453.8 478.6 478.6 478.6 478.6 478.6 478.6 511.5 511.5 511.5 511.5 511.5 490.2
2019 511.5 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 529.7
2020 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 531.3 585.8 535.9
2021 594.9 658.9

M27 WALL PAINT


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 85.4 85.4 85.4 91.5 94.5 98.4 104.3 104.4 111.0 111.0 114.2 114.8 100.0
1991 , 1992 . 1993 , ………………,2010 ,2011,2012,2013,2014,2015,2016
2017 721.9 721.9 721.9 721.9 721.9 721.9 721.9 721.9 721.9 721.9 779.3 779.3 731.4
2018 779.3 779.3 779.3 779.3 779.3 779.3 779.3 779.3 779.3 779.3 779.3 779.3 779.3
2019 779.3 901.2 901.2 901.2 901.2 907.0 907.0 907.0 907.0 928.4 928.4 928.4 899.7
2020 928.4 928.4 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1021.8 1006.3
2021 1021.8 1021.8

M28 WOOD PAINT


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 85.4 85.4 85.4 91.5 94.5 98.4 104.3 104.4 111.0 111.0 114.2 114.8 100.0
1991 , 1992 . 1993 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 711.8 711.8 711.8 711.8 711.8 711.8 711.8 711.8 711.8 711.8 744.6 744.6 717.2
2018 744.6 744.6 744.6 744.6 744.6 744.6 744.6 744.6 744.6 744.6 744.6 744.6 744.6
2019 744.6 783.1 783.1 783.1 783.1 791.4 791.4 791.4 791.4 802.3 802.3 802.3 787.4
2020 802.3 802.3 802.3 802.3 802.3 802.3 802.3 802.3 802.3 802.3 802.3 802.3 802.3
2021 802.3 802.3

Page 14
Base Year - 1990(AVG)
M29 CADJAN
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 83.5 85.3 85.3 81.7 81.7 82.6 88.8 88.0 123.3 134.6 133.3 131.9 100.0
1991 , 1992 . 1993 , ………………,2010 ,2011,2012,2013,2014,2015,2016
2017 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1
2018 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1
2019 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1
2020 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1 1066.1
2021 1066.1 1066.1

M30 BITUMEN 80/100 ( Drum Form)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 92.0 92.0 92.0 92.0 92.0 92.0 92.0 105.6 105.6 105.6 119.7 119.7 100.0
1991 , 1992 . 1993 , …………… ,2010,2011,2012,2013,2014,2015,2016
2017 598.6 598.6 598.6 598.6 598.6 598.6 598.6 598.6 598.6 598.6 598.6 598.6 598.6
2018 598.6 598.6 598.6 598.6 598.6 598.6 598.6 598.6 775.2 907.0 936.1 936.1 695.3
2019 936.1 956.6 956.6 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1 939.5
2020 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1 936.1
2021 936.1 936.1

Base Month - January 2001


M30A BITUMEN 80/100 ( Bulk Form)
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2001 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2002 , 2003 , ……. ,2010,2011,2012,2013,2014 ,2015,2016
2017 386.2 386.2 386.2 386.2 386.2 386.2 386.2 386.2 386.2 386.2 386.2 386.2 386.2
2018 386.2 386.2 386.2 386.2 386.2 386.2 386.2 386.2 391.1 408.5 414.7 414.7 393.2
2019 414.7 410.1 410.1 407.6 407.6 395.2 395.2 395.2 395.2 397.4 397.4 397.4 401.9
2020 397.4 397.4 374.8 362.4 362.4 362.4 328.0 328.0 328.0 328.0 328.0 357.0 354.5
2021 399.7 473.5

Base Month - January 2001


M30B BITUMEN 60/70 ( Drum Form)
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2001 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2002 , 2003 , ……. ,2010,2011,2012,2013,2014,2015,2016
2017 225.2 225.2 225.2 225.2 225.2 225.2 225.2 252.3 252.3 252.3 252.3 252.3 236.5
2018 252.3 252.3 252.3 252.3 252.3 252.3 297.3 297.3 320.8 375.4 387.4 387.4 298.3
2019 387.4 395.9 395.9 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4 388.8
2020 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4 387.4
2021 387.4 387.4

Base Month -January 2001


M30C BITUMEN 60/70 ( Bulk Form)
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2001 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2002 , 2003 , ……. ,2010,2011,2012,2013,2014,2015,2016
2017 353.5 353.5 353.5 353.5 353.5 353.5 353.5 353.5 353.5 353.5 353.5 353.5 353.5
2018 378.8 378.8 378.8 378.8 378.8 378.8 378.8 378.8 382.8 399.3 405.3 405.3 385.3
2019 405.3 429.3 429.3 398.7 398.7 377.3 377.3 377.3 377.3 379.3 379.3 379.3 392.4
2020 379.3 379.3 357.7 346.0 346.0 346.0 313.1 313.1 313.1 313.1 313.1 340.8 338.4
2021 381.5 452.0
Note : Indices of M30A, M30B, & M30C were introduced from October 2006 and back dated to January 2001.
Weighted average price has been used for 30A &M30C from September 2007 .

Page 15
Table 1 Continues.....

Base Month - April 1993

M31 TERRAZZO
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 99.3 113.3 113.3 113.3 117.3 120.6 120.6 120.6 113.1
1994 , 1995 ,1996 ……………… ,2010 ,2011,2012,2013,2014 ,2015,2016
2016 807.4 842.6 842.6 842.6 842.6 877.7 877.7 877.7 877.7 877.7 877.7 877.7 860.1
2017 877.7 891.5 891.5 891.5 891.5 891.5 891.5 891.5 950.8 950.8 950.8 950.8 910.1
2018 950.8 950.8 987.8 987.8 987.8 987.8 987.8 987.8 987.8 987.8 987.8 987.8 981.6
2019 987.8 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.6
2020 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9 991.9
2021 991.9 991.9

M32 FLOOR TILES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 109.8 109.8 109.8 109.8 109.8 109.8 106.5
1994 , 1995,1996 ………………,2010 ,2011,2012,2013,2014,2015,2016
2017 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1
2018 251.1 251.1 251.1 251.1 255.1 255.1 255.1 255.1 255.1 255.1 255.1 255.1 253.8
2019 255.1 255.1 255.1 255.1 255.1 255.1 259.5 259.5 259.5 259.5 259.5 259.5 257.3
2020 259.5 259.5 259.5 259.5 259.5 259.5 259.5 259.5 259.5 259.5 259.5 259.5 259.5
2021 259.5 259.5

M33 WALL TILES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
1994 , 1995 ,1996 ……………. ,2010 ,2011,2012,2013,2014 ,2015,2016
2017 944.8 944.8 944.8 944.8 944.8 944.8 944.8 944.8 944.8 944.8 944.8 944.8 944.8
2018 944.8 944.8 944.8 944.8 961.4 961.4 961.4 961.4 961.4 961.4 961.4 961.4 955.9
2019 961.4 1246.2 1246.2 1246.2 1246.2 1246.2 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1235.9
2020 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1 1273.1
2021 1273.1 1273.1

M34 GRANITE TILES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.8 101.3 101.8 102.4 100.3 100.3 100.3 100.8 100.9
1994 , 1995 . 1996 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 629.9 629.9 629.9 629.9 629.9 629.9 629.9 629.9 629.9 661.2 661.2 661.2 637.7
2018 661.2 661.2 661.2 661.2 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 684.0
2019 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4
2020 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4 695.4
2021 695.4 695.4

Page 16
Table 1 Continues.....

Base Month - Aprill 1993

M35 COLOUR PIGMENT


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 97.7 109.9 110.6 105.3 105.3 106.8 108.3 104.9
1994 , 1995 . 1996 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 330.4 330.4 330.4 330.4 330.4 330.4 330.4 330.4 330.4 330.4 330.4 330.4 330.4
2018 330.4 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 346.3
2019 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8
2020 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8 347.8
2021 347.8 347.8

M36 ALUMINIUM DOORS WINDOWS & PARTITIONS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.1 100.1 100.0
1994 , 1995 . 1996 , ……………… ,2010 ,2011,2012,2013,2014,2015,2016
2017 676.1 696.9 696.9 696.9 696.9 696.9 696.9 696.9 696.9 696.9 696.9 696.9 695.1
2018 721.9 721.9 721.9 721.9 721.9 721.9 721.9 749.2 749.2 749.2 749.2 749.2 733.3
2019 749.2 749.2 749.2 749.2 749.2 749.2 780.1 780.1 780.1 780.1 780.1 780.1 764.7
2020 780.1 780.1 780.1 780.1 780.1 858.1 858.1 858.1 858.1 858.1 858.1 858.1 825.6
2021 858.1 858.1

M37 ALUMINIUM SUSPENDED CEILING


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
1994 , 1995 . 1996 , ……………… ,2010,2011,2012,2013,2014 ,2015,2016
2017 507.4 530.9 530.9 530.9 530.9 530.9 530.9 530.9 530.9 530.9 530.9 530.9 529.0
2018 558.2 558.2 558.2 558.2 558.2 558.2 558.2 579.2 579.2 579.2 579.2 579.2 566.9
2019 579.2 579.2 579.2 579.2 579.2 579.2 652.9 652.9 652.9 652.9 652.9 652.9 616.1
2020 652.9 652.9 652.9 652.9 652.9 718.2 718.2 718.2 718.2 718.2 718.2 718.2 691.0
2021 718.2 718.2

M38 ELECTRICAL FITTINGS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.5 103.4 104.5 103.3 103.3 103.4 103.4 102.3
1994 , 1995 . 1996 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 231.2 231.2 242.7 242.7 242.7 242.7 242.7 242.7 242.7 242.7 242.7 242.7 240.8
2018 242.7 244.7 244.7 244.7 244.7 244.7 244.7 244.7 244.7 244.7 244.7 244.7 244.5
2019 244.7 244.7 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 251.1 250.1
2020 251.1 251.1 251.1 251.1 263.7 263.7 263.7 263.7 263.7 263.7 263.7 263.7 259.5
2021 263.7 263.7

Page 17
Table 1 Continues.....

Base Month - April 1993

M39 READY MIXED CONCRETE


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.5 102.6 102.6 108.4 108.4 111.0 108.4 108.4 105.6
1994 , 1995 . 1996 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 437.3 437.3 440.0 440.0 440.0 440.0 440.0 440.0 440.0 440.0 440.0 440.0 439.6
2018 440.6 440.6 440.6 440.6 440.6 440.6 443.3 446.6 446.6 446.6 446.6 446.6 443.3
2019 446.6 461.3 461.3 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9 462.7
2020 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9 464.9
2021 464.9 464.9

M40 HIGH TENSILE STEEL WIRE


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 100.0 100.0 105.1 105.1 105.1 101.7
1994 , 1995 . 1996 , ………………,2010,2011,2012,2013,2014,2015,2016
2016 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4
2017 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4
2018 632.4 632.4 632.4 632.4 632.4 632.4 632.4 632.4 651.8 651.8 651.8 651.8 638.8
2019 651.8 855.1 855.1 855.1 855.1 855.1 855.1 855.1 855.1 855.1 855.1 844.5 837.3
2020 844.5 844.5 844.5 844.5 844.5 869.8 893.5 908.0 911.5 911.5 911.5 911.5 878.3
2021 911.5 911.5

M41 PRE-STRESSED BRIDGE BEAMS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 105.3 105.3 105.3 105.3 105.3 105.3 103.6
1994 , 1995 . 1996 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 967.1 967.1 967.1 967.1 967.1 967.1 967.1 967.1 967.1 967.1 967.1 967.1 967.1
2018 967.1 967.1 967.1 967.1 967.1 967.1 967.1 967.1 983.1 983.1 983.1 983.1 972.4
2019 983.1 1226.6 1226.6 1226.6 1226.6 1226.6 1226.6 1226.6 1226.6 1226.6 1226.6 1202.5 1204.3
2020 1202.5 1202.5 1202.5 1202.5 1202.5 1233.5 1262.6 1270.9 1272.8 1272.8 1272.8 1272.8 1239.2
2021 1272.8 1272.8

M42 CONCRETE LAMP POST (Pre-Stressed)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 101.7 101.7 101.7 101.7 101.7 100.9
1994 , 1995 . 1996 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 733.5 733.5 733.5 733.5 733.5 733.5 733.5 733.5 733.5 733.5 733.5 733.5 733.5
2018 733.5 733.5 733.5 733.5 733.5 733.5 733.5 733.5 805.0 805.0 805.0 805.0 757.3
2019 805.0 953.2 953.2 953.2 953.2 953.2 953.2 953.2 953.2 953.2 953.2 934.5 939.3
2020 934.5 934.5 934.5 934.5 934.5 954.1 972.4 980.1 981.9 981.9 981.9 981.9 958.9
2021 981.9 981.9
Note : M40 ,M41 & M42 of July 2020 publications are incorrect,So please use the correct table here

Page 18
Table 1 Continues..…

Base Month - April 1993

M43 PRECAST CONCRETE COMPONENTS FOR BRIDGES,ROADS & BUILDING


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 108.7 108.7 108.7 108.7 108.7 108.7 105.8
1994 , 1995 . 1996 , …………… ,2010 ,2011,2012,2013,2014,2015,2016
2016 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4
2017 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4
2018 498.4 498.4 498.4 498.4 498.4 498.4 498.4 498.4 511.8 511.8 511.8 511.8 502.9
2019 511.8 504.7 504.7 504.7 504.7 504.7 504.7 504.7 504.7 504.7 504.7 501.4 505.0
2020 501.4 501.4 501.4 501.4 501.4 522.4 542.1 544.3 544.9 544.9 544.9 544.9 524.6
2021 544.9 544.9

M44 HUME PIPES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1993 ~~~ ~~~ ~~~ 100.0 100.0 100.0 104.3 104.3 104.3 104.3 104.3 104.3 102.9
1994 , 1995 . 1996 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 590.4 590.4 590.4 590.4 590.4 590.4 590.4 590.4 590.4 590.4 590.4 590.4 590.4
2018 590.4 590.4 590.4 590.4 590.4 590.4 590.4 590.4 596.8 596.8 596.8 596.8 592.5
2019 596.8 596.8 596.8 596.8 596.8 596.8 596.8 596.8 596.8 596.8 596.8 585.0 595.8
2020 585.0 585.0 585.0 585.0 585.0 608.0 629.5 642.3 645.4 645.4 645.4 645.4 615.5
2021 645.4 645.4

Base Month - January 1996

M45 EARTH
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1996 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 106.7 106.7 101.1
1997 , 1998 ,1999, ....... ,2010,2011,2012,2013,2014 ,2015,2016
2017 1042.7 1042.7 1042.7 1042.7 1109.3 1109.3 1109.3 1138.7 1138.7 1160.0 1160.0 1160.0 1104.7
2018 1160.0 1173.3 1173.3 1173.3 1200.0 1200.0 1235.2 1235.2 1235.2 1259.2 1259.2 1286.9 1215.9
2019 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9
2020 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1286.9 1333.3 1333.3 1333.3 1333.3 1302.4
2021 1333.3 1333.3

Base Month - January 2001

M46 ZINK ALUMINIUM SHEETS


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2001 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 102.6 102.6 102.6 100.7
2002,2003,2004, ....…,2010,2011,2012,2013,2014,2015,2016
2017 174.2 180.0 180.0 180.0 180.0 180.0 187.3 187.3 187.3 187.3 187.3 187.3 183.2
2018 190.2 190.2 190.2 190.2 190.2 190.2 190.2 194.8 194.8 194.8 194.8 194.8 192.1
2019 194.8 181.1 181.1 186.5 186.5 186.5 186.5 186.5 186.5 186.5 186.5 186.5 186.3
2020 186.5 186.5 186.5 186.5 190.0 190.0 190.0 190.0 190.0 190.0 190.0 190.0 188.9
2021 202.8 212.9

Page 19
Table 1 Continues..…

Base Month- May 2006

M47 DUCTILE IRON PIPE


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2006 ~~~ ~~~ ~~~ ~~~ 100.0 101.0 101.1 101.1 101.1 107.9 110.1 110.3 104.1
2007, 2008,…. ,2010,2011,2012,2013,2014,2015,2016
2017 235.8 235.8 235.8 235.8 235.8 235.8 241.4 241.4 241.4 241.4 241.4 241.4 238.6
2018 241.4 241.4 241.4 241.4 241.4 241.4 241.4 241.4 241.4 271.7 271.7 271.7 249.0
2019 271.7 271.7 271.7 271.7 271.7 271.7 271.7 271.7 271.7 271.7 271.7 289.3 273.1
2020 309.1 309.1 309.1 309.1 309.1 316.7 316.7 316.7 316.7 316.7 316.7 316.7 313.5
2021 316.7 316.7

Base Month- January 2000

M48 AGGREGATE BASE COURSE (ABC)


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2000 77.5 77.6 78.0 78.2 78.4 78.3 78.5 78.5 78.6 78.3 78.6 78.9 80.2
2001 ,2002 …… ...... ,2010,2011,2012,2013,2014,2015 ,2016
2017 190.2 190.2 190.2 190.2 193.4 193.4 193.4 193.4 195.7 195.7 195.7 195.7 193.1
2018 199.0 199.0 199.0 199.0 200.9 200.9 200.9 200.9 200.9 200.9 200.9 200.9 200.3
2019 200.9 200.9 231.4 231.4 231.4 231.4 231.4 231.4 231.4 231.4 231.4 231.4 226.3
2020 231.4 231.4 231.4 231.4 219.9 219.9 219.9 219.9 219.9 219.9 219.9 219.9 223.7
2021 219.9 241.2
Base Month - April 2007

M49 CHAIN LINK


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2007 ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 100.0 109.5 109.7 110.6 111.3 104.6
2008, 2009, 2010,2011 ,2012,2013,2014,2015,2016
2017 239.0 239.0 239.0 239.0 239.0 240.9 240.9 240.9 240.9 240.9 240.9 240.9 240.1
2018 240.9 240.9 242.5 242.5 242.5 242.5 242.5 242.5 242.5 242.5 242.5 242.5 242.2
2019 242.5 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 267.0
2020 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2 269.2
2021 299.9 299.9

Base Month - September 2007

M50 STAINLESS STEEL


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2007 ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 100.0
2008 ,2009 ,2010,2011,2012,2013,2014,2015,2016
2017 172.9 172.9 172.9 172.9 172.9 172.9 172.9 172.9 172.9 172.9 172.9 178.5 173.4
2018 178.5 178.5 178.5 178.5 178.5 178.5 178.5 178.5 178.5 178.5 178.5 178.5 178.5
2019 178.5 178.5 178.5 178.5 178.5 178.5 178.5 187.0 187.0 187.0 187.0 187.0 182.0
2020 187.0 187.0 187.0 187.0 187.0 189.2 189.2 189.2 189.2 189.2 189.2 189.2 188.3
2021 189.2 189.2

Base Month - June 2007

M51 CEMENT ROOF TILES


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2007 ~~~ ~~~ ~~~ ~~~ ~~~ 100.0 100.0 100.0 100.0 100.0 100.0 106.9 101.0
2008 , 2009 ,2010,2011,2012,2013,2014,2015,2016
2017 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7
2018 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7 148.7
2019 148.7 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 159.6
2020 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6 160.6
2021 160.6 160.6
Page 20
Table 1 Continues..…

Base Month- January 2009

M52 QUARRY DUST


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2009 100.0 101.2 101.2 101.2 102.0 102.4 104.1 105.7 105.7 106.1 106.9 106.9 103.6
2010, 2011,2012,2013,2014,2015,2016
2017 163.3 163.3 163.3 163.3 166.1 166.1 166.1 166.1 168.6 168.6 168.6 168.6 166.0
2018 171.4 171.4 171.4 171.4 172.7 172.7 177.1 177.1 177.1 177.1 177.1 177.1 174.5
2019 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1
2020 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1 177.1
2021 177.1 193.5

Base Month - May 2011

M53 GABION BOX


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2011 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2010, 2011,2012,2013,2014,2015,2016
2017 103.7 103.7 103.7 103.7 103.7 103.7 103.7 103.7 103.7 103.7 103.7 103.7 103.7
2018 103.7 107.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 112.2
2019 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5 113.5
2020 113.5 113.5 113.5 113.5 126.1 126.1 126.1 126.1 126.1 126.1 126.1 126.1 121.9
2021 131.3 131.3

Note : Indices of M53-Gabion Box are introduced in October 2011 and back dated to May 2011.

Base Month - January 2012

M54 GEO TEXTILE


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2011 ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~ ~~~
2011, 2012,2013,2014 ,2015,2016
2017 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2018 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2019 110.6 117.5 117.5 117.5 117.5 117.5 117.5 117.5 117.5 117.5 117.5 117.5 116.9
2020 117.5 117.5 117.5 117.5 117.5 117.5 117.5 117.5 117.5 117.5 127.0 127.0 119.0
2021 127.0 127.0

Note : Indices of M54-Geo Textile are introduced in October 2011 and back dated to May 2011.

Base Month - January 2014

M55 ROAD MARKING PAINT


YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
2015 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2017 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
2018 100.0 100.0 100.0 100.0 100.0 100.0 121.5 121.5 121.5 121.5 121.5 121.5 110.8
2019 121.5 122.5 122.5 122.5 122.5 122.5 122.5 122.5 122.5 122.5 122.5 122.5 122.4
2020 121.5 121.5 121.5 121.5 121.5 121.5 121.5 121.5 121.5 121.5 121.5 121.5 121.5
2021 121.5 121.5
Page 21
TABLE 2 : PRICE INDICES FOR LABOUR WAGES

Base Year - 1990 (AVG)

L1 SKILLED LABOUR
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 96.0 96.0 96.0 96.0 96.0 96.0 103.0 103.0 103.0 105.0 105.0 105.0 100.0
1991 , 1992 . 1993 , ………………,2010,2011,2012,2013,2014,2015,2016
2017 502.6 502.6 505.2 505.2 505.2 505.2 505.2 505.2 505.2 505.2 505.2 505.2 504.8
2018 505.2 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.0
2019 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 511.5 560.3 515.6
2020 560.3 560.3 560.3 560.3 560.3 560.3 560.3 560.3 560.3 560.3 560.3 560.3 560.3
2021 560.3 560.3

L2 SEMISKILLED LABOUR
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
1991 , 1992 . 1993 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8
2018 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8
2019 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 528.8 608.0 535.4
2020 608.0 608.0 608.0 608.0 608.0 608.0 608.0 608.0 608.0 608.0 608.0 608.0 608.0
2021 608.0 608.0

L3 UNSKILLED LABOUR
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 95.7 95.7 95.7 95.7 95.7 95.7 103.1 103.1 103.1 103.1 103.1 110.4 100.0
1991 , 1992 . 1993 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 572.4 572.4 598.5 598.5 598.5 598.5 598.5 598.5 598.5 598.5 598.5 598.5 594.1
2018 598.5 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 610.5
2019 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 611.6 690.8 618.2
2020 690.8 690.8 690.8 690.8 690.8 690.8 690.8 690.8 690.8 690.8 690.8 690.8 690.8
2021 690.8 690.8

Page 22
TABLE 3: PRICE INDICES FOR DRY HIRE RATES FOR PLANTS AND EQUIPMENTS

Base Year - 1990 (AVG)

P1 SMALL EQUIPMENT
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
1991 , 1992 . 1993 , ……………… ,2010,2011,2012,2013,2014,2015,2016
2017 400.8 400.8 400.8 445.0 445.0 445.0 445.0 445.0 445.0 445.0 445.0 445.0 433.9
2018 445.0 445.0 445.0 445.0 445.0 445.0 445.0 445.0 445.0 471.2 471.2 471.2 451.5
2019 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2
2020 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2 471.2
2021 471.2 471.2

P2 HEAVY EQUIPMENT
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0
1991 , 1992 . 1993 , …………… ,2011,2012,2013,2014,2015,2016
2017 346.4 346.4 346.4 375.0 375.0 375.0 375.0 375.0 375.0 375.0 375.0 375.0 367.8
2018 375.0 375.0 375.0 375.0 375.0 375.0 375.0 375.0 375.0 398.3 398.3 398.3 380.8
2019 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3
2020 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3 398.3
2021 398.3 398.3

P3 FUEL
YEAR JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC AVG
1990 93.8 93.8 93.8 93.8 93.8 93.8 93.8 93.8 107.5 107.5 107.5 127.0 100.0
,20161991 , 1992 . 1993 , ……………… ,2010,2011,2012,2013,2014,2015
2017 928.3 928.3 928.3 928.3 928.3 928.3 928.3 928.3 928.3 928.3 928.3 928.3 928.3
2018 928.3 928.3 928.9 930.8 1021.8 1065.1 1128.2 1153.1 1177.5 1203.4 1166.1 1037.5 1055.8
2019 977.5 991.2 1015.0 1020.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1012.1
2020 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7 1017.7
2021 1017.7 1017.7

Page 23
TABLE 4 :COST INDICES OF VARIOUS TYPES OF CONSTRUCTION WORK COMPUTED QUARTERLY
MODERN SEMI PERMENANT ALL NON RESIDENTIAL IRRIGATION IRRIGATION ROAD WATER OTHER CIVIL ALL ALL
YEAR QUARTER HOUSING HOUSING HOUSING BUILDING Major Minor WORKS SUPPLY & WORKS CIVIL CONSTRUCTION
DRAINAGE WORKS
1990 Third Quarter 103.3 104.4 103.4 102.5 101.5 102.0 101.8 101.5 101.5 101.6 102.5
1990 Fourth Quarter 107.2 109.4 107.3 107.1 103.6 105.0 105.5 107.7 106.3 106.0 106.8
,1991,1992,1993,1994,1995,1996,1997,1998,1999,2000,2001,2002,2003,2004,2005,2006,2007,2008,2009,2010
2011 First Quarter 501.8 738.0 516.5 482.2 361.0 405.9 404.3 487.2 494.9 442.9 481.7
2011 Second Quarter 508.7 762.5 524.5 489.5 362.9 408.7 408.0 491.2 500.8 447.1 488.1
2011 Third Quarter 514.3 780.5 530.8 493.8 363.9 409.9 410.9 491.8 506.1 450.0 492.7
2011 Fourth Quarter 524.1 796.7 541.0 502.2 368.7 416.1 418.3 495.0 514.9 456.6 501.1
2012 First Quarter 547.6 826.9 564.9 527.2 390.6 444.1 444.3 509.5 538.2 479.1 524.7
2012 Second Quarter 569.9 850.2 587.2 550.3 403.8 459.6 463.4 562.9 560.0 505.0 548.6
2012 Third Quarter 583.9 861.4 601.1 561.4 406.7 461.8 466.2 588.3 566.6 513.5 559.9
2012 Fourth Quarter 601.6 871.0 618.3 573.9 412.4 466.6 469.5 570.0 577.9 515.2 570.2
2013 First Quarter 616.4 899.5 633.9 587.2 421.3 480.2 481.0 577.4 586.8 524.8 583.1
2013 Second Quarter 622.2 924.2 640.9 591.4 422.4 482.3 483.0 578.7 589.0 526.6 587.6
2013 Third Quarter 630.7 941.9 650.0 598.5 426.2 488.9 487.8 582.7 592.3 530.8 594.4
2013 Fourth Quarter 633.7 943.7 652.9 600.9 427.0 489.9 489.4 583.3 593.9 532.1 596.6
2014 First Quarter 638.0 948.2 657.2 604.9 428.9 493.4 491.8 585.2 595.1 534.0 599.9
2014 Second Quarter 644.7 957.9 664.1 610.7 432.2 499.3 496.0 588.6 599.0 537.9 605.5
2014 Third Quarter 645.4 983.6 666.7 611.4 432.7 500.0 496.7 589.0 600.0 538.6 606.9
2014 Fourth Quarter 646.8 986.4 667.9 611.4 432.3 498.5 495.2 588.7 602.2 538.6 607.4
2015 First Quarter 654.7 993.6 675.8 615.8 434.4 500.9 495.0 591.7 600.2 538.8 611.7
2015 Second Quarter 662.7 1036.7 685.9 621.5 436.8 508.8 500.8 596.1 600.1 542.2 618.4
2015 Third Quarter 672.8 1040.5 695.6 628.3 438.6 512.1 503.0 598.5 601.7 544.2 624.6
2015 Fourth Quarter 681.4 1051.4 704.3 634.1 439.6 514.2 506.0 600.2 604.0 546.5 630.3
2016 First Quarter 692.7 1061.4 715.5 641.7 442.6 518.6 451.3 603.5 605.0 528.8 629.8
2016 Second Quarter 711.9 1075.5 734.4 654.9 445.7 523.3 452.3 611.8 606.0 531.6 641.5
2016 Third Quarter 720.9 1085.1 743.4 661.2 447.4 525.2 454.1 615.5 615.0 536.0 648.2
2016 Fourth Quarter 728.2 1093.5 750.9 667.2 450.1 530.3 455.1 618.3 624.2 540.1 654.1
2017 First Quarter 738.2 1107.3 761.1 675.3 452.7 535.1 462.0 625.6 629.5 546.0 662.2
2017 Second Quarter 746.7 1120.7 769.9 682.5 468.6 548.2 472.7 632.2 658.0 562.0 673.4
2017 Third Quarter 754.6 1139.2 778.4 692.4 470.4 551.6 476.2 637.9 676.2 570.1 682.1
2017 Fourth Quarter 764.7 1148.6 788.5 701.3 471.5 553.4 480.1 641.4 687.0 575.6 690.2
2018 First Quarter 773.5 1156.9 797.3 707.9 475.3 558.7 485.8 650.3 692.4 581.6 697.4
2018 Second Quarter 780.0 1161.9 803.6 713.9 479.1 565.1 490.5 656.9 699.7 587.4 703.5
2018 Third Quarter 784.6 1169.9 808.5 719.8 482.7 572.9 497.6 662.4 710.8 595.0 709.6
2018 Fourth Quarter 787.2 1171.3 811.0 722.6 493.7 579.5 503.9 664.9 716.3 600.9 713.5
2019 First Quarter 804.1 1186.3 827.8 740.4 497.0 578.4 506.5 686.6 743.7 614.7 729.3
2019 Second Quarter 814.5 1191.7 837.9 748.9 501.0 581.7 511.0 690.4 748.8 619.1 737.0
2019 Third Quarter 816.4 1193.1 839.7 750.4 501.2 581.8 511.4 695.9 748.9 620.4 738.5
2019 Fourth Quarter 828.2 1201.5 851.3 760.0 506.0 591.5 518.5 703.9 751.1 626.0 747.4
2020 First Quarter 837.9 1216.8 861.4 769.5 515.0 609.9 531.8 697.6 754.9 632.2 755.9
2020 Second Quarter 838.1 1216.1 861.6 772.7 513.1 609.6 534.7 699.5 758.5 634.5 757.5
2020 Third Quarter 841.5 1223.0 865.1 779.7 513.4 612.1 537.2 707.0 772.6 641.2 763.0
2020 Fourth Quarter 844.6 1231.3 868.5 782.3 513.9 613.5 538.6 719.3 778.8 646.1 766.8
* Please ignore Table 4 in February bulletin.
Page 24
TABLE 5: MONTHLY COST INDICES OF VARIOUS TYPE OF CONSTRUCTION WORK
Base = year 1990(avg.)

MODERN NON RESIDENTIAL WATER


YEAR MONTH HOUSING BUILDING SUPPLY &
DRAINAGE
1990 Monthly avarage 100.0 100.0 100.0
1991 to 2016 May
2016 October 727.1 666.1 618.1
November 727.9 667.0 618.3
December 729.7 668.5 618.5
2017 January 735.5 672.6 623.7
February 736.5 673.4 624.1
March 742.7 679.8 629.0
April 742.9 680.3 631.0
May 747.3 682.8 632.3
June 749.8 684.4 633.4
July 750.8 685.6 634.0
August 754.8 694.5 639.3
September 758.1 697.0 640.3
October 760.2 698.3 640.8
November 766.9 702.8 583.7
December 767.6 703.3 642.0
2018 January 769.2 704.6 648.1
February 770.8 704.8 648.3
March 777.3 710.9 652.0
April 778.1 711.4 652.1
May 780.7 714.7 658.9
June 781.1 715.7 659.6
July 783.7 718.2 661.3
August 784.7 719.2 662.0
September 785.3 721.2 663.3
October 788.4 729.6 669.6
November 788.5 731.3 668.4
December 787.7 730.1 666.8
2019 January 789.4 729.6 676.8
February * 809.5 745.4 692.8
March 813.4 749.3 690.3
April 813.7 749.6 690.4
May 814.7 750.0 690.4
June 815.9 750.8 690.4
July 816.5 751.4 690.4
August 816.6 751.6 698.7
September 817.2 753.6 698.7
October 821.8 755.3 699.0
November 821.8 755.3 699.0
December 842.2 762.5 698.4
2020 January 842.4 773.0 698.5
February 839.5 771.5 698.2
March 837.4 770.3 696.3
April 837.4 770.3 696.3
May 836.5 768.9 695.7
June 840.5 778.8 701.0
July 840.8 779.1 701.0
August 841.0 779.2 701.0
September 842.7 780.9 701.3
October 842.7 780.9 701.3
November 842.7 780.9 701.3
December 848.4 785.2 742.0
2021 January 849.8 790.3 753.2
February 856.8 793.9 754.6
*Due to error in M21 F/wk timber monthly cost indices in February shall revised
Page 25
VARIATIONS IN PRICE INDICES

Graph I -Variation in price Indices –Annually

Graph II (a) - Variation in price Indices - Monthly

Page 26
Graph II (b) - Variation in price Indices - Monthly

Notes to Graph I : This graph indicates the annual changes in Price Indices of
Labour & commonly used building materials. Prices of most of
the building materials continue to increase up to the year 2012.
Significant increases are shown in Sand & Bricks. Also slight
increases are shown in Cement, Metal, Steel, Aluminum,
Labour & General Timber.

Notes to Graph II (a) & II (b)


: These two graphs indicate the monthly changes in Price Indices
of commonly used building materials.