Flame Photometer: Models PFP7 and PFP7/C Operating and Service Manual
Flame Photometer: Models PFP7 and PFP7/C Operating and Service Manual
Flame Photometer: Models PFP7 and PFP7/C Operating and Service Manual
1. The unit described in this manual is designed to be operated only by trained personnel.
Any adjustments, maintenance and repair must be carried out as defined in this manual
by a person qualified to be aware of the hazards involved.
2. It is essential that both operating and service personnel employ a safe system of work
in addition to the detailed instructions provided in the manual.
3. The covers of the unit should only be removed by personnel who have been trained to
avoid the risk of shock. At this point the unit must be disconnected from all services i.e.
gas and electric.
4. References should always be made to the health and safety data supplied with any
chemicals used. Generally accepted laboratory procedures for safe handling of
chemicals should be employed.
5. If it is suspected that safety protection has been impaired in any way, the unit must be
made inoperative and secured against any intended operation. The fault condition
should be reported immediately to the appropriate servicing authority. In all such reports
the serial number of the flame photometer must be quoted.
1 PFP7/REV C/01-08
Contents:
SECTION 1 ..................................................................................................... 4
Introduction...............................................................................................................................4
1.1 Instrument description..................................................................................................4
1.2 Principles of operation .................................................................................................4
1.3 Specification.................................................................................................................6
SECTION 2 ..................................................................................................... 7
Installation.................................................................................................................................7
2.1 Services required .........................................................................................................7
2.2 Unpacking ....................................................................................................................7
2.3 Assembly......................................................................................................................8
2.4 Installation ....................................................................................................................9
2.5 Accessories................................................................................................................10
SECTION 3 ................................................................................................... 11
Analysis Preparation..............................................................................................................11
3.1 Calibration standards .................................................................................................11
3.2 Sample preparation....................................................................................................12
3.3 Dilution .......................................................................................................................13
SECTION 4 ................................................................................................... 14
Operation.................................................................................................................................14
4.1 Front and rear panel controls.....................................................................................14
4.2 Operation ...................................................................................................................16
4.3 Calibration: PFP7.......................................................................................................17
4.4 Calibration: PFP7/C ...................................................................................................19
4.5 Shutdown ...................................................................................................................19
4.6 Operating precautions................................................................................................20
4.7 Good practice guidelines ...........................................................................................20
SECTION 5 ................................................................................................... 21
Accessories ............................................................................................................................21
5.1 Water separator .........................................................................................................21
5.2 Compressor ...............................................................................................................21
5.3 Diluter.........................................................................................................................22
5.4 Datalogger .................................................................................................................22
Maintenance............................................................................................................................23
6.1 General ......................................................................................................................23
6.2 Weekly maintenance..................................................................................................23
6.3 Monthly maintenance.................................................................................................23
6.4 Six-monthly maintenance...........................................................................................24
2 PFP7/REV C/01-08
SECTION 7 ................................................................................................... 25
Trouble shooting ....................................................................................................................25
7.1 General ......................................................................................................................25
7.2 Unstable results .........................................................................................................25
7.3 Unable to set standard reading..................................................................................25
7.4 Non-linear results.......................................................................................................26
7.5 Flame will not light .....................................................................................................26
7.6 No electrical power ....................................................................................................26
7.7 No reading on display ................................................................................................27
7.8 Unable to set blank ....................................................................................................27
SECTION 8 ................................................................................................... 28
Service Information ................................................................................................................28
8.1 Sample system description ........................................................................................28
8.2 Combustion and ignition system description .............................................................29
8.3 Optical system description .........................................................................................30
8.4 Power supply description ...........................................................................................30
8.5 Signal processing description ....................................................................................33
SECTION 10 ................................................................................................. 44
Spare parts..............................................................................................................................44
10.1 Minor spares kit (500 172) .........................................................................................44
10.2 Major spares kit (500 173) .........................................................................................44
3 PFP7/REV C/01-08
Section 1
Introduction
*Note: Calcium is measured by using the calcium hydroxide band emission at 622nm as the
Calcium main atomic emission occurs at 423nm.
Over certain ranges of concentration the intensity of the emission is directly proportional to the
number of atoms returning to the ground state. This is in turn proportional to the absolute
quantity of the species volatized in the flame, i.e. light emitted is proportional to sample
concentration.
It can be seen that if the light emitted by the element at the characteristic wavelength is isolated
by an optical filter and the intensity of that light measured by a photo-detector, then an electrical
signal can be obtained proportional to sample concentration. Such an electrical signal can be
processed and the readout obtained in an analogue or digital form.
a) The burner: a flame that can be maintained in a constant form and at a constant
temperature.
b) Nebuliser and mixing chamber: a means of transporting a homogeneous solution into
the flame at a steady rate.
c) Simple colour filters (interference type): a means of isolating light of the wavelength to
be measured from that of extraneous emissions.
d) Photo-detector: a means of measuring the intensity of radiation emitted by the flame.
4 PFP7/REV C/01-08
Flame Filter Photodetector
Readout
Amplifier
Lens
Burner
Gas inlet
Mixing chamber
Nebuliser
Waste
Drain
Air inlet
“U” tube
Figure 1.2.1: Schematic diagram showing the component parts of a flame photometer.
The analysis of alkali and alkaline earth metals by flame photometry has two major advantages:
i. Their atoms reach the excited state at a temperature lower than that at which most
other elements are excited.
ii. Their characteristic wavelengths are easily isolated from those of most other elements
due to wide spectral separation.
The analysis of Na, K, Li, Ba and Ca are typically determined at low temperatures, i.e. 1500-
2000°C, therefore suitable fuel mixtures are propane/air, butane/air and natural gas/air.
5 PFP7/REV C/01-08
1.3 Specification
PFP7 PFP7/C
(x-x2)
And sample standard deviation as:
√ n-1
Where x is the reading, x is the mean readings of the series and n is
the number of readings.
Warm Up: The flame must be alight for at least 15 minutes to ensure
achievement of the above stated specifications.
Weight: 8kg
6 PFP7/REV C/01-08
Section 2
Installation
NOTE: The instrument will only operate with the correct type of air compressor and gas
regulator.
2.1.1 Voltage
90 - 125V or 190 - 250V @ 50 or 60Hz.
2.1.2 Fuel
• Propane or butane regulated to 10-15 inches water gauge (0.36-0.54psi or 0.025-
2
0.038kg/cm ).
• Natural gas at mains pressure between 3 and 10 inches water gauge (0.11-0.36psi or
0.0076-0.025kg/cm2).
• L.P.G. as for propane.
• Suitable regulators are available from Jenway; refer to Section 2.5.
2.1.3 Air
A supply of dry, clean and pulse-free air at a pressure between 14 and 30 psi (approx. 1-2
kg/cm2) at 6 litres/minute is required. A suitable compressor and water separator are available
from Jenway; refer to Section 2.5.
2.1.4 Drain
The instrument will need to be sited near a drain or sink to enable disposal of waste liquid. A
suitable receptacle can be utilised if provision is made for easy disposal of its contents.
WARNING: The waste liquid will still contain any hazardous materials that were in the original
samples and should be handled and disposed of with the same care. Waste liquid should
always be considered to be of a pathogenic nature where the instrument is used in a clinical
environment.
2.2 Unpacking
Remove the instrument from the packaging and ensure the following items are present:
Part Code
Model PFP7 or PFP7/C Flame photometer
Auxiliary power plug 009 035
Mains cable with connector (plug optional as ordered) 013 046
Nebuliser inlet tube (500mm) 500 193
Gas tube, low pressure (2 metres) 500 191
Silicon rubber tube (drain) 023 003
Air tube (2 metres) 500 192
Nozzle 1: gas 026 012
Nozzle 2: air 026 013
Allen key, 2.5mm 060 037
Adjustable hose clip 060 083
Drain trap 500 018
Drain trap clip 500 114
Nebuliser cleaning wire 500 194
7 PFP7/REV C/01-08
2.3 Assembly
Place the instrument on a bench and proceed as follows (see Figures 2.3.1 and 2.3.2 below).
1. Take the mixing chamber assembly and ensure that the fluted burner (1) is in place
(remove the retaining tape); offer up to the chimney. Look down the chimney and
ensure that the burner locates centrally in the inner chimney. Screw the locking ring (2)
onto the threaded boss provided and tighten until finger tight, ensuring that the mixing
chamber is at right angles to the side of the instrument.
2. Fit the nebuliser (3) into the end cap and screw on the tube (4) provided. Ensure that
the sealing olive is fitted correctly between the nebuliser and the screw on connector.
3. If natural gas is to be used, remove the restrictor (5) fitted into the end of the fuel inlet
(6) on the mixing chamber. The restrictor should remain in place if butane, propane or
L.P.G. is to be used as fuel. Keep the restrictor screw in case of any future change in
gas supply. Push the fuel tubing onto the fuel inlet connector (7). This tube does not
need securing.
1
5
6
3 (7)
2
(4)
4. Take the drain trap clip (8) and, with the screw provided, fix to the hole situated at the
chimney end of the rear panel. Fix a length of silicon rubber tubing (9) onto the side port
on the drain trap such that it is long enough to reach either the sink or the waste
receptacle to be used. Fit the drain trap into the clip on the rear panel and run the short
piece of tubing (10) from the bottom of the drain trap to the drain trap outlet (11) on the
bottom of the mixing chamber. This tube can be pushed on and does not need
securing.
8 PFP7/REV C/01-08
15a
7 12 15b
14
4
11
10 9
8 13
Figure 2.3.2: Rear panel showing the drain trap, air and fuel tubing.
2.4 Installation
WARNING The exhaust gases from the chimney are very hot. No
obstruction should be placed above the instrument and the
instrument should be located in a position that makes
accidental contact with the chimney or its exhaust unlikely.
Fit the air and fuel inlet connectors to the ports provided on the rear of the instrument.
1. Fit the appropriate lengths of tubing to the connectors (12 and 13) and secure with the
screw clips provided. Run the tubing to the air and fuel supplies to be used.
NOTE: The maximum inlet pressure and regulation requirements are defined
in Section 2.1.
Turn on the fuel supply at the cylinder or source and check all fuel joints for leaks by
using soap solution.
2. Check the position of the voltage selector switch (14) on the rear panel and the value of
the fuse FS1. If necessary, adjust to suit your supply voltage. If necessary connect a
9 PFP7/REV C/01-08
suitable plug to the 3-pin AC supply lead. The colours of the wires conform to the
internationally recognised standard such that:
BROWN LIVE
BLUE NEUTRAL
GREEN/YELLOW EARTH
If a compressor and/or pen recorder is to be run directly from the instrument then they
should be wired to the plugs provided and connected to the POWER OUT sockets (15a
and 15b).
Press the power switch on the front panel. The digital readout should be illuminated.
3. Fill the centre tube of the drain trap and the connecting silicon rubber tubing to the
mixing chamber with deionised water. Check that no air bubbles are trapped in this tube
and that it flows and runs to waste freely. Ensure that the drain trap is pushed
completely down on its clip.
2.5 Accessories
Always use recommended spares and accessories. Even if an alternative part may appear
obviously suitable there may be some minor variations in specification that could degrade the
performance of the instrument.
10 PFP7/REV C/01-08
Section 3
Analysis Preparation
1. Standards must always contain the constituents that are present in the samples in the
same concentration ratios; i.e. if samples are prepared in 0.05M HCl then the standards
should also contain 0.05M HCl.
2. Always ensure that the standards encompass the expected range of the sample
concentrations.
NOTE: The blank used should contain all the constituents of the standard solutions except the
element being measured.
Since a flame photometer measures the concentration of the element itself in solution, standard
solutions prepared from the salts of sodium, potassium, lithium, calcium and barium must be
made up to contain the concentrations required in terms of the quantity of the elements.
Below are two examples of how to prepare standards of 1mg Na/100ml (10ppm Na) and 1mg
K/100ml (10ppm K).
11 PFP7/REV C/01-08
3.1.1 Sodium
Accurately weigh 0.634g of dry “Analar” quality NaCl, dissolve in pure deionised water and wash
into a 500ml volumetric flask. Fill to the mark with pure deionised water. To prepare the
standard solution for use with the flame photometer, this stock solution should be diluted 1 in
50.
Calculation:
3.1.2 Potassium
Accurately weigh 0.477g of dry “Analar” quality KCl, dissolve in pure deionised water and wash
into a 500ml volumetric flask. Fill to the mark with pure deionised water. To prepare the
standard solution for use with the flame photometer, this stock solution should be diluted 1 in
50.
Calculation:
3.1.3 Storage
Store solutions away from direct sunlight in a cool place, ideally at temperatures below 25ºC.
Glass containers should not be used for storage as they can affect the sodium concentration
levels. Standards should be stored in sealed, plastic vessels and in high concentrations, (e.g. as
a stock 1000ppm solution) and dilutions prepared as required. The long-term storage of low
concentration standards is not recommended due to degradation of ionic species.
1. Avoid handling samples with fingers. This leads to serious contamination, e.g. if a finger
is immersed in 20ml of deionised water the resulting Na concentration will exceed that
of a 10ppm standard.
2. All analyses involve the use of a diluent, which is almost always deionised water. This
should be of the highest quality for accurate flame analysis. Sodium, potassium and
calcium are present in high concentrations in tap water and thus efficient deionisation is
essential.
3. Species that cause interference should be removed from samples or the equivalent
concentration of the interferant should be present in the standards so as to avoid
erroneous results, e.g. if a sample of approximately 10ppm Na contains approximately
12 PFP7/REV C/01-08
1000ppm Ca, then Na analysis can only be achieved by removing the Ca with
oxalate/oxalic acid or ensuring all standards contain 1000ppm Ca.
5. Standards and samples should not be exposed to the atmosphere for long periods due
to contamination from airborne particles and the evaporation of the solvent that could
lead to elevated concentrations.
6. When in doubt about the equipment or application, the operator should contact Jenway
for advice.
The sample must be in the form of an aqueous solution, with no solid matter present, to be
suitable for direct introduction into the flame photometer. This is achieved by:
• Extracting the salts from solid samples using deionised water or suitable extractants
e.g. saturated CaSO4 for sodium in soil. Extraction is more successful using a blender,
macerator or shaking machine.
• If the sample is organic then the organic material should be removed by ashing. The
remaining oxides are then dissolved using strong acids.
• Filtration/centrifugation is used to remove solid debris.
When aqueous, the sample can then be diluted to a known, accurately measured volume using
deionised water. If it is a concentrated sample then the dilution ratio should be increased. If the
sample concentration is low then a small volume of diluent and initial extractant should be used.
Whichever method of extraction is used, the resultant solution must always be free of any
particulate matter that may cause blockages in the nebuliser capillary tube.
3.3 Dilution
In order to obtain samples and standards of the right concentration for aspiration into the flame,
various levels of dilution will often be necessary. Good quality deionised water should normally
be used for carrying out these dilutions and it is recommended that the same batch of water
should be used for diluting the samples and standards. More information on typical dilution
ratios is given in Section 4.3.
13 PFP7/REV C/01-08
Section 4
Operation
ignition A spring loaded switch which, when depressed, will cause an electrical
discharge between the ignition electrode and the burner unit, thereby
causing fuel ignition.
fuel A fine needle valve that controls the flow of fuel and enables optimum
flame conditions to be set.
blank This control sets zero (or low reading) when a blank standard is
aspirated.
sensitivity: Two controls which are used in conjunction to set the digital readout to an
fine and coarse appropriate number when a calibration standard is aspirated.
filter select A five position control which will select the appropriate optical filter for the
element being determined.
NOTE: positions 1, 2 and 3 will normally be blank unless optional
filters (Ca, Ba or Li respectively) have been fitted.
14 PFP7/REV C/01-08
4.1.2 Rear panel controls
Voltage A two-position switch marked 230 and 115. These positions allow
selection operation from voltage supplies 190-250 volts and 90-125 volts
respectively at either 50 or 60Hz.
WARNING: when adjusting the operating voltage it may be
necessary to change the top fuse as indicated on the rear panel.
Fuses Two fuses are fitted to the instrument. FS1 is the primary fuse provided to
give protection to the instrument and any accessories connected to the
power out sockets. FS2 is to protect the electronic circuitry in the PFP7.
Both FS1 and FS2 should be of an anti-surge type.
POWER OUT Two three pin sockets for flame photometer accessories such as a
compressor and a pen recorder. The power from these sockets is
controlled by the instrument power switch on the front panel.
RECORDER Two 4mm sockets which will provide an analogue signal of approximately
1 volt when the readout is 1000 digits or 100.0, 10.00 and 1.000.
15 PFP7/REV C/01-08
4.2 Operation
1. Ensure that the drain trap is pushed fully down on its clip. Ensure that the drain trap has
solution in it and that no air locks are present. If necessary, purge by adding deionised
water and allowing the surplus to run away.
2. Close the fuel valve by turning fully clockwise. To avoid damaging the valve, it should
not be forced.
3. Turn the fuel valve the required number of turns anti-clockwise depending on the fuel
being used.
5. Switch on electrical power by depressing the power switch. If the air compressor is
powered separately, switch on the air compressor. Ensure that air is present by
listening for the hissing created as it passes through the nebuliser.
6. Depress the ignition switch and hold down. Watch the FLM indicator in the display
window. When this indicator is illuminated the flame is alight and the ignition switch can
be released. If the FLM indicator does not light within approximately 20 seconds,
release the switch and open the fuel valve one turn. Allow the gas to disperse before
continuing. Depress the ignition switch for a further 20 seconds. This process may be
repeated until successful ignition occurs. If the fuel valve has to be opened more than 5
turns more than recommended above, refer to Section 7.5.
8. Aspirate deionised water and set the readout to zero by adjusting the blank control.
10. Adjust the fuel valve in a clockwise direction until a peak reading is obtained.
NOTE: There is a time delay between adjusting the flow of fuel and seeing
the effect of the adjustment. A pause of a few seconds is therefore
necessary between making every fine adjustment.
11. For optimum performance the instrument should be allowed 15 minutes to warm-up.
During this warm-up period a blank deionised water sample should be aspirated. It
should be noted that results, adequate for most purposes, can be obtained from switch
on, although standardisation settings will need frequent checking during the warm-up
period.
16 PFP7/REV C/01-08
4.3 Calibration: PFP7
It is important to understand that the principles of flame photometry are such that, over certain
concentration ranges, light emitted from the flame is directly proportional to the concentration
of the species being aspirated.
The graph below shows that the direct relationship between the flame emission and
concentration is only true at relatively low concentrations. Above these low levels the flame
begins to saturate and the flame emission ceases to increase in a linear relationship to
concentration.
10
8
Readout
0
2 4 6 8 10 12
ppm
If the samples being analysed lie on the linear part of the curve then the user can take direct
concentration readings from the digital display. If, however, the concentration of samples are
above the levels shown on the graph then the user has the choice of either:
a. diluting the samples so that they lie on the linear part of the curve, or
b. constructing a calibration curve and relating the digital display reading to the
concentration by cross-reference to the curve.
A calibration curve is prepared using standard solutions containing known concentrations of the
elements to be determined and if necessary, other materials to ensure that the standard and
sample backgrounds match. The concentration range covered by the calibration curve will
depend upon the expected concentration of the samples so that the sample readings fall
somewhere in the middle of the calibration curve.
Once the calibration curve has been plotted, the readings for the sample solutions are
compared with the curve to allow the sample concentrations to be established.
It is important to realise that each element has its own characteristic curve and separate
calibration curves must be constructed.
If the same estimation is performed on a routine basis, the calibration curve need only be
prepared once and checked periodically. Instrument re-calibration is easily achieved by setting
the blank solution to read zero and the top standard to read the same value as it did when the
calibration curve was initially prepared. The graph in Figure 4.3.2 shows a typical curve
obtained when measuring in parts per million (ppm).
17 PFP7/REV C/01-08
25
Unknown sample
20 reads 20 and can
be seen to have a
concentration of
Readout
15
approx. 16.5ppm
10
Calibration points
5 at 5,10,15,20 and
25ppm
0
5 10 15 20 25
ppm
Customers working in medical environments are quite likely to be using the S.I. unit of mmol/l to
report their results. The relationship between mmol/l and ppm is defined below:
This relationship means that Na and K samples in the normal clinical range of 136-145mmol/l
Na and 3.5-5.0mmol/l K should be pre-diluted 1 in 100 or 1 in 200 to get optimum results from
the flame photometer.
1. Aspirate a blank solution and set the readout to 000 using the blank control.
2. Aspirate the highest standard solution and set the readout to an appropriate reading
using the fine and coarse sensitivity controls. Re-check the blank setting and adjust if
necessary.
3. Aspirate the remaining standard solutions (if used) to construct the calibration curve and
note the results.
4. When the blank and standards are set, unknown samples can be aspirated and the
results noted, either directly from the instrument readout, or by deriving the
concentrations from the calibration curve.
6. The decimal point (d.p.) switch can be set to illuminate the decimal point in any
significant position. This should be chosen to give sufficient resolution for the test
required.
18 PFP7/REV C/01-08
4.4 Calibration: PFP7/C
When using the PFP7/C, a calibration curve is not required as the display is calibrated in direct
concentration units. Therefore only one top standard is required to enable this calibration to be
performed.
Installation and set-up procedures should be carried out as for the standard Model PFP7.
To calibrate the unit for clinical use the following steps should be carried out:
2. Select the appropriate element (Na or K) on the filter select control and the position of
the decimal point using the d.p. switch.
3. Aspirate the required standard, e.g. 140mmol/l Na, 5.0mmol/l K which has been pre-
diluted at least 1 in 100 and set the display reading accordingly using the fine and
coarse sensitivity controls.
4. Adjust the fuel valve in a clockwise direction until a peak reading is obtained. Re-set the
display reading accordingly for the standard being aspirated.
NOTE: There is a time delay between adjusting the flow of fuel and seeing
the effect of the adjustment. A pause of a few seconds is therefore
necessary between making every fine adjustment.
4.5 Shutdown
1. Aspirate deionised water for at least ten minutes.
2. If the shutdown is short term i.e. the instrument is to be used again the same day/shift, it
is adequate to remove electrical power from the unit by depressing the power switch.
This will safely extinguish the flame.
3. If the shutdown is longer term or if the laboratory is likely to be left unattended during
the shutdown, then the fuel supply should be turned off at source; wait for the FLM
indicator to extinguish and then turn off the power. This ensures that there is no gas left
in the tubing to the unit.
19 PFP7/REV C/01-08
4.6 Operating precautions
1. The fuel gases used in the flame photometers are inflammable and therefore potentially
hazardous. Cylinders of fuel gas should always be stored and used in line with the
supplier’s recommendation.
2. It is possible that a small quantity of fuel will escape from the instrument during the
ignition sequence. The amount of fuel is harmless although may smell slightly. If the
smell of fuel gas persists the instrument should be immediately shut down and the
source of the leakage determined by using a soap solution on the hose joints.
3. Do not leave the instrument running unattended while the flame is alight.
4. The top of the instrument chimney unit becomes very hot when running and can cause
severe burns if touched.
5. The exhaust gases from the flame are very hot and the area approximately 1 metre
above the chimney must be avoided. Never attempt to look down the chimney whilst the
flame is running. Always use the inspection window.
6. The instrument uses potentially hazardous electrical supplies. Never remove covers
from the instrument without first ensuring that it has been isolated completely from the
AC mains supply.
7. If the instrument is used in a pathology laboratory, all samples should be handled with
the caution normally accorded to those known to contain pathogenic organisms. Care
should also be taken when undertaking maintenance on instruments that have been
used in these environments. A bactericidal agent should be used when cleaning parts
during routine maintenance.
2. It is recommended that blank and standard solutions should have a wetting agent (e.g.
1
Triton X-100 or Decon 90) added to promote good stability and self cleaning. Any such
wetting agent should be non-ionic and used at a concentration of less than 3ppm. It
should be added to the blank, standards and samples at the same concentration.
3. Take care when preparing standards. The performance of the instrument depends upon
the accuracy and purity of the calibration standards.
4. If standard solutions are required to be stored for any length of time or at an elevated
temperature, a suitable mould inhibitor e.g. azide should be added. However if this
contains the element to be measured (e.g. sodium) it is important that the samples also
contain an equivalent amount.
5. Always sample from the top half of the sample container. The bottom half may contain
sediment or particulate matter which could easily block the fine tubing used in the
nebuliser.
6. Always use recommended spares. Even where an alternative part may be obviously
suitable there may be good reasons for not using it.
20 PFP7/REV C/01-08
Section 5
Accessories
5.1.1 Features
1. Available in two sizes: large (normally recommended) (part code 500 177) or small (for
areas of low humidity) (part code 500 176).
2. Complete with all parts to connect to the flame photometer.
3. Provides optimum performance in minimum space.
4. Provides effective liquid and solid separation.
5. No maintenance required.
6. Finger operated plungers for easy draining.
5.1.2 Specifications
Large (500 177) Small (500 176)
Port size: 1/4, 3/8 1/8, 1/4
Maximum operating pressure: 100psi 100psi
Working temperature range: -5 to 80°C (with no freezing) -5 to 80°C (with no freezing)
Nominal filtration rating: 5µm 5µm
Bowl material: Polycarbonate Polycarbonate
Bowl guard: Yes No
Drain capacity (ml): 25 8
Weight (kg): 0.22 0.18
5.2 Compressor
The 8515/8516 is a reliable, quiet air compressor of oil-less design requiring minimal
maintenance. The compressor is constructed from a lightweight but rigid aluminium extrusion
and is housed in a protective case to ensure maximum user safety and convenience. Load
bearings are permanently lubricated and sealed for the life of the compressor. A Teflon
composition cup offers excellent sealing and wear properties. The integral motor has its own
cooling fan and is thermally protected against overload.
5.2.1 Specification
The 8515/8516 compressor gives a supply of dry, clean and pulse free air at a pressure
2
between 14 and 30 psi (approximately 1-2 kg/cm ) at 6 litres/minute.
5.2.2 Installation
The compressor should be positioned on a stable surface within 2 metres of the PFP7.
Connection to the PFP7 should be carried out as follows:
21 PFP7/REV C/01-08
3. Connect the other end of the air tubing to the air inlet located on the rear panel of the
PFP7 and secure with a hose clip.
4. Plug the 8515/8516 mains lead into either auxiliary power socket located on the rear
panel of the PFP7.
5.3 Diluter
The diluter is a stand alone diluter/dispenser that is programmed to dispense a final volume of
5.0ml of a 1 in 200 dilution of a sample in diluent, i.e. taking up 25µl of sample and 4.975 ml of
diluent. This is useful for the dilution of clinical samples prior to aspiration in the flame
photometer.
5.3.1 Specification
5.4 Datalogger
The analogue-RS232 datalogger is an easy to use PC based data acquisition product that plugs
into the serial port of a PC (desktop or laptop) and requires no power supply. Replacing costly
chart recorders, the datalogger enables data acquisition and printing from all PFP7 models. The
PicoLog software can collect data at rates from once per hour to 1000 per second and up to 1
million samples can be collected. Data can be displayed in both graphical or spreadsheet format
both during and after data collection.
5.4.1 Specification
22 PFP7/REV C/01-08
Section 6
Maintenance
6.1 General
The design of the Model PFP7 is such that maintenance requirements are minimal. To maintain
good performance and prolong the life of the instrument it is important that the procedures
defined in the manual are carried out regularly. The performance of the instrument depends
upon an adequate supply of compressed air. Recommended compressor maintenance
procedures should be carried out to ensure that compressor performance does not deteriorate.
1. Switch on the air supply to the flame photometer but do not light the flame.
2. Fill the measuring cylinder with deionised water and present to the nebuliser inlet tube
for one minute.
3. The consumption rate should be between 2 and 6ml/min. If correct, no further action is
required.
4. If the consumption rate is too low, this is likely to be caused by a blockage in the fine
capillary tubes and can usually be cleared by passing the cleaning wire through the
nebuliser. If, after taking this action and re-checking the consumption rate it is still too
low, then the inlet tube should be discarded and the test repeated using fresh tubing.
5. If the nebuliser operation is still unsatisfactory, remove the nebuliser from the mixing
chamber, disconnect from the air line, remove the inlet tubing and soak the nebuliser in
hot deionised water.
2. With the flame alight aspirate a 1 in 100 diluted sample of cleaning solution for 30
minutes, followed by deionised water for a further 30 minutes.
23 PFP7/REV C/01-08
6.4 Six-monthly maintenance
Burner cleaning.
2. If the instrument has been running with the flame alight, allow 30 minutes for the burner
system to cool down.
3. Disconnect the mixing chamber from the chimney unit by unscrewing the knurled
locking ring and dropping the chamber clear of the chimney.
4. Remove the fluted burner from the top of the burner tube.
5. Rinse the burner in deionised water and remove any deposits or encrustations by
brushing with a small stiff brush. If deposits are persistent, heating or boiling the
deionised water will help.
6. Replace the burner, pointed end downwards and re-assemble the mixing chamber onto
the chimney.
24 PFP7/REV C/01-08
Section 7
Trouble shooting
7.1 General
This section is a step-by step guide that should allow an operator to take appropriate actions to
clear simple faults. Any action not defined in this trouble shooting guide should only be
undertaken by qualified personnel.
Condensation in the air supply. Drain the tubing. If the problem persists a moisture-
free air supply should be arranged by using a water
separator.
Flame temperature not correctly set. Ensure that the fuel valve is correctly set for the
element being determined; refer to Section 4.2,
Operation.
Fuel cylinder nearly empty. Replace cylinder with a fully charged one.
Instrument not draining correctly. Ensure the “U” tube is clear of blockages and that
the drain trap is at the correct level i.e. pushed down
fully so the rim at the top is resting on the clip.
25 PFP7/REV C/01-08
Incorrect filter selected. Select correct filter.
Flame temperature not correctly set. Ensure the fuel valve is correctly set for the element
being determined, refer to Section 4.2.
Calibration curves incorrect. Check the validity of the calibration curves using
fresh standards.
Flame temperature not correctly set. Ensure the fuel valve is correctly set for the element
being determined, refer to Section 4.2.
Instrument not draining adequately. Ensure the “U” tube is clear of blockages and that
the drain trap is at the correct level.
Inadequate air supply. Check air connection to the rear panel and the
operation of the compressor.
Propane/butane fuel restrictor blocked. Carefully “blow out” the restrictor. Do not use wire to
clear the blockage as this will result in damage to
the restrictor.
Ignition electrode worn or bent. Straighten electrode or replace with a new part set
to the correct length.
AC supply not fully engaged. Check the power lead is correctly inserted.
26 PFP7/REV C/01-08
AC supply not available. Check mains supply.
Burner encrusted with salt. Clean the burner as defined in Section 6.4, Six
monthly maintenance.
Ensure that the cleaning procedure is carried out
more frequently.
Ignition electrode encrusted with salt. Clean or replace the ignition electrode as detailed in
Section 9.1.2.
27 PFP7/REV C/01-08
Section 8
Service Information
Burner
Restrictor screw
NB remove before using
natural gas
Fuel in
Nebuliser
Capillary
Inlet tubing
Impact bead
Baffles Air in
Drain
Figure 8.1.1: Sample system
The sample is taken up by a concentric type nebuliser unit. Air, at a constant pressure, is
passed around the end of a small capillary tube forming a partial vacuum inside the capillary
tube and drawing sample into it via the nebuliser inlet tubing. The sample leaves the end of the
capillary as a fine aerosol. The volume and droplet size of the aerosol is controlled by varying
the position of the capillary tube and air jet with respect to each other. This adjustment is the
most important single factor affecting the linearity, stability and reproducibility of the instrument
and is factory set and sealed.
The aspirated sample is passed into the mixing chamber where the fuel gas is introduced. The
sample aerosol then strikes the PTFE impact bead which further breaks up any large particles in
the spray. The fuel/air/sample mixture is then swirled around two PTFE baffles. The majority of
sample strikes these baffles and runs out of the mixing chamber, via the drain trap to waste.
The remaining sample, consisting of only the smallest droplets mixed uniformly with the fuel,
reaches the modified Meker type burner where the mixture burns in a tall, round flame situated
in a double skin chimney.
28 PFP7/REV C/01-08
8.2 Combustion and ignition system description
Regulator & gauge
assembly
To nebuliser
Air at 14 to 30 psi,
6 litres/min
To ‘Fuel in’ on
mixing chamber
Fuel gas regulated
to less than 0.5 psi
Ignition switch
& flame
detect circuits
The PFP7 can be used with propane, butane, natural gas or L.P.G. at pressures as defined in
Section 2. Immediately behind the rear panel fuel bulkhead is the fuel solenoid valve. This
solenoid valve is normally closed when there is no power to the instrument or where there is
power to the instrument but the flame is not alight. The solenoid will be latched in the open
position when the flame is alight and has been detected by the flame thermocouple. The fuel
solenoid can be held open manually during the flame ignition sequence by holding down the
front panel ignition switch; fuel then flows through small bore copper tubing to the fuel valve on
the front panel. This is a very fine needle valve and to avoid damage, this control should never
be screwed hard fully clockwise and should not be used as an on/off valve. From the fuel valve
the gas then passes to the mixing chamber and then on to the burner. A restrictor screw is fitted
to the mixing chamber fuel inlet for use with propane, butane or L.P.G. but must be removed if
natural gas is used.
Air is fed through the rear panel to the air regulator. The air regulator is factory set to 12psi.
Adjustment should not be necessary but can be achieved by lifting the yellow locking ring and
rotating the knob on the side of the regulator until the correct pressure is shown on the pressure
gauge. From the air regulator the air passes to the nebuliser where it acts as an atomising
agent.
Ignition is achieved by passing a high voltage spark between the ignition electrode and the
centre of the burner. The spark is generated by the self-contained ignition unit mounted inside
the instrument. This is activated by depressing the front panel ignition switch, which
simultaneously opens the fuel solenoid, allowing gas to flow through the stream of sparks and
hence ignite. The ignition switch must be manually held down until the thermocouple, mounted
at the top of the back of the chimney, detects the temperature rise due to the flame, latches the
solenoid in the open state and energises the FLM indicator in the display window. If the fuel flow
ceases and the flame is extinguished, the thermocouple will detect the fall in temperature and
the solenoid will automatically be closed, stopping any further gas escaping to atmosphere.
29 PFP7/REV C/01-08
8.3 Optical system description
Light is emitted from the flame and collected by a plano-convex lens mounted on the inner
chimney. The wavelength of light reaching the photo-detector is determined by up to 5 different
interference filters mounted in a wheel. The filter in the light path is selected by the front panel
control and is indicated by this control. Na (589nm) and K (766nm) filters are fitted as standard
and positions 1, 2 and 3 can be fitted with Ca (620nm), Ba (520nm) and Li (670nm) filters to
order.
The filters are held in the wheel by circlips. Should replacements or alternatives need to be
fitted, care must be taken to prevent fingerprints getting onto the optical surfaces. If this does
happen a small amount of ethanol on a very soft, lint-free cloth may be used to gently wipe
away deposits.
Filtered light from the flame falls on the PIN diode mounted on a small PCB on fixing brackets
that allow critical adjustment so that the lens on the diode can be set to an optimum position in
the light path. The electrical signal from the diode is taken via a 3-pin connector and a screened
cable to the main PCB.
The mains AC supply is fed in via the rear panel socket/filter unit to a 3A anti-surge fuse (6A
anti-surge fuse when operating on 115V). This fuse protects any equipment such as a recorder
or compressor plugged into the POWER OUT socket on the rear panel.
The AC line is taken via a 250mA fuse, for protecting the internal circuitry, to the power switch
on the front panel. The AC neutral is taken to the other pole of the power switch. The earth from
the mains supply is taken directly to the chassis.
From the power switch the AC line is taken to a two-position VOLTAGE SELECTOR switch
mounted on the rear panel and then onto the transformer primary winding; the other side of
which is connected to the neutral from the power switch. The transformer primary is auto wound
to provide a step up function to supply 240V for the igniter unit when a 115V supply is
connected.
The two 12V secondary windings are joined with a centre tap which forms the 0V rail; they are
full wave rectified to give a +12V and -12V supply with respect to the centre tap. The
unregulated +12V is fed to the 7805 1 amp regulator to give the +5V rail. The unregulated -12V
is fed to the 79L05 100mA regulator to give the -5V rail.
The unregulated +12V is used to automatically operate the fuel solenoid via the relay, but it is
also fed to one pole of the ignition switch for manual operation. The other pole is fed with 240V
which is then switched to the ignition unit, such that when the ignition switch is depressed, the
fuel solenoid is opened and the ignition unit activated to generate a series of high voltage
pulses (approx. 2 per second) which are discharged in the form of a spark between the ignition
electrode and burner, which is at earth potential. Hence the fuel passing through the solenoid
into the mixing chamber and out through the burner will be ignited by the series of sparks, whilst
the solenoid is manually held open.
The thermo-electric potential developed by the thermocouple mounted on the top, back of the
chimney is fed into the inverting input of the 741 (IC1). When this level becomes greater (due to
flame temperature) than the level set by RV8 on the non-inverting input to the 741 (IC1) then the
output rapidly switches from +4.5V approx. to -3.0V approx. turning off transistor TR2 which, in
turn, switches transistor TR1 on, energising the relay coil. The normally open contacts close
holding the +12V supply on the solenoid. If the flame should be extinguished the thermocouple
cools down and the voltage on the inverting input IC1 decreases. When the level falls below that
set by RV8 on the non-inverting input to IC1 the output goes back to +4.5V approx., turning on
30 PFP7/REV C/01-08
transistor TR2, which, in turn, switches off transistor TR1 which de-energises the coil of the
relay, breaks the relay contacts and removes the +12V supply from the solenoid, hence shutting
off any further gas flow. The inputs of IC1 are protected from the high voltage sparks generated
by the ignition discharge by diodes D1 and D2.
The reference level set by RV8 is factory set for optimum switching of the solenoid (on/off).
Adjustment of this may have a significant impact on the safe operation of the flame photometer
and should only be undertaken by trained engineers.
Back E.M.F.s generated by the coils in the relay and solenoid are dissipated by diodes D3 and
D4.
The collector of TR1 is taken to the main PCB to activate the FLM indicator when the flame has
been detected by the above circuitry.
Figure 8.4.1: Power supply and flame failure detection printed circuit board layout.
31 PFP7/REV C/01-08
Figure 8.4.2: Power supply and flame failure detection circuit.
32 PFP7/REV C/01-08
8.5 Signal processing description
Refer to Figures 8.5.1 and 8.5.2.
The signal from the PIN (PD1) diode is amplified by IC1, a high input impedance op-amp. The
coarse gain control switches 1, 10 and 100 Megohm resistors into the feedback to change the
gain on the first three ranges. On range 4 the 100 Megohm resistor is left in circuit and the
sensitivity of the 7107(IC5) is increased by a factor of approximately 10. The 10 Kilohm
potentiometer feeding into the inverting input of IC1 is a factory preset control for compensating
for any dark current from the PIN diode and for any offset in IC1. The output of IC1 is then fed
through a filter network consisting of R8, C4 and R9, C5; the signal is then fed into IC2 a non-
inverting buffer with RV2 its preset offset adjustment.
The front panel blank potentiometer, RV3, provides an adjustable DC offset which is fed into
the inverting input of IC3 to compensate for any signal from the flame background when setting
the readout to zero with the flame alight.
The front panel fine sensitivity potentiometer, RV4, controls the gain of IC3 and the values in
the feedback of this stage are selected to enable the sensitivity to be varied continuously
between each of the switched steps of the coarse sensitivity control.
The output of IC3 is fed via a filter consisting of R15 and C7 to the 7107 (IC5). The 7107 is an
Analogue to Digital converter complete with a 7 segment decoder/driver for the 3½ digit LED
display. The sensitivity of the A to D converter is set by RV6 to approximately 1mV per digit on
coarse sensitivity ranges 1, 2 and 3 and 0.1mV per digit on coarse sensitivity range 4 by SW1B
and RV7. The output of IC3 is also fed to the non inverting buffer IC4 (with preset offset control
RV5) to give a buffered recorder output of 1mV per digit on ranges 1, 2 and 3 and 0.1mV per
digit on range 4. The preferred decimal point may be selected by SW2 which connects the
relevant decimal point to 0V through a 560 ohm resistor, R16, R17 or R18.
33 PFP7/REV C/01-08
Figure 8.5.2: Main circuit board.
34 PFP7/REV C/01-08
Section 9
Component replacement
2 9
1 (4)
6
10
14
(3) 12
11 13
(5) 7
1. Ensure power, fuel and air supplies to the instrument are disconnected.
2. Remove the nebuliser (1) by turning the retaining cam and withdrawing the nebuliser
from the mixing chamber end cap (2). Unscrew the air inlet tube (3) from the nebuliser
and place it safely to one side. Pull the fuel inlet tube (4) and drain tube (5) from their
connectors on the mixing chamber end cap.
3. If the instrument has been running with the flame alight, allow 30 minutes for the burner
system to cool down. When it is cool the knurled brass ring (6) may be unscrewed and
the mixing chamber (7) lowered from the chimney and removed.
4. The burner (8) can be withdrawn from the burner tube (9) and the end cap removed by
releasing the three socket head screws (10). The impact bead and impeller assembly
(11) can be removed by releasing the centre pozidriv screw (12) in the rear plate (13) of
the mixing chamber. The rear plate can be removed by releasing the three outer
pozidriv screws (14).
5. All items should be inspected for damage and contamination before cleaning and re-
assembly. Re-assembly is the reverse of dismantling and the end cap and rear plate
retaining screws must be securely tightened to give gas tight seals.
6. Ensure that when re-assembling the mixing chamber that the baffles are positioned at
45 degrees to each other, as shown in Figure 9.1.2.
35 PFP7/REV C/01-08
Figure 9.1.2: Mixing chamber, impact bead and impeller assembly.
2. To access the inner chimney for cleaning only, refer to paragraphs (3) and (4) below; for
complete removal of the chimney continue to the end of this sub-section.
3. Pull the ignition cable connector from the ignition electrode housing, unscrew the PTFE
ignition housing and place to one side.
4. Unscrew the three black pozidriv screws that hold the chimney back plate. Loosen the
nut on the rear screw retaining the chimney top plate which passes through the top of
the back plate. The chimney back plate can now be removed taking care not to strain
the thermocouple cable. The stainless steel inner chimney can now be pivoted up and
cleaned with a soft, lint-free cloth, as can the lens mounted on the front of the inner
chimney.
5. The inner chimney can be fully removed by releasing the two screws that form the pivot
and sliding the inner chimney out, taking care to retain the spacers and washers. The
outer chimney can be removed by undoing the two pozidriv screws and two nuts that
retain the fixing brackets at the base of the chimney.
Replacement is the reverse of removal. Clean scale from the ignition electrode, or
replace by loosening the grub screw sealed with plasticine, that clamps the electrode.
Replace with a new electrode setting the protruding length to 10mm before retightening
the grub screw and re-sealing with plasticine. The plasticine also acts as an insulator so
the spark does not jump from the grub screw to the inner chimney.
36 PFP7/REV C/01-08
9.1.3 Thermocouple removal
1. Ensure that power is disconnected from the instrument. If the flame has been alight
allow 30 minutes for the burner and chimney to cool down.
2. When cool, unscrew the cap that holds the thermocouple in place, taking care not to
loosen the housing retaining nut. Remove the thermocouple complete with the
compression fixing.
3. Unscrew the thermocouple wires from the terminal block on the power supply PCB. Pull
the wires through the grommet in the side panel. If re-fitting a replacement
thermocouple ensure it is pushed through the housing as far as it will go before
clamping the compression fitting. Ensure correct polarity is observed when fitting into
the terminal block.
1. Ensure that power is disconnected from the instrument. Remove the four socket head
screws from the right hand side panel. Remove both left and right hand side panels and
place carefully to one side.
2. Remove the filter select knob. Unscrew the four screws on the bottom of the unit that
hold the chimney assembly in place. Carefully remove the chimney assembly from the
unit. Remove the four screws on the cover plate to release the filter wheel assembly
from the chimney assembly. Remove the two grub screws from the filter wheel to gain
access to the filters.
3. To fit additional filters: push out the round plastic blanking piece; fit the new filter into
the vacant position with the mirrored side towards the flame. Replace the circlip to
retain the new filter and replace the filter wheel.
4. Ensure that the PIN diode housing is in alignment with the filter recess. This can be
achieved by loosening the filter wheel via the two retaining grub screws and pushing the
PIN diode housing into the filter recess. Tighten the filter wheel in this position and slide
the PIN housing back to just clear the filter wheel in all positions.
1. Ensure that power is disconnected from the instrument. Remove the right hand side
panel as detailed in the previous sub-section.
2. Unplug the 3 pin connector from the PIN diode mounting PCB (UOD1). The PCB may
be removed complete with half of the mounting bracket by removing the two pozidriv
screws that pass through the adjusting slots into the captive nuts on the other half of the
bracket.
3. Replacement is the reverse of removal. Check that the diode is aligned with the optical
path on re-assembly as described in section 9.1.4
37 PFP7/REV C/01-08
2
38 PFP7/REV C/01-08
9.2 Power supply PCB
Refer to Figures 9.2.1 and 9.2.2.
3
4 5
2
1. Ensure that power is disconnected from the instrument. Remove the top rear cover from
the instrument by undoing the two pozidriv screws at the top of the rear panel and lifting
the angled cover from the retaining screws.
2. Identify the power supply PCB mounted on the base of the unit. Note the orientation
and polarization of the two multiway connectors branching from the cableform.
Disconnect these by pulling up on the connector housing; do not pull on the cables.
3. Remove the four wires (two from the solenoid and two from the thermocouple) from the
screw terminal block on the PCB
4. The easiest way to remove the PCB is by undoing the four screws from underneath the
instrument, leaving the pillars screwed to the PCB. The power supply PCB can now be
lifted out of the instrument. Replacement is the reverse of removal.
39 PFP7/REV C/01-08
Figure 9.2.2: Power supply PCB
1. Ensure that power, fuel and air supplies to the instrument are disconnected.
2. Remove the knob from the front panel d.p., blank, fine and coarse controls by loosening
the two grub screws in each. Remove the nuts securing the d.p. and coarse switches to
the front panel.
3. Remove the top rear cover as described in Section 9.2 step 1. Disconnect the three
connectors from the back of the main PCB by pulling on the housing box (do not pull on
the cables). Note the orientation and polarization of each.
4. Remove the two thumb-screws, one in the top right hand corner and the other in the top
left hand corner.
5. The PCB may be removed by tipping it back, releasing the front panel switch bosses
from their mounting holes and lifting the PCB back and up through the rear top cover.
Take care not to loose or disturb the washers on the switches. Replacement is the
reverse of removal.
40 PFP7/REV C/01-08
Figure 9.3.1: Main PCB
Figure 9.3.2: Main PCB rear view showing the linearization PCB for the model PFP7/C.
1. Ensure that power, fuel and air supplies to the instrument are disconnected. Remove
the top rear cover as described in Section 9.2 step 1.
2. Identify the two wires that come from the solenoid to the screw terminal block on the
power supply PCB Remove these two wires from the terminal block.
41 PFP7/REV C/01-08
3. Identify the cap nut on the compression fitting on the outlet of the solenoid. Loosen this
nut and slide it away from the solenoid along the micro-bore copper tubing. Pull the
compression fitting out of the solenoid outlet.
4. Remove the nut on the rear panel fuel inlet bulkhead connector. The solenoid can now
be pulled forward and lifted out of the instrument. Replacement is the reverse of
removal. Ensure that the solenoid is mounted at a slight angle so as not to foul the air
regulator. It must not be mounted horizontally.
5. Check all joints are gas tight using soapy water before relighting the flame.
1. Ensure that power, fuel and air supplies to the instrument are disconnected. Remove
the top rear cover as described in Section 9.2 step 1.
2. Pull the clear PVC tubing from the fuel inlet on the mixing chamber end cap. Locate this
tube inside the instrument and pull it back through the grommet in the chimney corner
into the instrument.
3. Remove the cap nut on the compression fitting on the inlet to the fuel needle valve.
Slide the nut away from the needle valve along the micro-bore copper tubing. Pull the
compression fitting out of the fuel needle valve inlet.
4. Remove the large knob from the fuel needle valve on the front panel by loosening the
two grub screws and then fully close the valve (taking care not to over-tighten) and
remove the preset stop knob by loosening the single grub screw. Care must be taken to
ensure that the needle valve is never closed any further once this stop has been
removed. If this position is maintained, then on re-assembly, it is only necessary to push
the knob on as far as it will go to reset the correct stop position.
5. Remove the front panel mounting nut and then the needle valve may be taken back into
the instrument and removed. Replacement is the reverse of removal.
6. Check all joints are gas tight using soapy water before relighting the flame.
1. Ensure that power to the instrument is disconnected. Remove the top rear cover as
described in Section 9.2 step 1. Identify the ignition spark generator module mounted
on the inside of the chimney corner.
2. Disconnect the high voltage cable from the push on connector on top of the module.
Disconnect the green earth lead on top of the module in a similar manner. Remove the
two M3 nuts and associated washers that retain the unit to the chimney corner.
3. Remove the switched line and neutral connections from the base of the module that can
now be removed from the instrument. Replacement is the reverse of removal. Ensure
correct polarity of all wires when reconnecting.
42 PFP7/REV C/01-08
9.7 Air regulator assembly replacement
Refer to Figure 9.2.1.
1. Ensure that power, fuel and air supplies to the instrument are disconnected. Remove
the top rear cover as described in Section 9.2 step 1.
2. Remove the compression fitting that retains the nylon tube to the outlet of the air
regulator assembly. Pull the tube and compression fitting out of the air regulator
assembly.
3. Remove the nut on the rear panel air inlet bulkhead connector. The air regulator
assembly can now be pulled forward so the connector clears the rear panel and then
remove from the instrument. Replacement is the reverse of removal.
4. Check that no air leaks are present and that the gauge can be set to 12psi with the
nebuliser connected.
43 PFP7/REV C/01-08
Section 10
Spare parts
44 PFP7/REV C/01-08
Thank you for reading this data sheet.
For pricing or for further information, please contact us at our UK Office, using the details
below.
UK Office
Keison Products,
P.O. Box 2124, Chelmsford, Essex, CM1 3UP, England.
Tel: +44 (0)1245 600560
Fax: +44 (0)1245 808399
Email: [email protected]
Please note - Product designs and specifications are subject to change without notice. The user is responsible for determining the
suitability of this product.