ASSEMBLY DRAWING NO. : 220 - PRB - E01 220 - PRS - E01 220 - PRS - E011
ALL INSTALLATION OF THE ABOVE STEEL STRUCTURE " PRIMARY REGIND AREA BUILDING AREA " HAS BEEN
COMPLETED INSTALLED SATISFACTORY IN ACCORDANCE WITH THE CLIENT SPECIFICATION
10
15 Grouting Completed
STEEL STRUCTURE PRIMARY REGRIND AREA HAS BEEN COMPLETED INSTALLATION SATISFACTORY IN
ACCORDANCE WITH, ISOMETRIC DRAWING AND THE CLIENT SPECIFICATION
Sign Off
Item Punch List Before After Discipline Action By Category Priority Close Date Remark
Conractor Client
Penetrant Application
Spraying Black light intensity : µw/cm2
Brushing Light Intensity : Lux
Other/ Light meter S/N :
Part Of IND. Size (mm) Result Welder IND. Size (mm) Result
Weld Welder Stamp No Part Of Weld Stamp No
Liner Rounded ACC REJ Liner Rounded ACC REJ
PT EMK PTAR
Name : Name :
Date : Date :
MILLING CAPACITY EXPANSION PROJECT
EMK Client
Contract
:
:
Report No.
Date
:
:
Ptoject : Sheet :