IOM - YAH-D - Ceiling Mounted FCU

Download as pdf or txt
Download as pdf or txt
You are on page 1of 15

YAH-D

Fan Coil Unit

INSTALLATION, OPERATION, MAINTENANCE IOM No:YAH-D-01IOM(YMM)(1215) SUPERSEDE :

Fan Coil Unit (Belt Drive)


Contents

Introduction to the Unit ···························· 1 Start, Troubleshoot and Operation ·············· 7


Brief Introduction ····································· 1 Check before Start ···································· 7
Main Parameters ······································· 2 Electrical Connection ································· 8
Unit Dimensions ······································· 3 Fan Part ················································· 8
Main Components ····································· 4 Motor ··················································· 9
Transportation & Installation ····················· 5 Adjustment of Belt and Belt Pulley ················ 9
Transportation·········································· 5 Mechanical Inspection································ 10
Receiving ··············································· 5 Not in use for Extended/Long Period of Time ···· 10
Storage ·················································· 5 Precautions during Starting Operation 10
Lifting of the Unit ····································· 5 Maintenance & Repairing ························· 11
Points for Attention before Installation ············· 5 Filter Part ··············································· 11
Points for Attention during Installation ············ 5 Cooling Coil Heating Coil ························· 11
Brief Introduction to Installation ···················· 5 Fan Part ················································· 11
Motor ··················································· 12
Checking on Electrical Parts and Safety Devices 12
Precautions during Maintenance ···················· 12
Failure Analysis ······································ 12
Low Air Flow Rate···································· 12
High Air Flow Rate ··································· 12
High-level Noise ······································ 12
Belt Breaking ·········································· 12
Introduction to the Unit
Installation, Operation and Maintenance Manual of the YAH-D Series Air Handling Unit

Introduction to the Unit


Brief Introduction
York YAH series is ceiling-mounted air handing unit, with a double-suction centrifugal forward multi-blade
which is used in central air conditioning system terminal. blower, combine with a totally enclosed fan cooled
Its functions are cooling, moisture separation, filtering, three-phase asynchronous motor of protection rate up to
purifying and ventilating, etc. It is applicable for supply IP55 and class F insulation, 380-415V 3-phase 50Hz as
of conditioned air to the place within distance through air standard offer power supply and a lubrication-free
duct, particularly applicable for small commercial bearing.
buildings and industry air conditioning projects. This series featuring its compact in size, easy installation,
York YAH air handling unit series provides 10 kind of simple operation, occupy small building area, low noise
models to be selected by client; each with different coil level, high refrigeration capacity, optional air delivery
arrangement option. The refrigerating capacity ranged distance (long or short), reasonable price, etc..
from 8kW to 115kW under the return air operating The structure of unit is designed with PE insulated
condition; 18kW to 252kW under the fresh air operating galvanized steel plate box, built-in cooling coil and fan
condition. Air flow rate is ranged from 1,500m3/h to and open return nylon filter. The cooling and heating
15,000m3/h. coils adopts the copper sleeved hyperbolic corrugated
York YAH model units are belt driven transmission type. aluminium sheets and the fins are arranged by 10~13
High quality fan, motor and pulley belt are selected for pieces per inch. The filter can be removed from the side
stable performance and high efficiency. Units is equipped or bottom.
.

Description of the Unit Model Code


TRANSPORTATION & INSTALLATION
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Air Handling Unit

Distinguish Left and Right Coil Connection Type


Facing toward air flow inlet, water inlet and outlet pipes arranged on the left hand side of the unit indicate left hand coil
connection type; conversely, it is a right-hand connection type. By default, the access door are designed at the same side
with coil connection type.

Main Parameters

Motor Dimensions(mm) Weight(kg)


Airflow Fan
Model Motor type power
m3/h type
(kW)
4 6
L W H
Rows Rows
YAH1.5B 1500 0.55 860 850 417 90 94
YAH02B 2000 0.55 860 935 417 97 103
YAH03B 3000 High 3-Ø 1.1 860 1360 417 132 140
YAH04B 4000 efficient, asynchronous 1.1 860 1600 417 155 165
YAH05B 5000 double motor, 1.5 940 1500 508 171 183
YAH06B 6000 air inlets F class 2.2 940 1750 508 193 208
YAH08B 8000 forward insulation, 3.0 980 2250 508 237 256
YAH10B 10000 curved IP55 3.0 1100 1850 736 264 292
YAH12B 12000 3.0 1150 2150 736 321 355
YAH15B 15000 4.0 1170 2625 736 377 419

Notes:
1. The unit weight listed in table above is shipment weight, based on weight of unit with additional 20%
considered.
TRANSPORTATION & INSTALLATION
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Air Handling Unit

Unit Dimensions

Drawing above applies to left hand unit.

Return air flange


L W H Supply air flange size Piping position
size

Airflow K
Model
3
m /h Return Fresh
A B C D E F G H J 6 L M N P Q
air air
Rows
4 Rows 4 Rows

YAH1.5B 1500 860 850 417 410 259 228 - 73 53 66 66 110 400 144 319 710 320

YAH02B 2000 860 935 417 410 259 228 - 73 53 66 66 110 400 144 319 795 320

YAH03B 3000 860 1360 417 470 259 228 184 73 53 66 66 110 400 144 319 1220 320

YAH04B 4000 860 1600 417 520 259 228 184 73 53 66 66 110 400 144 319 1460 320

YAH05B 5000 940 1500 508 580 232 262 184 107 63 66 66 110 400 144 420 1360 411

YAH06B 6000 940 1750 508 551 232 262 184 107 63 66 88 110 400 144 420 1610 411

YAH08B 8000 980 2250 508 705 298 262 244 107 63 66 88 110 400 144 420 2110 411

YAH10B 10000 1100 1850 736 690 471 404 - 112 77 83 110 138 441 145 641 1710 639

YAH12B 12000 1150 2150 736 690 373 404 294 112 77 83 110 138 441 145 641 2010 639

YAH15B 15000 1170 2625 736 793 373 40 294 112 77 83 110 138 441 145 641 2485 639

Note: G column expressed with “-” indicates the unit with only one air inlet.
TRANSPORTATION & INSTALLATION
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Air Handling Unit

Coil Connecting Pipe Diameters List


Coil piping (Connection diameter)
R (mm)
Model
Return air Return air Fresh air Fresh air Return air Return air Fresh air Fresh air
4 Rows 6 Rows 4 Rows 6 Rows 1 Rows 2 Rows 1 Rows 2 Rows
YAH1.5B Φ34 Φ34 Φ34 Φ34 Φ34 Φ34 Φ34 Φ34
YAH02B Φ34 Φ34 Φ34 Φ48 Φ34 Φ34 Φ34 Φ34
YAH03B Φ34 Φ48 Φ48 Φ48 Φ34 Φ34 Φ34 Φ34
YAH04B Φ48 Φ48 Φ48 Φ48 Φ34 Φ34 Φ34 Φ34
YAH05B Φ48 Φ48 Φ48 Φ60 Φ34 Φ34 Φ34 Φ34
YAH06B Φ48 Φ60 Φ60 Φ60 Φ34 Φ34 Φ34 Φ48
YAH08B Φ48 Φ60 Φ60 Φ60 Φ34 Φ48 Φ34 Φ48
YAH10B Φ60 Φ76 Φ76 Φ89 Φ48 Φ48 Φ48 Φ48
YAH12B Φ60 Φ76 Φ76 Φ89 Φ48 Φ48 Φ48 Φ48
YAH15B Φ60 Φ76 Φ76 Φ89 Φ48 Φ48 Φ48 Φ48

Note:
1. The coil connecting pipes uses the male thread of which the corresponding diameter in imperial unit
are shown below:
34mm —— 1″
42mm —— 1-1/4″
48mm —— 1-1/2″
60mm —— 2″
76mm —— 2-1/2″
89mm —— 3″
2. Condensate water pipe uses the male thread of 34mm in diameter.

Main Components
The main components of the YORK YAH ceiling air handling unit include:
Main Fittings:
Blower: SYT series double-suction forward centrifugal fan with V-belts transmission.
Motors: IE3 efficiency three-phase asynchronous motor, with class F insulation and IP55 protection rate.
Heat exchanger coil: Cooling/ Heating, 3Rows/4Rows + Heating 1Row/2rows.
Filter: Nylon Filter

Optional Fittings:
Filter: Aluminium Mesh filter, Washable synthetic fiber filter class G3 & G4.
TRANSPORTATION & INSTALLATION
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Air Handling Unit

TRANSPORTATION & INSTALLATION


Transportation Before the unit starts operate, clean and remove dirt that
are found in the water collecting tray and the water drain
a. The packed unit shall prevent from collision, topple, pipe.
crush, rain or snow during transporting process.
Note:
b. Move and handle the unit with care. Prevent contact
on coil inlet and outlet section that will cause If dirt on the motor or the fan blades remain unattended,
York Company will not be able to provide any effective
damage or deformation.
maintenance and repairing service.
Receiving
Introduction to Installation
YAH air handling unit is tested, inspected and packed
properly prior to delivery. Upon receiving, please carry Hydraulic Pipeline
out inspection to ensure that the unit is in good condition. All water inlet and outlet pipes should be constructed
Any damage noticed upon unit receiving, kindly demand according to design drawing and York’s sample drawing.
verification from delivery personnel; otherwise, York On the other hand, the hydraulic pipeline must be laid in
will not take any responsibility on it. accordance with the space allocation, ensuring accurate
pipe connection. Sufficient space should be reserved
Storage along water pipe for power and control cables (if
If the unit is stored outdoors, it should be protected required), or to insert thermal insulation sheet.
against moisture, rust and dust. The coil header of hot and cold coil are equipped with
the air exhaust and water drainage plugs. The exhaust
Lifting of Unit valve is positioned at the highest point of the water-outlet
During the lifting process, prevent improper operation header and the water-drainage valve is placed at the
that may cause damage to the unit. Insert corrugated lowest point of the water inlet collector.
sheet(cardboard) at contact point between lifting rope
and unit body to avoid damage on unit’s surface. Safety device should be installed at hot water inlet to
prevent the internal temperature of unit exceeding 60℃
Before Installation in the case of fan malfunction.
Before the unit is installed, the building should prepare Pipeline Support
the following:
The weight of every water pipe should be sustained by
1. Water Supply its supporter and not bear by the unit. Meanwhile,
2. Power Supply sufficient space should be reserved at water inlet, outlet
and drain pipe for pipe connection work.
3. Fresh air duct and return air duct
If hot and cold water shares the same pipe, note that pipe
4. Ceiling suspension mounting
will subject to contraction and expansion. It’s very likely
Item no.4 above is crucial. The distance between for the pipe to suffer from burst or damage if it is fixed
mountings should be same as in unit design to ensure firmly without extra space.
proper installation. Any inaccurate mounting position or
the displacement of water pipe might cause delay to Water Direction Identification
installation work. Any changes on site might cause extra The water inlet and outlet pipe connection can be
installation cost. arranged at right or left side of the unit. With the view
from unit air inlet (or along the air flow direction), if the
During Installation water inlet and outlet ducts are at the right side of the
unit, the unit is called a Right-hand Unit; conversely, it is
During installation, be careful not to make the plaster a Left-hand Unit. Alert to the difference between
stone, paint or dirt deposit on the panel, electric motor or Right-hand and Left hand unit when connecting the pipes.
fan blades, also not to damage the panel and heat
insulation sheet during the installation.
Start, Commissioning and Running
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Air handing Unit

Air Venting of the Coil


Each unit has a manual venting valve at the highest point of the coil. Open the valve to release air trapped in the coil,
keeping a steady water flow and uniform heat exchange condition. The air accumulated in the coil should be exhausted
regularly.
Condensed Water Drainage
Warning
Dear users,
Before the installation and commissioning of your unit, please connect the water
seal (not provided by York) with the condensed water drain pipe according the
following condition.
The coil is positioned in the negative pressure side:
P= Absolute Negative Pressure Value (Pa)
A= B ≥ P/10+20 (mm)

Air Duct Connection


The connection between the return air duct and the external filter frame and that between the air outlet flange and the air
delivery duct must be flexible. The rigid connection between the unit and the air outlet flange must be prohibited. Air
duct should be install with its own support, never let the unit to bear its weight, to avoid extra load on the unit.
Shock Absorber
The hoisting equipment should be equipped with shock absorber to prevent occurrence of resonance and increase of
low-frequency noise. It is suggested to install the shock absorber near to the hook support.

Precautions during Installation:


1. The unit should be installed horizontally in order to ensure smooth water drainage and a normal operation.
2. There should not be any foreign substance piled up in the water drain tray; and all foreign matters should be
removed from the tray. Only if the water drain path is guaranteed to be unobstructed can the unit be started up.
3. All cooling water pipe valve and cold water pipe of the unit should be supplied with anti-condensing protection.
Unless the cooling water pipe valve and cold water pipe are provided with a heat insulating sheet, the extended
tray should be added to the cooling water pipe valve and the cold water duct during installation work.
4. The length of air duct connection should not exceed the unit’s defined duct length. Moreover, the air duct is not
allowed to bear any load and should be connected with flexible joint.
5. The ceiling suspension unit can only be installed in non-flammable place.
6. The condensed water discharge duct must be installed with an external water seal device.
7. Demand on water quality: It’s recommended to use soft water to keep the unit under good operating condition.
Maintenance and Repairing
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Fan Coil Unit

Start, Troubleshoot and Operation


Check before Start
Check the YAH unit before start up.
1. Remove dust from interior and exterior of the unit.
2. Check for any loose component.
3. Check all moveable parts for ease of movement.
4. Check all electrical connection for motor, lights and control equipment. Perform checking on wiring, earth
connection and power supply; configure protection devices for short-circuit, overload and phase loss.
5. Clean the condensed water inlet and outlet U bends and fill it with water properly.
6. Perform water pressure system and air ventilation tests.
7. Before turning on the fan, check the air path, the flexible sleeve tube or the duct connection.
8. Check the fin surface. Clean with “Fin Comb” when required.
9. For belt-driven unit, check the belt tension, which should be in accordance with the following figure (Belt
Tension Indicator Drawing).
10. Check whether the rough filter is fitted place and ensure no debris or foreign substances attached on it.
11. Check whether the connection duct has been installed properly and the water flow is up to the standard.
Maintenance and Repairing
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Fan Coil Unit

ELECTRICAL CONNECTION
1. The electrical wiring can be configured by users with reference to Figure 1 or Figure 2, which is not provided with
the standard unit. The wires should be tightened.
2. All electrical connections should meet the local electrical installation standard.
3. The grounding point provided in the unit should be connected to the ground terminal of the unit control box.
4. Check whether every power supply is in accordance to the rating voltage on unit name plate and the power
distribution should adopt a proper fuse.
5. Check whether the protection devices against short circuit, overload and phase loss have been allocated along with
power input connection.

Figure 1 Principle Diagram Figure 2 Principle Diagram


Illustration for Direct Start up in case Illustration for Y-△ Start-up in case
of Motor Power ≤ 5.5KW of Motor Power ≥ 7.5KW

FAN PART
1. Switch off the master switch before carry out an internal inspection to the fan.
2. Check whether the electrical connected components of the unit is in accordance to circuit diagrams.
3. Check the motor’s rating plate and observe whether the rated voltage, phase and circuit are in accrdance with the
power supply recorded in field.
4. Before the fan starts operate, check for foreign matter in the fan housing, then rotate the fan blade manually and
check for any collision and friction to the housing; listen for any abnormal noise produced from bearing. If there is
no abnormity only the fan can be turn on.
5. After the power is switched on, first turn on the fan and check for correct rotate direction. If not, turn off the fan
and change the power phase sequence, then connect it with the power supply formally.
6. Check the motor operating current with ammeter and compare the obtained current value with data indicated in the
motor rating plate.
Maintenance and Repairing
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Fan Coil Unit

CHECKING THE FAN BEARING


Belt drive fans for all YAH unit are equipped with the permanent leak-proof lubricated bearings.
If the unit starts operation soon after delivered from the factory, no extra measure should be taken.
When turning on units that are not in use for extended period of time, it will depends on how long the unit has been
unused and the climate conditions to decide whether or not take the following measures on bearing:
1. Clean up the dusts and grease on bearing surface. For the case of unit unused for more than a month, manually
rotate the fan and listen for any abnormal noise and observe the bearing smoothness.
2. After 15 minutes of startup, if abnormity on bearing are observed, open up the cover of bearing. If the lubricating
grease appears to be black in color, then change the lubricant. Remove the old grease, then clean the bearing with
petrol and dry it. Next, fill in new lubricating grease entirely. Type of lubricant used are ALVANIA RL2 or GOLD
GREASE NO.3.
3. Check the temperature rise of the bearing, which should be less than 40℃.
4. If the unit has been unused for a long time or it is under an adverse weather conditions, the condensed water will
result in the rusting of bearings. In this case, it is required to replace it with a new bearing.
5. Reassemble the bearing, ensuring that the conical socket has been tighten and is within the specified margin
tolerance. Measure the temperature of the bearing after 15-minute trail operation, which should not be greater than
the ambient temperature.

MOTOR
It is possible to store the rotation equipment for a certain period of time. Even if the storage time and condition meet the
specifications, a series of electrical and mechanical checks are still necessary.
For the motor of 7.5KW or above, it should be equipped with a voltage dropping starter, avoiding the
over-starting-current.
STORAGE CONDITIONS
The motor should be stored in a dry environment, in which if the humidity exceeds 90%, the motor insulation device are
subject to prompt damage; when the humidity is up to 100%, the insulation device will lose its function completely.
Ambient Temperature
The ambient air temperature changes with the seasons but will not be greater than 40℃.

ADJUSTMENT OF BELT & BELT PULLEY


Adjustment of Smoothness
For the belt drive unit, inspect the alignment of the fan and motor belts with a ruler, that is, points of A, B, C and D
should be in the same line; otherwise, it is needed to adjust the alignment of the belt pulley.

Four-Point
Inspection
Method

Warning: Over-tightened or loose belt will influence the performance of fan operation.
Maintenance and Repairing
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Fan Coil Unit

Belt Adjustment
1. Before the starting and operation of your unit, check the tension of the belt.
2. After one-week operation, the belt will be expanded slightly. In this case, readjust the tensile force applied to the
belt and make it comply with the specifications listed in the belt Tension Indicator.
3. After 30-day operation of the unit, check the tension of the belt again.
4. After 3-months operation of the unit, make a complete inspection.

Mechanical Inspection
When in contact with air, the grease used to lubricate the bearing will suffer from oxidation or even deterioration.
Applying oxidized lubricating grease shall further shorten the life cycle of motor bearing.
Storage Time

< 6 months 6 months to one year > one year


The motor can be put into The motor should be lubricated Lubricate the motor
service directly if it is with grease before starting several times, ensuring
stored under proper operation. that all lubricant has been
conditions. replaced.

If the motor is lubricated just before it operates, a more effective lubricating effect can be obtained.

Not in use for Extended/Long Period of Time


If the motor of the unit has been unused for a long time, the incidents described above may occur.
In order to avoid the problems above, it is suggested to adopt an anti-condensation heater and perform a routine
maintenance.

Precautions during Starting Operation


1. Before the unit starts operation, loosen the coil air vent and release the air pockets in the coil.
2. During the operation of the unit, the water pressure should not be greater than 1.6MPa; the vapor pressure should
not be greater than 0.4MPa.
3. During the operation of the unit, all panels should be kept fixed firmly.
4. Strictly forbidden shutting off the air valve of the system duct during the normal operation of the fan; otherwise,
the casing structure may be damaged due to over-pressure.
5. If power failure occurs in the operation of the unit, shut down the cooling and heating pipeline, avoiding forming a
“boiler” or a “refrigerator” due to over-high or over-low temperature in the unit case.
6. When start up the unit, switch on the fan first and then the cooler, heater and humidifier; when shut down the unit,
close the cold or hot water pipeline and then switch off the fan.
7. In the cold area in winter, when starting the unit for heating, switch on the heater and make it operate 5 to 10
minutes or so first, then, start the fan, preventing the large amount of cold air from forming ice chock in the heat
exchanger; when stopping the unit, close the fresh air duct valve first and then stop the heating by hot water, drain
the accumulated water in the heater, and shut down the fan immediately, avoiding electrical equipment (such as
motor) failure due to overheat inside the unit and bearing grease loss.
Maintenance and Repairing
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Fan Coil Unit

Maintenance and Repairing


Filter
The nylon panel filter of 21mm in thickness is provided with the unit, which can filter dirt such as dust, soot, pollen and
other foreign substances.
When cleaning the filter, gently shake off the accumulated foreign matters. If required, clean it with the warm water
filled with liquid detergent, dry it and reassemble it back to the filter frame.
The filter can be removed from the unit only by dissemble the cover plate in the side or on the bottom of the filter
frame.
Operating
1. Remove the dirty filter away from the slip fitting carefully. Be careful not to course the dirt on other parts.
2. Shake the filter and wash it in the soap solution at temperature of 40℃.
3. Replace the filter if it has been damaged.
4. For the installation of a new filter, operate according to steps above in reverse order.

Cooling coil and Heating Coil


1. Observe the dirt accumulated in the heat exchanger and clean it if required (it is recommended to clean it with the
compressed air or high-pressure vapor at the air outlet side.
2. Check whether the cooling or heating liquid flows in correct direction.
3. When the unit stops work in winter, drain the accumulated water in the coil. If required, blow in the pipe with
compressed air, preventing the pipe from crack due to freeze.
4. Perform a complete maintenance after 3-year operation of the unit, cleaning the water deposition in the heat
exchanger, ensuring a good heat exchanging effect.
Replacement of Damaged Coil
If the coil is needed to be replaced, the side panel has to be removed.
After disconnecting the connection pipe, remove the side panel. The coil is installed in the unit chassis, disassemble coil
baffles first; then, replace the coil, reinstall the coil baffles on the new coil.

Fan Part
1. Before repair the internal part of the fan, switch off the control switch.
2. Check the V-belt and its tension regularly. If it is found that the tensile force applied to the belt is not enough,
retighten it. For correct tension data, refer to the Belt Tension Indicator.
3. Check the alignment of motor, fan V-belt and pulley.
4. Check whether the interior flexible parts are fixed firmly.
5. Check whether the motor can operate freely.
6. Refer to the maintenance instruction provided by the motor supplier.
7. Check if the fan are able to rotate smoothly, check the temperature of bearing.
8. Clean the fan blade regularly.
Fan Bearing
The double suction forward fan used in the YAH unit is designed with sealed bearing and normal service life is 75,000
working hours at least.
Due to continuous improvement and development, we reserve the right of changing the technical specification and
dimension without notice in advance.
Maintenance and Repairing
Installation, Operation and Maintenance Manual of the YAH-D Series Ceiling Fan Coil Unit

MOTOR
Any maintenance should be carried out in comply according to the motor instruction manual. This manual only provide
partial of technical information.
Replacement of Motor
Replace the motor from one side of the unit or after the top or side frame panel is removed.

Checking on Electrical Parts and Safety Devices


Carry out the routine check on all electrical parts and safety devices.
1. Water valve and air admission valve of the system duct.
2. Earth system.
3. Air switch.

Precautions during Maintenance


1. Maintenance work of the unit should be done by professional personnel. He/she should responsible for the
inspection and repairing routine. It is necessary to imply a strict job responsibility system and operating guides to
strengthen the maintenance and repair work.
2. Clean the inner part of unit regularly.
3. Check the electrical equipment of the unit regularly.
4. Refill or add grease to parts that required lubricant after 6 to 12 month operation of the unit.
5. Before repair work, switch off the power supply and place a warning sign to avoid from accident.
6. Open the air vent of the coil pipe regularly to release air trapped inside to maintain the optimum heat exchange
cycle efficiency.
7. When the air conditioner unit operates in winter and needs to stop operation, the fresh air valve of the system
pipeline must be closed, preventing the heater from failure due to freezing.

Failure Analysis

Low Air Flow Rate High-level Noise


The actual static pressure outside the unit is greater than Check whether there is a flexible connection between the
the design static pressure, the air flow rate is turned into air return and delivery duct; whether the mounting is
the static pressure. Thus, the air flow rate is lower than equipped with a shock absorber; whether the wind speed
normal. at air outlet is over high and whether is there any loosen
Loose belt causes reduction on rotation speed of the fan, part.
resulting in a low air flow rate.

High Air Flow Rate Belt Breaking


The actual static pressure outside the unit is lower than the In this case, check whether the belt is under over-tension,
design static pressure, and the static pressure is turned into misalignment between fan and motor belt pulley or poor
the air flow rate, making the air flow rate higher than belt quality.
normal. The increased air flow rate makes the wind speed
increase, consequence in high unit voice.
Product Origin :-

York (Malaysia) Manufacturing Sdn. Bhd.


Jalan Pengapit 15/19, P.O. Box 7196,
40706 Shah Alam, Selangor Darul Ehsan,
Malaysia.
Tel: +603 55192293
Fax: +603 55106282

www.johnsoncontrols.com

YAH-D-01IOM(YMM)(1215)
While utmost care is taken in ensuring that all details in the publication are correct at the time of going to press,
we are constantly striving for improvement and therefore please confirm with your local distribution office
for the latest update on the product interested. All rights reserved.

*Photo used for illustration purposes only