Group 7 RCV Lever: 1. Removal and Install

Download as pdf or txt
Download as pdf or txt
You are on page 1of 19

GROUP 7 RCV LEVER

1. REMOVAL AND INSTALL


1) REMOVAL
(1) Lower the work equipment to the ground
and stop the engine.
(2) Operate the control levers and pedals
several times to release the remaining
pressure in the hydraulic piping.
(3) Loosen the breather slowly to release the
pressure inside the hydraulic tank.
Escaping fluid under pressure can
penetrate the skin causing serious injury. 2
(4) Loosen the socket bolt(2).
(5) Remove the cover of the console box.
1
(6) Disconnect pilot line hoses(3).
(7) Remove the pilot valve assembly(1). 3
Ɠ When removing the pilot valve assembly,
check that all the hoses have been
disconnected.

2) INSTALL
(1) Carry out installation in the reverse order
to removal.
(2) Confirm the hydraulic oil level and check
the hydraulic oil leak or not.

8-118
2. DISASSEMBLY AND ASSEMBLY
1) STRUCTURE

451

402
421
422
453
454 452

401
455
458 431

457 411 456


412
413
501
323
301
459 315
302

212-2 312

213
212-1
211
151
214
215
121
216-1
125
241-1
216-2 217
241-2 221
201
126
101
122
111

Port 2,4 Port 1,3

8-119
101 Casing 216-1 Spring seat(port 1,3) 413 Plain washer
111 Port plate 216-2 Spring seat(port 2,4) 421 Screw 2
121 Seal washer 217 Washer 2 422 Nut
122 O-ring 221 Spring 431 Screw 3
125 Hex socket screw 241-1 Spring(port 1,3) 451 Roller
126 Spring pin 241-2 Spring(port 2,4) 452 Lever
131 Bushing 301 Universal joint 453 Switch seat 1
151 Plate 302 Plate 454 Switch seat 2
201 Spool 312 Adjust nut 455 Switch
211 Plug 315 Lock nut 456 Cord
212-1 Push rod(port 1,3) 323 Handle bar 457 Bushing
212-2 Push rod(port 2,4) 401 Handle 458 Tube
213 Seal 402 Handle cap 459 Terminal
214 O-ring 411 Screw 1 501 Bellows
215 Washer 1 412 Nut

8-120
2) TOOLS AND TIGHTENING TORQUE
(1) Tools

Tool name Remark

Allen wrench 6 B
22
Spanner
27
( + ) Driver Length 150
( - ) Driver width 4 ~ 5
Torque wrench Capable of tightening with the specified torques.

(2) Tightening torque

Torque
Part name Item Size
kgfşm lbfşft
Socket head bolt 125 M8 3.0 Ź 0.3 21.7 Ź 2.2
Joint 301 M 14 3.5 Ź 0.25 25.3 Ź 1.8
Adjusting nut 312 M 14 5.0 Ź 0.35 36.2 Ź 2.5
Lock nut 315 M 14 5.2 Ź 0.35 36.2 Ź 2.5
Screw 1 411 M4 0.05 0.36
Screw 2 421 M4 0.01 0.07
Screw 3 431 M5 0.09 Ź 0.01 0.65 Ź 0.07

8-121
3) DISASSEMBLY
(1) Clean pilot valve with kerosene.
Ɠ Put blind plugs into all ports
(2) Fix pilot valve in a vise with copper (or
lead) sheets.
(3) Remove end of bellows(501) from casing
(101) and take it out upwards.

Ɠ For valve with switch, remove cord(456)


also through hole of casing.

(4) Loosen lock nut(315) and adjusting nut


(312) with spanners on them respectively,
and take out handle section as one body.

8-122
(5) Loosen adjusting nut(312) and plate(302)
with spanners on them respectively, and
remove them.

(6) Turn joint anticlockwise to loosen it,


utilizing jig (special tool).
Ɠ When return spring(221) is strong in
force, plate(151), plug(211) and push
rod(212-1, 2) will come up on loosening
joint. Pay attention to this.

8-123
(7) Remove plate(151).

(8) When return spring(221) is weak in force,


plug(211) stays in casing because of
sliding resistance of O-ring.
Ɠ Take it out with minus screwdriver.
Take it out, utilizing external periphery
groove of plug and paying attention not to
damage it by partial loading.
Ɠ During taking out, plug may jump up due
to return spring(221) force.
Pay attention to this.

(9) Remove reducing valve subassembly


and return spring(221) out of casing.
Ɠ Record relative position of reducing
valve subassembly and return springs.

(10) Loosen hexagon socket head cap screws


with hexagon socket screw key.

8-124
(11) Remove port plate(111) and O-ring(122)
out of casing.

(12) Take out bushing(131) from casing.

(13) For disassembling reducing valve section,


stand it vertically with spool(201) bottom
placed on flat workbench. Push down
spring seat(216-1, 2) and remove two
pieces of semicircular washers1(215) with
tip of small minus screwdriver.
Ɠ Pay attention not to damage spool
surface.
Ɠ Record original position of spring
seat(216-1, 2).
Ɠ Do not push down spring seat more than
6mm.

(14) Separate spool(201), spring seat(216),


spring(241-1, 2) and washer 2(217)
individually.
Ɠ Until being assembled, they should be
handled as one subassembly group.

8-125
(15) Take push rod(212-1, 2) out of plug(211).

(16) Remove O-ring(214) and seal(213) from


plug(211).
Use small minus screwdriver or so on to
remove this seal.

(17) Remove lock nut(315) and then bellows


(501).

8-126
(18) Remove handle cap(402).
Ɠ For valve without switch, remove cap
(403) too.

(19) Loosen machine screw 2(421) with plus


screwdriver and remove it together with
nut(422).
Ɠ For valve with 2-point switch, roller(451)
can be taken out.

(20) Loosen machine screws 3 % 1(431 %


411) with plus screwdriver and remove
machine screw 1, nut(412) and plain
washer(413).

8-127
(21) Disassemble handle(401) into two.
Ɠ For valve with switch, switch lever (452),
switch(455) and switch seats 1 & 2(453 &
454) can be taken out.

(22) Cleaning of parts


‫ ڸ‬Put all parts in rough cleaning vessel
filled with kerosene and clean them
(rough cleaning)
Ɠ If dirty part is cleaned with kerosene just
after putting it in vessel, it may be
damaged. Leave it in kerosene for a
while to loosen dust and dirty oil.
Ɠ If this kerosene is polluted, parts will be
damaged and functions of reassembled
valve will be degraded.
Therefore, control cleanliness of
kerosene fully.
‫ ڹ‬Put parts in final cleaning vessel filled
with kerosene, turning it slowly to clean
them even to their insides(finish
cleaning).
Ɠ Do not dry parts with compressed air,
since they will be damaged and/or rusted
by dust and moisture in air.

(23) Rust prevention of parts.


Apply rust-preventives to all parts.
Ɠ If left as they after being cleaned, they will
be rusted and will not display their
functions fully after being reassembled.

8-128
4) ASSEMBLY
(1) Assemble bushing(131) and O-ring(122)
into casing(101).

(2) Fit port plate to casing(101) with hexagon


socket head cap screws(125) and seal
washers(121).
Ɠ Keep such assembling position that
spring pin(126) can enter into casing hole.

8-129
(3) Tighten hexagon socket head cap
screws(125) to the specified torque.
Ɠ Tighten two bolts alternately and slowly.

(4) Put washer 2(217), spring(241-1, 2) and


spring seat(216-1, 2) onto spool(201) in
this order.

(5) Stand spool vertically with its bottom


placed on flat workbench, and with
spring seat pushed down, put two pieces
of semicircular washers 1(215) on spring
seat without piling them on.
Ɠ Assemble washer 1(215) so that its
sharp edge side will be caught by head of
spool.
Do not push down spring seat more than
6mm.

(6) Assemble spring(221) into casing.


Assemble reducing valve subassembly
into casing.
Ɠ Assemble them to their original positions.

8-130
(7) Assemble O-ring(214) onto plug(211).

(8) Assemble seal(213) to plug(211).


Ɠ Assemble seal in such lip direction as
shown below.

(9) Assemble push rod(212-1,2) to plug(211).


Ɠ Apply working oil on push-rod surface.

(10) Assemble plug subassembly to casing.


Ɠ When return spring is weak in force,
subassembly stops due to resistance of
O-ring.

8-131
(11) When return spring is strong in force,
assemble 4 sets at the same time,
utilizing plate(151), and tighten joint(301)
temporarily.

(12) Fit plate(151).

(13) Tighten joint(301) with the specified


torque to casing, utilizing jig.

(14) Assemble plate(302) to joint(301).


Ɠ Screw it to position that it contacts with 4
push rods evenly.
Ɠ Do not screw it over.

8-132
(15) Assemble adjusting nut(312), apply
spanner to width across flat of plate(302)
to fix it, and tighten adjusting nut to the
specified torque.
Ɠ During tightening, do not change position
of disk.

(16) Tighten machine screw 3(431) to the


specified torque to fix handle bar and
handle.

(17) For valve with switch, assemble parts for


switch to handle.
Ɠ Pay attention to projections/ depression
for assembling on switch seat, switch,
switch lever, etc.

(18) Assemble remaining handle(401).

8-133
(19) Assemble cap(402) and tighten machine
screw 2(421) and nut(422) to their
specified torques.
Ɠ For valve with switch, assemble roller
(451) instead of cap and tighten them.
In this time confirm that the clearance
between roller and handle(401) is 0.5 to
1.5mm.

(20) Tighten remaining machine screws 3


(431) to the specified torque.

(21) Tighten machine screws 1(411), plain


washer(413) and nuts(412) to the
241 TITE
LOC

specified torque.
Ɠ Apply loctite #241 to threaded sections of
machine screws 1, 2 and 3.

(22) Fit handle cap(402).

8-134
(23) Fit bellows(501) and lock nut(315), and
handle subassembly is assembled
completely.

(24) Pull out cord(456) and tube(458) through


adjusting nut hole provided in direction
60Şto 120Şfrom casing hole.

(25) Assemble bushing(457) to plate and pass


cord and tube through it.
Ɠ Provide margin necessary to operation.

8-135
(26) Determine handle direction, tighten lock
nut(315) to specified torque to fix handle.

(27) Apply grease to rotating section of joint


and contacting faces of disk and push
rod.

(28) Assemble lower end of bellows to casing.

(29) Inject volatile rust-preventives through all


ports and then put blind plugs in ports.

8-136