Dampier Moorings Handbook

Download as pdf or txt
Download as pdf or txt
You are on page 1of 22

Moorings Handbook

SHEQ-SYS-H-004 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 1 of 1
Mooring Handbook

DEFINITIONS
In the Port of Dampier, a cyclone mooring must have minimum capability of
Cyclone Mooring
holding a nominated vessel in 30-second gust, wind speed of 90 knots (at 10
metres above sea level) for a 50 year return period.
A person or organisation with appropriate professional qualifications to;
a) prepare the technical specifications of a mooring system including
Mooring Designer configuration and materials;
b) to review and make recommendations on inspection reports; and
c) to ensure on-going suitability of mooring systems.
A sample list of Mooring Designers is set out in Appendix B.
A person or organisation duly qualified for their range of business and
licensed in Western Australia:
Mooring a) capable of conducting mooring inspections above or below water; and
Inspector b) to produce measurements and records suitable for evaluation by a
Mooring Designer.
A sample list of Mooring Inspectors is set out in Appendix B.

Mooring Licence In the Port of Dampier, a mooring licence is written approval to either set
(install) or use a mooring.
Mooring Licence
Terms and The terms and conditions of the Mooring Licence a copy of which are set
Conditions out in Appendix C.

Mooring
Standards The standards and other terms contained in this document.

Mooring User The mooring owner or user of any mooring or proposed mooring.

The Port of Dampier, Western Australia and its seabed and port waters
Port
together with all wharves, piers and land that are owned, vested in,
occupied by, licensed to or controlled by the DPA.
Storm Mooring In the Port of Dampier, a mooring other than a Cyclone Mooring, capable
of withstanding winds and weather up to Beaufort force 8-9.

ABBREVIATIONS
DPA
Dampier Port Authority

E
East

HAT
Highest Astronomical Tide

LOA
Length Overall

MHWN Mean High Water Neap

MHWS Mean High Water Spring

SE
South East

SW
South West

WA
Western Australia

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 2 of 22
Mooring Handbook

CONTENTS

1.0 INTRODUCTION ..................................................................................................... 5


1.1 PORT OF DAMPIER MOORING STANDARDS ............................................................................................. 5
1.2 DAMPIER PORT AUTHORITY .................................................................................................................... 5
1.3 DISCLAIMER.......................................................................................................................................... 6

2.0 PREAMBLE .............................................................................................................. 6


3.0 DAMPIER WEATHER CONDITIONS ........................................................................ 7
4.0 INDICATIVE MOORING LOADINGS ............................................................... 7 & 8
5.0 MOORING DESIGN AND COMPONENTS ............................................................. 9
5.1 GENERAL ............................................................................................................................................. 9
5.2 MOORING CLASSIFICATIONS ................................................................................................................. 9
5.3 STORM MOORINGS ............................................................................................................................. 10
5.3.1 Positions .............................................................................................................................. 10
5.3.2 Storm Mooring Component Standards ........................................................................ 10
5.3.3 Deadweight Anchors .............................................................................................. 10 & 11
5.4 CYCLONE MOORINGS ........................................................................................................................ 11
5.4.1 Positions .............................................................................................................................. 11

6.0 RESPONSIBILITIES OF A MOORING USER............................................................ 11


6.1 COMPLIANCE WITH MOORING STANDARDS AND MOORING LICENCE TERMS AND CONDITIONS ............. 11
6.2 SALE OR TRANSFER OF MOORINGS.............................................................................................. 11 & 12
6.3 YEARLY RENEWAL APPLICATION AND INSPECTION REPORTS ................................................................... 12
6.4 HARBOUR MASTER TO BE NOTIFIED OF VESSEL MOVEMENT ..................................................................... 12

7.0 NEW MOORING INSTALLATION PROCEDURE .................................................... 12


7.1 APPLICATIONS .................................................................................................................................... 12
7.2 MOORING INSTALLATION..................................................................................................................... 12

8.0 ANNUAL MOORING APPROVAL PROCEDURE ................................................... 14


8.1 ANNUAL MOORING REPORT ................................................................................................................ 14
8.2 PAYMENT OF FEES ............................................................................................................................... 14

9.0 MOORING INSPECTIONS .................................................................................... 16


9.1 RESPONSIBILITY FOR INSPECTIONS ......................................................................................................... 16
9.2 ANNUAL INSPECTIONS ........................................................................................................................ 16
9.3 INSPECTION REQUIRED BEFORE SALE OR ASSIGNMENT OF MOORING ....................................................... 16
9.4 ADDITIONAL INSPECTIONS .................................................................................................................... 16
9.5 INSPECTION REPORTS........................................................................................................................... 16
9.6 DETERIORATION AND NON-COMPLIANCE OF MOORINGS...................................................................... 17
9.7 MOORING INSPECTORS ....................................................................................................................... 17
9.8 TYPES OF INSPECTIONS ......................................................................................................................... 17
9.8.1 In-Water Inspection Report ............................................................................................. 18
9.8.2 Partial Raising Inspections ............................................................................................... 18

10.0 INFORMATION FOR MOORING INSPECTIONS ................................................... 18


10.1 PREAMBLE ........................................................................................................................................ 18
10.2 ANCHORS ........................................................................................................................................ 18
10.3 GROUND LEG SUB ASSEMBLY ............................................................................................................ 18
10.3.1 Chain ......................................................................................................................... 18 & 19
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 3 of 22
Mooring Handbook

10.3.2 Connecting Hardware – Ground Tackle .................................................................... 19


10.3.3 Ground Ring...................................................................................................................... 19
10.3.4 Riser Chain Sub Assembly .............................................................................................. 19
10.3.5 Connecting Hardware - Riser ........................................................................................ 20
10.3.6 Swivel.................................................................................................................................. 20
10.3.7 Buoy Upper Portion .......................................................................................................... 20
10.3.8 Illumination ........................................................................................................................ 20
10.3.9 Buoy Lower Portion ................................................................................................. 20 & 21

11.0 UNACCEPTABLE MOORING DESIGN ................................................................ 21


12.0 REFERENCES ...................................................................................................... 22
APPENDIX B ‘VESSEL CYCLONE MOORINGS – CRITICAL ASPECTS FOR CONSIDERATION BY VESSEL OWNERS
AND OPERATORS’ ..................................................................................................................................... 22

13.0 APPENDIX .......................................................................................................... 22


APPENDIX A FORMS .................................................................................................................................. 22
APPENDIX B LIST OF MOORING INSPECTORS AND DESIGNERS ...................................................................... 22
APPENDIX C MOORING LICENCE TERMS AND CONDITIONS ......................................................................... 22

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 4 of 22
Mooring Handbook

1.1 Port of Dampier Mooring Standards

This document has been produced to:

(a) Meet the information needs of the owners, designers, installers and users of moorings in
the Port of Dampier;

(b) Provide information with regard to mooring design, installation, maintenance and
usage. However, this document in no way absolves companies from their duty of care
to their employees, contractors, products or operations or any other obligations they
may owe in relation to their employees, contractors, products or operations; and

(c) Set rules and procedures that bind all Mooring Users.

This document must be read in conjunction with the DPA's Mooring Licence Terms and
Conditions (Appendix C) and the DPA Cyclone Procedure available on the DPA website
www.dpa.wa.gov.au or on request from the DPA.

DAMPIER PORT AUTHORITY’S PRIORITY IS SAFETY


AND PROTECTION OF THE ENVIRONMENT.

1.2 Dampier Port Authority

The DPA is a State Government agency that operates the Port under the Port Authorities Act
1999. The DPA has responsibilities:

• to facilitate trade within and through the Port and plan for future growth and
development of the Port;
• for the safe, secure and efficient operation of the Port; and
• to protect the Port environment.

In this role, the DPA approves the installation and usage of moorings in the Port and
regulates the usage and maintenance of the moorings through its broad mooring licensing
regime and these Mooring Standards.

DPA Contact Details

Vessel Traffic Manager

MOF Road Burrup Peninsula, Dampier Western Australia 6713

(Postal Address PO Box 285, Dampier Western Australia 6713)

Phone: (08) 9159 6575

Fax: (08) 9159 6558

Email mailto:[email protected]
Web: www.dpa.wa.gov.au

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 5 of 22
Mooring Handbook

1.3 Disclaimer

The information contained in these standards is believed to be correct at the time of issue.
However, the DPA does not guarantee the accuracy of the information and accepts no
liability for any damage, delay or loss resulting from any such inaccuracy. For more recent
information, please consult a Mooring Designer or the DPA.

2.0 PREAMBLE
The Port of Dampier (see Figure 2-1) hosts a vast range of recreational and commercial
vessels each year, many of which use moorings instead of anchoring within port limits. These
moorings may be recreational or commercial Storm Moorings or heavier construction
Cyclone Moorings. All moorings within the Port are managed by the DPA and the DPA's
approval is required for the design and installation of a mooring and the use of moorings.
The DPA monitors annual inspections, maintenance and repair of moorings within the Port.
DPA’s aim is to promote fair and equitable access to moorings, to ensure all moorings are
maintained to a high standard.

Each mooring must be capable of holding the assigned vessel and correct guidance and
advice from the Mooring Designer is necessary to safeguard the vessel owner’s investment.
A sample list of Mooring Designers and Mooring Inspectors can be found in Appendix B,
however DPA makes no guarantee in relation to individual company performance or
capability and vessel owners are advised to conduct their own due diligence when
selecting any mooring contractor.

All Mooring Licences are of a temporary nature and no person has a property right in any
mooring location without an express grant by the Commonwealth or WA State
Governments.

Figure 2-1 AUS 57, Dampier Archipelago

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 6 of 22
Mooring Handbook

3.0 DAMPIER WEATHER CONDITIONS


The Port of Dampier is centred at 20 degrees 30’ South and 116 degrees 45’ East and lies
within Australia’s cyclone belt. Between three and five cyclones might typically approach
the Pilbara Coast during the season (November to May) and winds over 100 knots can be
experienced along with associated sea conditions. In 2005-06 Dampier directly experienced
six cyclones, a record number.

Typically during November to May the winds blow in excess of 20 knots from the SW and
winds over 60 knots might be experienced during seasonal tropical storms. The SW winds
might blow strongly and continuously for 3-5 days.

During May to November the winds typically blow from E-SE, increasing in strength from the
early morning and easing by late afternoon or early evening. Morning winds may exceed 30
knots. Sea conditions within the harbour after prolonged SW winds can produce seas to 1.5
metres through Mermaid Strait and whenever a cyclone is in vicinity of the coast a ‘fetch’
from the north can create seas to 2 metres through Mermaid Sound. During past cyclones,
red alert phase seas to 9 metres have been encountered in Mermaid Sound. Storm tidal
surge is always possible in conjunction with any cyclone.

Accordingly, Mooring Owners in the region should familiarise themselves with the risks
associated with securing and mooring of vessels during adverse weather, including risks to
the vessel and to personnel and responsibilities towards other vessels moored in the vicinity.

Tables 3-1 and 3-2 show Significant Wave Heights and Indicative Tidal Heights respectively.

Table 3-1 Significant Wave Heights

Location Significant Wave Height (metres)


Southern Mermaid Sound 3.0 to 4.5
Hampton Harbour 1.5 to 3.0
Mermaid Strait 2.0 to 4.0
(South of West Lewis Island)
NOTE: Maximum cyclone waves may be 1.6 – 2.0 times higher than significant
wave height

Table 3-2 Indicative Tidal Heights

Description Level to Chart Datum CD Level to Australian Height


(metres) Datum AHD (metres)
HAT 5.22 2.51
MHWS 4.55 1.84
MHWN 3.22 0.51
NOTE: Storm Surge + Wind may add 3.5 metres to Sea Heights

4.0 INDICATIVE MOORING LOADINGS


The DPA commissioned an engineering consultancy group to prepare a mooring report and
design assessment (Report), (Appendix B) based on previous tropical cyclone analysis plus
mooring assessments undertaken by several operators in the region. The complete Report is
available on the DPA website www.dpa.wa.gov.au .

In the Report, Table 4-1 provides a range of indicative loadings for various vessel sizes and
mooring locations. These indicative figures are shown for general guidance only and DPA
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 7 of 22
Mooring Handbook

does not warrant the accuracy of any of the information contained in Table 4-1 or
elsewhere in the Report.

The 300 tonne mooring force for the large vessels illustrates the high loadings that might
occur due to a combination of low tide, shallow water depths, high winds and near
breaking wave conditions.

Table 4-1 Indicative Vessel Loadings on Moorings

Vessel Size Cyclone Mooring Approximate Return Total Mooring Force


Location Period (Tonnes)
(Years)
Small Vessel 10 metre LOA, Hampton Harbour 50 3-8
10 tonne displacement
Medium Vessel 18 metre Hampton Harbour 50 10-15
LOA,
25 tonne displacement
Large Vessels 30-35 metre West Lewis Island 10-50 50-300
LOA,
500-800 tonne
displacement
Small Ship 60-75 metre West Lewis Island 25-100 40-70 (Wind Only) Total
LOA, loadings not available
2000 tonne displacement (but would be expected
to exceed 250-500
tonnes)

Other factors that might significantly influence actual mooring behaviour and loadings
include:

• type of seabed anchorage (such as embedment anchor, drag anchor, spread


mooring);
• mooring line configuration (such as chain and mass, clump weights, soft lines and
type, buoys);
• vessel behaviour (such as windage, length, displacement, response amplitude,
operators); and
• method of analysis (such as static, frequency or time-domain numerical modelling).

Mooring Owners should engage a Mooring Designer to perform inquiries and calculations for
mooring parameters and loadings to suit their specific vessel characteristics, mooring
location and risk assessment.

A sample list of Mooring Designers and Mooring Inspectors can be found in Appendix B,
however the DPA makes no guarantee in regards to individual company performance or
capability and vessel owners are advised to conduct their own due diligence when
selecting any mooring contractor.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 8 of 22
Mooring Handbook

5.0 MOORING DESIGN AND COMPONENTS

5.1 General

All moorings must be designed, installed, used and maintained according to the design
specifications of a Mooring Designer and DPA's mooring requirements.

The DPA's mooring requirements include:


• Cyclone moorings must be designed for a nominated vessel or class of vessel and
certified by a Mooring Designer.
• Recreational Storm Moorings must comply with Table 5-1.
• Recreational craft moorings must be more than 300 millimetres in diameter and either
bright red or orange in colour.
• Commercial moorings must be bright yellow in colour.
• Mooring owners must ensure that their allocated mooring number is on the mooring,
positioned where it will always be clearly legible and if possible away from marine growth,
bird droppings and tackle chaffing areas.
• Moorings must have visibility aids to avert collision between moving craft and
moorings. As a minimum retro reflective material or "cats eyes" must be fitted to all
moorings. Lighted moorings must have retro reflective material or "cats eyes" in case lights
fail.
• Specifications for mooring tackle may not be varied without certification from a
Mooring Designer, and written approval from the DPA, which DPA may withhold in its sole
discretion.
• Hawsers are the responsibility of the Mooring Owner and need to be inspected and
maintained. Refer to Port of Dampier Marine Notice 06-2009 available on the DPA website
www.dpa.wa.gov.au .
• Moorings must not have a hawser secured to the mooring riser chain.

Failure to comply with these Mooring Standards or the Mooring Licence Terms and
Conditions may, amongst other things, result in the suspension, termination or non-renewal of
a Mooring Licence, the removal of a mooring, a fine being levied against the Mooring
Owner or other legal action against the Mooring Owner.

5.2 Mooring Classifications

Moorings within the Dampier Archipelago typically fall into four classifications:
• Recreational craft storm moorings;
• Commercial craft storm moorings;
• Recreational craft cyclone moorings; and
• Commercial craft cyclone moorings.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 9 of 22
Mooring Handbook

5.3 Storm Moorings

5.3.1 Positions

Storm Mooring Positions:


• Hampton Harbour;
• King Bay; and
• West Mid Intercourse.

5.3.2 Storm Mooring Component Standards

See Table 5-1 for Minimum Storm Mooring Component Specifications.

Table 5-1 Minimum Storm Mooring Component Specifications


Vessel Mushroom Concrete Block Chain size Hardware Line Size
Length Anchor/wheel (weight in water) Size
(m) (kg) (kg) (mm) (mm) (mm)
5-6 70 230 13 13 13
6 - 7.5 115 450 13 13 16
7.5 - 8.5 160 900 16 16 20
8.5 - 9.5 N/A 1400 19 20 22
9.5 - 12 N/A 1800 26 26 26
12 -15 N/A 2750 26 26 30
Over 15 Seek advice from Mooring Designer

Figure 5-2 Railway Wheels Figure 5-3 Concrete Block Anchor

5.3.3 Deadweight Anchors

Deadweight anchors such as wagon wheels and concrete blocks (clumps) become lodged
in the seabed over time, providing a degree of suction resistance in any bottom material
with cohesive properties. Thus, a deadweight anchor is not likely to break free from its set
like a mushroom anchor. (An anchor is "set" when it becomes buried in the seabed over
time.) Figure 5-2 and Figure 5-3 illustrate railway wheels and concrete block anchors
respectively.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 10 of 22
Mooring Handbook

Railway wheels of 320 to 400 kilograms are used extensively in single or group lots for
Hampton Harbour Storm Moorings.

The holding power of a concrete block anchor is approximately 1:2. In other words a
properly-designed concrete anchor provides up to 50 per cent of its weight in air. For
example, to provide a holding power of 900 kilograms in water, a concrete anchor would
weigh 1640 kilograms in air (displacement factor of 0.55). A square-block concrete anchor is
designed with the base dimensions greater than the anchor’s height for a low centre of
gravity to reduce transverse leverage.

5.4 Cyclone Moorings

5.4.1 Positions

Cyclone Mooring Positions:


• West Lewis Island Mooring Area
• Malus Island Mooring Area
• Hampton Harbour Mooring Area
• Enderby Island Mooring Area
• West Mid Intercourse Mooring Area

Figure 5-4 Admiralty Style Mooring – Typical Cyclone Mooring Layout

6.0 RESPONSIBILIIES OF A MOORING OWNER

6.1 Compliance with Mooring Standards and Mooring Licence Terms and Conditions

Mooring Owners must comply with the Mooring Standards and the Mooring Licence Terms
and Conditions.

6.2 Sale or Transfer of Moorings

A Non recreational or commercial mooring or location may be sold, transferred, or rented,


swapped, assigned, relocated or bartered except as permitted by the relevant Mooring
Licence or these Mooring Standards and Mooring Licence Terms and Conditions. The holder
of a recreational mooring may transfer his or her mooring to an immediate family member
with the approval of the Harbour Master following the submission and approval of an
Application for Use of Mooring.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 11 of 22
Mooring Handbook

Mooring Owners must seek written approval from DPA for vessels renting or swapping
moorings by submitting the Change of Mooring Ownership or Personal Details form in
Appendix B to the DPA's Vessel Traffic Manager. The information must include vessel name,
GRT, LOA and who the owner is by fax, email or letter. The mooring may require re-
certification by a Mooring Designer.

6.3 Yearly Renewal Application and Inspection Reports

Mooring Owners are required to complete and submit a Mooring Inspection Report and
Annual Mooring Report with a Renewal Application for Use of Mooring prior to the beginning
of each cyclone season, 1 November. Should a mooring not be inspected and reported by
1 November each year or if a mooring is not approved by the DPA, then the Mooring
Licence may be cancelled by the DPA. If a mooring is not approved by the DPA, the
Mooring User must relocate or remove the mooring at the discretion of the DPA and at the
Mooring User’s expense.

The Renewal Application for Use of Mooring is attached in Appendix A and is available on
the DPA's website www.dpa.wa.gov.au or by request form the DPA)

6.4 Harbour Master to be notified of Vessel movement

Mooring Owners or vessel operators must notify Dampier Port Communications or the
Harbour Master on VHF II or telephone 9159 6556 when a vessel is secured to or removed
from a mooring.

7.0 NEW MOORING INSTALLATION PROCEDURE

7.1 Applications
• All boat owners or operators (including recreational boat owners) (Applicants)
applying to install a new mooring and moor a vessel within the Port must complete
and submit to the DPA an Application for Installation of New Mooring, which is
attached in Appendix A and is available on the DPA's website www.dpa.wa.gov.au or
by request from the DPA.
• Applicants must detail the GPS position of the preferred location for approval by the
Harbour Master.
• No mooring shall be placed in the Port unless permitted by the Harbour Master and in
compliance with these Mooring Standards and the Mooring Licence Terms and
Conditions. A mooring system set without prior authorisation of the Harbour Master
may be removed immediately by the Harbour Master at the Mooring User’s sole
expense.
• Before placing a mooring in the water, the mooring tackle design and construction
must be in accordance with Mooring Designer specifications and a copy of this
specification furnished to, and approved by, the Harbour Master prior to installation.

7.2 Mooring Installation


• Upon installation, the mooring must be inspected by a Mooring Inspector for structural
integrity, disposition on the seabed and compliance with these Mooring Standards
and Mooring Licence Terms and Conditions – this report must include a written report
containing photographs from diver inspection of the below water tackle and specified
configuration.
• The Mooring Owner must forward to the Harbour Master a complete copy of the
Mooring Inspector's report and as-built drawings including final confirmation that the
mooring is set in the designated location, including GPS readout along with a
photograph of the top mark and markings.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 12 of 22
Mooring Handbook

Figure 0-1 New Cyclone Mooring Installation Procedure Flow Chart

NEW CYCLONE MOORING INSTALLATION PROCEDURE

Mooring Owner – Apply to DPA on Application for


Installation of Mooring and pay Application Fee.

DPA – Approve or reject Application for Installation of


Mooring to set. If approved, invoice for pro rata Annual
Mooring Fee

Mooring Owner –
Contact Mooring Designer to design mooring for a
nominated vessel in accordance with DPA requirements

Mooring Designer –
Provide mooring design to Mooring Owner

Mooring Owner –
Contract mooring installer to install mooring

NB: Commercial and


Recreational Storm
Mooring Installer –
Moorings Install mooring

New installation same


as above except the
Mooring Designer is Mooring Installer –
the Mooring Installer. Provide diver Mooring Inspection Report
of installed mooring to Mooring Owner

Mooring Owner – Forward details of installed mooring to


Mooring Designer

Mooring Designer – Provide Mooring Owner with As-Built


drawing based on installers report

Mooring Owner –
Provide DPA with As-Built mooring drawing and mooring
analysis and Mooring Inspection Report

DPA – Approve and record details of mooring, Send


Mooring Owner receipt of payment and signed annual
Mooring Licence.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 13 of 22
Mooring Handbook

8.0 ANNUAL MOORING APPROVAL PROCEDURE

8.1 Annual Mooring report

A Mooring Owner must arrange for an Annual Mooring Report and Mooring Inspection
Report (Mooring Reports) to be carried out by a Mooring Inspector before they apply for a
renewal of the Mooring Licence.

Once the dive inspection has been done and the recertification received from the Mooring
Designer, the Mooring Reports are to be completed and forwarded to the DPA by the
Mooring Owner with a signed Renewal Application for Use of Mooring and the Annual
Licence Fee prior to the start of the cyclone season on the 1st November each year.

The Mooring Reports will be reviewed by the DPA and if approved by the DPA, the owner will
be notified and a new Mooring Licence issued for the use of the mooring by the nominated
vessel.

Should a mooring not be inspected and the Mooring Reports not provided to the DPA by 1st
November each year or if a mooring is not approved by the DPA, then the Mooring Licence
may be cancelled by the DPA. If requested by the DPA, the Mooring User must remove the
unapproved mooring. If the unapproved mooring is not promptly removed, it may be
disposed of or relocated by the DPA at Mooring User’s expense.

See Annual Cyclone Mooring Installation Procedure Flow Chart on the next page.

8.2 Payment of Fees

The Mooring Owner must pay to the DPA the Annual Mooring Fee and any other applicable
fees and charges as set out in the Schedule of Fees at Appendix A. The mooring cannot be
used unless the fee is paid and licence issued.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 14 of 22
Mooring Handbook

Figure 0-2 Annual Cyclone Mooring Approval Procedure

ANNUAL CYCLONE MOORING APPROVAL PROCEDURE

Mooring Owner – Contract Mooring Inspector to carry


out inspection

Mooring Inspector –
Carry out mooring inspection and supply owner with
Mooring Inspection Report

Mooring Owner – Determine if any mooring components


require replacement (may be in conjunction with
Mooring Designer)

Mooring Owner –
Contract approved mooring installer to replace required
components (if any)

Mooring Inspector –
Replace components as required and complete
Mooring Inspection Report and sign as completed

Mooring Inspector – Forward completed Mooring


Inspection Report to Mooring Owner

Mooring Owner – Forward Mooring Inspection Report


and Annual Mooring Report to Mooring Designer for sign-
off

Mooring Designer – Sign-off on mooring and return


Mooring Inspection Report and Annual Mooring Report
to Mooring Owner

NB: Commercial
and Recreational Mooring Owner –
Storm Moorings as Sign form and forward Mooring Inspection Report and
above except the Annual Mooring Report to DPA with Renewal
Mooring Designer is Application
removed from the
process

DPA –
Approve or reject mooring for further use, record details
and if approved, issue invoice for payment of Mooring
Licence Fee

Mooring Owner - Pay Mooring Licence Fee


DPA - issue Mooring Licence and receipt of payment

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 15 of 22
Mooring Handbook

9.0 MOORING INSPECTIONS

9.1 Responsibility for Inspections

The Mooring Owner is responsible for the inspection, care, use and maintenance of mooring
components including but not limited to the anchor, chain, buoy, pennant, and associated
swivels, shackles, thimbles and eye splices, and the cost of their replacement. The Mooring
User must arrange and pay for all inspections required by these Mooring Standards and
Mooring Licence Terms and Conditions.

9.2 Annual Inspections

The frequency and scheduling of the different types of inspections shall be determined by
the Mooring Owner and the Harbour Master taking into account inputs such as: mooring
type; location; usage; previous mooring reports and climatic events. As a minimum, each
mooring must be inspected by a Mooring Inspector once per year.

9.3 Inspection required before sale or assignment of Mooring

Before a mooring is sold, assigned or otherwise transferred, the Mooring Owner must:

a) Arrange and pay for an inspection to be performed by a Mooring Inspector; and

b) Provide a copy of the Mooring Inspection Report to both the DPA and the new
Mooring Owner.

9.4 Additional inspections

An additional inspection may be required where a mooring:

(a) is intended to be used by a vessel larger than that currently permitted;

(b) is intended to be configured differently; or

(c) has been dragged.

9.5 Inspection Reports

(a) Following any mooring inspection, the Mooring Inspector must submit a Mooring
Inspection Report to the Mooring Owner. Mooring inspections shall incorporate
information as contained in the Mooring Inspection Report.

(b) The Mooring Owner must provide the Annual Mooring Report and all Mooring
Inspection Reports to the DPA together with evidence of recertification by a Mooring
Designer, and maintenance work, inclusive of current photographs. Inspection reports
must be submitted to the DPA before the 1st November each year. Annual Mooring
Reports and Mooring Inspection Report forms can be downloaded from the DPA
website www.dpa.wa.gov.au.

(c) Mooring inspections and maintenance performed underwater should be recorded on


video (if possible) with copies on CD ROM delivered to the Harbour Master together
with copies of relevant inspection and maintenance compliance documentation.
Any discrepancies arising from the inspection shall be described in the Mooring
Inspection Report.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 16 of 22
Mooring Handbook

9.6 Deterioration and non-compliance of Moorings

(a) If excessive deterioration is observed by the Mooring Inspector, the mooring is not to
be used until all worn components are replaced and re-endorsed by a Mooring Designer.
Mooring Users are to forward maintenance details to the Harbour Master.

(b) If 15% deterioration is observed, the mooring is not to be used until all worn
components are replaced and details of maintenance forwarded to the Harbour Master.

(c) If a mooring does not comply with design specifications, the Harbour Master in
consultation with the Mooring Designers may either downgrade the mooring’s rating to a
smaller vessel size or reclassify it from cyclone mooring to storm mooring.

(d) If the Mooring Designer determines the mooring components do not conform with
relevant standards and specifications, the DPA may, amongst other things, suspend the
relevant Mooring Licence. The Mooring Owner must remove the assigned vessel from the
mooring immediately after receiving notice from DPA in the form of a Breach Notice set out
in Appendix A. A Mooring Owners failure to remove the vessel may result in the immediate
termination of the Mooring Licence by the DPA.

(e) Further, if the nonconformity specified in the Breach Notice is not rectified within
fourteen (14) days after the Breach Notice has been given by the DPA, the DPA may deem
the mooring to be abandoned and the Mooring Licence for that location may be
terminated.

9.7 Mooring Inspectors

All inspections of moorings and its components shall be undertaken by a Mooring Inspector
(approved by the Harbour Master) each year. Organisations wishing to be listed as Mooring
Inspectors should apply to the DPA in writing, listing qualifications by 1st June each year.

9.8 Types of Inspections

Three types of mooring inspection are conducted at Dampier – in water, partial raising and
shore inspection:
• In water inspections are conducted by divers without removing the mooring to
examine the anchors, chains and fittings for wear, corrosion and marine growth fouling and
to check that shackle pins are not loose. The subsequent report should contain and
recommendations for work required.
• Partial raising inspections involve bringing the mooring buoy and chain components
onboard a vessel for inspection. This is required for major works, e.g. repositioning, chain
replacement, clearing marine growth, end-for-ending chain etc.
• Shore inspections involve complete removal of the mooring to a shore location for a
detailed inspection of all components. This operation might be required for change of
ownership, repositioning the mooring, or for assessment following an insurance claim.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 17 of 22
Mooring Handbook

9.8.1 In-Water Inspection Report

Personnel conducting the in-water inspections should have access to as-built drawings of
the moorings. The in water inspection report should be comprehensive and include a
diagram of the mooring and be in the form of the Mooring Inspection Report set out in
Appendix A and available from the DPA website www.dpa.wa.gov.au. The report should
contain sufficient technical detail to support the Mooring Inspector’s observations and
recommendations and clear photographs and videos (if any) must be included.

An in water inspection after a significant climatic event such as a tsunami or cyclone is a


prudent risk minimisation measure.

9.8.2 Partial Raising Inspections

Partial Raisings and shore inspections of moorings on the Western Australian coast are
generally carried out with a much lower frequency than in water inspections. The frequency
of these inspections would generally be determined by the Mooring Designer with reference
to the relevant Mooring Inspection Reports and records of mooring usage.

10.0 INFORMATION FOR MOORING INSPECTIONS

10.1 Preamble

The following standards may be added to or amplified by a Mooring Designer, and are to
be utilised in conjunction with the Mooring Inspection Report.

10.2 Anchors

If visible each anchor should be inspected and the following should be recorded.
• Anchor type and size.
• A small ‘pop’ float should be used to ascertain the anchor position by GPS.
• Anchor orientation (i.e. flukes buried, flukes up, anchor on its side, anchor facing
wrong direction etc.).
• Three good quality photographs should be taken of each anchor to show
embedment and orientation.

10.3 Ground Leg Sub Assembly

Each ground leg sub assembly should be inspected and the following information recorded:

10.3.1 Chain

• Chain type.
• Using appropriate tools clean the following for measurement, noting where sections
are buried and cannot be observed:
- a chain section of each leg below the ground ring;
- a chain section above the seabed (thrash zone); and
- a chain section about half way between these two areas.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 18 of 22
Mooring Handbook

• Measure and record double link measurements of the cleaned links. If one or more
legs extend considerable distances before entering the bottom, clean links and take
measurements at both ends and near the centre of each visible shot. If the chain is not
in tension, single link measurements should be taken and recorded.
• Record length of one of the links at each area.
• Check for and record manufacturer’s markings.
• Check for pitting, measure diameter and depth of any pits found, and record results.
• Record each anchor leg length from ground ring to bottom and from where it touches
bottom to where it becomes buried.
• Using a compass, note and record the relative bearing of each leg from the ground
ring.

10.3.2 Connecting Hardware – Ground Tackle

• Identify and record component type (shackle, detachable link, anchor joining shackle
etc.).
• Record components overall length and diameter.
• Report any loose, broken or missing parts.
• Check and report condition of locking safety pins.
• Record any manufacturer’s markings.
• Record position of each connection component by leg number and number of
metres from ground ring.

10.3.3 Ground Ring

• Record type of ground ring assembly observed.


• Measure and record the inside diameter of the ring.
• Check and report any distortion of the ring from circular that might indicate over-
stressing.

10.3.4 Riser Chain Sub Assembly

• Record chain type.


• Using appropriate tools clean the following locations in readiness for measurements:
- a chain section below buoy;
- a chain section above the ground ring;
- a chain section about half way between these two areas; and
- if the riser contains more than one shot of chain, clean links and take
measurements at both ends and near the centre of each shot.
• Measure and record double link measurements at the cleaned links.
• Record length of one of the links at each area.
• Check for and record any manufacturer’s markings.
• Check for pitting, measure diameter and depth of any pits found, and record results.
• Record water depth below buoy where each measurement is taken.

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 19 of 22
Mooring Handbook

10.3.5 Connecting Hardware - Riser

• Identify and record component type (shackle, detachable link, anchor joining shackle
etc.).
• Record components overall length and diameter.
• Report any loose, broken or missing parts.
• Check and report condition of locking safety pins.
• Record water depth below buoy of each component.
• Record any manufacturer’s markings.
• Measure least diameter of shackle pin immediately below the buoy, inspect whether
these pins exhibit any outward movement.

10.3.6 Swivel

• Check swivel for marine growth.


• Record components overall length and diameter.
• Report any loose, broken or missing parts.
• Record water depth below buoy of swivel.

10.3.7 Buoy Upper Portion

• Record buoy type, position and any markings. Comparison should be made to the
original buoy GPS position to determine if drag has occurred.
• Measure and record buoy freeboard and orientation (i.e. listing). If the buoy is listing
determine which compartment has water in it (if applicable).
• Record buoy overall condition (i.e. indents, paint condition, corrosion) and report any
visible damage.
• Identify each component attached to buoy (i.e. shackles, rings etc) and measure
diameter of each.
• Check and report the condition of buoy mooring arrangements (diameter, plate
thickness etc.).
• Check and report condition of buoy tension bar if applicable (diameter, thickness
etc.).
• Ensure a good quality photograph is taken of buoy upper portion.

10.3.8 Illumination

Inspectors should report the navigation lighting, solar charging and reflective materials on
the moorings.

10.3.9 Buoy Lower Portion

• Record marine growth thickness.


• If there is little or no marine growth check and record the type and condition of the
protective coating.
• Report any dents or other visible damage.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 20 of 22
Mooring Handbook

• Check and report on condition of buoy lower mooring arrangements (diameter, plate
thickness etc.).
• Check and report on condition of buoy tension bar if applicable (diameter, thickness
etc.).
• Record number size and location of installed anodes (if applicable).
• Ensure that each anode is securely
se attached to the buoy.

11.0 Unacceptable Mooring Designs

• Moorings which will not be accepted


accepted are those moorings designs
design where the hawser is
attached to the riser chain below the buoy.
buoy Please see figure 11--1.

Figure 11-1

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 21 of 22
Mooring Handbook

12.0 REFERENCES

Appendix B ‘Vessel Cyclone Moorings – Critical Aspects for Consideration by Vessel Owners
and Operators’

Port and Harbour Consultants. (1998), “Vessel Cyclone Moorings – Critical Aspects for
Consideration by Vessel Owners and Operators”, Document Number 032/07210/1

Date: 16 July 1998 Project 032/07210, Perth

13.0 APPENDIX

Appendix A Forms

SHEQ-SYS-F-068 Application for installation of mooring

SHEQ-SYS-F-090 Renewal Application for use of Mooring

SHEQ-SYS-F-057 Change of mooring ownership

SHEQ-SYS-F-055 Mooring inspection report

SHEQ-SYS-F-056Annual mooring report

SHEQ-SYS-F-071 Schedule of fees

SHEQ-SYS-F-082 Breach notice

SHEQ-SYS-F-083 Mooring Licence

Appendix B List of Mooring Inspectors and Designers

Appendix C Mooring Licence Terms and Conditions

SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 22 of 22

You might also like