SHEQ-SYS-H-004 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 1 of 1
Mooring Handbook
DEFINITIONS
In the Port of Dampier, a cyclone mooring must have minimum capability of
Cyclone Mooring
holding a nominated vessel in 30-second gust, wind speed of 90 knots (at 10
metres above sea level) for a 50 year return period.
A person or organisation with appropriate professional qualifications to;
a) prepare the technical specifications of a mooring system including
Mooring Designer configuration and materials;
b) to review and make recommendations on inspection reports; and
c) to ensure on-going suitability of mooring systems.
A sample list of Mooring Designers is set out in Appendix B.
A person or organisation duly qualified for their range of business and
licensed in Western Australia:
Mooring a) capable of conducting mooring inspections above or below water; and
Inspector b) to produce measurements and records suitable for evaluation by a
Mooring Designer.
A sample list of Mooring Inspectors is set out in Appendix B.
Mooring Licence In the Port of Dampier, a mooring licence is written approval to either set
(install) or use a mooring.
Mooring Licence
Terms and The terms and conditions of the Mooring Licence a copy of which are set
Conditions out in Appendix C.
Mooring
Standards The standards and other terms contained in this document.
Mooring User The mooring owner or user of any mooring or proposed mooring.
The Port of Dampier, Western Australia and its seabed and port waters
Port
together with all wharves, piers and land that are owned, vested in,
occupied by, licensed to or controlled by the DPA.
Storm Mooring In the Port of Dampier, a mooring other than a Cyclone Mooring, capable
of withstanding winds and weather up to Beaufort force 8-9.
ABBREVIATIONS
DPA
Dampier Port Authority
E
East
HAT
Highest Astronomical Tide
LOA
Length Overall
SE
South East
SW
South West
WA
Western Australia
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 2 of 22
Mooring Handbook
CONTENTS
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 4 of 22
Mooring Handbook
(a) Meet the information needs of the owners, designers, installers and users of moorings in
the Port of Dampier;
(b) Provide information with regard to mooring design, installation, maintenance and
usage. However, this document in no way absolves companies from their duty of care
to their employees, contractors, products or operations or any other obligations they
may owe in relation to their employees, contractors, products or operations; and
(c) Set rules and procedures that bind all Mooring Users.
This document must be read in conjunction with the DPA's Mooring Licence Terms and
Conditions (Appendix C) and the DPA Cyclone Procedure available on the DPA website
www.dpa.wa.gov.au or on request from the DPA.
The DPA is a State Government agency that operates the Port under the Port Authorities Act
1999. The DPA has responsibilities:
• to facilitate trade within and through the Port and plan for future growth and
development of the Port;
• for the safe, secure and efficient operation of the Port; and
• to protect the Port environment.
In this role, the DPA approves the installation and usage of moorings in the Port and
regulates the usage and maintenance of the moorings through its broad mooring licensing
regime and these Mooring Standards.
Email mailto:[email protected]
Web: www.dpa.wa.gov.au
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 5 of 22
Mooring Handbook
1.3 Disclaimer
The information contained in these standards is believed to be correct at the time of issue.
However, the DPA does not guarantee the accuracy of the information and accepts no
liability for any damage, delay or loss resulting from any such inaccuracy. For more recent
information, please consult a Mooring Designer or the DPA.
2.0 PREAMBLE
The Port of Dampier (see Figure 2-1) hosts a vast range of recreational and commercial
vessels each year, many of which use moorings instead of anchoring within port limits. These
moorings may be recreational or commercial Storm Moorings or heavier construction
Cyclone Moorings. All moorings within the Port are managed by the DPA and the DPA's
approval is required for the design and installation of a mooring and the use of moorings.
The DPA monitors annual inspections, maintenance and repair of moorings within the Port.
DPA’s aim is to promote fair and equitable access to moorings, to ensure all moorings are
maintained to a high standard.
Each mooring must be capable of holding the assigned vessel and correct guidance and
advice from the Mooring Designer is necessary to safeguard the vessel owner’s investment.
A sample list of Mooring Designers and Mooring Inspectors can be found in Appendix B,
however DPA makes no guarantee in relation to individual company performance or
capability and vessel owners are advised to conduct their own due diligence when
selecting any mooring contractor.
All Mooring Licences are of a temporary nature and no person has a property right in any
mooring location without an express grant by the Commonwealth or WA State
Governments.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 6 of 22
Mooring Handbook
Typically during November to May the winds blow in excess of 20 knots from the SW and
winds over 60 knots might be experienced during seasonal tropical storms. The SW winds
might blow strongly and continuously for 3-5 days.
During May to November the winds typically blow from E-SE, increasing in strength from the
early morning and easing by late afternoon or early evening. Morning winds may exceed 30
knots. Sea conditions within the harbour after prolonged SW winds can produce seas to 1.5
metres through Mermaid Strait and whenever a cyclone is in vicinity of the coast a ‘fetch’
from the north can create seas to 2 metres through Mermaid Sound. During past cyclones,
red alert phase seas to 9 metres have been encountered in Mermaid Sound. Storm tidal
surge is always possible in conjunction with any cyclone.
Accordingly, Mooring Owners in the region should familiarise themselves with the risks
associated with securing and mooring of vessels during adverse weather, including risks to
the vessel and to personnel and responsibilities towards other vessels moored in the vicinity.
Tables 3-1 and 3-2 show Significant Wave Heights and Indicative Tidal Heights respectively.
In the Report, Table 4-1 provides a range of indicative loadings for various vessel sizes and
mooring locations. These indicative figures are shown for general guidance only and DPA
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 7 of 22
Mooring Handbook
does not warrant the accuracy of any of the information contained in Table 4-1 or
elsewhere in the Report.
The 300 tonne mooring force for the large vessels illustrates the high loadings that might
occur due to a combination of low tide, shallow water depths, high winds and near
breaking wave conditions.
Other factors that might significantly influence actual mooring behaviour and loadings
include:
Mooring Owners should engage a Mooring Designer to perform inquiries and calculations for
mooring parameters and loadings to suit their specific vessel characteristics, mooring
location and risk assessment.
A sample list of Mooring Designers and Mooring Inspectors can be found in Appendix B,
however the DPA makes no guarantee in regards to individual company performance or
capability and vessel owners are advised to conduct their own due diligence when
selecting any mooring contractor.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 8 of 22
Mooring Handbook
5.1 General
All moorings must be designed, installed, used and maintained according to the design
specifications of a Mooring Designer and DPA's mooring requirements.
Failure to comply with these Mooring Standards or the Mooring Licence Terms and
Conditions may, amongst other things, result in the suspension, termination or non-renewal of
a Mooring Licence, the removal of a mooring, a fine being levied against the Mooring
Owner or other legal action against the Mooring Owner.
Moorings within the Dampier Archipelago typically fall into four classifications:
• Recreational craft storm moorings;
• Commercial craft storm moorings;
• Recreational craft cyclone moorings; and
• Commercial craft cyclone moorings.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 9 of 22
Mooring Handbook
5.3.1 Positions
Deadweight anchors such as wagon wheels and concrete blocks (clumps) become lodged
in the seabed over time, providing a degree of suction resistance in any bottom material
with cohesive properties. Thus, a deadweight anchor is not likely to break free from its set
like a mushroom anchor. (An anchor is "set" when it becomes buried in the seabed over
time.) Figure 5-2 and Figure 5-3 illustrate railway wheels and concrete block anchors
respectively.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 10 of 22
Mooring Handbook
Railway wheels of 320 to 400 kilograms are used extensively in single or group lots for
Hampton Harbour Storm Moorings.
The holding power of a concrete block anchor is approximately 1:2. In other words a
properly-designed concrete anchor provides up to 50 per cent of its weight in air. For
example, to provide a holding power of 900 kilograms in water, a concrete anchor would
weigh 1640 kilograms in air (displacement factor of 0.55). A square-block concrete anchor is
designed with the base dimensions greater than the anchor’s height for a low centre of
gravity to reduce transverse leverage.
5.4.1 Positions
6.1 Compliance with Mooring Standards and Mooring Licence Terms and Conditions
Mooring Owners must comply with the Mooring Standards and the Mooring Licence Terms
and Conditions.
Mooring Owners must seek written approval from DPA for vessels renting or swapping
moorings by submitting the Change of Mooring Ownership or Personal Details form in
Appendix B to the DPA's Vessel Traffic Manager. The information must include vessel name,
GRT, LOA and who the owner is by fax, email or letter. The mooring may require re-
certification by a Mooring Designer.
Mooring Owners are required to complete and submit a Mooring Inspection Report and
Annual Mooring Report with a Renewal Application for Use of Mooring prior to the beginning
of each cyclone season, 1 November. Should a mooring not be inspected and reported by
1 November each year or if a mooring is not approved by the DPA, then the Mooring
Licence may be cancelled by the DPA. If a mooring is not approved by the DPA, the
Mooring User must relocate or remove the mooring at the discretion of the DPA and at the
Mooring User’s expense.
The Renewal Application for Use of Mooring is attached in Appendix A and is available on
the DPA's website www.dpa.wa.gov.au or by request form the DPA)
Mooring Owners or vessel operators must notify Dampier Port Communications or the
Harbour Master on VHF II or telephone 9159 6556 when a vessel is secured to or removed
from a mooring.
7.1 Applications
• All boat owners or operators (including recreational boat owners) (Applicants)
applying to install a new mooring and moor a vessel within the Port must complete
and submit to the DPA an Application for Installation of New Mooring, which is
attached in Appendix A and is available on the DPA's website www.dpa.wa.gov.au or
by request from the DPA.
• Applicants must detail the GPS position of the preferred location for approval by the
Harbour Master.
• No mooring shall be placed in the Port unless permitted by the Harbour Master and in
compliance with these Mooring Standards and the Mooring Licence Terms and
Conditions. A mooring system set without prior authorisation of the Harbour Master
may be removed immediately by the Harbour Master at the Mooring User’s sole
expense.
• Before placing a mooring in the water, the mooring tackle design and construction
must be in accordance with Mooring Designer specifications and a copy of this
specification furnished to, and approved by, the Harbour Master prior to installation.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 12 of 22
Mooring Handbook
Mooring Owner –
Contact Mooring Designer to design mooring for a
nominated vessel in accordance with DPA requirements
Mooring Designer –
Provide mooring design to Mooring Owner
Mooring Owner –
Contract mooring installer to install mooring
Mooring Owner –
Provide DPA with As-Built mooring drawing and mooring
analysis and Mooring Inspection Report
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 13 of 22
Mooring Handbook
A Mooring Owner must arrange for an Annual Mooring Report and Mooring Inspection
Report (Mooring Reports) to be carried out by a Mooring Inspector before they apply for a
renewal of the Mooring Licence.
Once the dive inspection has been done and the recertification received from the Mooring
Designer, the Mooring Reports are to be completed and forwarded to the DPA by the
Mooring Owner with a signed Renewal Application for Use of Mooring and the Annual
Licence Fee prior to the start of the cyclone season on the 1st November each year.
The Mooring Reports will be reviewed by the DPA and if approved by the DPA, the owner will
be notified and a new Mooring Licence issued for the use of the mooring by the nominated
vessel.
Should a mooring not be inspected and the Mooring Reports not provided to the DPA by 1st
November each year or if a mooring is not approved by the DPA, then the Mooring Licence
may be cancelled by the DPA. If requested by the DPA, the Mooring User must remove the
unapproved mooring. If the unapproved mooring is not promptly removed, it may be
disposed of or relocated by the DPA at Mooring User’s expense.
See Annual Cyclone Mooring Installation Procedure Flow Chart on the next page.
The Mooring Owner must pay to the DPA the Annual Mooring Fee and any other applicable
fees and charges as set out in the Schedule of Fees at Appendix A. The mooring cannot be
used unless the fee is paid and licence issued.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 14 of 22
Mooring Handbook
Mooring Inspector –
Carry out mooring inspection and supply owner with
Mooring Inspection Report
Mooring Owner –
Contract approved mooring installer to replace required
components (if any)
Mooring Inspector –
Replace components as required and complete
Mooring Inspection Report and sign as completed
NB: Commercial
and Recreational Mooring Owner –
Storm Moorings as Sign form and forward Mooring Inspection Report and
above except the Annual Mooring Report to DPA with Renewal
Mooring Designer is Application
removed from the
process
DPA –
Approve or reject mooring for further use, record details
and if approved, issue invoice for payment of Mooring
Licence Fee
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 15 of 22
Mooring Handbook
The Mooring Owner is responsible for the inspection, care, use and maintenance of mooring
components including but not limited to the anchor, chain, buoy, pennant, and associated
swivels, shackles, thimbles and eye splices, and the cost of their replacement. The Mooring
User must arrange and pay for all inspections required by these Mooring Standards and
Mooring Licence Terms and Conditions.
The frequency and scheduling of the different types of inspections shall be determined by
the Mooring Owner and the Harbour Master taking into account inputs such as: mooring
type; location; usage; previous mooring reports and climatic events. As a minimum, each
mooring must be inspected by a Mooring Inspector once per year.
Before a mooring is sold, assigned or otherwise transferred, the Mooring Owner must:
b) Provide a copy of the Mooring Inspection Report to both the DPA and the new
Mooring Owner.
(a) Following any mooring inspection, the Mooring Inspector must submit a Mooring
Inspection Report to the Mooring Owner. Mooring inspections shall incorporate
information as contained in the Mooring Inspection Report.
(b) The Mooring Owner must provide the Annual Mooring Report and all Mooring
Inspection Reports to the DPA together with evidence of recertification by a Mooring
Designer, and maintenance work, inclusive of current photographs. Inspection reports
must be submitted to the DPA before the 1st November each year. Annual Mooring
Reports and Mooring Inspection Report forms can be downloaded from the DPA
website www.dpa.wa.gov.au.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 16 of 22
Mooring Handbook
(a) If excessive deterioration is observed by the Mooring Inspector, the mooring is not to
be used until all worn components are replaced and re-endorsed by a Mooring Designer.
Mooring Users are to forward maintenance details to the Harbour Master.
(b) If 15% deterioration is observed, the mooring is not to be used until all worn
components are replaced and details of maintenance forwarded to the Harbour Master.
(c) If a mooring does not comply with design specifications, the Harbour Master in
consultation with the Mooring Designers may either downgrade the mooring’s rating to a
smaller vessel size or reclassify it from cyclone mooring to storm mooring.
(d) If the Mooring Designer determines the mooring components do not conform with
relevant standards and specifications, the DPA may, amongst other things, suspend the
relevant Mooring Licence. The Mooring Owner must remove the assigned vessel from the
mooring immediately after receiving notice from DPA in the form of a Breach Notice set out
in Appendix A. A Mooring Owners failure to remove the vessel may result in the immediate
termination of the Mooring Licence by the DPA.
(e) Further, if the nonconformity specified in the Breach Notice is not rectified within
fourteen (14) days after the Breach Notice has been given by the DPA, the DPA may deem
the mooring to be abandoned and the Mooring Licence for that location may be
terminated.
All inspections of moorings and its components shall be undertaken by a Mooring Inspector
(approved by the Harbour Master) each year. Organisations wishing to be listed as Mooring
Inspectors should apply to the DPA in writing, listing qualifications by 1st June each year.
Three types of mooring inspection are conducted at Dampier – in water, partial raising and
shore inspection:
• In water inspections are conducted by divers without removing the mooring to
examine the anchors, chains and fittings for wear, corrosion and marine growth fouling and
to check that shackle pins are not loose. The subsequent report should contain and
recommendations for work required.
• Partial raising inspections involve bringing the mooring buoy and chain components
onboard a vessel for inspection. This is required for major works, e.g. repositioning, chain
replacement, clearing marine growth, end-for-ending chain etc.
• Shore inspections involve complete removal of the mooring to a shore location for a
detailed inspection of all components. This operation might be required for change of
ownership, repositioning the mooring, or for assessment following an insurance claim.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 17 of 22
Mooring Handbook
Personnel conducting the in-water inspections should have access to as-built drawings of
the moorings. The in water inspection report should be comprehensive and include a
diagram of the mooring and be in the form of the Mooring Inspection Report set out in
Appendix A and available from the DPA website www.dpa.wa.gov.au. The report should
contain sufficient technical detail to support the Mooring Inspector’s observations and
recommendations and clear photographs and videos (if any) must be included.
Partial Raisings and shore inspections of moorings on the Western Australian coast are
generally carried out with a much lower frequency than in water inspections. The frequency
of these inspections would generally be determined by the Mooring Designer with reference
to the relevant Mooring Inspection Reports and records of mooring usage.
10.1 Preamble
The following standards may be added to or amplified by a Mooring Designer, and are to
be utilised in conjunction with the Mooring Inspection Report.
10.2 Anchors
If visible each anchor should be inspected and the following should be recorded.
• Anchor type and size.
• A small ‘pop’ float should be used to ascertain the anchor position by GPS.
• Anchor orientation (i.e. flukes buried, flukes up, anchor on its side, anchor facing
wrong direction etc.).
• Three good quality photographs should be taken of each anchor to show
embedment and orientation.
Each ground leg sub assembly should be inspected and the following information recorded:
10.3.1 Chain
• Chain type.
• Using appropriate tools clean the following for measurement, noting where sections
are buried and cannot be observed:
- a chain section of each leg below the ground ring;
- a chain section above the seabed (thrash zone); and
- a chain section about half way between these two areas.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 18 of 22
Mooring Handbook
• Measure and record double link measurements of the cleaned links. If one or more
legs extend considerable distances before entering the bottom, clean links and take
measurements at both ends and near the centre of each visible shot. If the chain is not
in tension, single link measurements should be taken and recorded.
• Record length of one of the links at each area.
• Check for and record manufacturer’s markings.
• Check for pitting, measure diameter and depth of any pits found, and record results.
• Record each anchor leg length from ground ring to bottom and from where it touches
bottom to where it becomes buried.
• Using a compass, note and record the relative bearing of each leg from the ground
ring.
• Identify and record component type (shackle, detachable link, anchor joining shackle
etc.).
• Record components overall length and diameter.
• Report any loose, broken or missing parts.
• Check and report condition of locking safety pins.
• Record any manufacturer’s markings.
• Record position of each connection component by leg number and number of
metres from ground ring.
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 19 of 22
Mooring Handbook
• Identify and record component type (shackle, detachable link, anchor joining shackle
etc.).
• Record components overall length and diameter.
• Report any loose, broken or missing parts.
• Check and report condition of locking safety pins.
• Record water depth below buoy of each component.
• Record any manufacturer’s markings.
• Measure least diameter of shackle pin immediately below the buoy, inspect whether
these pins exhibit any outward movement.
10.3.6 Swivel
• Record buoy type, position and any markings. Comparison should be made to the
original buoy GPS position to determine if drag has occurred.
• Measure and record buoy freeboard and orientation (i.e. listing). If the buoy is listing
determine which compartment has water in it (if applicable).
• Record buoy overall condition (i.e. indents, paint condition, corrosion) and report any
visible damage.
• Identify each component attached to buoy (i.e. shackles, rings etc) and measure
diameter of each.
• Check and report the condition of buoy mooring arrangements (diameter, plate
thickness etc.).
• Check and report condition of buoy tension bar if applicable (diameter, thickness
etc.).
• Ensure a good quality photograph is taken of buoy upper portion.
10.3.8 Illumination
Inspectors should report the navigation lighting, solar charging and reflective materials on
the moorings.
• Check and report on condition of buoy lower mooring arrangements (diameter, plate
thickness etc.).
• Check and report on condition of buoy tension bar if applicable (diameter, thickness
etc.).
• Record number size and location of installed anodes (if applicable).
• Ensure that each anode is securely
se attached to the buoy.
Figure 11-1
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 21 of 22
Mooring Handbook
12.0 REFERENCES
Appendix B ‘Vessel Cyclone Moorings – Critical Aspects for Consideration by Vessel Owners
and Operators’
Port and Harbour Consultants. (1998), “Vessel Cyclone Moorings – Critical Aspects for
Consideration by Vessel Owners and Operators”, Document Number 032/07210/1
13.0 APPENDIX
Appendix A Forms
SHEQ-SYS-F-082 Authorised by: Steve Lewis Date: 7/8/2009 Review Date: 7/8/2011 Issue No: 1 Page 22 of 22