Masinloc Power Facility Fire Pump Flow Test: Technical Summary Report
Masinloc Power Facility Fire Pump Flow Test: Technical Summary Report
Masinloc Power Facility Fire Pump Flow Test: Technical Summary Report
Facility
Fire Pump Flow Test
Technical Summary Report
Prepared by:
Roland Christopher G. Tuppal
Performance Engineer
This flow testing procedure is an initial test procedure of how the authority having jurisdiction
interprets clause covered by NFPA 25 standard (Chapter 4 and Chapter 6). It is intended to see the
actual flow discharge of both the diesel driven and electric driven fire pump. In addition, changes on this
procedure may be done as per recommendation of persons having authority over the equipment.
Before this test is done, coordination with the operator, maintenance and safety department is highly
required.
Persons Involved:
Jonathan P. Baculo
Melvin E. Aguila
Elmer L. Quintero
Eman E. Dimalanta
Nazario C. Balita
Fire Pump Flow Testing Procedure
12.00
11.00
10.00
9.00
8.00
7.00
6.00
0.00 100.00 200.00 300.00 400.00 500.00 600.00
2019 Diesel Engine Driven Fire Pump flow test yielded the following:
a. Higher flow rates were observed during the test at a higher discharge pressure compared to the
acceptance test data and slightly lower discharge pressures compared to 2018 Test with 1 to 3 fully
opened playpipes.
b. At 4 to 6 fully opened playpipes, 2019 Test still have higher discharge flow rate compared to
acceptance test and 2018 Test with slight difference in discharge pressures.
c. Engine speed averaged at 2,102 RPM with the highest discharge flow rate at 527.0 m³/h at 7.7
kg/cm².
d. No abnormal conditions were observed during the test.
e. Overall, the pump is still in good working condition.
Electric Motor Driven Fire Pump
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
0.00 100.00 200.00 300.00 400.00 500.00 600.00
2019 Electric Motor Driven Fire Pump flow test yielded the following:
a. Higher volume flow rates and discharge pressures were observed all throughout the test compared
to the last year data, however, flow rates at 5 to 6 fully opened playpipes were lower than the
acceptance test.
b. Engine speed averaged at 3,750 RPM and maximum flow rate during the test is 565.3 m³/h at 9.5
kg/cm².
c. No abnormal conditions were observed during the test.
d. Overall, the pump is still in good working condition.
TEST DATA SHEET: