P-3370 Rotor Cpi Tir

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

PT.

Sulzer Indonesia
PROJECT NO. : P-03370
CUSTOMER : PT. CPI
TOTAL INDICATED RUNOUT INSPECTION REPORT MFR : GENERAL ELECTRIC
SERIAL NO. : TBA
REPORT NO. : Rev.00

INSPECTED BY: KAMIDI & AGUS P DATE: 2020


STATUS: INCOMING OTHERS/…………. FINAL SURFACES: RADIAL AXIAL UNITS: MILLIMETERS INCHES

Position 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
0° 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
45° 0.005 0.060 0.050 0 0.010 0.040 -0.070 0.030 -0.010 -0.010 0.020 -0.005 -0.010 0.005 0
90° 0.010 0.090 0.010 0 0.010 0.015 -0.060 0.030 -0.010 -0.050 0.010 -0.015 0 0.010 0
135° 0.005 0.100 0.005 0 -0.040 0.005 -0.040 -0.050 -0.010 0.045 0.010 0.015 -0.010 -0.005 -0.005
180° 0.005 -0.020 -0.020 0 -0.010 -0.010 0.130 0.050 0.060 -0.010 -0.015 -0.015 -0.010 -0.010 -0.005
225° 0.010 0.005 0.005 0 -0.015 -0.025 -0.050 -0.010 0.010 -0.020 -0.020 -0.035 0.005 0.010 0
270° 0.005 -0.020 0.010 0 -0.020 0.005 -0.090 0.030 0.145 -0.055 0.005 -0.025 0.010 0 -0.005
315° 0.010 0.025 0.010 0 0.010 0.035 0.020 0.020 0.090 0.080 0.250 0.005 0.010 0 0.005
TIR 0.005 0.110 0.045 0 0.050 0.065 0.130 0.050 0.155 0.035 0.240 0.040 0.020 0.010 0.010

This material is the exclusive property of PT. Sulzer Indonesia SULZER CONFIDENTIAL
PRO-01FR-56 Rev.04 Page 1 of 2
PT. Sulzer Indonesia

Position 16 17 18 19
1. 0° 0 0 0 0
2. 45° 0.010 0 0.025 0.015
3. 90° 0 0 0 0.010
4. 135° 0 0.005 0 -0.020
1. 180° 0.005 0 0.020 0.025
2. 225° 0 -0.005 -0.010 0.020
3. 270° 0 0.010 0.010 0
4. 315° 0.005 0 0 0
TIR 0.010 0.010 0.035 0.025

NOTE:
1. ALL PHASE RECORDED : CW VIEWED FROM DRIVE END
2. ZERO DEGREE POINT IS : CENTER POLE
3. ROTOR SUPPORTED BY : V-BLOCK
4.

PREPARED BY: Wira Agung

APPROVED BY:

This material is the exclusive property of PT. Sulzer Indonesia SULZER CONFIDENTIAL
PRO-01FR-56 Rev.04 Page 2 of 2

You might also like