These are general guidelines for connecting, downloading and uploading from
an S7-300 or S7-400 PLC. The following procedures were created using
Siemens SIMATIC STEP 7 version 5.4 software.
3. An Ethernet cable
The CP5512 card and the PC Adapter can communicate on either an MPI or
PROFIBUS port. Note that PROFIBUS is labeled as DP on the Siemens
connection ports. These cables can piggyback on existing connectors. Be aware
that the PC Adapter draws its power to work from the connection port so check
the power LED for proper operation. The CP5512 card draws its power from
the computer.
For Ethernet (TCP/IP) use a standard Ethernet cable from the computer to
a CPU with an Ethernet port, a CP 343/443 module or a network switch all
ready attached to the PLC network.
Checking Communications
With the programming cable plugged in, you can check for proper operation by
clicking on the Accessible Nodes icon.
If communications are successful, you'll see a window pop up similar to the
one below. If so, then close the Accessible Nodes window and proceed to the
download or upload section.
This indicates that the cable is not in the right computer port or the cable is not
plugged in properly.
In order to start communication to the PLC you will need to match the "PG
Interface" setting with the programming cable and protocol. To do this, select
the menu Options > Set PG/PC Interface.
The following dialog box will open up displaying all the different interfaces
(i.e. communication drivers).
Each cable has its own interface. For Ethernet select the TCP/IP interface for
your computers network card. Be careful not to select your wireless Ethernet
connection.
To get it working quickly it is best to select the interface with the Auto
designation. This will discover working settings and use them automatically.
For the PC Adapter click on the Properties button and make sure the Station
Parameters Address is a unique network address. It should not conflict with
existing PLC and slave devices on the network. Also, check under the Local
Connection tab and make sure connection selection matches the port the cable
is connected into.
Once the proper interface is selected and the properties are set then click OK
and use the Accessible Nodes window to check for successful communications.
It should work. If not double-check the connection and cable. With the CP5512
and PC Adapter cables, you should use the MPI port, as this is the default
connection for Siemens.
Partial Download
Partial downloads are used in existing projects where only one or more blocks
will be downloaded. To perform this type of download select the block(s) you
wish to download and then select the PLC > Download menu item or the
download button .
Holding down the Ctrl key or the Shift key allows more then one block to be
selected at a time. Be careful though as the order of download will occur in the
order that the blocks were selected. This may mean that an error will occur if a
block is called before it is downloaded.
The CPU will need to be in Stop mode before downloading the System Data
Block (SDB) as this is equivalent to a hardware configuration download. This
is usually not necessary in a PLC that has all ready had its hardware
configured. If you do download the system data, the following messages will
prompt you through the transitions.
If the CPU is in Run mode then you will be prompted to Stop the CPU. The
software will do the Run to Stop transition when you click OK.
After downloading the SDB you will be prompted to Run the CPU again.
Clicking Yes will automatically put the CPU back into run mode.
Full Download
To download all the blocks at once make sure you are in the Block folder and
select the Edit > Select All menu item. Click on the Download icon . You
will be prompted to overwrite any existing blocks and if you want to load the
system data (see above).
The partial and full download methods above will overwrite existing blocks but
will not any blocks from memory. In order to completely delete the existing
program in the CPU and download a new project select the Blocks folder and
then use the PLC > Download User Program to Memory Card menu item.
The following dialog box will pop up prompting you about the deletion of all
the blocks and project data in the PLC. Click Yes to perform the operation.
After this, follow the normal download procedure.
Uploading
There are two methods for uploading. The first is when you have the original
project and you want to preserve the symbols and comments. The second
method, when you don't have the original project, will upload everything from
the CPU but will have no associated documentation (i.e. symbols and
comments).
With the existing project open, select the View > Online menu item.
There is a connection between these two versions so that uploading from the
online partner makes sure to preserve all the symbols and comments. Be
careful. After uploading, make sure to close the online partner and do all work
from the offline version.
To upload individual blocks, select them in the Online view and choose
the PLC > Upload to PG menu item. For a full upload, select the Block folder
and do the same.
Follow these steps when you do not have the original project but wish to upload
the program for backup purposes. With an existing project open or a new blank
project select the PLC > Upload Station to PG ¦ menu selection.
In the next screen, fill in the slot the CPU is in (this is always 2 for S7-300) and
the node address of the communication port on the CPU. In the case below we
are talking to a CPU over MPI with node address 10.
After clicking OK, the whole contents of the PLC including all blocks and