Vent Calculation
Vent Calculation
Vent Calculation
MINIMUM
Activity Unit Flow Rate m3/ hr
Reactor in Operation 6 668
Discharging of reactor 1 1600
Release of pressure @ 1 Bar 00
Vacuum Pump 1 350
Total Flow Rate 2617.9
Safety Margin 3141
NORMAL
Activity Unit Flow Rate m3/ hr
Reactor in Operation 10 1113
Discharging of reactor 1 1600
Release of pressure @ 1 Bar 00
Vacuum Pump 2 700
Total Flow Rate 3413.1
Safety Margin 4096
Activity Basis Unit
Discharging of reactor 1600 m3/ Hr
Release of pressure @ 1 Bar 180000 m3/ Hr
Velocity flow during reaction or ideal 350 FPM
Venting Nozzel
Volume flow sizereaction
during consideration
or ideal 150 mm
condition 111 m3/Hr
Vacuum Pump 350 m3/ Hr
DATA
batch discharging batch 1.1 kg pressure
time discharging pressure pressure release 0 pressure
date Dilutor start time end time start time time start time time
25/10/2019 lk 14 1800 kg 16200 kg 12:42 12:55
9:55 10:34
initial After
P (atm) 1 2
V (L) 30000 2070.30050
30000
N (mole) 1035.150252 4
R (Latm/(K*mole) 0.0821 0.0821
T (K) 353 353
vaccume create time (-0.7) zero vaccume time
Int final Int final
0:13 7:59 8:20 1:49 1:57