Supply Systems Exhaust and Return System Room Data
1 Date Date Room number and name
System No System No and Location Supply and exhaust system number
2
Supply System
1 Fan RPM
10 Identify for each system which air damper was left in full open position
1 Fan RPM
Room Data
1 Room/Area Temperature
Company: Daikin
CONTRACT: ATCEP(NCB:02): INTERNATIONAL TERMINAL BUILDING EXPANSION & RECONFIGURATION AND ASSOCIATED WORKS AT TIA
CONTRACTOR:
1 Fan RPM
10 Identify for each system which air damper was left in full open position
1 Fan RPM
Room Data
1 Room/Area Temperature
SHARMA- PRERA-ASHISH JV
g units
Date:
As per site
AC 3 AC 4
CIVIL AVIATION AUTHORITY OF NEPAL
AIR TRANSPORT CAPACITY ENHANCEMENT PROJECT
CONTRACT: ATCEP(NCB:02): INTERNATIONAL TERMINAL BUILDING EXPANSION & RECONFIGURATION AND ASSOCIATED WORKS AT TIA