Project Ampara I Road (AM-02) Sub Contractor SJT Engineering PVT - LTD Supplier NEM Construction PVT LTD Date 08.06.2020 Period 31st March 2020

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Project Ampara I Road (AM-02)

Sub Contractor SJT Engineering Pvt.Ltd pag -1


Supplier NEM Construction Pvt Ltd
Date 08.06.2020
Period 31st March 2020

SECOND INTEGRATED ROAD INVESTMENT PROGRAM


Contract Package - R RDA/ADB/iROAD-2(EP)/NCB/AM-02

Previous Certified This Period Cummulative Up to date


Item Description Unit Rate
Qty Qty Amount Qty Amount

Asphalt Concrete wearing course (Ex-Plant) From Plant


1 MT 7,100.00 1,198.41 8,508,711.00 2,049.56 14,551,876.00 3,247.97 23,060,587.00
Mahiyanganaya
Asphalt Concrete Binder course (Ex-Plant) From Plant
MT 6,725.00 246.68 1,658,923.00 - 246.68 1,658,923.00
Mahiyanganaya
Mobilization & De-mobilization of Asphalt laying
2 Item 687,500.00 - - - -
machinery and equipment

3 Laying of 50mm Thick Asphalt Concrete Ton 1,100.00 1,445.09 1,589,599.00 2,049.56 2,254,516.00 3,494.65 3,844,115.00

4 Bitumen Spray Bowser (Dry) Mnth 215,000.00 - - - -

5 Selfloader One Way (Wet) Km 300.00 - - - -

Load 7,500.00 - - - - -
Asphalt Transport Dump truck 6 wheels (Minimum
6
charge Rs: 7,500.00 Per Trip)
Ton/Km 11.00 71,895.73 790,853.03 89,628.94 985,918.34 161,524.67 1,776,771.37

12,548,086.03 17,792,310.34 30,340,396.37