Question Results: (Skipped)
Question Results: (Skipped)
Question Results: (Skipped)
Score 0 of 1
(skipped)
Question:
In Make-to-order production, which field controls whether the components will be planned as sales order specific stock?
Please choose the correct answer.
Response:
Score 0 of 1
Question:
Response:
Simulation of planned changes for costing and mater all requirements planning
Score 0 of 1
Question:
What are the possible categories for the Business Partner master data object in SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Person
Organization
Vendor
Customer
Group
Score 0 of 1
(skipped)
Question:
Your customer is using storage location is in SAP ECC and wants to switch to SAP S/4HANA. What do you have to consider?
Please choose the correct answer.
Response:
You have to set one MRP area for every storage location.
MRP Live does NOT support storage locations, but classic MRP still does.
Storage location MRP is replaced by MRP area functionality.
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
What are the main processes of the embedded PP/OS in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
At the end of the MRP run you receive the exception message “Reschedule In Operation”. What caused the message to be
generated?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Strategic analysis
Score 0 of 1
(skipped)
Question:
What Kanban status automatically posts goods receipt with reference to the procurement element?
Please choose the correct answer.
Response:
Empty
Wait
In use
Full
Score 0 of 1
(skipped)
Question:
What are the options for transferring data to SAP S/4HANA with the SAP S/4HANA Migration Cockpit?
There are 2 correct answers to this question.
Response:
CSV files
Staging tables
XML files
Temporary tables
Score 0 of 1
(skipped)
Question:
You want to integrate an existing planned order into Advanced Production Planning. Which report do you use?
Please choose the correct answer.
Response:
/SAPAPO/UPD_LOC_SP_PL
/SAPAPO/CURTO_CREATE
/SAPAPO/CREATE_LOCATION
/SAPAPO/PPDS_DELTA_ORD_TRANS
Score 0 of 1
(skipped)
Question:
Response:
Bulk materials
Co-products
Waste products
By-products
Score 0 of 1
(skipped)
Question:
Before a user can add multiple production versions in a material master, what information should be collected?
There are 3 correct answers to this question.
Response:
BOM status
Validity dates
Lot sizes
Score 0 of 1
(skipped)
Question:
A planner updated a production order status from partially confirmed “PCNF” to technically completed “TECO” by mistake.
What impact would this have to other users for this specific production order?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
What information is included in the SAP Readiness Check result for SAP S/4HANA?
There are 3 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
To ensure that the warehouse operator only stages large components in the exact required quality for each production
order, which warehouse material staging method would you recommend?
Response:
Pick parts
Crate parts
Kanban
Score 0 of 1
(skipped)
Question:
Which of the following functions can be performed when the production order has the status “Created” (CRTD)?
Please choose the correct answer.
Response:
A user can schedule a background job to release production orders (transaction COOIS).
A user can trigger material staging via mass processing (transaction COHV).
A user trigger material availability check via mass processing (transaction COHV)
Score 0 of 1
(skipped)
Question:
Response:
Activities
Phases
Operations
Resources
Score 0 of 1
(skipped)
Question:
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network?
There are 3 correct answers to this question.
Response:
SAP Concur
SAP SuccessFactors
SAP Ariba
SAP S/4HANA
Score 0 of 1
(skipped)
Question:
Which times are used for Basic Date Scheduling of manufacturing planned orders in MRP?
There are 2 correct answers to this question.
Response:
Opening period
Setup time
Score 0 of 1
(skipped)
Question:
How does the new Inventory Management Data model contribute to the reduction of the data footprint?
There are 3 correct answers to this question.
Response:
How can Production Planning and Detailed Scheduling (PP/DS) enhance the standard planning functionality?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
The settings for MRP can be maintained at different levels. If settings have been maintained in different places, in which
sequence does the system search for the MRP settings?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them
automatically copied to production orders?
There are 2 correct answers to this question.
Response:
Material master
Bill of material
Routing header
Work center
Score 0 of 1
(skipped)
Question:
Response:
By plant
By industry
By period
By mater al type
Score 0 of 1
(skipped)
Question:
What does the bill of material usage (BOM usage) control at the BOM item level?
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Response:
SAP Fieldglass
SAP Hybris
Concur
Score 0 of 1
(skipped)
Question:
MRP created a planned order for a material that has one single material from stock as a component. What happens to this
dependent requirement when you convert the planned order into a production order?
Response:
Score 0 of 1
(skipped)
Question:
You produce your material based on a forecast derived from historical sales and expect it to be in inventory when your
customer orders. If customers order more that the forecasted quantity, you want to increase production to try to meet the
extra demand.
Which is the appropriate planning strategy to use?
Response:
40 – Planning with-final-assembly
10 – Anonymous make-to-stock
Score 0 of 1
(skipped)
Question:
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials
(BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is
NOT possible.
Response:
Planning strategy 50 (Planning without final assembly) and the corresponding individual
Collective indicator
Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP
indicator
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
You define forecast consumption as an integral part of your Production Planning and Detailed Scheduling process. Which of
the following order types consume the forecast?
Response:
Purchase order
Dependent demand
Planned order
Sales order
Score 0 of 1
(skipped)
Question:
Response:
Routings (N)
Score 0 of 1
(skipped)
Question:
On which of the following levels can you influence the availability check for the components of production orders?
There are 2 correct answers to this question.
Response:
Material master
MRP controller
Production controller
Score 0 of 1
(skipped)
Question:
Response:
An evaluation to verify if there are overstock situations in the balance between receipt and
issue elements after the production planning run.
An evaluation that is ordered according to the network structure of all related products and
represents the coverage of issue elements with receipt elements.
An evaluation to verify if there are mater al or capacity shortages in the network after the
production planning run.
Score 0 of 1
(skipped)
Question:
What is the sequence of the five steps of Demand-Driven Replenishment in SAP S/4HANA?
Please choose the correct answer.
Response:
Analytics, replenishment planning, replenishment execution, buffer positioning, buffer sizing
Score 0 of 1
(skipped)
Question:
Which of the following is used by the MRP Live planning run in SAP S/4HANA?
Please choose the correct answer.
Response:
MRP list
Planning horizon
Score 0 of 1
(skipped)
Question:
Which of the following elements does the MRP run take into account?
There are 2 correct answers to this question.
Response:
Sales orders
Shipments
Material documents
Score 0 of 1
(skipped)
Question:
When a developer creates a new SAP Fiori app, they begin by selecting a template to ensure the application has a
consistent look-and-feel.
Response:
Factsheet
Analytical
Maintenance view
Transactional
Web Dynpro
Score 0 of 1
(skipped)
Question:
What data processing steps are obsolete if you use SAP S/4HANA Analytics?
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that the production
flow happens only in physically connected tanks?
Please choose the correct answer.
Response:
Resource network
Setup matrix
Operation network
Score 0 of 1
(skipped)
Question:
What must be used in the system to plan the requirements for different subcontractors separately?
Response:
Planning plant
Production versions
Storage locations
MRP areas
Score 0 of 1
(skipped)
Question:
The procurement type of your material is set to "E" for In-house production. Which of the following is valid to determine a
source of supply in SAP S/4HANA?
Please choose the correct answer.
Response:
Selection Method
Contract
Score 0 of 1
(skipped)
Question:
Response:
Configuration guides
Process diagrams
Solution packages
Building blocks
Scope items
Score 0 of 1
(skipped)
Question:
Which of the following elements does MRP take into account during net requirement calculation?
There are 2 correct answers to this question.
Response:
Lot size
Purchase orders
Safety stock
Score 0 of 1
(skipped)
Question:
You want to represent setup time as a graphical object in the Detailed Scheduling Planning Board. Which actions are
needed?
There are 2 correct answers to this question.
Response:
Create and assign a new graphical object for setup time in the planning board.
Create and assign setup group/setup keys in the production data structure.
Create and assign a setup matrix with setup transition time to the resource
Score 0 of 1
(skipped)
Question:
Response:
To reduce the total production lead time for along production line
Score 0 of 1
(skipped)
Question:
In which material master views can you select the batch management checkbox?
There are 2 correct answers to this question.
Response:
Work Scheduling
Purchasing
Basic Data 1
MRP 4
Score 0 of 1
(skipped)
Question:
Advanced Planning uses master data and transaction data from SAP S/4HANA. In which data objects can you set the
advanced planning flag?
There are 2 correct answers to this question.
Response:
Material
Plant
Work center
Production version
Score 0 of 1
(skipped)
Question:
Response:
Move time
Queue time
Wait time
Score 0 of 1
(skipped)
Question:
In which of the following master data objects can you define the production order default storage location for a material
component?
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
Which reports can you access via the order and resource reporting transaction in advanced planning?
There are 3 correct answers to this question.
Response:
Production overview
Operation list
Production list
WIP list
Score 0 of 1
(skipped)
Question:
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished
good is received.
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
Your customer wants to include restricted-use stock as a potential receipt in the existing ATP check for component
availability.
Which information is required to implement this change request in the scope of check?
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
Response:
Score 0 of 1
(skipped)
Question:
How Is the bill of material (BOM) exploded when you use a BOM explosion number?
Please choose the correct answer.
Response:
With respect to a common change status for product and each assembly
With respect to defined separate key dates for product and each assembly
With respect to a defined separate change status for product and each assembly
With respect to a common key date for product and each assembly
Score 0 of 1
(skipped)
Question:
The pegging situation was changed because of an MRP heuristic run. What is a capability of dynamic pegging?
Response:
It enables the propagation of network alerts across the bill of materials structure
It links receipts from an alternative location in case of a shortage in the default location
It replaces fixed pegging relationships unless they have been created for stock
Score 0 of 1
(skipped)
Question:
Which material master setting is required to use the repetitive planning table for production with production orders?
Please choose the correct answer.
Response:
At least one valid production version must exist on the MRP4 view
Score 0 of 1
(skipped)
Question:
The method in which a production order is credited or debited depends on the variant of cost object controlling (COC).
What basis can be used to carry this out?
There are 2 correct answers to this question.
Response:
Cost-related
Product-related
Milestone-related
Order-related
Score 0 of 1
(skipped)
Question:
In the Manage Shortage view of the new SAP Fiori app “Monitor Material Coverage”, what do the stars indicate?
Please choose the correct answer.
Response:
Score 0 of 1
(skipped)
Question:
A customer is considering switching from order-related settlement to product-related settlement. What are capabilities of
cost collectors?
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
For which data objects do you have to set up CIF integration models in S/4HANA to use them in advanced planning?
There are 2 correct answers to this question.
Response:
Work center
Material master
Contract
Production plant
Score 0 of 1
(skipped)
Question:
Response:
Guided Configuration
Premium engagement
SAP MaxAttention
Score 0 of 1
(skipped)
Question:
The material master of your finished product contains MRP type “PD”. You set a manual firming date in the stock
requirements list. Which of the following will firm planned orders”
There are 2 correct answers to this question.
Response:
Score 0 of 1
(skipped)
Question:
Response:
Capacity leveling
Resource selection
Capacity planning
Resource scheduling
Score 0 of 1
(skipped)
Question:
A production order is created from a planned order. The system should determine a valid production version. What must
you doing the system for the selection to occur?
Response:
Change the production version assignment in the production order using the Read Master
Data function.
Score 0 of 1
(skipped)
Question:
Response:
Backorder processing
Optimization
Detailed scheduling functions
Heuristics
Demand consumption
Score 0 of 1
(skipped)
Question:
The SAP Kanban procedure could be used to trigger which of the following kinds of replenishment?
There are 2 correct answers to this question.
Response:
Subcontracting
Vendor consignment
In-house production
Stock transfer
Score 0 of 1
(skipped)
Question:
Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?
There are 2 correct answers to this question.
Response:
100% check
Simultaneous
By usage probability
Score 0 of 1
(skipped)
Question:
What does it mean for the production planner when MRP works with infinite capacities?
Please choose the correct answer.
Response:
MRP creates capacity requirements only if the work center has sufficient capacity.
MRP assigns capacity requirements automatically to work center is with the earliest
available capacity.
MRP creates capacity requirements without checking the capacity of a work center.
MRP assigns capacity requirements automatically after the last scheduled order on a work
center.
Score 0 of 1
(skipped)
Question:
In Demand-Driven Replenishment, materials are classified according to several criteria. What criteria can you use?
There are 3 correct answers to this question.
Response:
Goods issue value
Demand variation
Score 0 of 1
(skipped)
Question:
An issue storage location was NOT found through the work center, bill of material (BOM) item, or material master. What
determines whether the storage location can be derived from the production version?
Response:
Plant Data
MRP Group
MRP Profile
MRP Controller
Score 0 of 1
(skipped)
Question:
Response:
Only co-products are identified by a special item category in the bill of material (BOM).
Score 0 of 1
(skipped)
Question:
Which material master data can you copy when you use the Copy Material program (transaction MMCC, Material Master
Copier) to create new materials?
There are 2 correct answers to this question.
Response:
Response:
Production versions
Quota arrangements
Outline agreement
Score 0 of 1
(skipped)
Question:
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the
highest priority?
Please choose the correct answer.
Response:
Choose one:
What is SAP’s strategic solution to perform Sales and Operations planning when you use SAP S/4HANA Manufacturing?
Please choose the correct answer.
Choose one:
Flexible Planning
Choose:
Production Version
Bill of Material
Routing
In a production process, you need a certain amount of liquid as input material. The source tank is directly connected to the
reactor. How can you process consumption postings?
Please choose the correct answer.
Choose one:
Kanban
Picking list
Transfer order
Back flushing
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing.
What is the impact of this decision?
There are 3 correct answers to this question.
Choose:
Which of the following time elements does MRP use during backward scheduling for in-house production?
There are 2 correct answers to this question.
Choose:
Opening period
Where can you find the latest in version of the Simplification List for SAP S/4HANA?
Please choose the correct answer.
Choose one:
How can you enhance the system statuses of a production order scenario with user statuses?
Please choose the correct answer.
Choose one:
You want to schedule an order in the graphical planning board. What are valid planning directions?
There are 2 correct answers to this question.
Choose:
Squeezing in
Backwards
Infinite sequencing
Choose one:
Source determination
BOM explosion
When can the material availability check occur automatically in a production order?
There are 2 correct answers to this question.
Choose:
At order creation
At order settlement
At order release
At order confirmation
Advanced Planning is delivered with standard out-of-the-box order and resource evaluations. Which evaluations are
available?
There are 2 correct answers to this question.
Choose:
Order list
Resource overview
Resource utilization
Production list
What are possible configuration steps when setting up the alert monitor in Advanced Planning?
There are 3 correct answers to this question.
Choose:
Choose one:
Warehouse order
Warehouse task
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient
way to handle last minute demands and protect the current production plan?
Choose:
In the material master record, set MRP type to P4 and a planning time fence on the
replenishment lead time of the material
In the material master record, set MRP type to P1 and a planning time fence on the
replenishment lead time of the material
In the stock requirements list, set a manual firming fence for a date based on the
replenishment lead time of the material
Manually firm all planned orders for materials within the replenishment lead time of the
material
In order to use strategy 70 – Planning At Assembly Level, what order field must be set besides the planning strategy?
Please choose the correct answer.
Choose one:
Which master data object governs the relationship between supply source and demand source in the Kanban process?
Please choose the correct answer.
Choose one:
Control cycle
Replenishment strategy
Rate routing
Choose:
You have maintained the parameters for simple discontinuation in the material master of a component. Which business
process will be affected if the available stock is zero and the discontinuation date is in the past?
Choose one:
Backflushing
Kanban
Choose one:
Choose:
The OLAP system needs to write back the data to the OLTP system
Choose:
Available-to-promise
Capacity planning
Demand planning
Backorder processing
For which planning-relevant data objects do you set just one indicator to include then in PP/DS?
There are 2 correct answers to this question.
Choose:
Plant
Production version
Material
Work center
How can you limit the number of master data objects to be created when the manufacturing process is the same for many
different products?
Please choose the correct answer.
Choose one:
In your plant, MRP is activated. Which options do you have to exclude a material from the MRP run?
There are 2 correct answers to this question.
Choose:
Choose:
Confirmation profile
Which elements are included in the structure of the batch where-used list?
There are 3 correct answers to this question.
Choose:
Purchase orders
Collective orders
Planned orders
Stock transfers
Which of the following data objects are updated when a user confirms an operation?
Please choose the correct answer.
Choose one:
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have?
There are 2 correct answers to this question.
Choose:
Model a handling resource in the location master and goods receipt time in the mater all
master.
You are creating a production order manually. What activities are involved in this process?
There are 3 correct answers to this question.
Choose:
Planning selection
Actual cost calculation
Which of the following objects can you release so that the business transactions for process order execution and process
management can be executed?
There are 2 correct answers to this question.
Choose:
Individual operations
Individual phases
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode
selection?
Please choose the correct answer.
Choose one:
What are the consequences when you assign a planned order to a production line manually, using the planning table in
repetitive manufacturing?
Please choose the correct answer.
Choose one:
Choose:
Business partner
Developer
Expert
Employee
Occasional
How can you set up the supply source for the SAP Kanban process?
There are 3 correct answers to this question.
Choose:
Which of the following is an advantage of MRP Live and NOT available in classical MRP?
There are 2 correct answers to this question.
Choose:
Response:
New implementation
System activation
Landscape transformation
System upgrade
System conversion
Choose:
Which of the following business processes are controlled by production order type-dependent parameters?
There are 2 correct answers to this question.
Choose:
Planning
Implementation
Which actions does the system perform by default when you save a confirmation for a finished product in repetitive
manufacturing?
There are 3 correct answers to this question.
Choose:
A planner wants to interactively resolve an overload situation on a resource using advanced planning tools without any
automatic rescheduling activity by the system.
Which combination of settings for resource and detailed scheduling strategy are required to receive related alerts?
Choose one:
In which data object is the production line (Repetitive manufacturing relevant work center) maintained?
Please choose the correct answer.
Choose one:
Cost collector
Bill of material
Production version
You want to perform capacity availability checks on your production orders. What must be set for this to occur?
There are 2 correct answers to this question.
Choose:
Choose:
Move time
Pick/pack time
Queue time
Wait time
Which technological advances enabled the development of SAP S/4HANA as the digital core?
There are 3 correct answers to this question.
Choose:
What are examples of assignment objects you can maintain in the Engineering Workbench?
There are 3 correct answers to this question.
Choose:
Component assignment
Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?
There are 2 correct answers to this question.
Choose:
What are the advantages of the new MRP Live in SAP S/4HANA compared to the classic MRP from SAP ECC?
There are 2 correct answers to this question.
Choose:
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of
material shortage. What must you do?
There are 2 correct answers to this question.
Choose:
Add the agreement to the source list and mark it for MRP relevance
Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
Add the agreement to the quota arrangement and mark it for MRP relevance.
Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in
production. How can you identify all affected finished goods stocks?
Choose one:
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials
(BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is
NOT possible.
Response:
Planning strategy 50 (Planning without final assembly) and the corresponding individual
Collective indicator
Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP
indicator
You want to triggering-house production of a semi-finished mater al before a sales order for the corresponding finished
good is received.
Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?
Please choose the correct answer.
Response:
Choose:
It was created for better planning and estimation of your way to S/4HANA
A material in your company is planned with planning strategy 70 (Planning at assembly level). The consumption mode has
been set to backwards with a consumption period of 12 days.
Choose one:
You are using heuristic SAP_ERP_001. Which of the following criteria are included in the automatic source determination
logic when a planned order is created?
Please choose the correct answer.
Choose one:
Costs
Delivery date
Component availability
Vendor rating
Quota arrangement
In which customizing activity do you set up automatic routing selection for production orders?
Please choose the correct answer.
Choose one:
Choose:
How can you avoid order proposals for planned independent requirements with dates in the past?
There are 2 correct answers to this question.
Choose:
With which SAP Fiori app can you access the Guided Configuration environment for an SAP S/4HANA Cloud
implementation?
Please choose the correct answer.
Choose one:
Manage Licenses
Choose:
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Choose one:
Control recipe
Process order
Process message
PI sheet
Process order
Control recipe
Process message
PI sheet
Control recipe
Process order
PI sheet
Process message
Process order
Control recipe
PI sheet
Process message
Which SAP solutions are part of the Digital Value Network portfolio?
There are 3 correct answers to this question.
Choose:
Concur
SAP Hybris
SAP Fieldglass
Choose one:
What are possible configuration steps when setting up the alert monitor in Advanced Planning?
There are 3 correct answers to this question.
Choose:
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Choose:
Slotting
Labor Management
Yard Management
Choose:
Process instructions
Receiver-sender relationships
Which data model changes have been implemented in Sales and Distribution?
There are 3 correct answers to this question.
Choose:
Choose:
Question:
Your customer complains about incorrect duration for production order operations. What time elements could cause the
issue?
There are 3 correct answers to this question.
Response:
Queue time
Floating time
Move time
You have a quality control check to avoid using a high-value component tin faulty materials in subsequent assembly
operations. How do you account for potentials crap of the high-value material?
Choose one:
Enter the operation scrap and set the net indicator in the component of the bill of mater al
of the assembly.
master of the assembly and set the net indicator in the routing operation where the
component is used
Enter the assembly scrap in the material master of the component and set the net
indicator in the component of the bill of material of the assembly.
Enter the component scrap in the component of the bill of material of the assembly and
leave the net indicator initial in the bill of material.
During planning you are facing an overload situation on a resource. Which activities do you consider to create a feasible
production plan?
There are 3 correct answers to this question.
Choose:
In which data objects do you maintain the production in as the work center for repetitive manufacturing?
There are 2 correct answers to this question.
Choose:
Routing
Production version
Question:
When the goods receipt for a finished product is posted during confirmation on a manufacturing environment, which of the
following actions are also performed by default?
There are 2 correct answers to this question.
Response:
Reduction of the capacity requirements