Sl. Item Code Description. Unit Dhaka, Sylhet Zone Khulna, Rajshahi & Chattogram Zone
No Mymenisngh & Barisal Rangpur Zone
Cumilla & Gopalganj
Zone Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 1 - General & Site Facilities
Lump
1 1/1/01 Maintenance and Protection of Traffic 144,431.00 144,042.00 144,431.00 144,042.00 144,431.00
Sum
10 1/3/02 Maintain Site Laboratory Month 7,866.00 7,866.00 7,866.00 7,866.00 7,866.00
12 1/4/01 Saloon Car 1200cc Capacity Month 119,302.00 119,302.00 119,302.00 119,302.00 119,302.00
13 1/4/02 Pick- up (Double Cab) Month 169,535.00 169,535.00 169,535.00 169,535.00 169,535.00
14 1/4/03 Four Wheel Drive Vehicle Min. 6 seats Month 295,116.00 295,116.00 295,116.00 295,116.00 295,116.00
15 1/4/04 Motor Cycle 125cc Month 5,651.00 5,651.00 5,651.00 5,651.00 5,651.00
16 1/4/05 Motor Boat min 5m length Month 16,859.00 16,859.00 16,859.00 16,859.00 16,859.00
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 2 – Earthwork
1 2/1/01 Clearing and Grubbing sq. metre 55.00 51.00 55.00 51.00 55.00
3 2/2/02 Roadway Excavation in Suitable Soil cu metre 144.00 141.00 144.00 141.00 144.00
8 2/4/01 Channel Excavation in Unsuitable Materials cu metre 211.00 198.00 211.00 198.00 211.00
9 2/4/02 Channel Excavation in Suitable Material cu metre 211.00 198.00 211.00 198.00 211.00
10 2/5/01 Excavation and Backfill for Structures cu metre 447.00 424.00 447.00 424.00 447.00
11 2/5/02 Concrete Backfill for Structures cu metre 12,533.00 11,506.00 12,050.00 11,390.00 12,087.00
12 2/5/03 Sand Backfill for Structures cu metre 1,309.00 1,250.00 1,352.00 1,365.00 1,381.00
13 2/06/1(a) Embankment Fill from Excavation on site. cu metre 144.00 141.00 144.00 141.00 144.00
16 2/6/03 Sand Backfill to Swamp cu metre 791.00 786.00 791.00 858.00 834.00
17 2/7/01 Preparation of Subgrade 300 mm Depth sq. metre 24.00 24.00 24.00 24.00 24.00
18 2/7/02 Preparation of Subgrade 450 mm depth sq. metre 40.00 39.00 40.00 39.00 40.00
24 2/10/01 Construction of Soil Earthen Shoulders cu metre 838.00 801.00 797.00 807.00 840.00
Lin.
25 2/12/01 Subgrade Drains 385.00 357.00 404.00 372.00 380.00
Metre
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
2 3/1/02 Repair of Potholes on the Existing Pavement cu metre 21,452.00 20,418.00 21,451.00 20,609.00 20,514.00
4 03/02/01 (b) Sub-Base (with Paver) cu metre 5,588.00 5,968.00 5,263.00 4,959.00 5,363.00
5 03/03/01(a) Aggregate Base Type I cu metre 8,832.00 7,926.00 8,384.00 7,720.00 8,273.00
6 03/03/01 (b) Aggregate Base Type I (with Paver) cu metre 9,020.00 8,118.00 8,572.00 7,912.00 8,461.00
7 03/03/02 (a) Aggregate Base Type II cu metre 5,932.00 6,378.00 5,554.00 5,194.00 5,662.00
8 03/03/02 (b) Aggregate Base Type II (with Paver) cu metre 6,120.00 6,570.00 5,742.00 5,386.00 5,850.00
9 03/06/1a Bituminous Prime Coat (Plant Placed) sq. metre 114.00 116.00 117.00 120.00 113.00
10 03/06/1b Bituminous Prime Coat (hand placed) sq. metre 109.00 110.00 112.00 114.00 107.00
11 03/07/1a Bituminous Tack Coat (Plant Work) sq. metre 51.00 51.00 53.00 54.00 50.00
12 03/07/1b Bituminous Tack Coat (Labour intensive work) sq. metre 45.00 46.00 47.00 48.00 44.00
13 3/8/01 Primer seal sq. metre 113.00 111.00 115.00 114.00 112.00
24 3/11/01 Premix Bituminous Carpeting cu metre 20,841.00 19,648.00 20,666.00 19,776.00 19,831.00
Sl. Item Code Description. Unit Dhaka, Sylhet Zone Khulna, Rajshahi & Chattogram Zone
No Mymenisngh & Barisal Rangpur Zone
Cumilla & Gopalganj
Zone Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
12 mm Compacted Premix Bituminous Seal
25 3/12/02 sq. metre 185.00 176.00 186.00 180.00 177.00
Coat
15 mm Compacted Premix Bituminous Seal
26 3/12/03 sq. metre 227.00 217.00 228.00 221.00 217.00
Coat
125 mm Thick Brick on End Edging Lin.
27 3/13/01 (a) 199.00 215.00 185.00 172.00 189.00
(1st Class) Metre
125 mm Thick Brick on End Edging Lin.
28 3/13/01 (b) 233.00 249.00 219.00 205.00 223.00
(Machine Made) Metre
Single Layer Brick Flat Soling i/c 75mm thick
29 3/13/02 (a) sq. metre 555.00 592.00 522.00 496.00 535.00
compacted sand cushion (1st Class)
Single Layer Brick Flat Soling i/c 75mm thick
30 3/13/02 (b) sq. metre 636.00 673.00 604.00 577.00 616.00
compacted sand cushion (Machine Made)
Herring Bond Brick Pavement i/c 12mm sand
31 3/13/03 (a) sq. metre 780.00 844.00 726.00 673.00 740.00
cushion (1st Class)
Herring Bond Brick Pavement i/c 12mm sand
32 3/13/03 (b) sq. metre 915.00 979.00 861.00 808.00 875.00
cushion (Machine Made)
Dry Lean Concrete Class-20 (Concrete
33 03/14/2(a) cu meter 13,961.00 12,929.00 13,482.00 12,802.00 13,454.00
Mixture).
Dry Lean Concrete Class-20 (Batching Plant
34 03/14/2(b) cu meter 15,348.00 14,357.00 14,870.00 14,230.00 14,842.00
without Concrete Paver).
Dry Lean Concrete Class-20 (Batching Plant
35 03/14/2(c) cu meter 15,537.00 14,558.00 15,058.00 14,431.00 15,030.00
with Concrete Paver).
Cement Concrete Pavement (Concrete Class-
36 03/15/1(a) cu meter 16,513.00 15,551.00 16,084.00 15,441.00 16,042.00
25) (Concrete Mixture).
Cement Concrete Pavement (Concrete Class-
37 03/15/1(b) cu meter 17,882.00 16,962.00 17,454.00 16,851.00 17,412.00
25) (Batching Plant without Concrete Paver).
Cement Concrete Pavement (Concrete Class-
38 03/15/1(c) cu meter 18,222.00 17,314.00 17,794.00 17,204.00 17,752.00
25) (Batching Plant with Concrete Paver).
Precast RCC Pavement slab (Concrete Class-
39 03/15/1(d) cu meter 22,035.00 21,100.00 21,582.00 20,983.00 21,538.00
25) (Batching Plant)
Cement Concrete Pavement (Concrete Class-
40 03/15/2(a) cu meter 17,375.00 16,385.00 16,932.00 16,270.00 16,889.00
30) (Concrete Mixture).
Cement Concrete Pavement (Concrete Class-
41 03/15/2(b) cu meter 18,634.00 17,741.00 18,191.00 17,627.00 18,148.00
30) (Batching Plant without Concrete Paver).
Cement Concrete Pavement (Concrete Class-
42 03/15/2(c) cu meter 18,990.00 18,097.00 18,547.00 17,983.00 18,504.00
30) (Batching Plant with Concrete Paver).
Precast RCC Pavement slab (Concrete Class-
43 03/15/2(d) cu meter 22,911.00 21,944.00 22,442.00 21,823.00 22,398.00
30) (Batching Plant)
Cement Concrete Pavement (Concrete Class-
44 03/15/3(a) cu meter 17,600.00 16,677.00 17,173.00 16,562.00 17,128.00
35) (Concrete Mixture).
Cement Concrete Pavement (Concrete Class-
45 03/15/3(b) cu meter 18,815.00 17,953.00 18,388.00 17,839.00 18,342.00
35) (Batching Plant without Concrete Paver).
Cement Concrete Pavement (Concrete Class-
46 03/15/3(c) cu meter 19,171.00 18,309.00 18,744.00 18,195.00 18,698.00
35) (Batching Plant with Concrete Paver).
Precast RCC Pavement slab (Concrete Class-
47 03/15/3(d) cu meter 23,417.00 22,379.00 23,110.00 22,258.00 22,839.00
35) (Batching Plant)
Cement Concrete Pavement (Concrete Class-
48 03/15/3(e) cu meter 19,054.00 18,193.00 18,627.00 18,079.00 18,582.00
40) (Batching Plant without Concrete Paver).
Cement Concrete Pavement (Concrete Class-
49 03/15/3(f) cu meter 19,410.00 18,548.00 18,983.00 18,434.00 18,937.00
40) (Batching Plant with Concrete Paver).
Sl. Item Code Description. Unit Dhaka, Sylhet Zone Khulna, Rajshahi & Chattogram Zone
No Mymenisngh & Barisal Rangpur Zone
Cumilla & Gopalganj
Zone Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
9 4/1/04 High Yield Deformed Steel Reinforcing Bars Tonne 92,710.00 92,918.00 94,004.00 93,564.00 92,064.00
24 4/2/04 High Yield Reinforcement Bars Tonne 92,710.00 92,918.00 94,004.00 93,564.00 92,064.00
Lin.
25 4/3/01 King Post 820.00 827.00 760.00 757.00 814.00
Metre
Lin.
26 4/3/02 Raker Piles (including Tie Bars) 1,168.00 1,178.00 1,082.00 1,078.00 1,160.00
Metre
27 4/3/03 Precast Planks (including Reinforcement Steel) Sq Metre 3,384.00 3,410.00 3,261.00 3,252.00 3,361.00
Sl. Item Code Description. Unit Dhaka, Sylhet Zone Khulna, Rajshahi & Chattogram Zone
No Mymenisngh & Barisal Rangpur Zone
Cumilla & Gopalganj
Zone Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
High Yield Deformed Steel Reinforcing Bars to
29 4/3/05 Tonne 92,710.00 92,918.00 94,004.00 93,564.00 92,064.00
King Posts and Raker Piles
Load Test on Cast In Place Working Pile (Proof
30 04/04/1a Number 99,486.00 96,509.00 99,486.00 97,608.00 100,145.00
Load to be specified in BoQ)50 Ton
31 04/04/1b Load test on cast in place piles (For 100 Ton) Number 174,847.00 168,995.00 174,847.00 171,193.00 176,166.00
32 04/04/1c Load Test on cast in place piles (For 200 Ton) Number 299,600.00 289,880.00 299,600.00 294,275.00 302,237.00
41 4/7/02 Class-20 Concrete for RCC Well cum 14,874.00 14,773.00 14,874.00 14,773.00 14,874.00
42 4/7/03 Concrete in Top/Bottom Plugging cum 14,919.00 13,920.00 14,468.00 13,695.00 14,356.00
Labor for Well Sinking (Size
43 4/07/4(a) Metre 24,457.00 24,034.00 24,457.00 24,034.00 24,457.00
5000mmX10000mm) Depth 0m-6m
Labor for Well Sinking (Size
44 4/07/4(b) Metre 37,497.00 37,195.00 37,497.00 37,195.00 37,497.00
5000mmX10000mm) Depth 6m-12m
Labor for Well Sinking (Size
45 4/07/4(c) Metre 42,415.00 42,114.00 42,415.00 42,114.00 42,415.00
5000mmX10000mm) Depth 12m-18m
Labor for Well Sinking (Size
46 4/07/4(d) Metre 53,874.00 53,517.00 53,874.00 53,517.00 53,874.00
5000mmX10000mm) Depth 18m-24m
Labor for Well Sinking (Size
47 4/07/4(e) Metre 64,340.00 63,982.00 64,340.00 63,982.00 64,340.00
5000mmX10000mm) Depth Above 24m
Labor for Well Sinking (Size
48 4/07/4(f) Metre 16,581.00 16,296.00 16,581.00 16,296.00 16,581.00
4270mmX7940mm) Depth 0m-6m
Labor for Well Sinking (Size 4270mm X
49 4/07/4(g) Metre 25,650.00 25,447.00 25,650.00 25,447.00 25,650.00
7940mm) Depth 6m-12m
Labor for Well Sinking (Size
50 4/07/4(h) Metre 28,653.00 28,457.00 28,653.00 28,457.00 28,653.00
4270mmX7940mm) Depth 12m-18m
Labor for Well Sinking (Size 4270mm X
51 4/07/4(i) Metre 36,272.00 36,033.00 36,272.00 36,033.00 36,272.00
7940mm) Depth 18m-24m
Labor for Well Sinking (Size 4270mm X
52 4/07/4(j) Metre 43,503.00 43,259.00 43,503.00 43,259.00 43,503.00
7940mm) Depth Above 24m
53 4/7/05 Sand Filling cum 1,309.00 1,250.00 1,353.00 1,366.00 1,381.00
54 4/7/06 High Steel Reinforcement Bars Ton 93,966.00 94,173.00 95,260.00 94,820.00 93,320.00
Sl. Item Code Description. Unit Dhaka, Sylhet Zone Khulna, Rajshahi & Chattogram Zone
No Mymenisngh & Barisal Rangpur Zone
Cumilla & Gopalganj
Zone Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 5 -Structures
1 5/1/01 Single Layer Brick Flat Soling sq. metre 528.00 566.00 495.00 468.00 507.00
Concrete Class as Detailed on Drawings
2 05/01/2a cu metre 9,725.00 9,996.00 9,344.00 8,970.00 9,517.00
(Class10) (Concrete Mixer)
Concrete class-20 (Foundation) (Concrete
3 05/01/2b cu metre 14,481.00 13,414.00 14,003.00 13,287.00 13,975.00
Mixer)
Concrete class - 20 (Vertical member col. pier,
4 05/01/2c abutment / wing wall,culvert etc.) (Concrete cu metre 16,960.00 15,748.00 16,480.00 15,621.00 16,452.00
Mixer)
Concrete class-20 (Girder, cross
5 05/01/2d cu metre 19,408.00 18,145.00 18,930.00 18,019.00 18,902.00
girder,diaphram,beam etc) (Concrete Mixer)
Concrete class-20 (Deck slab,side walk,wheel
6 05/01/2e cu metre 17,232.00 16,052.00 16,753.00 15,926.00 16,725.00
guard,curb etc (Concrete Mixer)
Concrete class -20 (rail & post) (Concrete
7 05/01/02f cu metre 21,221.00 19,720.00 20,742.00 19,593.00 20,714.00
Mixer)
Concrete Class - 25 (Foundation) (Concrete
8 05/01/2g cu metre 14,595.00 13,605.00 14,155.00 13,489.00 14,130.00
Mixer)
Concrete class -25 (Vertical member col,
9 05/01/2h pier,abutment/wing wall,culvert etc) (Concrete cu metre 17,047.00 15,914.00 16,608.00 15,798.00 16,583.00
Mixer)
Concrete class - 25 (Girder, beam, cross
10 05/01/02i cu metre 19,673.00 18,487.00 19,233.00 18,371.00 19,208.00
girder,and diaphram etc) (Concrete Mixer)
Concrete class - 25 (RCC/CC Pavement work)
11 05/01/02j cu metre 17,852.00 16,666.00 17,412.00 16,550.00 17,387.00
(Concrete Mixer)
Concrete class-30 (Deck slab, side walk, wheel
12 05/01/2k cu metre 18,232.00 17,101.00 17,778.00 16,981.00 17,751.00
guard,curb etc (Concrete Mixer)
13 05/01/02l Concrete Class – 35 (Concrete Mixer) cu metre 28,715.00 27,660.00 28,429.00 27,548.00 28,193.00
Concrete Class – 40 (Pre-stressed Girder)
14 05/01/2m cu metre 29,150.00 28,121.00 28,876.00 28,015.00 28,644.00
(Concrete Mixer)
Concrete Class as Detailed on Drawings
15 05/01/3a cu metre 10,509.00 10,339.00 10,481.00 10,438.00 10,566.00
(Class10) (Batching Plant)
16 05/01/3b Concrete class-20 (Foundation) (Batching cu metre 16,284.00 15,216.00 15,805.00 15,089.00 15,777.00
Concrete class - 20 (Vertical member col. pier,
17 05/01/3c abutment / wing wall,culvert etc.) (Batching cu metre 18,728.00 17,516.00 18,249.00 17,390.00 18,221.00
Plant)
Concrete class-20 (Girder, cross
18 05/01/3d cu metre 21,166.00 19,903.00 20,687.00 19,776.00 20,659.00
girder,diaphram,beam etc) (Batching Plant)
Concrete class-20 (Deck slab,side walk,wheel
19 05/01/3e cu metre 18,990.00 17,810.00 18,511.00 17,683.00 18,483.00
guard,curb etc) (Batching Plant)
20 05/01/3f Concrete class -20 (rail & post) (Batching Plant) cu metre 22,979.00 21,478.00 22,500.00 21,351.00 22,472.00
Concrete Class - 25 (Foundation) (Batching
21 05/01/3g cu metre 16,286.00 15,296.00 15,847.00 15,180.00 15,821.00
Plant)
Concrete class -25 (Vertical member col,
22 05/01/3h pier,abutment/wing wall,culvert etc) (Batching cu metre 18,827.00 17,694.00 18,388.00 17,578.00 18,363.00
Plant)
Concrete class - 25 (Girder, beam, cross
23 05/01/03i cu metre 21,417.00 20,232.00 20,978.00 20,116.00 20,952.00
girder,and diaphram etc) (Batching Plant)
Concrete class - 25 (RCC/CC Pavement work)
24 05/01/03j cu metre 19,597.00 18,412.00 19,158.00 18,296.00 19,132.00
(Batching Plant)
Concrete class-30 (Deck slab, side walk, wheel
25 05/01/03k cu metre 19,986.00 18,855.00 19,532.00 18,735.00 19,506.00
guard,curb etc) (Batching Plant)
26 05/01/03l Concrete Class – 35 (Batching Plant) cu metre 29,222.00 28,290.00 28,936.00 28,179.00 28,700.00
Concrete Class – 40 (Pre-stressed Girder)
27 05/01/3m cu metre 29,657.00 28,752.00 29,383.00 28,645.00 29,151.00
(Batching Plant)
29 5/2/02 High Yield Reinforcement Bars Tonne 91,203.00 91,461.00 92,497.00 92,108.00 90,557.00
30 5/2/03 Wire Mesh Reinforcement Tonne 83,435.00 84,082.00 84,754.00 84,742.00 82,776.00
31 5/3/01 Prestressing Wire or Strand Tonne 278,585.00 278,585.00 278,585.00 278,585.00 278,585.00
32 5/4/01 Modification to Existing Concrete cu metre 10,109.00 10,109.00 10,109.00 10,109.00 10,109.00
Sl. Item Code Description. Unit Dhaka, Sylhet Zone Khulna, Rajshahi & Chattogram Zone
No Mymenisngh & Barisal Rangpur Zone
Cumilla & Gopalganj
Zone Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Concrete Surface Repair Works
33 5/4/02 sq. metre 217.00 217.00 217.00 217.00 217.00
(Superstructures)
34 5/4/03 Concrete Surface Repair Works sq. metre 289.00 289.00 289.00 289.00 289.00
35 5/4/04 Resin Repair Mortars Kg - - - - -
Lin.
36 5/4/05 Cement Mortar in Cracks 70.00 68.00 70.00 68.00 70.00
Metre
37 5/4/06 Anchor and Tie Bars Tonne 2,009.00 2,009.00 2,009.00 2,009.00 2,009.00
38 5/5/01 New and Extended Brickwork cu metre 8,896.00 9,256.00 8,479.00 8,095.00 8,652.00
39 5/5/02 Brick Drainage Layer cu metre 5,902.00 6,354.00 5,511.00 5,106.00 5,608.00
40 5/5/03 Replacement of Defective Existing brick cu metre 14,193.00 14,485.00 13,783.00 13,302.00 13,937.00
41 5/5/04 Repointing of Existing Brickwork Joints sq. metre 622.00 612.00 620.00 619.00 626.00
42 5/5/05 Steel Tie Bars and Pattress Plates Tonne - - - - -
43 5/6/01 Preparation and Painting of Existing Structures sq. metre 597.00 577.00 597.00 577.00 597.00
44 5/7/01 Carriage of Bridge Steelwork from Port to Site Tonne - - - - -
45 5/7/02 Fixing of bearings for Unit Bridging Number - - - - -
Supply and Fixing of Elastomeric Bearings for
46 5/7/03 Number - - - - -
Composite Bridge Construction
Lin.
47 5/7/04 Asssembly and Installation of Unit Bridging - - - - -
Metre
Installation of Steelwork for Composite Bridge
48 5/7/05 Tonne - - - - -
Construction.
Installation of Steel Post and Barrier Parapet to Lin.
49 5/7/06 - - - - -
Reinforced Concrete Deck Slab Metre
Expansion Joint complete as detailed on the
Lin.
50 5/8/01 Drawings in the location described in the BoQ. 13,186.00 13,186.00 13,186.00 13,186.00 13,186.00
Metre
(Updated with new drawing/2014)
Bridge Deck Joint Complete as detailed on the Lin.
51 5/8/02 - - - - -
Drawings. Metre
Provision and Fixing of drainage to structures Lump
52 5/9/01 - - - - -
as detailed on the Drawings. sum
Lump
53 5/10/01 Embedment of Inserts and Fittings - - - - -
Sum
Supply and Installation of Pot bearings (Size-
54 5/12/1(a) Number - - - - -
500X500X72)
Supply and Installation of Pot bearings (Size-
55 5/12/1(b) Number - - - - -
500X450X72)
Supply and Installation of Pot bearings (Size-
56 5/12/1(c) Number - - - - -
400X300X72)
Supply and Installation of Shock Transmission
57 5/12/02 Number - - - - -
units
Neoprene rubber bearing or Elastomeric
58 5/13/1(a) Number 17,247.00 17,365.00 19,836.00 17,239.00 17,267.00
bearing supplying & fitting fixing, etc.
Neoprene rubber bearing or Elastomeric
59 5/13/1(b) Number 20,009.00 20,128.00 22,598.00 20,001.00 20,030.00
bearing supplying & fitting fixing, (b) , etc.
Double Single Bailey Bridge or Acrow panel Lin.
60 5/14/1(b) 3,798.00 3,760.00 3,798.00 3,760.00 3,798.00
(Erecting and Assembling). Metre
Calender Hamilton Truss Bridge (Erecting and Lin.
61 5/14/1(c) 12,897.00 12,784.00 12,897.00 12,784.00 12,897.00
Assembling) Metre
Double Single Bailey Bridge or Acrow panel Lin.
62 5/14/2(b) 2,581.00 2,566.00 2,581.00 2,566.00 2,581.00
(Delaunching). Metre
Lin.
63 5/14/2(c) Calender Hamilton Truss Bridge (Delaunching). 8,916.00 8,811.00 8,916.00 8,811.00 8,916.00
Metre
Lin.
64 5/15/01 Mobilization for railing type work, etc. 2,612.00 2,567.00 2,612.00 2,567.00 2,612.00
Metre
65 5/16/01 Dismantling of deck slab, thickness 175mm. Sq Metre 6,757.00 6,375.00 6,757.00 6,375.00 6,757.00
Lin.
66 5/16/02 Steel Beam (W 530 x 167) 11,306.00 11,293.00 11,435.00 11,287.00 11,307.00
Metre
Sl. Item Code Description. Unit Dhaka, Sylhet Zone Khulna, Rajshahi & Chattogram Zone
No Mymenisngh & Barisal Rangpur Zone
Cumilla & Gopalganj
Zone Zone
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Division 6 - Incidental
1 6/1/01 Grouted Riprap Pavement sq. metre 2,895.00 2,472.00 2,752.00 2,389.00 2,709.00
2 6/1/02 Concrete Slope Protection sq. metre 1,709.00 1,629.00 1,678.00 1,614.00 1,657.00
3 6/1/03 Loose stone Riprap Protection cu metre 8,590.00 6,945.00 7,962.00 6,568.00 7,836.00
Lin.
9 6/3/03 Concrete Side Ditch/ U-Drain - - - - -
Metre
Lin.
11 6/4/01 Concrete Kerb (as detailed on the drawings) - - - - -
Metre
14 6/5/02 Road Marking - Road marking Paint Sq Metre 499.00 498.00 499.00 498.00 499.00
15 6/5/03 Reflecting Road Studs Number 917.00 917.00 917.00 917.00 917.00
Lin.
20 6/8/01 Guardrail - - - - -
Metre
25 6/11/01 Rumble strips (Bituminous Concrete Volume) cum 16,311.00 15,652.00 16,464.00 15,995.00 15,617.00
Unit Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.) Rate (Tk.)
Lin.
29 6/13/1(a) Bullah Palisiding (150mm – 175mm) 10,032.00 9,902.00 10,032.00 9,902.00 10,032.00
Metre
31 6/14/01 Mobilization for deck slab repairing work, etc. Sq Metre 1,168.00 1,145.00 1,168.00 1,145.00 1,168.00
32 6/15/01 Concrete Guide Post (1.6 m long, 200mm dia) No. 2,359.00 2,269.00 2,338.00 2,266.00 2,322.00
33 6/16/01 Concrete Kilometer Post (As per drawing) No. 9,048.00 8,733.00 8,811.00 8,481.00 8,825.00
Lin.
34 6/17/1(a) RCC Palisiding (4m post, 200mm X 200mm) 10,328.00 9,934.00 10,251.00 9,925.00 10,171.00
Metre
Lin.
35 6/17/1(b) RCC Palisiding (3m post, 150mm X 150mm) 6,809.00 6,514.00 6,753.00 6,504.00 6,713.00
Metre