Required Data Collection for Study of the existing water pipe lines
system –
• Existing water pipeline layout with material / Dia / Length / Pressure
Rating
• Topographical survey levels
• Location / size / pressure rating of different types of valves viz. Isolation
Valves, Air Valves, Pressure Reducing Valves, Scour Valves, Surge
Protection Valves, any other.
• Problematic area/ types of issues faced during O & M viz. pipe bursting,
leakage from joints, not meeting required pressure at irrigator etc.
• Details of each irrigator such as flow and head requirement at the inlet
Required Data Collection for Study of the existing pumping
arrangement –
• General Arrangement Drawing of the pumping station
• Existing pumping units – Nos. / Arrangement / Working / Standby
• Duty of the pumping unit
• Existing flow control methodology viz. pressure switch / variable
frequency drives etc.
• Working hours
• Pump efficiency curve
• Age of pumping unit
• Pumping unit maintenance schedule
• Water source location
• Type of pump suction head – positive or negative
Water Pipe Line Alignments/ Route –
Topographical Survey
Detail Topographical survey will be carried out from the established control network, all above
grade features and change of ground within the specified area will be surveyed considering but
not limited to the following :-
Existing Ground levels ( OGL) will be taken @ every 5m Grid unless otherwise any changes in
the natural ground or slopes will be picked and surveyed at 2m Grid and highlighted in the
plan.
30m corridor will be the ground of interest for the survey corridor (main & sub )
X-Cross section of the path will be taken @ every 10m interval
Data Input –
• Draw Network with different types of valves in the system
• Type of pipe
• Age of pipe
• Roughness coefficient
• Various pipe network components
• Levels of pipe networks
• Water demand at various outlets/ nodes
• Water levels in tank
• Section of tank
• Water pumping unit i.e. pump designed duty, pump curve, max.head,
max. operating capacity head
Data Output -
Network Analysis Reports wrt head losses in pipe segments, pressure
available at nodes in different scenarios of pumping operations and check
for the critical conditions at various operation scenario
Water Hammer and Transient Analysis Software
Software – Bentley Hammer
Assigned Task - Water Hammer and Transient Analysis Software
Data Input –
• User-Defined Lateral "K"
• Ultimate Lateral Load
• User-Defined Axial Stif
• Ultimate Axial Load
• User-Defined Upward Stif
• Ultimate Upward Load
• User-Defined Downward Stif
• Ultimate Downward Load
• Soil Models
Data Output –
• Element stiffness matrices and load vectors
• Solves for displacements, forces and
moments, reactions, and stresses.