Proposal for General Consultancy cum Project Management Consultancy for Construction

of Elevated and Underground Metro Railway Works from Mominpur (Ex.) to Esplanade, Approx. 5.30 KM
in Connection with Joka-BBD Bag Metro Corridor in the State of West Bengal, India RVNL

Combinations 1 2 3 4 5

General Athens
CIRCLE Downtown
Consultancy CMRL KVMRT Chile CAIRO Metro KMRC
LINE Singapore
(Criteria) (Attiko)

Completion
after June'10
       
Not a subcon        
Prelim design
& drawings
         
Bid design &
bid documents
for 'Design &
         
Build’ contract

Proof checking          

Bid evaluation           
         
Civil Engg
Structures
        
Electrical
Traction &          
Distribution
U/g section
ventilation &           
A/c
           
Railway/metro
railway project
       
3km
continuous
TBM tunnel         
incl c&c
stations
Finished
c/section =        
24sqm
           
MEETS
HURDLE      
CRITERIA

Finalised Combinations of Projects


Proposal for General Consultancy cum Project Management Consultancy for Construction
of Elevated and Underground Metro Railway Works from Mominpur (Ex.) to Esplanade, Approx. 5.30 KM
in Connection with Joka-BBD Bag Metro Corridor in the State of West Bengal, India RVNL

Combinatio Completion Status of each


Projects
n Combination

1 CMRL Completed
2 KVMRT + Chile + Cairo Completed
Athens Metro + Circle
3 Completed
Line
4 Downtown Completed

5 KMRC Substantially Completed