GRAPH OF CONE PENETRATION TEST CPT

PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.01


CLIENT : PT Bukaka Teknik Utama T ested by : ARIS CS
LOCAT ION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur Date : 11-May-20
GROUND WAT ER LEVEL : -m Depth : 12.8 m

0 5 10 15 20 25 30
0.00

2.00

4.00

6.00

Friction Ratio (%)


D e p t h (m)

8.00

10.00

12.00

14.00

qc 0 50 100 150 200 250 kg/cm2

LF 0 5 10 15 20 25 kg/cm2

++++ T F 0 500 1000 1500 2000 2500 kg/cm


PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.01
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimant an T imur Date : 11-May-20
GROUND Water Level : -m Depth : 12.8 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) 2 2 2 [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
[kg/cm ] [kg/cm ] [kg/cm ]

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.20 5.00 8.00 3.00 0.27 5.31 5.31 5.31
0.40 5.00 8.00 3.00 0.27 5.31 10.62 5.31
0.60 2.00 4.00 2.00 0.18 3.54 14.16 8.85
0.80 12.00 14.00 2.00 0.18 3.54 17.70 1.48
1.00 20.00 23.00 3.00 0.27 5.31 23.01 1.33
1.20 20.00 23.00 3.00 0.27 5.31 28.32 1.33
1.40 16.00 19.00 3.00 0.27 5.31 33.63 1.66
1.60 2.00 4.00 2.00 0.18 3.54 37.17 8.85
1.80 2.00 4.00 2.00 0.18 3.54 40.71 8.85
2.00 4.00 6.00 2.00 0.18 3.54 44.25 4.43
2.20 4.00 6.00 2.00 0.18 3.54 47.79 4.43
2.40 4.00 16.00 12.00 1.06 21.24 69.03 26.55
2.60 32.00 38.00 6.00 0.53 10.62 79.65 1.66
2.80 4.00 6.00 2.00 0.18 3.54 83.19 4.43
3.00 4.00 6.00 2.00 0.18 3.54 86.73 4.43
3.20 4.00 6.00 2.00 0.18 3.54 90.27 4.43
3.40 4.00 6.00 2.00 0.18 3.54 93.81 4.43
3.60 3.00 5.00 2.00 0.18 3.54 97.35 5.90
3.80 3.00 5.00 2.00 0.18 3.54 100.89 5.90
4.00 2.00 4.00 2.00 0.18 3.54 104.43 8.85
4.20 2.00 4.00 2.00 0.18 3.54 107.97 8.85
4.40 2.00 4.00 2.00 0.18 3.54 111.51 8.85
4.60 2.00 4.00 2.00 0.18 3.54 115.05 8.85
4.80 2.00 4.00 2.00 0.18 3.54 118.59 8.85
5.00 2.00 3.00 1.00 0.09 1.77 120.36 4.43
5.20 2.00 3.00 1.00 0.09 1.77 122.13 4.43
5.40 2.00 3.00 1.00 0.09 1.77 123.90 4.43
5.60 2.00 3.00 1.00 0.09 1.77 125.67 4.43
5.80 4.00 6.00 2.00 0.18 3.54 129.21 4.43
6.00 4.00 6.00 2.00 0.18 3.54 132.75 4.43
6.20 10.00 12.00 2.00 0.18 3.54 136.29 1.77
6.40 13.00 16.00 3.00 0.27 5.31 141.60 2.04
6.60 20.00 23.00 3.00 0.27 5.31 146.91 1.33
6.80 16.00 20.00 4.00 0.35 7.08 153.99 2.21
7.00 10.00 13.00 3.00 0.27 5.31 159.30 2.66
7.20 10.00 13.00 3.00 0.27 5.31 164.61 2.66
7.40 48.00 54.00 6.00 0.53 10.62 175.23 1.11
7.60 28.00 32.00 4.00 0.35 7.08 182.31 1.26
7.80 28.00 35.00 7.00 0.62 12.39 194.70 2.21
8.00 32.00 36.00 4.00 0.35 7.08 201.78 1.11
8.20 30.00 34.00 4.00 0.35 7.08 208.86 1.18
8.40 30.00 34.00 4.00 0.35 7.08 215.94 1.18
8.60 33.00 36.00 3.00 0.27 5.31 221.25 0.80
8.80 34.00 39.00 5.00 0.44 8.85 230.10 1.30
9.00 42.00 45.00 3.00 0.27 5.31 235.41 0.63
9.20 39.00 42.00 3.00 0.27 5.31 240.72 0.68
9.40 39.00 42.00 3.00 0.27 5.31 246.03 0.68
9.60 39.00 42.00 3.00 0.27 5.31 251.34 0.68
9.80 39.00 42.00 3.00 0.27 5.31 256.65 0.68
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.01
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimant an T imur Date : 11-May-20
GROUND Water Level : -m Depth : 12.8 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) [kg/cm2 ] [kg/cm2 ] [kg/cm2 ] [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
10.00 50.00 55.00 5.00 0.44 8.85 203.55 0.89
10.20 46.00 50.00 4.00 0.35 7.08 208.86 0.77
10.40 42.00 48.00 6.00 0.53 10.62 219.48 1.26
10.60 46.00 50.00 4.00 0.35 7.08 223.02 0.77
10.80 48.00 52.00 4.00 0.35 7.08 228.33 0.74
11.00 48.00 50.00 2.00 0.18 3.54 233.64 0.37
11.20 48.00 50.00 2.00 0.18 3.54 238.95 0.37
11.40 43.00 48.00 5.00 0.44 8.85 249.57 1.03
11.60 60.00 63.00 3.00 0.27 5.31 251.34 0.44
11.80 52.00 56.00 4.00 0.35 7.08 258.42 0.68
12.00 62.00 250.00 188.00 16.64 332.76 589.41 26.84
12.20 62.00 250.00 188.00 16.64 332.76 536.31 26.84
12.40 70.00 250.00 180.00 15.93 318.60 527.46 22.76
12.60 70.00 250.00 180.00 15.93 318.60 538.08 22.76
12.80 80.00 250.00 170.00 15.05 300.90 523.92 18.81
GRAPH OF CONE PENETRATION TEST CPT
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.02
CLIENT : PT Bukaka Teknik Utama T ested by : ARIS CS
LOCAT ION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur Date : 11-May-20
GROUND WAT ER LEVEL : 1.8 m Depth : 12.2 m

0 5 10 15 20 25 30
0.00

2.00

4.00

6.00

Friction Ratio (%)


D e p t h (m)

8.00

10.00

12.00

14.00

qc 0 50 100 150 200 250 kg/cm2

LF 0 5 10 15 20 25 kg/cm2

++++ T F 0 500 1000 1500 2000 2500 kg/cm


PROJECT : Re ncana Pe mbangunan W orkshop PT Bukaka Te knik Utama Point : S.02
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan T imur Date : 11-May-20
GROUND Water Level : 1.8 m Depth : 12.2 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) 2 2 2 [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
[kg/cm ] [kg/cm ] [kg/cm ]

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.20 7.00 10.00 3.00 0.27 5.31 5.31 3.79
0.40 7.00 10.00 3.00 0.27 5.31 10.62 3.79
0.60 18.00 21.00 3.00 0.27 5.31 15.93 1.48
0.80 18.00 21.00 3.00 0.27 5.31 21.24 1.48
1.00 30.00 33.00 3.00 0.27 5.31 26.55 0.89
1.20 24.00 28.00 4.00 0.35 7.08 33.63 1.48
1.40 21.00 24.00 3.00 0.27 5.31 38.94 1.26
1.60 10.00 13.00 3.00 0.27 5.31 44.25 2.66
1.80 7.00 9.00 2.00 0.18 3.54 47.79 2.53
2.00 13.00 17.00 4.00 0.35 7.08 54.87 2.72
2.20 22.00 26.00 4.00 0.35 7.08 61.95 1.61
2.40 34.00 38.00 4.00 0.35 7.08 69.03 1.04
2.60 28.00 32.00 4.00 0.35 7.08 76.11 1.26
2.80 22.00 26.00 4.00 0.35 7.08 83.19 1.61
3.00 11.00 14.00 3.00 0.27 5.31 88.50 2.41
3.20 4.00 8.00 4.00 0.35 7.08 95.58 8.85
3.40 2.00 4.00 2.00 0.18 3.54 99.12 8.85
3.60 2.00 4.00 2.00 0.18 3.54 102.66 8.85
3.80 2.00 4.00 2.00 0.18 3.54 106.20 8.85
4.00 2.00 3.00 1.00 0.09 1.77 107.97 4.43
4.20 2.00 3.00 1.00 0.09 1.77 109.74 4.43
4.40 2.00 3.00 1.00 0.09 1.77 111.51 4.43
4.60 2.00 3.00 1.00 0.09 1.77 113.28 4.43
4.80 2.00 3.00 1.00 0.09 1.77 115.05 4.43
5.00 2.00 3.00 1.00 0.09 1.77 116.82 4.43
5.20 2.00 3.00 1.00 0.09 1.77 118.59 4.43
5.40 2.00 3.00 1.00 0.09 1.77 120.36 4.43
5.60 2.00 3.00 1.00 0.09 1.77 122.13 4.43
5.80 4.00 6.00 2.00 0.18 3.54 125.67 4.43
6.00 10.00 12.00 2.00 0.18 3.54 129.21 1.77
6.20 11.00 14.00 3.00 0.27 5.31 134.52 2.41
6.40 14.00 18.00 4.00 0.35 7.08 141.60 2.53
6.60 22.00 26.00 4.00 0.35 7.08 148.68 1.61
6.80 25.00 30.00 5.00 0.44 8.85 157.53 1.77
7.00 21.00 24.00 3.00 0.27 5.31 162.84 1.26
7.20 26.00 30.00 4.00 0.35 7.08 169.92 1.36
7.40 33.00 36.00 3.00 0.27 5.31 175.23 0.80
7.60 33.00 36.00 3.00 0.27 5.31 180.54 0.80
7.80 35.00 39.00 4.00 0.35 7.08 187.62 1.01
8.00 38.00 42.00 4.00 0.35 7.08 194.70 0.93
8.20 34.00 37.00 3.00 0.27 5.31 200.01 0.78
8.40 35.00 38.00 3.00 0.27 5.31 205.32 0.76
8.60 35.00 38.00 3.00 0.27 5.31 210.63 0.76
8.80 37.00 40.00 3.00 0.27 5.31 215.94 0.72
9.00 32.00 35.00 3.00 0.27 5.31 221.25 0.83
9.20 32.00 35.00 3.00 0.27 5.31 226.56 0.83
9.40 25.00 30.00 5.00 0.44 8.85 235.41 1.77
9.60 30.00 40.00 10.00 0.89 17.70 253.11 2.95
9.80 30.00 40.00 10.00 0.89 17.70 270.81 2.95
PROJECT : Re ncana Pe mbangunan W orkshop PT Bukaka Te knik Utama Point : S.02
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan T imur Date : 11-May-20
GROUND Water Level : 1.8 m Depth : 12.2 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) [kg/cm2 ] [kg/cm2 ] [kg/cm2 ] [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
10.00 45.00 55.00 10.00 0.89 17.70 205.32 1.97
10.20 43.00 50.00 7.00 0.62 12.39 207.09 1.44
10.40 43.00 50.00 7.00 0.62 12.39 212.40 1.44
10.60 45.00 65.00 20.00 1.77 35.40 240.72 3.93
10.80 49.00 68.00 19.00 1.68 33.63 244.26 3.43
11.00 65.00 110.00 45.00 3.98 79.65 295.59 6.13
11.20 65.00 110.00 45.00 3.98 79.65 300.90 6.13
11.40 65.00 200.00 135.00 11.95 238.95 465.51 18.38
11.60 75.00 250.00 175.00 15.49 309.75 545.16 20.65
11.80 78.00 250.00 172.00 15.22 304.44 557.55 19.52
12.00 80.00 250.00 170.00 15.05 300.90 571.71 18.81
12.20 80.00 250.00 170.00 15.05 300.90 506.22 18.81
GRAPH OF CONE PENETRATION TEST CPT
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.03
CLIENT : PT Bukaka Teknik Utama T ested by : ARIS CS
LOCAT ION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur Date : 12-May-20
GROUND WAT ER LEVEL : 1.8 m Depth : 13.8 m

0 5 10 15 20 25 30
0.00

2.00

4.00

6.00

Friction Ratio (%)


D e p t h (m)

8.00

10.00

12.00

14.00

qc 0 50 100 150 200 250 kg/cm2

LF 0 5 10 15 20 25 kg/cm2

++++ T F 0 500 1000 1500 2000 2500 kg/cm


PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.03
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan T imur Date : 12-May-20
GROUND Water Level : 1.8 m Depth : 13.8 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) 2 2 2 [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
[kg/cm ] [kg/cm ] [kg/cm ]

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.20 6.00 8.00 2.00 0.18 3.54 3.54 2.95
0.40 12.00 16.00 4.00 0.35 7.08 10.62 2.95
0.60 22.00 26.00 4.00 0.35 7.08 17.70 1.61
0.80 32.00 35.00 3.00 0.27 5.31 23.01 0.83
1.00 30.00 33.00 3.00 0.27 5.31 28.32 0.89
1.20 12.00 15.00 3.00 0.27 5.31 33.63 2.21
1.40 20.00 22.00 2.00 0.18 3.54 37.17 0.89
1.60 6.00 8.00 2.00 0.18 3.54 40.71 2.95
1.80 5.00 7.00 2.00 0.18 3.54 44.25 3.54
2.00 8.00 11.00 3.00 0.27 5.31 49.56 3.32
2.20 12.00 16.00 4.00 0.35 7.08 56.64 2.95
2.40 30.00 33.00 3.00 0.27 5.31 61.95 0.89
2.60 18.00 20.00 2.00 0.18 3.54 65.49 0.98
2.80 22.00 25.00 3.00 0.27 5.31 70.80 1.21
3.00 22.00 25.00 3.00 0.27 5.31 76.11 1.21
3.20 10.00 12.00 2.00 0.18 3.54 79.65 1.77
3.40 7.00 10.00 3.00 0.27 5.31 84.96 3.79
3.60 6.00 8.00 2.00 0.18 3.54 88.50 2.95
3.80 4.00 6.00 2.00 0.18 3.54 92.04 4.43
4.00 2.00 4.00 2.00 0.18 3.54 95.58 8.85
4.20 2.00 4.00 2.00 0.18 3.54 99.12 8.85
4.40 2.00 4.00 2.00 0.18 3.54 102.66 8.85
4.60 2.00 4.00 2.00 0.18 3.54 106.20 8.85
4.80 2.00 4.00 2.00 0.18 3.54 109.74 8.85
5.00 2.00 4.00 2.00 0.18 3.54 113.28 8.85
5.20 2.00 4.00 2.00 0.18 3.54 116.82 8.85
5.40 2.00 4.00 2.00 0.18 3.54 120.36 8.85
5.60 2.00 4.00 2.00 0.18 3.54 123.90 8.85
5.80 2.00 4.00 2.00 0.18 3.54 127.44 8.85
6.00 4.00 6.00 2.00 0.18 3.54 130.98 4.43
6.20 4.00 6.00 2.00 0.18 3.54 134.52 4.43
6.40 4.00 6.00 2.00 0.18 3.54 138.06 4.43
6.60 3.00 5.00 2.00 0.18 3.54 141.60 5.90
6.80 3.00 5.00 2.00 0.18 3.54 145.14 5.90
7.00 6.00 9.00 3.00 0.27 5.31 150.45 4.43
7.20 6.00 9.00 3.00 0.27 5.31 155.76 4.43
7.40 8.00 12.00 4.00 0.35 7.08 162.84 4.43
7.60 8.00 12.00 4.00 0.35 7.08 169.92 4.43
7.80 8.00 12.00 4.00 0.35 7.08 177.00 4.43
8.00 10.00 15.00 5.00 0.44 8.85 185.85 4.43
8.20 18.00 21.00 3.00 0.27 5.31 191.16 1.48
8.40 20.00 24.00 4.00 0.35 7.08 198.24 1.77
8.60 18.00 21.00 3.00 0.27 5.31 203.55 1.48
8.80 18.00 21.00 3.00 0.27 5.31 208.86 1.48
9.00 26.00 30.00 4.00 0.35 7.08 215.94 1.36
9.20 30.00 35.00 5.00 0.44 8.85 224.79 1.48
9.40 25.00 30.00 5.00 0.44 8.85 233.64 1.77
9.60 28.00 32.00 4.00 0.35 7.08 240.72 1.26
9.80 28.00 32.00 4.00 0.35 7.08 247.80 1.26
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.03
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan T imur Date : 12-May-20
GROUND Water Level : 1.8 m Depth : 13.8 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) [kg/cm2 ] [kg/cm2 ] [kg/cm2 ] [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
10.00 26.00 32.00 6.00 0.53 10.62 187.62 2.04
10.20 26.00 32.00 6.00 0.53 10.62 196.47 2.04
10.40 34.00 40.00 6.00 0.53 10.62 201.78 1.56
10.60 40.00 45.00 5.00 0.44 8.85 207.09 1.11
10.80 40.00 45.00 5.00 0.44 8.85 212.40 1.11
11.00 70.00 75.00 5.00 0.44 8.85 217.71 0.63
11.20 63.00 68.00 5.00 0.44 8.85 224.79 0.70
11.40 52.00 56.00 4.00 0.35 7.08 231.87 0.68
11.60 92.00 96.00 4.00 0.35 7.08 240.72 0.38
11.80 148.00 155.00 7.00 0.62 12.39 253.11 0.42
12.00 110.00 115.00 5.00 0.44 8.85 256.65 0.40
12.20 116.00 120.00 4.00 0.35 7.08 194.70 0.31
12.40 120.00 128.00 8.00 0.71 14.16 210.63 0.59
12.60 105.00 110.00 5.00 0.44 8.85 210.63 0.42
12.80 125.00 132.00 7.00 0.62 12.39 219.48 0.50
13.00 152.00 160.00 8.00 0.71 14.16 226.56 0.47
13.20 165.00 170.00 5.00 0.44 8.85 226.56 0.27
13.40 172.00 184.00 12.00 1.06 21.24 246.03 0.62
13.60 205.00 220.00 15.00 1.33 26.55 258.42 0.65
13.80 250.00 255.00 5.00 0.44 8.85 249.57 0.18
GRAPH OF CONE PENETRATION TEST CPT
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.04
CLIENT : PT Bukaka Teknik Utama T ested by : ARIS CS
LOCAT ION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur Date : 12-May-20
GROUND WAT ER LEVEL : 1.2 m Depth : 12.0 m

0 5 10 15 20 25 30
0.00

2.00

4.00

6.00

Friction Ratio (%)


D e p t h (m)

8.00

10.00

12.00

14.00

qc 0 50 100 150 200 250 kg/cm2

LF 0 5 10 15 20 25 kg/cm2

++++ T F 0 500 1000 1500 2000 2500 kg/cm


PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.04
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimant an T imur Date : 12-May-20
GROUND Water Level : 1.2 m Depth : 12.0 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) 2 2 2 [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
[kg/cm ] [kg/cm ] [kg/cm ]

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.20 6.00 8.00 2.00 0.18 3.54 3.54 2.95
0.40 9.00 12.00 3.00 0.27 5.31 8.85 2.95
0.60 8.00 10.00 2.00 0.18 3.54 12.39 2.21
0.80 8.00 10.00 2.00 0.18 3.54 15.93 2.21
1.00 12.00 16.00 4.00 0.35 7.08 23.01 2.95
1.20 20.00 25.00 5.00 0.44 8.85 31.86 2.21
1.40 30.00 34.00 4.00 0.35 7.08 38.94 1.18
1.60 28.00 31.00 3.00 0.27 5.31 44.25 0.95
1.80 24.00 27.00 3.00 0.27 5.31 49.56 1.11
2.00 12.00 15.00 3.00 0.27 5.31 54.87 2.21
2.20 28.00 32.00 4.00 0.35 7.08 61.95 1.26
2.40 28.00 32.00 4.00 0.35 7.08 69.03 1.26
2.60 28.00 32.00 4.00 0.35 7.08 76.11 1.26
2.80 28.00 32.00 4.00 0.35 7.08 83.19 1.26
3.00 29.00 33.00 4.00 0.35 7.08 90.27 1.22
3.20 29.00 33.00 4.00 0.35 7.08 97.35 1.22
3.40 19.00 23.00 4.00 0.35 7.08 104.43 1.86
3.60 19.00 23.00 4.00 0.35 7.08 111.51 1.86
3.80 17.00 20.00 3.00 0.27 5.31 116.82 1.56
4.00 15.00 18.00 3.00 0.27 5.31 122.13 1.77
4.20 15.00 18.00 3.00 0.27 5.31 127.44 1.77
4.40 8.00 10.00 2.00 0.18 3.54 130.98 2.21
4.60 5.00 8.00 3.00 0.27 5.31 136.29 5.31
4.80 5.00 8.00 3.00 0.27 5.31 141.60 5.31
5.00 4.00 6.00 2.00 0.18 3.54 145.14 4.43
5.20 4.00 6.00 2.00 0.18 3.54 148.68 4.43
5.40 2.00 4.00 2.00 0.18 3.54 152.22 8.85
5.60 2.00 4.00 2.00 0.18 3.54 155.76 8.85
5.80 2.00 4.00 2.00 0.18 3.54 159.30 8.85
6.00 2.00 4.00 2.00 0.18 3.54 162.84 8.85
6.20 4.00 6.00 2.00 0.18 3.54 166.38 4.43
6.40 8.00 12.00 4.00 0.35 7.08 173.46 4.43
6.60 10.00 13.00 3.00 0.27 5.31 178.77 2.66
6.80 10.00 13.00 3.00 0.27 5.31 184.08 2.66
7.00 18.00 21.00 3.00 0.27 5.31 189.39 1.48
7.20 16.00 19.00 3.00 0.27 5.31 194.70 1.66
7.40 16.00 19.00 3.00 0.27 5.31 200.01 1.66
7.60 15.00 18.00 3.00 0.27 5.31 205.32 1.77
7.80 15.00 18.00 3.00 0.27 5.31 210.63 1.77
8.00 24.00 28.00 4.00 0.35 7.08 217.71 1.48
8.20 32.00 35.00 3.00 0.27 5.31 223.02 0.83
8.40 42.00 46.00 4.00 0.35 7.08 230.10 0.84
8.60 26.00 30.00 4.00 0.35 7.08 237.18 1.36
8.80 46.00 55.00 9.00 0.80 15.93 253.11 1.73
9.00 100.00 105.00 5.00 0.44 8.85 261.96 0.44
9.20 85.00 90.00 5.00 0.44 8.85 270.81 0.52
9.40 46.00 50.00 4.00 0.35 7.08 277.89 0.77
9.60 39.00 43.00 4.00 0.35 7.08 284.97 0.91
9.80 46.00 50.00 4.00 0.35 7.08 292.05 0.77
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.04
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan T imur Date : 12-May-20
GROUND Water Level : 1.2 m Depth : 12.0 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) 2 2 2 [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
[kg/cm ] [kg/cm ] [kg/cm ]
10.00 48.00 52.00 4.00 0.35 7.08 217.71 0.74
10.20 48.00 52.00 4.00 0.35 7.08 224.79 0.74
10.40 48.00 52.00 4.00 0.35 7.08 230.10 0.74
10.60 50.00 55.00 5.00 0.44 8.85 238.95 0.89
10.80 50.00 55.00 5.00 0.44 8.85 246.03 0.89
11.00 65.00 100.00 35.00 3.10 61.95 315.06 4.77
11.20 60.00 115.00 55.00 4.87 97.35 359.31 8.11
11.40 65.00 150.00 85.00 7.52 150.45 421.26 11.57
11.60 70.00 250.00 180.00 15.93 318.60 596.49 22.76
11.80 85.00 250.00 165.00 14.60 292.05 577.02 17.18
12.00 90.00 250.00 160.00 14.16 283.20 575.25 15.73
GRAPH OF CONE PENETRATION TEST CPT
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.05
CLIENT : PT Bukaka Teknik Utama T ested by : ARIS CS
LOCAT ION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur Date : 12-May-20
GROUND WAT ER LEVEL : 2.6 m Depth : 12.8 m

0 5 10 15 20 25 30
0.00

2.00

4.00

6.00

Friction Ratio (%)


D e p t h (m)

8.00

10.00

12.00

14.00

qc 0 50 100 150 200 250 kg/cm2

LF 0 5 10 15 20 25 kg/cm2

++++ T F 0 500 1000 1500 2000 2500 kg/cm


PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.05
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan T imur Date : 12-May-20
GROUND Water Level : 2.6 m Depth : 12.8 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) 2 2 2 [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
[kg/cm ] [kg/cm ] [kg/cm ]

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0.20 12.00 15.00 3.00 0.27 5.31 5.31 2.21
0.40 6.00 8.00 2.00 0.18 3.54 8.85 2.95
0.60 5.00 6.00 1.00 0.09 1.77 10.62 1.77
0.80 3.00 5.00 2.00 0.18 3.54 14.16 5.90
1.00 2.00 4.00 2.00 0.18 3.54 17.70 8.85
1.20 2.00 4.00 2.00 0.18 3.54 21.24 8.85
1.40 2.00 4.00 2.00 0.18 3.54 24.78 8.85
1.60 2.00 4.00 2.00 0.18 3.54 28.32 8.85
1.80 3.00 6.00 3.00 0.27 5.31 33.63 8.85
2.00 6.00 8.00 2.00 0.18 3.54 37.17 2.95
2.20 6.00 8.00 2.00 0.18 3.54 40.71 2.95
2.40 18.00 21.00 3.00 0.27 5.31 46.02 1.48
2.60 25.00 30.00 5.00 0.44 8.85 54.87 1.77
2.80 20.00 24.00 4.00 0.35 7.08 61.95 1.77
3.00 15.00 18.00 3.00 0.27 5.31 67.26 1.77
3.20 15.00 18.00 3.00 0.27 5.31 72.57 1.77
3.40 18.00 21.00 3.00 0.27 5.31 77.88 1.48
3.60 15.00 18.00 3.00 0.27 5.31 83.19 1.77
3.80 13.00 16.00 3.00 0.27 5.31 88.50 2.04
4.00 14.00 16.00 2.00 0.18 3.54 92.04 1.26
4.20 7.00 10.00 3.00 0.27 5.31 97.35 3.79
4.40 5.00 8.00 3.00 0.27 5.31 102.66 5.31
4.60 6.00 8.00 2.00 0.18 3.54 106.20 2.95
4.80 6.00 8.00 2.00 0.18 3.54 109.74 2.95
5.00 5.00 7.00 2.00 0.18 3.54 113.28 3.54
5.20 5.00 6.00 1.00 0.09 1.77 115.05 1.77
5.40 4.00 5.00 1.00 0.09 1.77 116.82 2.21
5.60 3.00 4.00 1.00 0.09 1.77 118.59 2.95
5.80 2.00 4.00 2.00 0.18 3.54 122.13 8.85
6.00 2.00 4.00 2.00 0.18 3.54 125.67 8.85
6.20 2.00 4.00 2.00 0.18 3.54 129.21 8.85
6.40 2.00 4.00 2.00 0.18 3.54 132.75 8.85
6.60 2.00 4.00 2.00 0.18 3.54 136.29 8.85
6.80 2.00 4.00 2.00 0.18 3.54 139.83 8.85
7.00 2.00 4.00 2.00 0.18 3.54 143.37 8.85
7.20 2.00 4.00 2.00 0.18 3.54 146.91 8.85
7.40 2.00 4.00 2.00 0.18 3.54 150.45 8.85
7.60 8.00 10.00 2.00 0.18 3.54 153.99 2.21
7.80 8.00 10.00 2.00 0.18 3.54 157.53 2.21
8.00 10.00 13.00 3.00 0.27 5.31 162.84 2.66
8.20 13.00 16.00 3.00 0.27 5.31 168.15 2.04
8.40 18.00 21.00 3.00 0.27 5.31 173.46 1.48
8.60 33.00 37.00 4.00 0.35 7.08 180.54 1.07
8.80 52.00 56.00 4.00 0.35 7.08 187.62 0.68
9.00 23.00 26.00 3.00 0.27 5.31 192.93 1.15
9.20 35.00 40.00 5.00 0.44 8.85 201.78 1.26
9.40 35.00 40.00 5.00 0.44 8.85 210.63 1.26
9.60 45.00 50.00 5.00 0.44 8.85 219.48 0.98
9.80 45.00 50.00 5.00 0.44 8.85 228.33 0.98
PROJECT : Rencana Pembangunan Workshop PT Bukaka Teknik Utama Point : S.05
CLIENT : PT Bukaka Teknik Utama Tested by : ARIS CS
LOCATION : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan T imur Date : 12-May-20
GROUND Water Level : 2.6 m Depth : 12.8 m

Depth R1 R2 R2 - R1 LF 20 x LF TF R
(m) 2 2 2 [kg/cm] [kg/cm] [kg/cm] [LF/qu] x 100%
[kg/cm ] [kg/cm ] [kg/cm ]
10.00 42.00 47.00 5.00 0.44 8.85 166.38 1.05
10.20 45.00 49.00 4.00 0.35 7.08 169.92 0.79
10.40 48.00 52.00 4.00 0.35 7.08 175.23 0.74
10.60 52.00 58.00 6.00 0.53 10.62 184.08 1.02
10.80 55.00 65.00 10.00 0.89 17.70 198.24 1.61
11.00 60.00 75.00 15.00 1.33 26.55 214.17 2.21
11.20 65.00 78.00 13.00 1.15 23.01 215.94 1.77
11.40 76.00 86.00 10.00 0.89 17.70 219.48 1.16
11.60 70.00 100.00 30.00 2.66 53.10 263.73 3.79
11.80 75.00 115.00 40.00 3.54 70.80 290.28 4.72
12.00 75.00 115.00 40.00 3.54 70.80 299.13 4.72
12.20 80.00 250.00 170.00 15.05 300.90 300.90 18.81
12.40 80.00 250.00 170.00 15.05 300.90 300.90 18.81
12.60 90.00 250.00 160.00 14.16 283.20 283.20 15.73
CAPACITY OF PILE
S.01 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495657
Y : 9864098
2
Pile Diameter (F) = 40.60 (16") As = 127.5 cm Ap = 1293.96 cm ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 20.00 0.18 2.30 2.59 4.88 1.80 0.77
2.00 4.00 0.04 2.75 0.52 3.27 1.13 0.92
3.00 4.00 0.04 3.21 0.52 3.73 1.28 1.07
4.00 2.00 0.02 3.44 0.26 3.70 1.25 1.15
5.00 2.00 0.02 3.67 0.26 3.93 1.33 1.22
6.00 4.00 0.04 4.13 0.52 4.65 1.58 1.38
7.00 10.00 0.09 5.28 1.29 6.57 2.28 1.76
8.00 32.00 0.29 8.95 4.14 13.09 4.64 2.98
9.00 42.00 0.38 13.77 5.43 19.20 6.76 4.59
10.00 50.00 0.45 19.51 6.47 25.98 9.09 6.50
11.00 48.00 0.43 25.02 6.21 31.23 10.82 8.34
12.00 62.00 0.56 32.13 8.02 40.15 13.92 10.71
12.80 80.00 0.72 39.47 10.35 49.83 17.30 13.16

S.01 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495657
Y : 9864098
Pile Diameter (F) = 61.00 (24") As = 191.6 cm Ap = 2922.47 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 20.00 0.18 3.45 5.84 9.29 3.49 1.15
2.00 4.00 0.04 4.14 1.17 5.31 1.85 1.38
3.00 4.00 0.04 4.83 1.17 6.00 2.08 1.61
4.00 2.00 0.02 5.17 0.58 5.76 1.96 1.72
5.00 2.00 0.02 5.52 0.58 6.10 2.07 1.84
6.00 4.00 0.04 6.21 1.17 7.38 2.54 2.07
7.00 10.00 0.09 7.93 2.92 10.85 3.81 2.64
8.00 32.00 0.29 13.45 9.35 22.80 8.22 4.48
9.00 42.00 0.38 20.69 12.27 32.97 11.81 6.90
10.00 50.00 0.45 29.31 14.61 43.93 15.62 9.77
11.00 48.00 0.43 37.59 14.03 51.62 18.14 12.53
12.00 62.00 0.56 48.28 18.12 66.40 23.34 16.09
12.80 80.00 0.72 59.32 23.38 82.70 29.13 19.77
CAPACITY OF PILE
S.01 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495657
Y : 9864098
Pile Diameter (F) = 81.30 (32") As = 255.3 cm Ap = 5186.05 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 20.00 0.18 4.60 10.37 14.97 5.68 1.53
2.00 4.00 0.04 5.51 2.07 7.59 2.67 1.84
3.00 4.00 0.04 6.43 2.07 8.51 2.97 2.14
4.00 2.00 0.02 6.89 1.04 7.93 2.71 2.30
5.00 2.00 0.02 7.35 1.04 8.39 2.87 2.45
6.00 4.00 0.04 8.27 2.07 10.35 3.59 2.76
7.00 10.00 0.09 10.57 5.19 15.76 5.60 3.52
8.00 32.00 0.29 17.92 16.60 34.52 12.61 5.97
9.00 42.00 0.38 27.57 21.78 49.35 17.90 9.19
10.00 50.00 0.45 39.06 25.93 64.99 23.39 13.02
11.00 48.00 0.43 50.09 24.89 74.98 26.65 16.70
12.00 62.00 0.56 64.34 32.15 96.49 34.31 21.45
12.80 80.00 0.72 79.04 41.49 120.53 42.94 26.35

S.01 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495657
Y : 9864098
Pile Diameter (F) = 91.40 (36") As = 287.0 cm Ap = 6557.8 cm
2
ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 20.00 0.18 5.17 10.37 15.54 5.87 1.72
2.00 4.00 0.04 6.20 2.07 8.27 2.90 2.07
3.00 4.00 0.04 7.23 2.07 9.31 3.24 2.41
4.00 2.00 0.02 7.75 1.04 8.79 3.00 2.58
5.00 2.00 0.02 8.27 1.04 9.30 3.17 2.76
6.00 4.00 0.04 9.30 2.07 11.37 3.93 3.10
7.00 10.00 0.09 11.88 5.19 17.07 6.04 3.96
8.00 32.00 0.29 20.15 16.60 36.74 13.35 6.72
9.00 42.00 0.38 31.00 21.78 52.78 19.04 10.33
10.00 50.00 0.45 43.91 25.93 69.84 25.01 14.64
11.00 48.00 0.43 56.31 24.89 81.20 28.73 18.77
12.00 62.00 0.56 72.32 32.15 104.48 36.97 24.11
12.80 80.00 0.72 88.86 41.49 130.34 46.21 29.62
CAPACITY OF PILE
S.02 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495671
Y : 9864110
2
Pile Diameter (F) = 40.60 (16") As = 127.5 cm Ap = 1293.96 cm ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 3.44 3.88 7.32 2.70 1.15
2.00 13.00 0.12 4.93 1.68 6.62 2.32 1.64
3.00 11.00 0.10 6.20 1.42 7.62 2.63 2.07
4.00 2.00 0.02 6.43 0.26 6.68 2.25 2.14
5.00 2.00 0.02 6.66 0.26 6.91 2.32 2.22
6.00 10.00 0.09 7.80 1.29 9.10 3.12 2.60
7.00 21.00 0.19 10.21 2.72 12.93 4.49 3.40
8.00 38.00 0.34 14.57 4.92 19.49 6.82 4.86
9.00 32.00 0.29 18.25 4.14 22.39 7.74 6.08
10.00 45.00 0.41 23.41 5.82 29.23 10.13 7.80
11.00 65.00 0.59 30.87 8.41 39.28 13.65 10.29
12.00 80.00 0.72 40.05 10.35 50.40 17.49 13.35
12.20 80.00 0.72 41.88 10.35 52.24 18.10 13.96

S.02 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495671
Y : 9864110
Pile Diameter (F) = 61.00 (24") As = 191.6 cm Ap = 2922.47 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 5.17 8.77 13.94 5.23 1.72
2.00 13.00 0.12 7.41 3.80 11.21 3.99 2.47
3.00 11.00 0.10 9.31 3.21 12.53 4.39 3.10
4.00 2.00 0.02 9.66 0.58 10.24 3.45 3.22
5.00 2.00 0.02 10.00 0.58 10.59 3.57 3.33
6.00 10.00 0.09 11.73 2.92 14.65 5.08 3.91
7.00 21.00 0.19 15.35 6.14 21.48 7.57 5.12
8.00 38.00 0.34 21.90 11.11 33.01 11.74 7.30
9.00 32.00 0.29 27.42 9.35 36.77 12.88 9.14
10.00 45.00 0.41 35.18 13.15 48.33 16.99 11.73
11.00 65.00 0.59 46.39 19.00 65.38 23.06 15.46
12.00 80.00 0.72 60.18 23.38 83.56 29.41 20.06
12.20 80.00 0.72 62.94 23.38 86.32 30.33 20.98
CAPACITY OF PILE
S.02 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495671
Y : 9864110
Pile Diameter (F) = 81.30 (32") As = 255.3 cm Ap = 5186.05 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 6.89 15.56 22.45 8.52 2.30
2.00 13.00 0.12 9.88 6.74 16.62 5.99 3.29
3.00 11.00 0.10 12.41 5.70 18.11 6.42 4.14
4.00 2.00 0.02 12.87 1.04 13.90 4.70 4.29
5.00 2.00 0.02 13.33 1.04 14.36 4.86 4.44
6.00 10.00 0.09 15.62 5.19 20.81 7.28 5.21
7.00 21.00 0.19 20.45 10.89 31.34 11.17 6.82
8.00 38.00 0.34 29.18 19.71 48.89 17.61 9.73
9.00 32.00 0.29 36.53 16.60 53.13 18.82 12.18
10.00 45.00 0.41 46.87 23.34 70.21 24.96 15.62
11.00 65.00 0.59 61.81 33.71 95.52 34.09 20.60
12.00 80.00 0.72 80.19 41.49 121.68 43.33 26.73
12.20 80.00 0.72 83.87 41.49 125.35 44.55 27.96

S.02 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495671
Y : 9864110
Pile Diameter (F) = 91.40 (36") As = 287.0 cm Ap = 6557.8 cm2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 7.75 15.56 23.31 8.81 2.58
2.00 13.00 0.12 11.11 6.74 17.85 6.40 3.70
3.00 11.00 0.10 13.95 5.70 19.65 6.93 4.65
4.00 2.00 0.02 14.46 1.04 15.50 5.24 4.82
5.00 2.00 0.02 14.98 1.04 16.02 5.41 4.99
6.00 10.00 0.09 17.56 5.19 22.75 7.93 5.85
7.00 21.00 0.19 22.99 10.89 33.88 12.02 7.66
8.00 38.00 0.34 32.80 19.71 52.51 18.82 10.93
9.00 32.00 0.29 41.07 16.60 57.67 20.33 13.69
10.00 45.00 0.41 52.69 23.34 76.03 26.90 17.56
11.00 65.00 0.59 69.48 33.71 103.19 36.64 23.16
12.00 80.00 0.72 90.15 41.49 131.64 46.64 30.05
12.20 80.00 0.72 94.28 41.49 135.77 48.02 31.43
CAPACITY OF PILE
S.03 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495683
Y : 9864078
2
Pile Diameter (F) = 40.60 (16") As = 127.5 cm Ap = 1293.96 cm ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 3.44 3.88 7.32 2.70 1.15
2.00 8.00 0.07 4.36 1.04 5.40 1.87 1.45
3.00 22.00 0.20 6.89 2.85 9.73 3.43 2.30
4.00 2.00 0.02 7.11 0.26 7.37 2.48 2.37
5.00 2.00 0.02 7.34 0.26 7.60 2.55 2.45
6.00 4.00 0.04 7.80 0.52 8.32 2.81 2.60
7.00 6.00 0.05 8.49 0.78 9.27 3.14 2.83
8.00 10.00 0.09 9.64 1.29 10.93 3.73 3.21
9.00 26.00 0.23 12.62 3.36 15.99 5.55 4.21
10.00 26.00 0.23 15.61 3.36 18.97 6.55 5.20
11.00 70.00 0.63 23.64 9.06 32.70 11.50 7.88
12.00 110.00 0.99 36.26 14.23 50.49 17.78 12.09
13.00 152.00 1.37 53.70 19.67 73.37 25.77 17.90
13.80 250.00 2.25 76.65 32.35 109.00 38.49 25.55

S.03 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495683
Y : 9864078
Pile Diameter (F) = 61.00 (24") As = 191.6 cm Ap = 2922.47 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 5.17 8.77 13.94 5.23 1.72
2.00 8.00 0.07 6.55 2.34 8.89 3.12 2.18
3.00 22.00 0.20 10.35 6.43 16.78 6.02 3.45
4.00 2.00 0.02 10.69 0.58 11.28 3.80 3.56
5.00 2.00 0.02 11.04 0.58 11.62 3.91 3.68
6.00 4.00 0.04 11.73 1.17 12.89 4.38 3.91
7.00 6.00 0.05 12.76 1.75 14.51 4.95 4.25
8.00 10.00 0.09 14.48 2.92 17.41 6.00 4.83
9.00 26.00 0.23 18.97 7.60 26.57 9.36 6.32
10.00 26.00 0.23 23.45 7.60 31.05 10.86 7.82
11.00 70.00 0.63 35.52 20.46 55.98 20.02 11.84
12.00 110.00 0.99 54.49 32.15 86.64 31.02 18.16
13.00 152.00 1.37 80.70 44.42 125.12 44.67 26.90
13.80 250.00 2.25 115.19 73.06 188.25 67.62 38.40
CAPACITY OF PILE
S.03 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495683
Y : 9864078
Pile Diameter (F) = 81.30 (32") As = 255.3 cm Ap = 5186.05 cm 2 ss = 3
sp = 2.5
Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 6.89 15.56 22.45 8.52 2.30
2.00 8.00 0.07 8.73 4.15 12.88 4.57 2.91
3.00 22.00 0.20 13.79 11.41 25.20 9.16 4.60
4.00 2.00 0.02 14.25 1.04 15.28 5.16 4.75
5.00 2.00 0.02 14.71 1.04 15.74 5.32 4.90
6.00 4.00 0.04 15.62 2.07 17.70 6.04 5.21
7.00 6.00 0.05 17.00 3.11 20.11 6.91 5.67
8.00 10.00 0.09 19.30 5.19 24.49 8.51 6.43
9.00 26.00 0.23 25.27 13.48 38.76 13.82 8.42
10.00 26.00 0.23 31.25 13.48 44.73 15.81 10.42
11.00 70.00 0.63 47.33 36.30 83.63 30.30 15.78
12.00 110.00 0.99 72.61 57.05 129.65 47.02 24.20
13.00 152.00 1.37 107.53 78.83 186.36 67.38 35.84
13.80 250.00 2.25 153.49 129.65 283.14 103.02 51.16

S.03 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495683
Y : 9864078
Pile Diameter (F) = 91.40 (36") As = 287.0 cm Ap = 6557.8 cm2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 30.00 0.27 7.75 15.56 23.31 8.81 2.58
2.00 8.00 0.07 9.82 4.15 13.96 4.93 3.27
3.00 22.00 0.20 15.50 11.41 26.91 9.73 5.17
4.00 2.00 0.02 16.01 1.04 17.05 5.75 5.34
5.00 2.00 0.02 16.53 1.04 17.57 5.93 5.51
6.00 4.00 0.04 17.56 2.07 19.64 6.68 5.85
7.00 6.00 0.05 19.11 3.11 22.23 7.62 6.37
8.00 10.00 0.09 21.70 5.19 26.88 9.31 7.23
9.00 26.00 0.23 28.41 13.48 41.90 14.86 9.47
10.00 26.00 0.23 35.13 13.48 48.61 17.10 11.71
11.00 70.00 0.63 53.21 36.30 89.51 32.26 17.74
12.00 110.00 0.99 81.62 57.05 138.67 50.03 27.21
13.00 152.00 1.37 120.88 78.83 199.71 71.83 40.29
13.80 250.00 2.25 172.54 129.65 302.20 109.38 57.51
CAPACITY OF PILE
S.04 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495692
Y : 9864048
2
Pile Diameter (F) = 40.60 (16") As = 127.5 cm Ap = 1293.96 cm ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 12.00 0.11 1.38 1.55 2.93 1.08 0.46
2.00 12.00 0.11 2.75 1.55 4.31 1.54 0.92
3.00 29.00 0.26 6.08 3.75 9.83 3.53 2.03
4.00 15.00 0.14 7.80 1.94 9.74 3.38 2.60
5.00 4.00 0.04 8.26 0.52 8.78 2.96 2.75
6.00 2.00 0.02 8.49 0.26 8.75 2.93 2.83
7.00 18.00 0.16 10.56 2.33 12.89 4.45 3.52
8.00 24.00 0.22 13.31 3.11 16.42 5.68 4.44
9.00 100.00 0.90 24.79 12.94 37.73 13.44 8.26
10.00 48.00 0.43 30.29 6.21 36.51 12.58 10.10
11.00 65.00 0.59 37.75 8.41 46.16 15.95 12.58
12.00 99.00 0.89 49.11 12.81 61.92 21.50 16.37

S.04 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495692
Y : 9864048
Pile Diameter (F) = 61.00 (24") As = 191.6 cm Ap = 2922.47 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 12.00 0.11 2.07 3.51 5.58 2.09 0.69
2.00 12.00 0.11 4.14 3.51 7.65 2.78 1.38
3.00 29.00 0.26 9.14 8.48 17.61 6.44 3.05
4.00 15.00 0.14 11.73 4.38 16.11 5.66 3.91
5.00 4.00 0.04 12.42 1.17 13.58 4.61 4.14
6.00 2.00 0.02 12.76 0.58 13.35 4.49 4.25
7.00 18.00 0.16 15.86 5.26 21.12 7.39 5.29
8.00 24.00 0.22 20.00 7.01 27.02 9.47 6.67
9.00 100.00 0.90 37.25 29.22 66.47 24.11 12.42
10.00 48.00 0.43 45.52 14.03 59.55 20.79 15.17
11.00 65.00 0.59 56.73 19.00 75.73 26.51 18.91
12.00 99.00 0.89 73.80 28.93 102.74 36.17 24.60
CAPACITY OF PILE
S.04 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495692
Y : 9864048
Pile Diameter (F) = 81.30 (32") As = 255.3 cm Ap = 5186.05 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 12.00 0.11 2.76 6.22 8.98 3.41 0.92
2.00 12.00 0.11 5.51 6.22 11.74 4.33 1.84
3.00 29.00 0.26 12.18 15.04 27.22 10.08 4.06
4.00 15.00 0.14 15.62 7.78 23.40 8.32 5.21
5.00 4.00 0.04 16.54 2.07 18.62 6.34 5.51
6.00 2.00 0.02 17.00 1.04 18.04 6.08 5.67
7.00 18.00 0.16 21.14 9.33 30.47 10.78 7.05
8.00 24.00 0.22 26.65 12.45 39.10 13.86 8.88
9.00 100.00 0.90 49.63 51.86 101.49 37.29 16.54
10.00 48.00 0.43 60.66 24.89 85.55 30.18 20.22
11.00 65.00 0.59 75.59 33.71 109.30 38.68 25.20
12.00 99.00 0.89 98.34 51.34 149.68 53.32 32.78

S.04 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495692
Y : 9864048
Pile Diameter (F) = 91.40 (36") As = 287.0 cm Ap = 6557.8 cm2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 12.00 0.11 3.10 6.22 9.32 3.52 1.03
2.00 12.00 0.11 6.20 6.22 12.42 4.56 2.07
3.00 29.00 0.26 13.69 15.04 28.73 10.58 4.56
4.00 15.00 0.14 17.56 7.78 25.34 8.97 5.85
5.00 4.00 0.04 18.60 2.07 20.67 7.03 6.20
6.00 2.00 0.02 19.11 1.04 20.15 6.79 6.37
7.00 18.00 0.16 23.76 9.33 33.10 11.66 7.92
8.00 24.00 0.22 29.96 12.45 42.41 14.97 9.99
9.00 100.00 0.90 55.79 51.86 107.65 39.34 18.60
10.00 48.00 0.43 68.19 24.89 93.08 32.69 22.73
11.00 65.00 0.59 84.98 33.71 118.69 41.81 28.33
12.00 99.00 0.89 110.55 51.34 161.89 57.39 36.85
CAPACITY OF PILE
S.05 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495709
Y : 9864069
2
Pile Diameter (F) = 40.60 (16") As = 127.5 cm Ap = 1293.96 cm ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 2.00 0.02 0.23 0.26 0.49 0.18 0.08
2.00 6.00 0.05 0.92 0.78 1.69 0.62 0.31
3.00 15.00 0.14 2.64 1.94 4.58 1.66 0.88
4.00 14.00 0.13 4.25 1.81 6.06 2.14 1.42
5.00 5.00 0.05 4.82 0.65 5.47 1.87 1.61
6.00 2.00 0.02 5.05 0.26 5.31 1.79 1.68
7.00 2.00 0.02 5.28 0.26 5.54 1.86 1.76
8.00 10.00 0.09 6.43 1.29 7.72 2.66 2.14
9.00 23.00 0.21 9.07 2.98 12.04 4.21 3.02
10.00 42.00 0.38 13.88 5.43 19.32 6.80 4.63
11.00 60.00 0.54 20.77 7.76 28.53 10.03 6.92
12.00 75.00 0.68 29.38 9.70 39.08 13.67 9.79
12.80 95.00 0.86 38.10 12.29 50.39 17.62 12.70

S.05 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495709
Y : 9864069
Pile Diameter (F) = 61.00 (24") As = 191.6 cm Ap = 2922.47 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 2.00 0.02 0.34 0.58 0.93 0.35 0.11
2.00 6.00 0.05 1.38 1.75 3.13 1.16 0.46
3.00 15.00 0.14 3.97 4.38 8.35 3.08 1.32
4.00 14.00 0.13 6.38 4.09 10.47 3.76 2.13
5.00 5.00 0.05 7.24 1.46 8.70 3.00 2.41
6.00 2.00 0.02 7.59 0.58 8.17 2.76 2.53
7.00 2.00 0.02 7.93 0.58 8.52 2.88 2.64
8.00 10.00 0.09 9.66 2.92 12.58 4.39 3.22
9.00 23.00 0.21 13.62 6.72 20.34 7.23 4.54
10.00 42.00 0.38 20.87 12.27 33.14 11.86 6.96
11.00 60.00 0.54 31.21 17.53 48.75 17.42 10.40
12.00 75.00 0.68 44.14 21.92 66.06 23.48 14.71
12.80 95.00 0.86 57.25 27.76 85.01 30.19 19.08
CAPACITY OF PILE
S.05 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur
X : 0495709
Y : 9864069
Pile Diameter (F) = 81.30 (32") As = 255.3 cm Ap = 5186.05 cm 2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 2.00 0.02 0.46 1.04 1.50 0.57 0.15
2.00 6.00 0.05 1.84 3.11 4.95 1.86 0.61
3.00 15.00 0.14 5.28 7.78 13.06 4.87 1.76
4.00 14.00 0.13 8.50 7.26 15.76 5.74 2.83
5.00 5.00 0.05 9.65 2.59 12.24 4.25 3.22
6.00 2.00 0.02 10.11 1.04 11.15 3.78 3.37
7.00 2.00 0.02 10.57 1.04 11.61 3.94 3.52
8.00 10.00 0.09 12.87 5.19 18.05 6.36 4.29
9.00 23.00 0.21 18.15 11.93 30.08 10.82 6.05
10.00 42.00 0.38 27.80 21.78 49.58 17.98 9.27
11.00 60.00 0.54 41.59 31.12 72.70 26.31 13.86
12.00 75.00 0.68 58.82 38.90 97.72 35.17 19.61
12.80 95.00 0.86 76.28 49.27 125.55 45.13 25.43

S.05 Location : Jl Mulawarman KM 21, Manggar, Balikpapan, Kalimantan Timur


X : 0495709
Y : 9864069
Pile Diameter (F) = 91.40 (36") As = 287.0 cm Ap = 6557.8 cm2 ss = 3
sp = 2.5

Note :
Water table at - m (average) below the existing ground surface. Elevation of the top of pile is not yet available

Elevation qc fa (max=2) Qsu (tons) Qpu (tons) Qtu (tons) Qts (tons) Qss (tons)

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


1.00 2.00 0.02 0.52 1.04 1.55 0.59 0.17
2.00 6.00 0.05 2.07 3.11 5.18 1.93 0.69
3.00 15.00 0.14 5.94 7.78 13.72 5.09 1.98
4.00 14.00 0.13 9.56 7.26 16.82 6.09 3.19
5.00 5.00 0.05 10.85 2.59 13.44 4.65 3.62
6.00 2.00 0.02 11.37 1.04 12.40 4.20 3.79
7.00 2.00 0.02 11.88 1.04 12.92 4.38 3.96
8.00 10.00 0.09 14.46 5.19 19.65 6.90 4.82
9.00 23.00 0.21 20.41 11.93 32.33 11.57 6.80
10.00 42.00 0.38 31.25 21.78 53.04 19.13 10.42
11.00 60.00 0.54 46.75 31.12 77.87 28.03 15.58
12.00 75.00 0.68 66.12 38.90 105.02 37.60 22.04
12.80 95.00 0.86 85.76 49.27 135.02 48.29 28.59