Wuhuan - MR Pi Jinlin
Wuhuan - MR Pi Jinlin
Wuhuan - MR Pi Jinlin
and
Economic & Environmental
Sustainability Analysis
3 3E Analysis of MCGI
Ammonia Urea/Melamine/AN/
Route Other fertilizers
• Olefin/DME
Methanol • Formaldehyde/Acetic Acid
Route • MTBE/ DMMn
• Medicine/Solvents
Coal Gasification Purification EG Polyesters/Surfactants
Route /Solvents
Liquif.
Gasoline/Diesel/LPG
Route
Fuel Gas
Route Town gas/SNG/IGCC
1. Background of MCGI
(2) Methanol
China capacity is ~80 MTPA, ~60% of the world
~70% of China methanol is produced from coal
1. Background of MCGI
(3) EG
China capacity is ~8.1mt/a, ~25% of the world
Capacity of coal-based EG is ~2.45 mt/a, ~30% of China total
3.15 MTPA Coal-based EG projects are under construction
(6) MTO/MTP
China’s capacity of olefin is ~50mt/a
Capacity of coal-based olefin is ~13mt/a, ~25% of China’s total
Coal-based olefin projects with a total capacity of ~20mt/a are under
construction
(7) SNG
China’s capacity is ~5 billion Nm3/a.
SNG projects with a total capacity of 70 billion Nm3/a are under
construction
1. Background of MCGI
Lurgi
Fixed Bed Gasf. BGL
U.G.I. GE-Texaco
E-Gas
Coal Slurry
Multi-Nozzle
Gasifi
Entr. Flow Gasf.
-cation
Shell
Dry Pulverised Coal
Prenflo
HTW GSP
KRW HT-L
Fluid Gasf.
U-gas
TRIG
SCCR
2. Application of MCG Technologies
Inherent safety
Environment-friendly
High energy efficiency
High feed flexibility
High single-train capacity
High reliability and easy maintenance
2. Application of MCG Technologies
Reference List
Feedstock scale
Number of Syngas
Items for Single Remarks
Gasifiers x106 Nm3/d
Gasifier
<1,000 t/d 5
Multi-Nozzle Gasification Total feedstock amount is
1,000~2,000 t/d 76 -
(Coal Slurry Entr. Flow Gasification) 110,000 t/d
~3,000 t/d 12
<1,000 t/d 8
SHELL Gasification
Including 2 trains of SHELL
(Dry Pulverised Coal side fired Entr. 1,000~3,000 t/d 19 113.5
bottom quench gasifiers
Flow Gasfication) >3,000 t/d 6
GSP Gasification 200 MW (1,000 t/d) 2
(Dry Pulverised Coal top fired Entr. 98 -
Flow Gasfication) 500 MW(2,000 t/d) 31
1,000 t/d 27
HT-L Gasification
(Dry Pulverised Coal top fired Entr. 2,000 t/d 61 - -
Flow Gasification)
3,000 t/d 1
2. Application of MCG Technologies
2 SO2 - - 50
3 NOx - - 100
4 H2S 80 9.3 -
3. Analysis of 3E on MCGI
Energy consumption
≤1.9 ≤1.6 ≤2.2 ≤1.8 ≤4.0 ≤3.0 ≤1.4 ≤1.3
(t coal eq/t or /kNm3)
Coal consumption
≤3.5 ≤3.0 ≤3.3 ≤2.8 ≤5.1 ≤4.6 ≤2.0 ≤1.6
(t coal eq/t or /kNm3)
Water Consumption
≤7.5 ≤6.0 ≤7.5 ≤6.0 ≤16.0 ≤12.0 ≤6.0 ≤5.5
(t /t or /kNm3)
Energy Efficiency
≥55.0 ≥57.0 ≥42.0 ≥44.0 - - ≥51.0 ≥57.0
(%)
3. Analysis of 3E on MCGI
O2/Steam CO2
Lignite
Pre Gasifi Purifi NH3 Urea Urea
-drying -cation -cation Synth. Synth.
Note:
1. Annual operating time 8,000 hrs.
2. Construction time: 3 years, Running time: 17 years
3. Analysis of 3E on MCGI
O2/Steam
Lignite
Pre Gasifi Purifi Methanol Methanol MOH
-drying -cation -cation Synth. Distill.
2 Main feedstock
Feedstock coal (lignite, LHV ~ 3,000
2.1 Kt/a 1,271.7 15USD/t
kcal/kg, as received)
Fuel coal (lignite, LHV ~ 3,000
2.2 Kt/a 792 15USD/t
kcal/kg, as received)
2.3 Fresh water Kt/a 9,100 1.5USD/t
2.4 Electricity kwh/a Balance
3. Analysis of 3E on MCGI
Note:
1. Annual operating time 8,000 hrs.
2. Construction time: 3 years, Running time: 17 years
3. Analysis of 3E on MCGI
O2/Steam
Lignite
Pre Gasifi Purifi PSA EG EG
-drying -cation -cation CO Synthesis
Cryogen.
Sep.
Gasification and Purification Gas Sep. and EG Synth.
2 Main feedstock
Feedstock coal (lignite, LHV ~
2.1 Kt/a 1,128 15 USD/t
3,000 kcal/kg, as received)
Fuel coal (lignite, LHV ~ 3,000
2.2 Kt/a 1,344 15 USD/t
kcal/kg, as received)
2.3 Fresh water Kt/a 12,848 1.5 USD/t
2.4 Electricity kwh/a Balance
3. Analysis of 3E on MCGI
Note:
1. Annual operating time 8,000 hrs.
2. Construction time: 3 years, Running time: 17 years
3. Analysis of 3E on MCGI