BSES Rajdhani Power Limited                                                              Application Form Number ………………………….

… 

APPLICATION FOR INTENT TO SEEK CONNECTIVITY OF


RENEWABLE ENERGY SYSTEM

For any query call @39999956 or e-mail us on [email protected]

                       
BSES Rajdhani Power Limited                                                              Application Form Number ………………………….… 

To CEO BRPL,
I intend to install grid connected Renewable energy system, in compliance of Delhi Electricity Regulatory Commission
(Net Metering for Renewable Energy) Regulations, 2014. Kindly permit the same.

Name
1
Full Address of Consumer

2 Consumer No. (CA. No.) & Division

3 Email address

Telephone No
4 Res: Mob:

Whether the Consumer is under TOD billing system (Please


5 Yes No
tick)

Non Any other:


6 Category (Please tick ) Domestic Industrial
Domestic

7 BRPL Supply voltage level

8 Sanctioned Load

Type of Renewable energy system proposed (Solar, wind,


9
etc.)

Capacity of Renewable Energy System proposed to be


10
connected

Supply voltage of Renewable Energy System proposed to be


11
connected

Location of Proposed Renewable Energy System (Please Ground Any other:


12 Roof Top
tick) Mounted

13 Preferred mode of Communication (Please tick) Post By hand Electronic

Following documents are attached-


1) Last paid Bill (Yes/No):-
2) Declaration /undertaking (Yes/No) :-
3) Owner ship proof/permission letter for installation of renewable generator at my premises(Yes/ No):-
4) Signature ID Proof (Pan Card/Passport/Driving License) of applicant. (Yes/ No):-+

Place:
Date : Signature of Consumer
..…………………………………………………………………………………………………………………………………………………….
ACKNOWLEDGEMENT
Application Number………………………………………
Received the application for connectivity of Renewable Energy System
Name ………..……………….…………CA No. ..…………………………….Date………………………….Time……………………………
Renewable Energy Plant Capacity……………………. ………………Renewable Energy Type……………………………………………
Mode of payment – (Cheque / DD / Auto debit application fee from electricity bill )
• Cheque/DD details ………………………………………………………………………………………………………………………..
• Auto Debit of Application fee Rs.500/-(Rupee five Hundred only) through consumer electricity bill CA No. ……………………

Name of Officer Signature of Officer & Date

                       
BSES Rajdhani Power Limited                                                              Application Form Number ………………………….… 

DECLARATION/UNDERTAKING

(On Rs.10/- non judicial stamp paper, duly attested by Notary public)

I,We……………………………………... Son/daughter/wife of …..……………………... having electricity connection

CA No ……………..……….……….…………………at…………………………………………………..…………………..…

…….……………………………………………………………….(Detail of premises) do hereby solemnly affirm and

declare as under:

1. That I/We Am/Are the owner of / co-owner of / legal heir of / have permission to use
………………………………..……………………………………………………………………………………………………..
………………………………………….. (Hereinafter referred to as the “Premises”). 
2. I/We have submitted the application to install the renewable Energy system at above mentioned premises. 
NOC from the other co –owner is enclosed / Will or Succession certificate in proof of legal heirship is enclosed. 
(Please delete if not applicable).
3. I/We understand that once this application is approved, the same is valid for 30 days, within which I/we will
submit the Registration form.
4. I/We agree to Auto debit the application fee Rs. 500/-(Rupee five Hundred) through my/our electricity bill, as
per the Delhi Electricity Regulatory Commission (Net Metering for Renewable Energy) Regulations, 2014.
5. I/We agree that BRPL has permission to access the Renewable energy system installed at my/our
premises.
6. I/We undertake that ownership of the roof/land where solar PV system is installed is with me.
7. I/We have clearly understand that if the above statement is found to be false or incorrect or on receipt of
any objection from the concerned competent land owing/Law enforcing agency, the Net metering system can be
disconnected and the meter/service line can be removed by BRPL without any further notice to me.
8. The Renewable energy system installed at my premises will be in synchronization with BRPL supply
voltage level at my premises and rated Frequency (50 hz +-5%), in compliance to Delhi Electricity Regulatory
Commission (Net Metering for Renewable Energy) Regulations, 2014.

                                     

                                                                                                                                                                   Signature of Consumer     

                       