WATERWAY CALCULATION FOR MAJOR BRIDGE

BRIDGE NO: 317 CHAINAGE: 227139.301 SECTION:

Longitude = 76°52'21.70"E Vertical Clearance Reqd = 1.50 m


Latitude = 16°48'49.34"N (As per Cl 4.8.1 of sub struct. Code)
Sub - Zone = 3(h)
Q50 HFL(BL+Depth of flow+Afflux) = 392.95 m
Catchment Area = 283.08 sq.km
VC provided for Proposed = 401.30 - 392.953
Pro. ( BOG - Q50 HFL) = 8.34 m
No of span = 2 = 1.50 m

Span in "M" = 18.30 FB provided for Proposed = 403.55 - 392.953


( FL - Q50 HFL) = 10.59 m
Rail Level = 404.29 ˃ 1.00 m

Formation Level = 403.55 The bridge is SAFE for passing the Q50 discharge with Std. V.C and F.B.

Bottom of girder (RL-DC) = 401.30 Scour depth calculations:


( 404.285 - 2.988 )
Silt factor "f" = 4.50
Bed Level (average) = 386.09
Q50 Discharge = 1045.2 Cumecs
Pier thickness = 1.50 m
Foundation design Discharge = 1.3 x Q50 discharge
Depth of Rockey strata = 4.50 m
from Bed Level = 1.3 x 1045.21

Bed material = Mediun to low = 1358.8 Cumecs


plasticity clay
Depth of flow = 5.68 m Anticipated scour depth as per = 1.25*1.338*(1.3*Q50/S)^2/f)^0.33
IRS Sub-structure code Cl.4.6.4
Velocity of flow = 5.022 m/sec 1.25 x 1.338 x ((( 1.3 x 1045 )/ 36.60 )^ 2
/ 4.50 ) ^ 0.33
Water way required = Q50 / V
= 11.061 m
= 1045.21 / 5.022
Scour depth required from bed level.
= 208.13 sq m
= Scour depth - depth of flow including afflux
Water way Provided - Proposed
= 11.061 - 6.859
No of spans x Span x Vent ht.
= 4.201 m
2 x 18.30 x 13.703
Depth of foundation available =BL - Bottom of foundation found.
= 501.53 sq m
= 386.09 - 381.59
The Waterway Provided > The Waterway Required.
= 4.500 m < 4.201 m
Hence Safe
However the bottom of foundation will go upto the Rockey
strata. Necessary protective work such as flooring with
the bund heights are very less curtain wall is proposed. Hence SAFE.

Certified that the water way, Vertical clearance, Free foard Certified that the water way and depth of foundation have
and depth of foundation have been provided as per CWC been checked as per latest guidelines and found safe.
report and IRS Sub-structure code.
DESIGN CALCULATION OF WATER WAY :

1 Catchment Area (A) = 283.08 sq.km

2 Length of longest stream (L) = 29.836 km

3 Length of longest stream oppto C.G ( Lc ) = 16.06 km

4 Equivalent bed slope of stream - (S) = 2.52 m/km

COMPUTATION OF EQUIVALENT SLOPE ( S )

Sl. No. Reduced Reduced Length of each Height above Cumulative Ht. Above Li x (Di-1+Di)
distance Level of segment (Li) datum in "m' datum in "m"
from the stream bed in ( Di ) (Di-1+Di)
bridge site "m"
1 2 3 4 5 6 7=4x6
1 0.000 386.094 0.000 0.00 0.00 0.000
2 5.980 400.000 5.980 13.906 13.906 83.158
3 14.645 420.000 8.665 33.906 47.812 414.291
4 20.337 440.000 5.692 53.906 87.812 499.826
5 29.087 460.000 8.750 73.906 127.812 1118.355
6 29.831 480.000 0.744 93.906 167.812 124.852
7
8
9
10

Total Li x ( Di -I + Di ) = 2240.482

Li x ( Di -I + Di )
S =
L2
2
= 2240.48 / 29.836

S = 2.52 m/km
II By Synthetic Unit Hydrograph Method

Determination of Synthetic Unit Hydrograph Parameters

1 Time for the centre of Unit rainfall duration to the 0.447


peak of Unit hydrograph in hours -tp L x LC
= 0.325 x
Sqrt. ( S )
0.447
29.836 x 16.06
= 0.325 x
Sqrt. 2.52

= 4.17 Hours

Say = 4.00 Hours

2 Peak discharge of Unit Hydrograph per Unit


area in cumecs per sq.km -qp 0.996 0.996
= = 0.497
0.497 4.00
( tp )

qp = 0.5 Cumecs/Sq.km

3 Width of unit hydrograph measured at 50% max.


discharge ordinate ( Q p ) in hours ---W50 2.389 2.389
= = 1.065
( q p ) 1.065 0.500

= 5.00 Hours

4 Width of unit hydrograph measured at 75% max. 1.415 1.415


= 1.067 = 1.067
discharge ordinate ( Q p ) in hours ---W75 ( q p) 0.500

= 2.97 Hours

5 Width of rising side of unit hydrograph measured at 50% max.


discharge ordinate ( Q p ) in hours ---WR50
0.753 = 0.753
= 1.229 1.229
( q p) 0.500

= 1.77 Hours

6 Width of rising side of unit hydrograph measured at 75% max.


discharge ordinate ( Q p ) in hours ---WR75
0.558 0.558
= = 1.088
( q p ) 1.088 0.500

= 1.19 Hours

0.524
7 Base width of Unit hydrograph in hours - T B = 7.392 x ( tp)
0.524
= 7.392 x 4.00

= 15.28 Hours

say = 15.00 Hours

8 Peak discharge of unit hydrograph in hours -( Q p) = qp x Catchment area

= 0.5 x 283.08

= 141.54 Cumecs
9 Time for the centre of start of rise to the peak of unit
= tp + tr /2
hydrograph
in hours -- Tm
tr - Unit rainfall duration adopted ; Specified study in hours = 1 hr

= 4.00 + 1 x 0.5

= 4.50 Hours

10 Total discharge for the catchments ∑Qiti = A x d / ( 0.36 x tr )

A = Catchment area d = Runoff depth 1cm

∑Qiti 283.08 x 1
=
0.36 x 1

= 786.32 Cumecs

11 Design storm duration ( TD ) = 1.1 x tp

= 1.1 x 4.00

= 4.4 Hours

Say = 4.00 Hours

III POINT AND AREAL RAINFALL

1 50 year 24 hours point rainfall for the location = 160 mm


( Plate 9.4 (b) ) Corresponding to C.G

2 Conversion factor for the conversion


50 years 24 hours rainfall to TD hr rainfall = 0.680 (Vide CWCR -Fig- 10 )

3 50 years TD hour point rainfall -R50 = 50 year 24 hr point rainfall for the location
x
Conversion factor vide step 3 above
= 108.8 mm
= 10.88 cm

4 Areal reduction factor for the catchment area


with TD hour duration = 0.742 ( Vide CWCR annexure 4.4)

5 50 year TD hour areal rainfall = 50 yr. TD hr. point rain fall vide step 4
x
Areal reduction factor Vide step 5

= 108.8 x 0.742

= 80.73 mm

= 8.07 cm
TIME DISTRIBUTION OF AREAL RAINFALL
Areal rain fall = 8.07 cm

Sl. Duration Distribution Strom rainfall 1 hour rain fall


No in hour co-effts vide Col.3 x TD hr increment in
CWC report ARF Cm
1 2 3 4 5
1 1 0.67 5.41 5.41
2 2 0.86 6.94 1.53
3 3 0.96 7.75 0.81
4 4 1.00 8.07 0.32
ESTIMATION OF EFFECTIVE RAINFALL UNITS
( Loss rate of of 0.10 cm/hour vide section 3.6 of CWCR )

Sl. Duration 1 hr rainfall Design loss 1 hour


No in hour vide col. 5 of rate in effective
step-12 Cm/hour rainfall in Cm
1 2 3 4 5
1 1 5.41 0.10 5.31
2 2 1.53 0.10 1.43
3 3 0.81 0.10 0.71
4 4 0.32 0.10 0.22

0.523
5 ESTIMATION OF BASE FLOW qb = 0.536 / (A)
0.523
= 0.536 / 283.08

qb = 0.028 Cumecs/Sqkm

Total Base flow = 283.08 x 0.028

= 7.92 Cumecs
ESTIMATION OF 50 YEAR PEAK FLOOD

Arranging max. efft. rainfall units against max. Unit graph ordinate to get max. discharge

Sl. Duration Hydrograph Hour effective Direct runoff in


No in hour ordinates in rainfall cumecs
cumecs
1 2 3 4 5
1 0 0.00
2 1 10.00
3 2 26.00
4 3 55.00
5 4 110.00 0.71 77.77
6 5 141.54 5.31 751.15
7 6 130.00 1.43 186.29
8 7 99.00 0.22 22.08
9 8 75.00
10 9 52.00
11 10 36.00
12 11 23.00
13 12 15.00
14 13 9.00
15 14 5.00
16 15 0.00
17
18
786.54 Total Flow 1037.29 Cumecs
Base Flow 7.92 Cumecs
50 Year flood peak 1045.21 Cumecs
COMPUTATION OF VELOCITY FOR BRIDGE NO. 317
VELOCITY IN THE STREAM
2/3 1/2
Using Mannings formula V = 1 x R x S m/sec
n

taking n = 0.03 Manning's constant

Top width of stream = 60.82 m

Bottom width of stream = 38.10 m

Depth of flow (Assumed) = 5.68 m

Area of flow = 280.93 Sq.m

Wetted perimeter = 63.50 m

Hydraulic mean radius of the 280.93


= = 4.424 m
stream "R" = A/P 63.50

Bed slope of stream "S" = 1 / 320

= 0.003
2/3 1/2
Therfore V = 1
x 4.424 x 0.003
0.03

= 5.022 m/sec
velocity considerd = 3.000

FIXING AND CHECKING OF THE BRIDGE DIMENSION

Velocity in the stream V = 5.022 m/sec

Waterway required for 1045.2


=
Q50 discharge with the above velocity 5.022

A = LxD = 208.13 sq. m

L = 2 x 18.30

= 36.60 m

Depth of flow D = A = Area of Waterway


L No. of span x Span

= 208.13
36.60

= 5.69 m

AFFLUX CALCULATION:

1 Velocity in un-obstructed stream in m/sec (V) - 5.022 Afflux 'h' (in m) =


[V2/17.88 + 0.01524] X [(A/a)2-1]
Unobstructed sectional area of the river in m2
2 - 281.01 = [5.022²/17.88 + 0.01524] x [(281.01/207.888)² - 1]
(A)

3 Obstructed sectional area of the river in m2 (a) - 207.89


= 1.179 m
Tm - 5 hours Synthetic U.G Parameters

Hydrograph
170.00 Duration
C.A = 283.08 sqkm ordinates in
Qp - 75.88 cumecs in hour
160.00 cumecs
tp = 4.00 hrs 0 0.00
150.00 TB = 15.00 hrs 1 10.00
140.00 QP = 141.54 cumecs 2 26.00
W50 = 5.00 hrs 3 55.00
130.00 W75 = 2.97 hrs 4 110.00
120.00 WR50 = 1.77 hrs 5 141.54
Hydrograph ordinates in cumecs

WR75 = 1.19 hrs 6 130.00


110.00 cumecs
qp = 0.5 7 99.00
/sqkm
100.00
LLC/√S = 301.93 8 75.00
90.00 d = 1.0 cm 9 52.00
Tm = 4.50 hrs 10 36.00
80.00
∑Qi ti = (Axd)/ (trx0.36) 11 23.00
70.00 = 786.32 cumecs 12 15.00
13 9.00
60.00
14 5.00
50.00 15 0.00

40.00
Total 786.54
30.00
Flow cumecs
20.00

10.00

0.00
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Duration in hour

TB - 15 hours SYNTHETIC UNIT HYDROGRAPH

BRIDGE NO. 317