Environmental Management Plan

Download as pdf or txt
Download as pdf or txt
You are on page 1of 36
At a glance
Powered by AI
The key takeaways are the environmental management plan outlines the organizational structure, roles and responsibilities, communication procedures, environmental impacts and mitigation plans for a highway construction project.

The environmental team roles include the project manager, engineer, environmental officer, environmental supervisor, and site supervisor. Their responsibilities are outlined on pages 1-2.

The communication procedures outlined on page 2 include communicating with clients, suppliers/subcontractors, stakeholders, and environmental awareness amongst staff.

Environmental Management Plan

Client: Highway Department, HKSAR

NAME TITLE SIGNATURE

Prepared by:

Reviewed by:

Approved by:

Effective Date: 27 Nov 2018, Revision 0

I. TABLE OF CONTENTS
II. DISTRIBUTION LIST ...........................................................................................4
III. DEFINITION / ABBREVIATION...........................................................................4
1 INTRODUCTION ..................................................................................................5
1.1 SCOPE & OBJECTIVE ..............................................................................................5
1.2 DESCRIPTION OF WORK ........................................................................................5
1.3 STRUCTURE OF PLAN ............................................................................................9
1.4 COMPANY ENVIRONMENTAL POLICY STATEMENT .............................................9
2 ENVIRONMENTAL ORGANIZATION ...............................................................10
Page 1 of 31
2.1 ENVIRONMENTAL STAFF ORGANIZATION STRUCTURE ...................................10
2.2 ROLES & RESPONSIBILITIES OF KEY PERSONNEL ...........................................10
2.3 ENVIRONMENTAL TEAM .......................................................................................11
Project Manager .............................................................................................................11
Engineer .........................................................................................................................11
Environmental Officer .....................................................................................................11
Environmental Supervisor ...............................................................................................12
Site Supervisor/Foreman ................................................................................................13
Report to Engineer, has responsibility for .......................................................................13
3 COMMUNICATIONS PROCEDURES ...............................................................14
3.1 COMMUNICATING WITH CLIENT’S .......................................................................14
3.2 COMMUNICATING WITH SUPPLIERS & SUBCONTRACTORS ............................14
3.3 COMMUNICATING WITH STAKEHOLDERS ..........................................................14
3.4 ENVIRONMENTAL AWARENESS AMONGS STAFF..............................................15
3.5 ENVIRONMENTAL REPORTING & SITE MEETING ...............................................15
ENQUIRIES, COMPLAINTS & REQUEST FOR INFORMATION ......................................16
4 SUMMARY OF ENVIRONMENTAL IMPACTS & MITIGATION PLANS ...........16
4.1 STATUTORY COMPLIANCE ...................................................................................16
4.2 IDENTIFICATION OF SIGNIFICANT ENVIRONMENTAL ASPECTS ......................17
4.3 ENVIRONMENTAL IMPACTS & MITIGATION PLAN ..............................................17
Air Pollution Control ........................................................................................................17
Water Pollution Control ...................................................................................................17
Noise Control ..................................................................................................................18
Planning 19
4.3.1.1 Precaution & Control Measures ......................................................................19
Waste Management ........................................................................................................19
4.3.1.2 Inert Construction and Demolition (C&D) Waste .............................................19
4.3.1.3 Non-inert C&D Waste .....................................................................................19
4.3.1.4 Municipal Solid Waste ....................................................................................20
4.3.1.5 Planning for Waste Reduction ........................................................................20
4.3.1.6 Waste Handling ..............................................................................................20
4.3.1.6.1 Excavated Materials ...................................................................................20
4.3.1.6.2 Construction & Demolition (C&D) Wastes ..................................................21
4.3.1.6.3 Chemical Waste .........................................................................................21
4.3.1.6.4 General Refuse ..........................................................................................21
Dangerous Goods Control ..............................................................................................22
Chemical Management ...................................................................................................22
Energy Conservation ......................................................................................................22
Ecology...........................................................................................................................22
Material Resources Management ...................................................................................23

Page 2 of 31
Consumption and Waste Disposal Figures .....................................................................23
General Housekeeping ...................................................................................................23
Environmental Mitigation Implementation Schedule ........................................................23
5 ENVIRONMENTAL PROCEDURES ..................................................................24
5.1 ENVIRONMENTAL TRAINING, AWARENESS & COMPLIANCE ............................24
5.2 ENVIRONMENTAL EMERGENCY PROCEDURES ................................................24
5.3 DOCUMENTATION .................................................................................................25
5.4 DOCUMENT CONTROL ..........................................................................................26
5.5 ENVIRONMENTAL INSPECTION/PERFORMAANCE MONITORING .....................27
5.6 COMPLAINTS, NON-CONFORMANCE & CORRECTIVE / PREVENTIVE ACTION27
5.7 PROGRAMME FOR UPDATING ENVIRONMENTAL MANAGEMENT PLAN .........27
5.8 CONTROL OF SUBCONTRACTOR ........................................................................29
5.9 SITE INPSECTION ..................................................................................................29
ANNEX I: ENVIRONMENTAL POLICY .................................................................30
ANNEX 2: ENVIRONMENTAL CHECKLIST .....................................................31
ANNEX 3: WEEKLY ENVIRONMENATL INSPECTION REPORT ....................36

Page 3 of 31
II. DISTRIBUTION LIST
Location Holder Copy Status

Site Office Tsit Fung Engineering Company Master Copy

Client Highway Department, HKSAR Copy

Main Contractor: TIML MOM Limited Copy

III. DEFINITION / ABBREVIATION

COP Company Operating Procedure

EMP Environnemental Management Plan

EMS Environnemental Management System

Project Repainting of the Suspenders

Page 4 of 31
1 INTRODUCTION
1.1 SCOPE & OBJECTIVE
This Environmental Management Plan (EMP) has been prepared for the Project for
“Repainting of the Suspenders”. It describes how environmental issues will be managed
and, covers Tsit Fung’s environmental policy, organization, implementation, monitoring and
review procedures with respect to this subject and the requirement of HKSAR and CLIENT..
The objective of this EMP is to detail our approach to efficient and effective environmental
management throughout the life cycle of the Project.

1.2 DESCRIPTION OF WORK


The outline scope of project is described below:
 Repainting of the Suspenders
An EMP is produced so that environmental considerations will become an integral part of the
Project.
This EMP will be enforced by an environmental committee led by Project Director & Project
Manager to ensure TSIT FUNG’s compliance with environmental regulations (and applicable
ordinances) and CLIENT’S requirements. It will define the process to identify areas in which
potential environmental risks may be avoided or reduced, how efficiency may be improved
and highlight other areas of environmental concern so that they can be adequately managed.
TSIT FUNG will:
 comply to environmental regulations and ordinances, and CLIENT’S requirements;
 where appropriate, identify environmental aspects with particular emphasis on:
i. A
i
r

Q
u
a
l
i
t
y

M
a
n
a
g
e
m
e
n
t

Page 5 of 31
ii. N
o
i
s
e

C
o
n
t
r
o
l

M
a
n
a
g
e
m
e
n
t

iii. E
n
e
r
g
y

S
a
v
i
n
g

M
a
n
a
g
e
m
e

Page 6 of 31
n
t

iv. W
a
s
t
e

(
C
h
e
m
i
c
a
l

a
n
d

W
a
s
t
e
w
a
t
e
r
)

M
a
n
a
g
e
m
e
n
t

Page 7 of 31
v. M
a
t
e
r
i
a
l

R
e
s
o
u
r
c
e
s

M
a
n
a
g
e
m
e
n
t
vi. E
c
o
l
o
g
y

 Identify other areas of environmental impact such as operational and documentation


control, monitoring, etc.

Page 8 of 31
1.3 STRUCTURE OF PLAN
In addition to this introductory section, the EMP consists of the following sections:
Section 2 Environmental Organization - Details of the Tsit Fung’s Environmental
Organization which identify the key personnel, their roles and responsibilities,
Section 3 Communications Procedures – Details of internal and external communications
procedures regarding environmental matters.
Section 4 Summary of Environmental Impacts and Mitigation Plans - A summary of the
environmental considerations, their impacts and appropriate investigation plans.
Section 5 Environmental Procedures - Details of specified environmental procedures to be
implemented.

1.4 COMPANY ENVIRONMENTAL POLICY STATEMENT


TSIT FUNG hereby declares the commitment to implement, enforce and comply to this
Environmental Management Plan, and as recognition that environmental concern and
protection forms an integral part of our business strategy. The copy of Environmental Policy is
attached on Annex I.

Page 9 of 31
2 ENVIRONMENTAL ORGANIZATION
TSIT FUNG has established a supporting organization structure for implementing, monitoring
and improving the Environmental Management System. Details of organization, role and
responsibilities are stated hereafter.

2.1 ENVIRONMENTAL STAFF ORGANIZATION STRUCTURE


Below is a chart showing the environmental team within SHSI.

TSIT FUNG Project Environmental Team

Project
Manager/Site
HKSAR
Agent
Environmental
Protection
Department,
Environmental MTR’s
Officer Representatives
& External
Concerned
Parties
Environmental
Supervisor

Foreman/
Subcontractors
Line of
communication

FIGURE 1 - Tsit Fung’s Project Environmental Organization Chart

2.2 ROLES & RESPONSIBILITIES OF KEY PERSONNEL


This EMP is set up so as to enable, implement and enforce environmental management to
minimize and avoid possible pollution sources and activities. This includes regular
environmental checking, monitoring and auditing to ensure the enforcement of the EMP, by
both TSIT FUNG and CLIENT’S.

Page 10 of 31
2.3 ENVIRONMENTAL TEAM
Tsit Fung’s Project Manager will be overall responsible for Environmental Management
System, and shall be directly responsible for enforcing and implementing the EMP including
the applicable statutory and contractual obligations. The Project Manager or his
representative shall liaise with and enter into regular meetings with the CLIENT’S’s
Environmental Team. The Project Manager or his representative will also instruct and monitor
all staffs, if any, to follow the EMP requirements and action plan.
Tsit Fung’s Project Manager or his representative shall carry out the supervision and assist to
carry out duties, such as environmental auditing, reporting, site inspections, training and
liaison with sub-contractors.

A brief description of the roles and responsibilities for key personal is shown as below.
Project Manager
Report to the General Management of the Tsit Fung and has responsibility for
 Ensuring the successful implementation and completion of the project.
 Achieving the key success criteria for the project and ensuring that all
requirements of the specification are met on time and to budget.
 The risk management of the project and for ensuring the required level of
Quality, Environmental and Safety standards are maintained throughout the
project
Engineer
Report to the Project Manager, has responsibilities for
 Overall day-to-day running of the project. He will be the single point of contact
for instructions or contractual matters between client and Tsit Fung.
 Achieving the key success criteria for the project;
 Ensuring that all the requirements of the specification are met regarding time,
quality and budget;
 The risk management of the project;
 The configuration management;
 Ensuring that the required level of quality, environmental and safety is
maintained throughout the project; and
 Resource management throughout the lifecycle of the project
 Responsible also for all commercial, financial, technical, risk management
oversight and control for the project, client and subcontractors.

Environmental Officer
Report to Project Manager, has responsibility for
 Prepare, implement and update the Environmental Management Plan;

Page 11 of 31
 Advise on measures to be taken in the interest of environmental protection, and
implement such measures;
 Carry out inspections of the Site for identifying potential hazards to the
environment, and to report findings with recommendations for corrective
actions;
 Participate in the weekly environmental walks (whether this is combined with
the weekly safety walk or otherwise) with the nominated site staff of the
Engineer, and to supervise and monitor the environmental performance on the
Site;
 Check and ensure that any polluting or potentially polluting situation is promptly
rectified;
 Attend Site Safety and Environmental Management Committee (SSEMC)
meetings and Site Safety and Environmental Committee (SSEC) meetings;
 Compile the monthly environmental report for submission to the Engineer at
least five working days before the SSEMC meetings;
 Arrange and provide the environmental training including the site specific
induction training and toolbox talks for the staff and workers on the Site, and to
organize environmental promotional activities; and
 Advise the Contractor on the implementation of an environmental management
system.

Environmental Supervisor
Report to Environmental Supervisor, has responsibility for
 Prepare, implement and update the Environmental Management Plan;
 Advise on measures to be taken in the interest of environmental protection, and
implement such measures;
 Assist the Environmental Officer carrying out his duties;
 Carry out daily site environmental inspections based on a checklist approved by
the Engineer, and to ensure that follow-up action is taken promptly to rectify
defects and deficiencies identified;
 Attend the weekly environmental walk if required;
 Supervise and promote the execution of environmental protection works by the
workers on the Site;
 Attend SSEMC meetings and SSEC meetings; and
 Advise the Environmental Officer on the upkeeping of environmental
performance and standards of the Site;

Page 12 of 31
 Carry out daily site environmental inspections based on a checklist approved by
the Engineer, and to ensure that follow-up action is taken promptly to rectify
defects and deficiencies identified;
 Advise the Environmental Officer on the upkeeping of environmental
performance and standards of the Site;
 Assist the Environmental Officer carrying out his duties
 Conduct toolbox talks as assigned by the Contractor's agent after acquiring the
necessary qualifications.

Site Supervisor/Foreman
Report to Engineer, has responsibility for
 All site activities, including supervision of installation, coordination with all
relevant parties, as well as, technical support, repair activities and site quality,
environmental and safety matters.
 Key interfacing on site for co-ordinating the different teams.
 Directly managing the teams in charge of equipment for installation and will be
in interface with all site parties.
 Daily works arrangement
 Site co-ordination, housekeeping and safety, quality & environmental aspects.
 Checking of all material incoming in respect to the relevant/client’s requirements

Page 13 of 31
3 COMMUNICATIONS PROCEDURES
TSIT FUNG shares the environmental efforts with CLIENT’S, subcontractors, suppliers,
stakeholders and staffs. Besides, the communication system for handling all environmental
related feedbacks and reporting our environmental performance is already established.

3.1 COMMUNICATING WITH CLIENT’S


TSIT FUNG is encouraged to influence CLIENT’S and show how meeting the environmental
performance standards are synonymous with meeting this Project’s objectives. Throughout all
Project stages, TSIT FUNG keeps the on-going communication with CLIENT’S to:
 Identifying the agreed potential environmental impacts clearly.
 Programming the installation work practically with due consideration of time required for
environmental provisions.
 Exchanging the details of environmental commitment, environmental organization and
resources, environment programs and alternatives environmental practices.

3.2 COMMUNICATING WITH SUPPLIERS & SUBCONTRACTORS


TSIT FUNG aims to purchase and uses environmentally friendly products and services
whenever possible. Thus, a communication with our suppliers and subcontractors is built to
ensure all our suppliers and subcontractors are aware of Tsit Fung’s environmental
requirements and capable of meeting our environmental needs. Follows are a numbers of
activities that we take:
 Providing our suppliers of Tsit Fung’s environmental purchasing guideline.
 Providing our subcontractors of Tsit Fung’s environmental working instruction and
conducting environmental briefing to subcontractor’s staff.
 Establishing a long-standing relationship with major suppliers and subcontractors for
working together to achieve the environmental goals.
 Encouraging suppliers and subcontractors to provide their guarantees on environmental
friendly authenticity.

3.3 COMMUNICATING WITH STAKEHOLDERS


TSIT FUNG takes simple initiatives including report our environmental achievements and
communicate other information to help in raising general public community environmental
awareness. There are a number of ways we involve:
 Establishing a procedure to receive environmental complaints and suggestions for
improvement in environmental performances.
 Getting involved and supporting community environmental activities.

Page 14 of 31
3.4 ENVIRONMENTAL AWARENESS AMONGS STAFF
Tsit Fung’s ensure that all concerned staffs including subcontractors are aware of the
applicable environmental requirements in the Project. The Environmental
Officer/Environmental Supervisor is responsible for scheduling specific induction training, tool
box talk, environmental briefing and training sessions for site staff and staff of subcontractors.
These sessions will cover the environmental requirements, management and mitigation
measures, the environmental objectives, targets and programme, environmental nuisance
abatement and waste management

3.5 ENVIRONMENTAL REPORTING & SITE MEETING


The Contractor shall submit a monthly report on environmental management for discussion in
the SSEMC meeting. The monthly report shall be prepared by the Environmental Officer as
mentioned in clause 1(2)(a) and duly endorsed by the Contractor’s agent containing the
following information:
(a) A summary of pollution incidents and remedies, comprising:
(i) Complaints
(ii) abatement notices issued by EPD
(iii) offences spotted by EPD during inspections
(iv) summonses of environmental offences
(b) A list of major forthcoming activities in the next two months which will likely
have environmental impacts or cause nuisances to the surroundings, together
with the proposed control or mitigation measures;
(c) The training programme for the next month and records of training arranged/conducted in
the previous month pursuant to clause 1(4) above;
(d) The updated organization chart on environmental management;
(e) A summary of defects and deficiencies identified during inspections and weekly
environmental walks, together with the follow-up actions and remedies taken to prevent similar
recurrences.
Followings are several reporting and meeting we are going to take for ensuring the
environmental performance is communicated:
Communication Means Frequency
Site Safety and Environmental Management Monthly
Committee (SSEMC) meetings
Site Safety and Environmental Committee Monthly
(SSEC)meetings
Non-compliance or complaint Immediate site investigation and remedial
action as appropriate, report to all relevant
parties involved.
Monthly Report Monthly- at least five working days before
the SSEMC meetings

Page 15 of 31
The following items should be included in the agenda for discussion at every SSEMC meeting
and SSEC meeting
 Review the sufficiency of the measures in the EMP and proposals for improvement;
 Monitor the Contractor’s environmental performance and achievement with reference to
EMP;
 Access the effectiveness of EMP taking into account the Contractor’s environmental
performance and achievement; and
 Monitor the follow-up action by the Contractor on the defects and deficiencies identified in
weekly inspections
ENQUIRIES, COMPLAINTS & REQUEST FOR INFORMATION
Enquiries, complaints and requests for information regarding the Environmental Management
System can be expected from a wide range of individuals including CLIENT’S, other
contractors on site, members of the public, governmental departments, the media and
community groups. Correspondence of this nature will be sent jointly to Tsit Fung’s Projects
Manager and the CLIENT’S's representative to be resolved in accordance with this plan
and/or in accordance with the CLIENT’S's own internal procedures.

4 SUMMARY OF ENVIRONMENTAL IMPACTS & MITIGATION PLANS


4.1 STATUTORY COMPLIANCE
The following HKSAR’s legislation and customer contractual documents have been identified
and complied as the applicable environmental legislation which covers Tsit Fung’s activities
under this Project:
 Air Pollution Control Ordinance (Cap 311) (Cap 311R)
 Air Pollution Control (Construction Dust) Regulation;
 Water Pollution Control Ordinance (Cap 358)
 Waste Disposal Ordinance (Cap 354)
 Waste Disposal (Chemical Waste) (General) Regulation (Cap 354C)
 Waste Disposal (Charges for Disposal of Construction Waste) Regulation (Cap 354N)
 Noise Control Ordinance (Cap 400)
 Environmental Impact Assessment Ordinance (Cap 499)
Besides, relevant codes of practices, practices notes, guides, guidance notes, technical
memoranda and CLIENT’S’s rule and regulation are always be referred when determining the
environmental aspects.
Environmental Officer is responsible to obtain any necessary amendments to above-
mentioned statutory documents and ensure the updated information is communicated and
captured by the Project.

Page 16 of 31
4.2 IDENTIFICATION OF SIGNIFICANT ENVIRONMENTAL ASPECTS
Before the commencement of this Project, Environmental Officer, with the inputs from Project
Director / Project Manager, will be responsible to identify the environmental aspects of the
activities that it can control or, over which it can be expected to have an influence.
Environmental Officer also determines which environmental aspects have or can have a
significant impact on the environment. The criteria include (but not limit to) previous project
experience, professional and management judgment, advises from environmental team,
employees, consultants, client’s representative, or professional bodies.
For these significant impacts, possible control and/or mitigation measures will be put in place
to manage or improve the impact to an acceptable level. The identification results and
mitigation measures are presented in Annex 4 & Annex 5 of this EMP.

4.3 ENVIRONMENTAL IMPACTS & MITIGATION PLAN


For this Project, the main environmental aspects and possible impacts come from the
installation works. The majority of the installation works on this project will be carefully
planned in the order stage to minimize the potential environmental impact. A summary of the
identified environmental impacts and relevant mitigation measures is shown below.

Air Pollution Control


For this Project, no environmental license requirement applies. The majority of the works is
simple installation works, thus no significant air polluting work is involved. However, small
amounts of suspended particles, dust and debris are emitted and Tsit Fung’s conducts the
following control measures to minimize the impact to air quality:
 Maintaining a high standard of housekeeping on site.
 All vehicle engines are required to be turned off when they are not in use.
 Damping all dusty materials on proper waste bins before leave the working site.
 Inspecting vehicles regularly to ensure that exhaust emissions are not causing nuisance,
such as dark smoke emission
 All motorized vehicles on site are restricted to a maximum speed of 8km per hour.
 All haulage and delivery vehicles are restricted to designated roadways inside the site.
 Only unleaded fuel or ultra low sulphur diesel is allowed to use for motorized vehicles.
 All ozone depleting substances are not allowed to use in the execution of the Project.
 All asbestos materials are not allowed to use in the execution of the Project.

Water Pollution Control


Tsit Fung will minimize the generation of wastewater from the Site through the following
means:
 Prevent the surface from washing across the Site and spilling over to areas outside of the
Site, which should include the layout plan for collection of wastewater, the provision

Page 17 of 31
for its treatment before discharge and the method of disposal of sewage effluent from
the Site;

Noise Control
No significant noise-generated mechanical equipment is used in this project, because the
majority of the works are installation, testing and commissioning. Acoustic control required for
all used machinery is complying with the Noise Control Ordinance (Cap 400). No noise permit
for “Powered Mechanical Equipment” is required in this project.

Page 18 of 31
Planning
TSIT FUNG has considered the following areas during the planning stage, in order to reduce
noise problem:
 The installation work will be carried out in the CLIENT’S’ designated areas and any
generated noise will be contained within that area.
 No noisy activity is carried out beyond the restricted hours.
 Avoiding simultaneous operation of several noisy activities close to a noise sensitive
receiver to reduce the cumulative impacts.

4.3.1.1 Precaution & Control Measures


Following measures were conducted to minimize noise arising during work:
 Switching off or throttling down any idle equipment, especially for Powered Mechanical
Equipment.
 Regular maintaining all equipment, especially for Powered Mechanical Equipment, to
avoid noise from abnormal operation.
 Starting up vehicles and equipment sequentially rather than all together.
 For site staffs, ear muffs are strictly required to wear when working under noisy
environment or using Powered Mechanical Equipment.

Waste Management
A waste management scheme is developed for achieving waste avoidance, reduction,
treatment and disposal measures for SHSI. It has divided three types of waste

4.3.1.2 Inert Construction and Demolition (C&D) Waste


Wastes suitable for filling material derived from the following uncontaminated product groups:
clay brick, concrete, mortar, asphalt waste and trimmings, and cement products. These
materials should be transferred to public filling areas. Materials like concrete and asphalt can
also be recovered for construction re-use.

4.3.1.3 Non-inert C&D Waste


Non-inert C&D waste comprises of bamboo, timber, vegetation, packaging waste and other
organic materials. In contrast to public fill, non-inert waste is not suitable for land reclamation
and subject to recovery of reusable / recyclable items, is disposed of at landfills.

Page 19 of 31
4.3.1.4 Municipal Solid Waste
Mixed wastes arising from catering activities, office activities and general domestic waste
which may include (without limitation) putrescibles such as oil, grease, discarded food; food
containers, paper, cardboard, timber, plastics and metal packaging; and other domestic waste
products.

The following sections outline the measures taken.

4.3.1.5 Planning for Waste Reduction


TSIT FUNGhas planned ahead before the project commencement, in order to reduce the
amount of waste generated. Following measures are considered:
 Purchasing environmental friendly materials that can be re-used or recycled.
 Coordinating with clients, suppliers and sub-contractors to minimize over-ordering and use
biodegradable plastic packaging materials, and then wastage of materials.
 Checking consistency of drawings and specifications to avoid unnecessary re-work.
 Implementing an effective materials control system to minimize material loss and ensuring
the efficient use of materials.
 If possible, using alternative materials and practices which generated less amount of
wastes.
 Providing training to all staffs for adopting recycling and re-use practices of materials.

4.3.1.6 Waste Handling


All wastes generated are divided into four categories for disposal at landfills or public filling
areas, which have different handling methods:

4.3.1.6.1 Excavated Materials


No excavated material may be generated by this installation, test and commissioning works.

Page 20 of 31
4.3.1.6.2 Construction & Demolition (C&D) Wastes
Small amounts of C&D wastes are generated during the installation, testing and
commissioning activities. The C&D materials will be included
 Scrap metal/plastic materials from demolition of existing systems/structures/equipment
 Wood crates/drums, plastics, plastics foam, paper, and rubber from packaging waste
for new systems/instruments/equipment
 Unusable/surplus materials from the installation works and
 Site clearance
For the temporary storage of C&D material, it will be preferably at the immediate working area.
The sorted and processed C&D materials shall be promptly removed from site to minimize
temporary stockpiling and to optimize the use of sorting areas. All C&D wastes shall be sorted
into inert portion (e.g. rock, brick and concrete, etc) as public fill and non-inert portion (e.g.
wood, paper, materials) as landfill wastes. The C&D wastes are required to dispose at the
location in the following table
Types of Waste Location
Inert C&D Waste (Public Fills) Public Filling Area Tuen Mun Area 38
Non-inert C&D Waste  WENT Landfill
 NENT Landfill
 SENT Landfill

4.3.1.6.3 Chemical Waste


TSIT FUNG will apply the license to be the Chemical Waste Producer if there is possible
chemical wastes generated by this project. It may include: spent lube oil, spent solvent, spent
lubricating/mineral oil, spent grease, paint residues. All chemical wastes will be temporary
disposed in the chemical waste container and TSIT FUNG will employ licensed chemical
waste collectors to collect the chemical waste.

4.3.1.6.4 General Refuse


Only solid waste is identified for this Project. Following handling measures are carried out:
 Purchasing materials with minimized packaging and encouraged suppliers to reuse or
recycle the original packaging materials.
 Storing and disposing all general refuse in waste skips and garbage bins with proper
covers.
 Ensuring a reputable waste collector to remove general refuse.

Page 21 of 31
Dangerous Goods Control
Dangerous good (as defined by Dangerous Goods (General) Regulation) used in the project
will be stored in the DG store. Tsit Fung will apply for the Dangerous good Storage License.

Chemical Management
For this project, Chemical will be used. It includes: Paints, Spent lubricating/mineral oil.

If it is confirmed that these chemical are sued, following handling measures are required to
apply, if applicable:
 Appropriate "Materials Safety Data Sheet" is prepared and kept.
 Properly labeling, packaging and temporarily storing all chemical in a designated chemical
storage area if applicable.
 Developing and implementing a contingency scheme for handling potential chemical
spillage or accidents in the chemical storage area.
 Storing all chemicals in tanks with a minimum capacity of 110% of chemical storage bins
or tanks.
 The chemical storage area is sheltering from rain water.
 Only authorized staff is allowed to access and use the chemicals.
 Prior to using the chemicals, briefing is arranged to personnel involved for the discussion
on potential hazard and information highlighted in the "Materials Safety Data Sheet".
 Keeping the inventory records for the chemical.

The chemical waste should only be disposed by the licensed chemical waste collector and
transferred to designated and licensed reception point for further treatment.

Energy Conservation
Several measures are taken to reduce the use of energy, most of which involved simple and
effective practices that require minimal time and effort.
 Switching off lighting and electrical equipment when not is use.
 Proper scheduling and monitoring the works to avoid rework or defects.

Ecology
Care is taken before commencement of any work inside a site boundary that there is no threat
to the ecology.
 Prohibit any dumping of rubbish, food, oil or chemicals outside the side boundary.
 Prohibit any accessing or working on restricted areas.

Page 22 of 31
Material Resources Management
TSIT FUNG uses environmental criteria in selecting suppliers and subcontractors for the
materials and services provided. By all means, TSIT FUNG will procure only from sustainable
resources in order to reducing environmental impacts associated with use of materials and
services.
All project activities are designed to optimise the use of materials so as to minimize waste and
scrap. All purchasers of materials shall consider minimizing waste through careful estimation
of quantities required and careful consideration of any environmental impacts created for
materials and services purchased. Also, a clear understanding and control of material
restrictions is necessary.

Consumption and Waste Disposal Figures


The consumption figures on electricity and fuel, and waste disposal figures will be minimized.

General Housekeeping
Site staff will conduct daily site inspections to determine that the requirements of this
Environmental Management Plan are met. Site staff will further check against the site
cleanliness as well as following general housekeeping measures:
 Common areas will be maintained in clean and sanitary conditions at all times.
 All site areas are kept free from liter and rubbish.
 All passageways, staircases, corridors and means of escape routes will always be kept
clear.
 Oily and greasy rages will be stored in metal bins and handled and disposed of as
chemical waste.
 Tools will not be left unattended on the site areas that could potentially cause an accident.
 All lighting and ventilation facilities will be kept clean and unobstructed at all times.
 The floor of work places will be kept in a non-slippery condition.

Environmental Mitigation Implementation Schedule


The Environmental Mitigation Implementation Schedule is prepared for the project. It lists out
all details of above identified and applicable environmental mitigation measures. It is saved in
the company server for providing guidelines for implementation of the measures.

Page 23 of 31
5 ENVIRONMENTAL PROCEDURES
5.1 ENVIRONMENTAL TRAINING, AWARENESS & COMPLIANCE
In order to ensure that staff at all levels are aware of the importance of environmental
procedures and Tsit Fung’s commitment to enforce the EMP. The following shall be
implemented:
 Extracts of the EMP shall be issued to TSIT FUNG staff and subcontractors.
 The Project Manager or his representative shall hold meetings with responsible staffs and
subcontractors to explain Tsit Fung’s commitment and enforcement of the EMP.
 TSIT FUNG will provide, if necessary, introductory briefing and training to responsible
staffs and sub-contractor's workers regarding the environmental control and EMP
enforcement.
 TSIT FUNG will conduct regular environmental training / toolbox talks. All training records
would be maintained.
 Display approved publicity posters on appropriate locations and the notice board.
 The subcontractor shall assign supervising or management staff who will be responsible
for environmental matters and, report and respond to the Project Manager.
 Regularly circulate the environmental newsletter.
 The CLIENT’S’s Environmental Policy and the associated environmental requirements are
communicated to all TSIT FUNG and subcontractor through site meeting and briefing.

5.2 ENVIRONMENTAL EMERGENCY PROCEDURES


All site personnel shall be informed of procedures that should be carried out in case of the
following emergency situations, whether caused by SHSI, subcontractors, or other contractors:
 Chemical spillage;
 Excessive dust;
 Unknown smell or odour;
 Excessive heat or high temperature, or break out of fire;
 Typhoons and heavy rainstorms.
Depending on the type of incident and severity, the project team leader should take the
following actions, if necessary:
 raise alarm immediate vicinity, evacuate the area and conduct a head count;
 lead the emergency evacuation;
 if considered safe, switch off equipment;
 raise alarm at main works site and report to supervisory or senior management;
 investigate and rectify situation; and
 report the incidence to senior management through the Incident Advice.

Page 24 of 31
IMS Section will conduct drill exercises for ensuring the effective implementation of above
emergency procedures. After each drill exercises, the effectiveness will be reviewed. If
necessary, modification to existing emergency procedure will be followed.
Chemical storage, labeling, transportation and spillage plan should be followed as per
guidance given in the Code of Practice of Chemical Waste if appropriate.
Project Manager shall investigate the case and report the details to CLIENT’S’s representative
immediately after occurrence of case. If there is any warning or environmental prosecution
issued by Authorities, Project Manager will immediately notify CLIENT’S’s representative.

5.3 DOCUMENTATION
Tsit Fung’s will maintain records to document the main elements of the EMP. The location of
these documents will be determined by the Project Manager and kept in the project offices so
that any employee can easily access and retrieve information as required. The Environmental
Management System of this Project consist the following documentation structure:
 Environmental legislation (ordinances, technical memoranda, codes of practice and
guidelines) for reference purposes
 Environmental Management Plan
 Environmental Mitigation Implementation Schedule
 Records of permits and licenses
 Records of complaints
 Equipment maintenance / calibration records
 Internal and external audit reports
 Operating procedures and work instructions
 Meeting records
 Records of training and briefing
In addition, communications, correspondence and reporting records between Tsit Fung’s and
external parties will be registered. These documents include:
 communications between the CLIENT’S, Tsit Fung’s and Sub-contractors;
 correspondence with the governmental departments, when related to environmental
matters;
 communications with the Tsit Fung’s Environmental Team;
 Minutes of environmental management site meetings.

Page 25 of 31
5.4 DOCUMENT CONTROL
TSIT FUNG recognizes that maintaining updated documents and records is a critical part of its
environmental management system. In order to ensure that document control is maintained,
the ISO 9001 quality management system method of registering and controlling documents
and their revisions will be used.
The Tsit Fung’s document control system will, therefore, ensure that documents (such as the
EMP, regulations etc.) are:
 located easily;
 identifiable, dated (with reference to current and previous revisions) and maintained safely;
 periodically reviewed and approved for adequacy;
 updated and available to relevant parties;
 the retention period for all records are 7 years after project completion or as specified by
CLIENT’S; and
 Retained for any legal or auditing related purposes, if obsolete, but identified as such.

Page 26 of 31
5.5 ENVIRONMENTAL INSPECTION/PERFORMAANCE MONITORING
In order to establish an environmental monitoring programme. Tsit Fung’s will ensure that the
monitoring programme is a comprehensive but straightforward activity. The most important
step will be to establish and maintain documented procedures for the monitoring of the key
characteristics of Tsit Fung’s operations that may have a significant impact on the
environment. The environmental checklist is attached in Annex 2 and 3 and will be used to
assist in the monitoring.

Environmental Supervisor will conduct daily site environmental inspections based on a


checklist.(Annex 2)
Environmental Officer, the Contractor’s Agent, and client’s Engineer will conduct the weekly
environmental walk to check the environmental performance of the Site is satisfactory and in
compliance with the requirements under the Contract and EMP. A comprehensive checklist for
use in weekly environmental walk is attached in Annex 3.

5.6 COMPLAINTS, NON-CONFORMANCE & CORRECTIVE / PREVENTIVE


ACTION
For all complaints and non-conformances regarding the Environment Management System,
Tsit Fung’s will correct the problems and attempt to prevent their recurrence. The problem will
not only be identified, but the cause will be examined in order to understand why it occurred
and how it can be prevented.
Procedures will be prepared as part of the Environmental Management Plan which will:
 define the responsibility for handling and investigating non-conformance (in most cases it
will be the staff member responsible for the action plan);
 evaluate and mitigate the resulting impact(s) on the environment; initiate and complete
corrective and preventive action (restore compliance as quickly as possible); and
implement and record changes to documented procedures that result from corrective and
preventive action. The Project Manager in co-operation may also carry out cause analysis
with the employee responsible for the area of operations. This will detail the incident, loss,
immediate cause, basic cause and lack of control. This analysis can be used in auditing to
help assess the effectiveness of corrective and, more importantly, preventive measures.
 Inform the Engineer about all complaints and non-conformances and agree with the
Engineer on the mitigation measures.

5.7 PROGRAMME FOR UPDATING ENVIRONMENTAL MANAGEMENT PLAN


TSIT FUNG will review the EMP after each internal environmental audit. TSIT FUNG will
follow these recommendations made from the initial in order to honour their commitment to
continual improvement.
The Project Manager will review the EMP to ensure the plan remains suitable, adequate and
effective. A comprehensive evaluation will be conducted involving all environmental aspects,

Page 27 of 31
environmental auditing undertaken, and all relevant information. The review will also be
documented.
The review will take into consideration: any changing circumstances (processes, legislation,
and input from interested parties, updated pollution control, upgraded prevention equipment
and environmental incidents) and a commitment to continuous improvement.
The results of the review will be used in the planning and implementation of improvements to
the EMP or the environmental policy statement and, therefore, changes throughout the EMP
itself. The CLIENT’S will be notified and seek approval of any changes made to the EMP.

Page 28 of 31
5.8 CONTROL OF SUBCONTRACTOR
TSIT FUNGuses environmental criteria and commitment in selecting subcontractors. All
subcontractors are encouraged for the environmentally sound work practices and avoid those
that are damaged to the environment.
During the project execution, subcontractor shall:
 Follow all responsibilities set out in the subcontractor agreement and this EMP.
 Comply with legislative and Tsit Fung’s environmental requirements and site regulations.
 Identify and report any environmental problems on site.
 Ensure all their employee complies with environmental requirements.
The performance of subcontractor on environmental management is checked through different
channels such as: site checking by Site Foreman, feedback or complaints raised by
CLIENT’S’s representatives, internal environmental audit by or CLIENT’S, annual re-
assessment, etc.
If any noncompliance found for subcontractor’s works on environmental management, Project
Manager investigates with subcontractor, and develops the corrective and preventive action
required, as well as report non-compliance, and the effectiveness of corrective and preventive
actions to CLIENT’S’s representatives as soon as possible.

5.9 SITE INPSECTION


To ensure all site works comply with requirements of environmental management, Project
Manager / Environmental Officer shall check the environmental elements during the routine
site inspection. If there is any non-compliance found, Project Manager / Environmental Officer
shall inform Project Manager for determining the corrective and preventive action. Records of
the site inspection should be made after site inspection. Besides, a monthly inspection record
is required to complete by Project staff / Environmental Officer or delegated. The copy of
Monthly Environmental Inspection Checklist is shown in Annex 3.

Page 29 of 31
ANNEX I: ENVIRONMENTAL POLICY

Page 30 of 31
ANNEX 2: ENVIRONMENTAL CHECKLIST
Project No. 工程編號 : Site Location 工地位置 :

Date of Inspection 巡查日期 : Inspected by 巡查員:

Check Item 巡查項目 Result If No, Why? Follow-up


巡查結果 如結果是”否”,原 action
因? 跟進行動
Chemical Handling 化學物品處理
1 Any Chemical used on site? Yes; Complete following. 有,回答以下巡查項目.
在工地有否使用化學品?
No; Jump to Q.6 沒有, 跳至問題 6 .
2 Chemical storage location and containers Yes 是 No 否
are prepared 有適當的化學品存放區及容器
3 Check the following:
檢查下列各項:
Warning label & chemical identification are
stuck Yes 是 No 否
已張貼警告牌和化學品標籤
Maximum storage capacity label are stuck Yes 是 No 否
已張貼最高容量標籤
Chemicals are properly stored in containers Yes 是 No 否
化學品存放在容器內
Containers are in good condition & properly
lidded Yes 是 No 否
容器保持完好無缺和封蓋保持緊鎖
Keep clean and dry for storage containers &
areas Yes 是 No 否
保持化學廢物貯存範圍及容器整潔和乾爽
Different chemicals are stored separately Yes 是 No 否
不同化學品已分開存放
4 Related “Material Safety Data Sheets” are Yes 是 No 否
available 有適當的”化學品安全資料指示”
5 All delivery notes for chemicals received are
sent back to head office Yes 是 No 否
所有化學品的送貨單已交回辦公室以作記錄

Page 31 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
巡查結果 如結果是”否”,原 action
因? 跟進行動
Chemical Waste Handling 化學廢料處理
6 Any Chemical Waste stored on site? Yes; Complete following. 有,回答以下巡查項目.
在工地有否存放化學廢料?
No; Jump to Q11. 沒有, 跳至問題 11.
7 Chemical Waste containers and storage
location are prepared 有適當的化學廢料容 Yes 是 No 否
器及存放區
8 Check the following:
檢查下列各項:
Warning label & chemical waste
identification are stuck 已張貼警告牌和化學 Yes 是 No 否
廢料標籤
Chemical Wastes are properly stored in Yes 是 (No 否
containers 化學品存放在容器內
Containers are in good condition & properly
lidded Yes 是 No 否
容器保持完好無缺和封蓋保持緊鎖
Keep clean and dry for storage containers &
areas Yes 是 No 否
保持化學廢物貯存範圍及容器整潔和乾爽
Chemical Waste storage location is far
away from drainage system. Yes 是 No 否
化學廢物貯存範圍跟水渠保持距離
9 If required, related “Chemical Waste
Producer Licenses” are available on site.
Yes 是 No 否
如須要,在工地有適當的”化學廢料產生者牌
照”
10 Chemical wastes collected in last month?
If yes, fill-in following information:
在對上一個月有否回收化學廢料,如有,填
寫下列資料: Yes 是 No 否
Date of last collection:
收集日期:
Collector Name:
收集商名稱:

Page 32 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
查結果 如結果是”否”, action
原因? 跟進行動
Waste Water Handling 污水處理
11 Waste water is properly discharged to
assigned drainage system. No waste water
is discharged outside the site. Yes 是 No 否
污水只在指定的污水排放處排放。沒有污水
流出工地範圍以外。
12 No excess waster water was stored inside
the site Yes 是 No 否
沒有多餘的污水貯存在工地內
Waste Handling 廢物處理
13 Normal wastes are properly stored in
covered garbage bin (if with cover or lid) Yes 是 No 否
貯存普通垃圾在有蓋垃圾桶內(如有蓋)
14 Properly dispose all normal wastes Yes 是 No 否
適當棄置普通垃圾

Air Pollutant Control 防止空氣污染


15 Visible air pollutant produced during Yes; Complete following. 有,回答以下巡查項目.
operation?
No; Jump to Q.20 沒有, 跳至問題 20 .
工作過程中有沒有排放肉眼可見的塵埃?
16 Properly reduce or eliminate the visible
air pollutant produced Yes 是 No 否
工作時, 適當地減低或除去產生的塵埃
17 Properly wear mask or other necessary
personal protective equipment Yes 是 No 否
員工已適當地載上口罩或其他所須的個
人防護裝備
18 Properly clean the visible air pollutant
produced & cumulated on site Yes 是 No 否
已適當地清理產生及積存在工地的塵埃
19 No smoke emitted from electricity
generator (if use) Yes 是 No 否
發電機沒有排放黑煙(如有裝設)

Page 33 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
巡查結果 如結果是”否”, action
原因? 跟進行動
Noise Control 噪音控制
20 Any abnormal or excess noise produced Yes; Complete following. 有,回答以下巡查項目.
during operation?
工作過程中有沒有產生不正常或過量的噪音? No; Jump to Q.24 沒有, 跳至問題 24 .
21 Properly eliminate or reduce noise
generated Yes 是 No 否
適當地除去或減低所產生的噪音
22 Staff properly wear ear-mask or other
necessary personal protective equipment
Yes 是 No 否
員工己適當地載上耳塞或其他所須的個人防
護裝備
23 Properly maintain and operate the
equipment for ensuring no abnormal noise
is produced Yes 是 No 否
適當地對所有工具保養及操作以防止產生噪

24 No noisy work is conducted outside the
noise emission permitted timeframe Yes 是 No 否
沒有在指定噪音管制時間以外進行發出噪音
的工作
Vehicle Control 工程車輛控制
25 Any vehicle assigned and used under this Yes; Complete following. 有,回答以下巡查項目.
project?
此工程有沒有專用工程車輛? No; Jump to Q.29 沒有, 跳至問題 29 .
26 No smoke produced from vehicle Yes 是 No 否
沒有排放黑煙
27 Keep vehicle in good condition and
appearance Yes 是 No 否
車輛須保持良好狀態及外觀整潔完好
28 Properly handle the disposed material such
as battery, tire, grease oil, etc. Yes 是 No 否
已正確處理及棄置所有車輛之損耗物品。包
括電池,車呔,油格及機油等

Page 34 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
巡查結果 如結果是”否”, action
原因? 跟進行動

Resource & Energy Saving 資源及電源節省


29 Properly maintain and operate the
equipment to ensure no excess energy is
used Yes 是 No 否
適當地保養及操作所有工具以節省電力的使

30 Electrical equipment are switched off after
work Yes 是 No 否
使用後關掉電力設備以節省電力
Environment Incident Reporting 環保事故報告
31 Any environmental incident(s) occurred
within last month? If Yes, please describe
details & follow-up action.
在過去一個月有否發生環保事故,如有,請 Yes 是 No 否
詳述事故及跟進行動。

Other Inspection Items & Follow-up Action (Attach as per request) 其他巡查及跟進事項: (需要時可另加紙
張) :

Inspector Signature
巡查員簽署

Page 35 of 31
ANNEX 3: WEEKLY ENVIRONMENATL INSPECTION REPORT

Page 36 of 31