Environmental Management Plan
Environmental Management Plan
Environmental Management Plan
Prepared by:
Reviewed by:
Approved by:
I. TABLE OF CONTENTS
II. DISTRIBUTION LIST ...........................................................................................4
III. DEFINITION / ABBREVIATION...........................................................................4
1 INTRODUCTION ..................................................................................................5
1.1 SCOPE & OBJECTIVE ..............................................................................................5
1.2 DESCRIPTION OF WORK ........................................................................................5
1.3 STRUCTURE OF PLAN ............................................................................................9
1.4 COMPANY ENVIRONMENTAL POLICY STATEMENT .............................................9
2 ENVIRONMENTAL ORGANIZATION ...............................................................10
Page 1 of 31
2.1 ENVIRONMENTAL STAFF ORGANIZATION STRUCTURE ...................................10
2.2 ROLES & RESPONSIBILITIES OF KEY PERSONNEL ...........................................10
2.3 ENVIRONMENTAL TEAM .......................................................................................11
Project Manager .............................................................................................................11
Engineer .........................................................................................................................11
Environmental Officer .....................................................................................................11
Environmental Supervisor ...............................................................................................12
Site Supervisor/Foreman ................................................................................................13
Report to Engineer, has responsibility for .......................................................................13
3 COMMUNICATIONS PROCEDURES ...............................................................14
3.1 COMMUNICATING WITH CLIENT’S .......................................................................14
3.2 COMMUNICATING WITH SUPPLIERS & SUBCONTRACTORS ............................14
3.3 COMMUNICATING WITH STAKEHOLDERS ..........................................................14
3.4 ENVIRONMENTAL AWARENESS AMONGS STAFF..............................................15
3.5 ENVIRONMENTAL REPORTING & SITE MEETING ...............................................15
ENQUIRIES, COMPLAINTS & REQUEST FOR INFORMATION ......................................16
4 SUMMARY OF ENVIRONMENTAL IMPACTS & MITIGATION PLANS ...........16
4.1 STATUTORY COMPLIANCE ...................................................................................16
4.2 IDENTIFICATION OF SIGNIFICANT ENVIRONMENTAL ASPECTS ......................17
4.3 ENVIRONMENTAL IMPACTS & MITIGATION PLAN ..............................................17
Air Pollution Control ........................................................................................................17
Water Pollution Control ...................................................................................................17
Noise Control ..................................................................................................................18
Planning 19
4.3.1.1 Precaution & Control Measures ......................................................................19
Waste Management ........................................................................................................19
4.3.1.2 Inert Construction and Demolition (C&D) Waste .............................................19
4.3.1.3 Non-inert C&D Waste .....................................................................................19
4.3.1.4 Municipal Solid Waste ....................................................................................20
4.3.1.5 Planning for Waste Reduction ........................................................................20
4.3.1.6 Waste Handling ..............................................................................................20
4.3.1.6.1 Excavated Materials ...................................................................................20
4.3.1.6.2 Construction & Demolition (C&D) Wastes ..................................................21
4.3.1.6.3 Chemical Waste .........................................................................................21
4.3.1.6.4 General Refuse ..........................................................................................21
Dangerous Goods Control ..............................................................................................22
Chemical Management ...................................................................................................22
Energy Conservation ......................................................................................................22
Ecology...........................................................................................................................22
Material Resources Management ...................................................................................23
Page 2 of 31
Consumption and Waste Disposal Figures .....................................................................23
General Housekeeping ...................................................................................................23
Environmental Mitigation Implementation Schedule ........................................................23
5 ENVIRONMENTAL PROCEDURES ..................................................................24
5.1 ENVIRONMENTAL TRAINING, AWARENESS & COMPLIANCE ............................24
5.2 ENVIRONMENTAL EMERGENCY PROCEDURES ................................................24
5.3 DOCUMENTATION .................................................................................................25
5.4 DOCUMENT CONTROL ..........................................................................................26
5.5 ENVIRONMENTAL INSPECTION/PERFORMAANCE MONITORING .....................27
5.6 COMPLAINTS, NON-CONFORMANCE & CORRECTIVE / PREVENTIVE ACTION27
5.7 PROGRAMME FOR UPDATING ENVIRONMENTAL MANAGEMENT PLAN .........27
5.8 CONTROL OF SUBCONTRACTOR ........................................................................29
5.9 SITE INPSECTION ..................................................................................................29
ANNEX I: ENVIRONMENTAL POLICY .................................................................30
ANNEX 2: ENVIRONMENTAL CHECKLIST .....................................................31
ANNEX 3: WEEKLY ENVIRONMENATL INSPECTION REPORT ....................36
Page 3 of 31
II. DISTRIBUTION LIST
Location Holder Copy Status
Page 4 of 31
1 INTRODUCTION
1.1 SCOPE & OBJECTIVE
This Environmental Management Plan (EMP) has been prepared for the Project for
“Repainting of the Suspenders”. It describes how environmental issues will be managed
and, covers Tsit Fung’s environmental policy, organization, implementation, monitoring and
review procedures with respect to this subject and the requirement of HKSAR and CLIENT..
The objective of this EMP is to detail our approach to efficient and effective environmental
management throughout the life cycle of the Project.
Q
u
a
l
i
t
y
M
a
n
a
g
e
m
e
n
t
Page 5 of 31
ii. N
o
i
s
e
C
o
n
t
r
o
l
M
a
n
a
g
e
m
e
n
t
iii. E
n
e
r
g
y
S
a
v
i
n
g
M
a
n
a
g
e
m
e
Page 6 of 31
n
t
iv. W
a
s
t
e
(
C
h
e
m
i
c
a
l
a
n
d
W
a
s
t
e
w
a
t
e
r
)
M
a
n
a
g
e
m
e
n
t
Page 7 of 31
v. M
a
t
e
r
i
a
l
R
e
s
o
u
r
c
e
s
M
a
n
a
g
e
m
e
n
t
vi. E
c
o
l
o
g
y
Page 8 of 31
1.3 STRUCTURE OF PLAN
In addition to this introductory section, the EMP consists of the following sections:
Section 2 Environmental Organization - Details of the Tsit Fung’s Environmental
Organization which identify the key personnel, their roles and responsibilities,
Section 3 Communications Procedures – Details of internal and external communications
procedures regarding environmental matters.
Section 4 Summary of Environmental Impacts and Mitigation Plans - A summary of the
environmental considerations, their impacts and appropriate investigation plans.
Section 5 Environmental Procedures - Details of specified environmental procedures to be
implemented.
Page 9 of 31
2 ENVIRONMENTAL ORGANIZATION
TSIT FUNG has established a supporting organization structure for implementing, monitoring
and improving the Environmental Management System. Details of organization, role and
responsibilities are stated hereafter.
Project
Manager/Site
HKSAR
Agent
Environmental
Protection
Department,
Environmental MTR’s
Officer Representatives
& External
Concerned
Parties
Environmental
Supervisor
Foreman/
Subcontractors
Line of
communication
Page 10 of 31
2.3 ENVIRONMENTAL TEAM
Tsit Fung’s Project Manager will be overall responsible for Environmental Management
System, and shall be directly responsible for enforcing and implementing the EMP including
the applicable statutory and contractual obligations. The Project Manager or his
representative shall liaise with and enter into regular meetings with the CLIENT’S’s
Environmental Team. The Project Manager or his representative will also instruct and monitor
all staffs, if any, to follow the EMP requirements and action plan.
Tsit Fung’s Project Manager or his representative shall carry out the supervision and assist to
carry out duties, such as environmental auditing, reporting, site inspections, training and
liaison with sub-contractors.
A brief description of the roles and responsibilities for key personal is shown as below.
Project Manager
Report to the General Management of the Tsit Fung and has responsibility for
Ensuring the successful implementation and completion of the project.
Achieving the key success criteria for the project and ensuring that all
requirements of the specification are met on time and to budget.
The risk management of the project and for ensuring the required level of
Quality, Environmental and Safety standards are maintained throughout the
project
Engineer
Report to the Project Manager, has responsibilities for
Overall day-to-day running of the project. He will be the single point of contact
for instructions or contractual matters between client and Tsit Fung.
Achieving the key success criteria for the project;
Ensuring that all the requirements of the specification are met regarding time,
quality and budget;
The risk management of the project;
The configuration management;
Ensuring that the required level of quality, environmental and safety is
maintained throughout the project; and
Resource management throughout the lifecycle of the project
Responsible also for all commercial, financial, technical, risk management
oversight and control for the project, client and subcontractors.
Environmental Officer
Report to Project Manager, has responsibility for
Prepare, implement and update the Environmental Management Plan;
Page 11 of 31
Advise on measures to be taken in the interest of environmental protection, and
implement such measures;
Carry out inspections of the Site for identifying potential hazards to the
environment, and to report findings with recommendations for corrective
actions;
Participate in the weekly environmental walks (whether this is combined with
the weekly safety walk or otherwise) with the nominated site staff of the
Engineer, and to supervise and monitor the environmental performance on the
Site;
Check and ensure that any polluting or potentially polluting situation is promptly
rectified;
Attend Site Safety and Environmental Management Committee (SSEMC)
meetings and Site Safety and Environmental Committee (SSEC) meetings;
Compile the monthly environmental report for submission to the Engineer at
least five working days before the SSEMC meetings;
Arrange and provide the environmental training including the site specific
induction training and toolbox talks for the staff and workers on the Site, and to
organize environmental promotional activities; and
Advise the Contractor on the implementation of an environmental management
system.
Environmental Supervisor
Report to Environmental Supervisor, has responsibility for
Prepare, implement and update the Environmental Management Plan;
Advise on measures to be taken in the interest of environmental protection, and
implement such measures;
Assist the Environmental Officer carrying out his duties;
Carry out daily site environmental inspections based on a checklist approved by
the Engineer, and to ensure that follow-up action is taken promptly to rectify
defects and deficiencies identified;
Attend the weekly environmental walk if required;
Supervise and promote the execution of environmental protection works by the
workers on the Site;
Attend SSEMC meetings and SSEC meetings; and
Advise the Environmental Officer on the upkeeping of environmental
performance and standards of the Site;
Page 12 of 31
Carry out daily site environmental inspections based on a checklist approved by
the Engineer, and to ensure that follow-up action is taken promptly to rectify
defects and deficiencies identified;
Advise the Environmental Officer on the upkeeping of environmental
performance and standards of the Site;
Assist the Environmental Officer carrying out his duties
Conduct toolbox talks as assigned by the Contractor's agent after acquiring the
necessary qualifications.
Site Supervisor/Foreman
Report to Engineer, has responsibility for
All site activities, including supervision of installation, coordination with all
relevant parties, as well as, technical support, repair activities and site quality,
environmental and safety matters.
Key interfacing on site for co-ordinating the different teams.
Directly managing the teams in charge of equipment for installation and will be
in interface with all site parties.
Daily works arrangement
Site co-ordination, housekeeping and safety, quality & environmental aspects.
Checking of all material incoming in respect to the relevant/client’s requirements
Page 13 of 31
3 COMMUNICATIONS PROCEDURES
TSIT FUNG shares the environmental efforts with CLIENT’S, subcontractors, suppliers,
stakeholders and staffs. Besides, the communication system for handling all environmental
related feedbacks and reporting our environmental performance is already established.
Page 14 of 31
3.4 ENVIRONMENTAL AWARENESS AMONGS STAFF
Tsit Fung’s ensure that all concerned staffs including subcontractors are aware of the
applicable environmental requirements in the Project. The Environmental
Officer/Environmental Supervisor is responsible for scheduling specific induction training, tool
box talk, environmental briefing and training sessions for site staff and staff of subcontractors.
These sessions will cover the environmental requirements, management and mitigation
measures, the environmental objectives, targets and programme, environmental nuisance
abatement and waste management
Page 15 of 31
The following items should be included in the agenda for discussion at every SSEMC meeting
and SSEC meeting
Review the sufficiency of the measures in the EMP and proposals for improvement;
Monitor the Contractor’s environmental performance and achievement with reference to
EMP;
Access the effectiveness of EMP taking into account the Contractor’s environmental
performance and achievement; and
Monitor the follow-up action by the Contractor on the defects and deficiencies identified in
weekly inspections
ENQUIRIES, COMPLAINTS & REQUEST FOR INFORMATION
Enquiries, complaints and requests for information regarding the Environmental Management
System can be expected from a wide range of individuals including CLIENT’S, other
contractors on site, members of the public, governmental departments, the media and
community groups. Correspondence of this nature will be sent jointly to Tsit Fung’s Projects
Manager and the CLIENT’S's representative to be resolved in accordance with this plan
and/or in accordance with the CLIENT’S's own internal procedures.
Page 16 of 31
4.2 IDENTIFICATION OF SIGNIFICANT ENVIRONMENTAL ASPECTS
Before the commencement of this Project, Environmental Officer, with the inputs from Project
Director / Project Manager, will be responsible to identify the environmental aspects of the
activities that it can control or, over which it can be expected to have an influence.
Environmental Officer also determines which environmental aspects have or can have a
significant impact on the environment. The criteria include (but not limit to) previous project
experience, professional and management judgment, advises from environmental team,
employees, consultants, client’s representative, or professional bodies.
For these significant impacts, possible control and/or mitigation measures will be put in place
to manage or improve the impact to an acceptable level. The identification results and
mitigation measures are presented in Annex 4 & Annex 5 of this EMP.
Page 17 of 31
for its treatment before discharge and the method of disposal of sewage effluent from
the Site;
Noise Control
No significant noise-generated mechanical equipment is used in this project, because the
majority of the works are installation, testing and commissioning. Acoustic control required for
all used machinery is complying with the Noise Control Ordinance (Cap 400). No noise permit
for “Powered Mechanical Equipment” is required in this project.
Page 18 of 31
Planning
TSIT FUNG has considered the following areas during the planning stage, in order to reduce
noise problem:
The installation work will be carried out in the CLIENT’S’ designated areas and any
generated noise will be contained within that area.
No noisy activity is carried out beyond the restricted hours.
Avoiding simultaneous operation of several noisy activities close to a noise sensitive
receiver to reduce the cumulative impacts.
Waste Management
A waste management scheme is developed for achieving waste avoidance, reduction,
treatment and disposal measures for SHSI. It has divided three types of waste
Page 19 of 31
4.3.1.4 Municipal Solid Waste
Mixed wastes arising from catering activities, office activities and general domestic waste
which may include (without limitation) putrescibles such as oil, grease, discarded food; food
containers, paper, cardboard, timber, plastics and metal packaging; and other domestic waste
products.
Page 20 of 31
4.3.1.6.2 Construction & Demolition (C&D) Wastes
Small amounts of C&D wastes are generated during the installation, testing and
commissioning activities. The C&D materials will be included
Scrap metal/plastic materials from demolition of existing systems/structures/equipment
Wood crates/drums, plastics, plastics foam, paper, and rubber from packaging waste
for new systems/instruments/equipment
Unusable/surplus materials from the installation works and
Site clearance
For the temporary storage of C&D material, it will be preferably at the immediate working area.
The sorted and processed C&D materials shall be promptly removed from site to minimize
temporary stockpiling and to optimize the use of sorting areas. All C&D wastes shall be sorted
into inert portion (e.g. rock, brick and concrete, etc) as public fill and non-inert portion (e.g.
wood, paper, materials) as landfill wastes. The C&D wastes are required to dispose at the
location in the following table
Types of Waste Location
Inert C&D Waste (Public Fills) Public Filling Area Tuen Mun Area 38
Non-inert C&D Waste WENT Landfill
NENT Landfill
SENT Landfill
Page 21 of 31
Dangerous Goods Control
Dangerous good (as defined by Dangerous Goods (General) Regulation) used in the project
will be stored in the DG store. Tsit Fung will apply for the Dangerous good Storage License.
Chemical Management
For this project, Chemical will be used. It includes: Paints, Spent lubricating/mineral oil.
If it is confirmed that these chemical are sued, following handling measures are required to
apply, if applicable:
Appropriate "Materials Safety Data Sheet" is prepared and kept.
Properly labeling, packaging and temporarily storing all chemical in a designated chemical
storage area if applicable.
Developing and implementing a contingency scheme for handling potential chemical
spillage or accidents in the chemical storage area.
Storing all chemicals in tanks with a minimum capacity of 110% of chemical storage bins
or tanks.
The chemical storage area is sheltering from rain water.
Only authorized staff is allowed to access and use the chemicals.
Prior to using the chemicals, briefing is arranged to personnel involved for the discussion
on potential hazard and information highlighted in the "Materials Safety Data Sheet".
Keeping the inventory records for the chemical.
The chemical waste should only be disposed by the licensed chemical waste collector and
transferred to designated and licensed reception point for further treatment.
Energy Conservation
Several measures are taken to reduce the use of energy, most of which involved simple and
effective practices that require minimal time and effort.
Switching off lighting and electrical equipment when not is use.
Proper scheduling and monitoring the works to avoid rework or defects.
Ecology
Care is taken before commencement of any work inside a site boundary that there is no threat
to the ecology.
Prohibit any dumping of rubbish, food, oil or chemicals outside the side boundary.
Prohibit any accessing or working on restricted areas.
Page 22 of 31
Material Resources Management
TSIT FUNG uses environmental criteria in selecting suppliers and subcontractors for the
materials and services provided. By all means, TSIT FUNG will procure only from sustainable
resources in order to reducing environmental impacts associated with use of materials and
services.
All project activities are designed to optimise the use of materials so as to minimize waste and
scrap. All purchasers of materials shall consider minimizing waste through careful estimation
of quantities required and careful consideration of any environmental impacts created for
materials and services purchased. Also, a clear understanding and control of material
restrictions is necessary.
General Housekeeping
Site staff will conduct daily site inspections to determine that the requirements of this
Environmental Management Plan are met. Site staff will further check against the site
cleanliness as well as following general housekeeping measures:
Common areas will be maintained in clean and sanitary conditions at all times.
All site areas are kept free from liter and rubbish.
All passageways, staircases, corridors and means of escape routes will always be kept
clear.
Oily and greasy rages will be stored in metal bins and handled and disposed of as
chemical waste.
Tools will not be left unattended on the site areas that could potentially cause an accident.
All lighting and ventilation facilities will be kept clean and unobstructed at all times.
The floor of work places will be kept in a non-slippery condition.
Page 23 of 31
5 ENVIRONMENTAL PROCEDURES
5.1 ENVIRONMENTAL TRAINING, AWARENESS & COMPLIANCE
In order to ensure that staff at all levels are aware of the importance of environmental
procedures and Tsit Fung’s commitment to enforce the EMP. The following shall be
implemented:
Extracts of the EMP shall be issued to TSIT FUNG staff and subcontractors.
The Project Manager or his representative shall hold meetings with responsible staffs and
subcontractors to explain Tsit Fung’s commitment and enforcement of the EMP.
TSIT FUNG will provide, if necessary, introductory briefing and training to responsible
staffs and sub-contractor's workers regarding the environmental control and EMP
enforcement.
TSIT FUNG will conduct regular environmental training / toolbox talks. All training records
would be maintained.
Display approved publicity posters on appropriate locations and the notice board.
The subcontractor shall assign supervising or management staff who will be responsible
for environmental matters and, report and respond to the Project Manager.
Regularly circulate the environmental newsletter.
The CLIENT’S’s Environmental Policy and the associated environmental requirements are
communicated to all TSIT FUNG and subcontractor through site meeting and briefing.
Page 24 of 31
IMS Section will conduct drill exercises for ensuring the effective implementation of above
emergency procedures. After each drill exercises, the effectiveness will be reviewed. If
necessary, modification to existing emergency procedure will be followed.
Chemical storage, labeling, transportation and spillage plan should be followed as per
guidance given in the Code of Practice of Chemical Waste if appropriate.
Project Manager shall investigate the case and report the details to CLIENT’S’s representative
immediately after occurrence of case. If there is any warning or environmental prosecution
issued by Authorities, Project Manager will immediately notify CLIENT’S’s representative.
5.3 DOCUMENTATION
Tsit Fung’s will maintain records to document the main elements of the EMP. The location of
these documents will be determined by the Project Manager and kept in the project offices so
that any employee can easily access and retrieve information as required. The Environmental
Management System of this Project consist the following documentation structure:
Environmental legislation (ordinances, technical memoranda, codes of practice and
guidelines) for reference purposes
Environmental Management Plan
Environmental Mitigation Implementation Schedule
Records of permits and licenses
Records of complaints
Equipment maintenance / calibration records
Internal and external audit reports
Operating procedures and work instructions
Meeting records
Records of training and briefing
In addition, communications, correspondence and reporting records between Tsit Fung’s and
external parties will be registered. These documents include:
communications between the CLIENT’S, Tsit Fung’s and Sub-contractors;
correspondence with the governmental departments, when related to environmental
matters;
communications with the Tsit Fung’s Environmental Team;
Minutes of environmental management site meetings.
Page 25 of 31
5.4 DOCUMENT CONTROL
TSIT FUNG recognizes that maintaining updated documents and records is a critical part of its
environmental management system. In order to ensure that document control is maintained,
the ISO 9001 quality management system method of registering and controlling documents
and their revisions will be used.
The Tsit Fung’s document control system will, therefore, ensure that documents (such as the
EMP, regulations etc.) are:
located easily;
identifiable, dated (with reference to current and previous revisions) and maintained safely;
periodically reviewed and approved for adequacy;
updated and available to relevant parties;
the retention period for all records are 7 years after project completion or as specified by
CLIENT’S; and
Retained for any legal or auditing related purposes, if obsolete, but identified as such.
Page 26 of 31
5.5 ENVIRONMENTAL INSPECTION/PERFORMAANCE MONITORING
In order to establish an environmental monitoring programme. Tsit Fung’s will ensure that the
monitoring programme is a comprehensive but straightforward activity. The most important
step will be to establish and maintain documented procedures for the monitoring of the key
characteristics of Tsit Fung’s operations that may have a significant impact on the
environment. The environmental checklist is attached in Annex 2 and 3 and will be used to
assist in the monitoring.
Page 27 of 31
environmental auditing undertaken, and all relevant information. The review will also be
documented.
The review will take into consideration: any changing circumstances (processes, legislation,
and input from interested parties, updated pollution control, upgraded prevention equipment
and environmental incidents) and a commitment to continuous improvement.
The results of the review will be used in the planning and implementation of improvements to
the EMP or the environmental policy statement and, therefore, changes throughout the EMP
itself. The CLIENT’S will be notified and seek approval of any changes made to the EMP.
Page 28 of 31
5.8 CONTROL OF SUBCONTRACTOR
TSIT FUNGuses environmental criteria and commitment in selecting subcontractors. All
subcontractors are encouraged for the environmentally sound work practices and avoid those
that are damaged to the environment.
During the project execution, subcontractor shall:
Follow all responsibilities set out in the subcontractor agreement and this EMP.
Comply with legislative and Tsit Fung’s environmental requirements and site regulations.
Identify and report any environmental problems on site.
Ensure all their employee complies with environmental requirements.
The performance of subcontractor on environmental management is checked through different
channels such as: site checking by Site Foreman, feedback or complaints raised by
CLIENT’S’s representatives, internal environmental audit by or CLIENT’S, annual re-
assessment, etc.
If any noncompliance found for subcontractor’s works on environmental management, Project
Manager investigates with subcontractor, and develops the corrective and preventive action
required, as well as report non-compliance, and the effectiveness of corrective and preventive
actions to CLIENT’S’s representatives as soon as possible.
Page 29 of 31
ANNEX I: ENVIRONMENTAL POLICY
Page 30 of 31
ANNEX 2: ENVIRONMENTAL CHECKLIST
Project No. 工程編號 : Site Location 工地位置 :
Page 31 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
巡查結果 如結果是”否”,原 action
因? 跟進行動
Chemical Waste Handling 化學廢料處理
6 Any Chemical Waste stored on site? Yes; Complete following. 有,回答以下巡查項目.
在工地有否存放化學廢料?
No; Jump to Q11. 沒有, 跳至問題 11.
7 Chemical Waste containers and storage
location are prepared 有適當的化學廢料容 Yes 是 No 否
器及存放區
8 Check the following:
檢查下列各項:
Warning label & chemical waste
identification are stuck 已張貼警告牌和化學 Yes 是 No 否
廢料標籤
Chemical Wastes are properly stored in Yes 是 (No 否
containers 化學品存放在容器內
Containers are in good condition & properly
lidded Yes 是 No 否
容器保持完好無缺和封蓋保持緊鎖
Keep clean and dry for storage containers &
areas Yes 是 No 否
保持化學廢物貯存範圍及容器整潔和乾爽
Chemical Waste storage location is far
away from drainage system. Yes 是 No 否
化學廢物貯存範圍跟水渠保持距離
9 If required, related “Chemical Waste
Producer Licenses” are available on site.
Yes 是 No 否
如須要,在工地有適當的”化學廢料產生者牌
照”
10 Chemical wastes collected in last month?
If yes, fill-in following information:
在對上一個月有否回收化學廢料,如有,填
寫下列資料: Yes 是 No 否
Date of last collection:
收集日期:
Collector Name:
收集商名稱:
Page 32 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
查結果 如結果是”否”, action
原因? 跟進行動
Waste Water Handling 污水處理
11 Waste water is properly discharged to
assigned drainage system. No waste water
is discharged outside the site. Yes 是 No 否
污水只在指定的污水排放處排放。沒有污水
流出工地範圍以外。
12 No excess waster water was stored inside
the site Yes 是 No 否
沒有多餘的污水貯存在工地內
Waste Handling 廢物處理
13 Normal wastes are properly stored in
covered garbage bin (if with cover or lid) Yes 是 No 否
貯存普通垃圾在有蓋垃圾桶內(如有蓋)
14 Properly dispose all normal wastes Yes 是 No 否
適當棄置普通垃圾
Page 33 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
巡查結果 如結果是”否”, action
原因? 跟進行動
Noise Control 噪音控制
20 Any abnormal or excess noise produced Yes; Complete following. 有,回答以下巡查項目.
during operation?
工作過程中有沒有產生不正常或過量的噪音? No; Jump to Q.24 沒有, 跳至問題 24 .
21 Properly eliminate or reduce noise
generated Yes 是 No 否
適當地除去或減低所產生的噪音
22 Staff properly wear ear-mask or other
necessary personal protective equipment
Yes 是 No 否
員工己適當地載上耳塞或其他所須的個人防
護裝備
23 Properly maintain and operate the
equipment for ensuring no abnormal noise
is produced Yes 是 No 否
適當地對所有工具保養及操作以防止產生噪
音
24 No noisy work is conducted outside the
noise emission permitted timeframe Yes 是 No 否
沒有在指定噪音管制時間以外進行發出噪音
的工作
Vehicle Control 工程車輛控制
25 Any vehicle assigned and used under this Yes; Complete following. 有,回答以下巡查項目.
project?
此工程有沒有專用工程車輛? No; Jump to Q.29 沒有, 跳至問題 29 .
26 No smoke produced from vehicle Yes 是 No 否
沒有排放黑煙
27 Keep vehicle in good condition and
appearance Yes 是 No 否
車輛須保持良好狀態及外觀整潔完好
28 Properly handle the disposed material such
as battery, tire, grease oil, etc. Yes 是 No 否
已正確處理及棄置所有車輛之損耗物品。包
括電池,車呔,油格及機油等
Page 34 of 31
Check Item 巡查項目 Result If No, Why? Follow-up
巡查結果 如結果是”否”, action
原因? 跟進行動
Other Inspection Items & Follow-up Action (Attach as per request) 其他巡查及跟進事項: (需要時可另加紙
張) :
Inspector Signature
巡查員簽署
Page 35 of 31
ANNEX 3: WEEKLY ENVIRONMENATL INSPECTION REPORT
Page 36 of 31