DED Lamongan Shorebase
DED Lamongan Shorebase
DED Lamongan Shorebase
1 Design Basis 1
2 Control Philosophy 1
3 Process Flow Diagram Bitumen 1
4 Process Flow Diagram Hot Oil 1
5 Piping & Instrumentation Diagram Bitumen 1
6 Piping & Instrumentation Diagram Hot Oil 1
7 Tank Sizing Calculation 1
8 Pump Sizing Calculation 1
9 Pipeline Sizing Calculation 1
10 Pipe Support Calculation 1
11 Line Sizing Calculation 1
12 Piping Strength Calculation 1
13 PRV Calculation 1
14 Load list Calculation 1
15 Cable Calculation 1
16 Heat Flow Calculation 1
17 Hot Oil Heater Calculation 1
18 Foundation Calculation 1
19 Cut and fill calculation 1
20 Air Utility and Electrical Consumption 1
21 Cathodic Protection Calculation 1
22 Fire Protection Calculation 1
23 Specification for Tanks 1
24 Specification for Piping 1
25 Specification for Pipeline 1
26 Specification for Pumps and Equipment 1
27 Specification for Instrumentation and Control 1
28 Specification Electrical & Control Room 1
29 Specification Heating System 1
30 Specification Hot oil heater 1
31 Specification Bundwall and Secondary Containment 1
32 Specification Foundations 1
33 Specification Truck Loading Bay 1
34 Specification Weight Bridge 1
35 Specification APAR 1
36 Specification Fire Protection 1
37 Specification Shelter 1
38 Datasheet for Tanks 1
39 Datasheet for Piping 1
40 Datasheet for Pumps 1
41 Datasheet for Instrumentation and Control 1
42 Datasheet Electrical & Control Room 1
43 Datasheet Heating System 1
44 Datasheet Truck Loading Bay 1
45 Datasheet Weight Bridge 1
46 Datasheet Fire Protection 1
47 Datasheet Shelter 1
48 Datasheet APAR 1
49 Drawing Tank Bitumen 1
50 Drawing Tank New Filling Tank 1
51 Drawing Tank New Expansion Tank 1
52 Drawing Tank New Hot Oil Heater 1
53 Drawing Layout & Equiptment 1
54 Drawing Pipeline 1
55 Drawing Piping plan 1
56 Drawing Isometric 1
57 Drawing SLD / One Line Diagram 1
58 Drawing Panel 1
59 Drawing Lighting Layout 1
60 Drawing Lightning and Grounding 1
61 Drawing Control System 1
62 Drawing Instrument Hook Up diagram 1
63 Drawing Spill Containment 1
64 Drawing Ditch 1
65 Drawing Fence 1
66 Drawing Shelter include Loading Bay 1
67 Drawing Civil Foundation 1
68 Drawing Bundwall 1
69 Drawing Office, post security, toilet and mushola 1
70 Drawing Escape Route 1
71 Drawing APAR Layout 1
72 Drawing CCTV system 1
73 MTO 1
Total A 73
B Site Survey
No Description Unit Price (IDR) Qty
1 Air Ticket (JKT - SBY - JKT) 3,000,000 3
2 Hotel & meal 1,000,000 3
3 Rent Car, driver & Gas 2,000,000 1
4 Software
5 Dedicated engineer at site 18,000,000
6 Drafter at site 12,000,000
Total B
Total A + B
Unit Duration (hour) Cost (IDR)
180,000.00 /hour
set 56 10,080,000.00
set 48 8,640,000.00
set 40 7,200,000.00
set 40 7,200,000.00
set 40 7,200,000.00
set 48 8,640,000.00
set 64 11,520,000.00
set 64 11,520,000.00
set 32 5,760,000.00
set 16 2,880,000.00
set 38 6,840,000.00
set 24 4,320,000.00
set 16 2,880,000.00
set 24 4,320,000.00
set 24 4,320,000.00
set 48 8,640,000.00
set 32 5,760,000.00
set 144 25,920,000.00
set 48 8,640,000.00
set 24 4,320,000.00
set 16 2,880,000.00
set 48 8,640,000.00
set 32 5,760,000.00
set 48 8,640,000.00
set 24 4,320,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 48 8,640,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 48 8,640,000.00
set 32 5,760,000.00
set 24 4,320,000.00
set 32 5,760,000.00
set 64 11,520,000.00
set 64 11,520,000.00
set 48 8,640,000.00
set 48 8,640,000.00
set 24 4,320,000.00
set 64 11,520,000.00
set 32 5,760,000.00
set 16 2,880,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 32 5,760,000.00
set 48 8,640,000.00
set 48 8,640,000.00
set 64 11,520,000.00
set 64 11,520,000.00
set 32 5,760,000.00
set 64 11,520,000.00
set 64 11,520,000.00
set 24 4,320,000.00
set 32 5,760,000.00
set 64 11,520,000.00
set 16 2,880,000.00
set 16 2,880,000.00
set 16 2,880,000.00
set 64 11,520,000.00
set 80 14,400,000.00
set 24 4,320,000.00
set 32 5,760,000.00
set 16 2,880,000.00
set 16 2,880,000.00
set 16 2,880,000.00
set 48 8,640,000.00
518,040,000.00