Risk Assessment For Installation of Ducts and Accessories

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 17
At a glance
Powered by AI
The key takeaways are that the document outlines a risk assessment for installation of ducts and accessories work. It identifies various hazards for people and proposes control measures to reduce risks.

Some of the main hazards identified are delivery and storage of materials, manual handling, use of hand tools, pinch points and ergonomic issues.

The process for evaluating risks outlined includes identifying hazards, examining risks associated with hazards, evaluating likelihood and severity of risks to determine risk rating scores, and examining existing and proposed control measures.

Document Reference

AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012


Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) Delivery/ collection drivers shall be subject to


McLaren induction/Training with regards to traffic
management.
Plant and Traffic 2)Ensure exclusion zone is set up around the
movement preparation work area and all plant movement
and checked by supervisor
3) Always use the pedestrian access provided
 Run over by
4) Traffic light batons shall be provided for banks
vehicles/plants
man at night
 Hit by reversing
5) All plant to have a fully trained banks man
equipment
present all times.
Delivering,  Overhead
6) No plant to reverse without banks man.
unloading and obstructions
Operatives 7) Ensure access route are sufficient and safe to Site Eng.
storing of HVAC  Vehicle break Staff/visitors
1 Medi use. Supervisor,
Duct materials down 3 4 12 1 4 4 Low
um 8) Do not take rest in or under vehicles Foreman,
using pickup and  Property damage 9) Proper barricade and safety signboard
unloading by
 Collision with provided on open excavation
manual handling
other vehicles 10) All vehicles must be fitted with reverse alarm
 Personal injury / Flashing light.
 Fatality 11) The work place and all access to be well
Accident due to illuminated.
poor lighting and 12) Ensure close supervision, Effective
visibility (operation Communication & Coordination with McLaren
at night 13) Enforce Speed limit
14) Ensure all vehicles entering the site is
properly maintained and reported if found any
defect
15) Ensure materials are secured/tied in pallet

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

trolley to avoid fall from trolley.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) Eliminate the need for manual handling by


using mechanical aid.
2)Reduce the weight of a load to limit force
exertion
3) If unsure of the load weight, check with
supervisor.
5)Ensure proper manual handling procedure Supervisor,
musculoskeletal
Manual Handling Operatives Med 6) Identify and eliminate sharp edges before any Foreman,
2 disorders, Hand
involved in work
Low
3 4 12 ium manual lift 1 4 4 Site Eng.
injuries, cut , bruises
7) Ensure adherence with sufficient and
Sharp edges
appropriate PPE.
Slip/Trip hazards
8) Limit load carrying to 20kg per person
9) Supervisor must make sure while manual
handling load individual task and environment to
be considered to reduce the risk of manual
handling.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) Ensure accesses are kept clear at all times.


2)Housekeeping to be carried out regularly
throughout the day when required
3)Supervisor to ensure operatives are stacking
material neatly and stacks are stable and in a safe
condition Supervisor,
Operatives
Slips, Trips and fall 4)Provide adequate lighting especially during
Staff/storekeeper Med Foreman,
3 Material storing Poor house keeping 3 4 12 night hours 1 4 4 Low
ium Site Eng.
5) Appropriate space is allowed around storage
areas for employees to move around safely
without the risk being trapped between stacked
materials.
6) Maintain good housekeeping.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1. Ensure grinding /cutting disks are appropriate


for the application and do not use if date is
expired.
2. Ensure that wheel speed marked on disk
should greater than grinder machine
3. Ensure that grinder have safety guard
4. Operatives must use face shield and eye
protection
5. Ensure that grinding/cutting area free from
combustible materials
Grinder/Cutter 6. Hot work permit must be obtained for any
Eye injury type of hot work.
Fragile Duct 7. Fire blanket must use for any grinding
Involved all work /cutting work. Site Eng.
Fabrication work materials
force and Medi 8. Ensure Fire Extinguisher and sand bucket in
4 for HVAC Duct and Noise
supervisor/forem
3 4 12
um place.
1 4 4 Low Supervisor
accessories Metal waste Foreman
an 9. Ensure all electrical cables are in good
Electric shock condition and away from hot work area.
Fire 10. Use ear protection for noise control
11. Ensure there is no loose connection and no
damage electrical cable or socket for
preventing electric shock.
12. Ensure Proper earthling and use of industrial
socket only.
13. Operatives must aware of voltage and use
accordingly the socket considering colour.
14. Fire watcher must ensure hot work area have
no fume or spark or any smoke before leave
the work area
15. Ensure that operative’s cloths not to
entanglement with rotating tools and injury.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

16. Work area must clean and tidy to avoid slip


trip or fire.
17. Ensure adequate earth leakage protections
are provided.
18. Proper illumination in work place.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1 Eliminate the need for manual handling by using


mechanical aid.
2)Reduce the weight of a load to limit force
exertion
3) If unsure of the load weight, check with
supervisor.
5)Ensure proper manual handling procedure
musculoskeletal 6) Identify and eliminate sharp edges before any
HVAC Duct fixing disorders, Hand manual lift Site Eng.
Involved all Medi 7) Ensure adherence with sufficient and
5 by using manual injuries, cut , bruises
operatives
3 4 12
um
1 4 4 Low Supervisor
handling Sharp edges appropriate PPE. Foreman
Tripping hazard 8) Limit load carrying to 20kg per person
9) Supervisor must make sure while manual
handling load individual task and environment to
be considered to reduce the risk of manual
handling.
10) Ensure accesses are kept clear at all times.
11 Prior to start the activity ensure that lifting devices
are inspected by competent person
12)Always comply with the WLL & man loading capacity

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) Only trained and authorised personnel to carry


out the task.
2) Ensure the PTW in place.
3) Ensure proper working platform with complete
fall protection
Work at height 4) Ensure Full body harness and 100% Tie off
5) Ensure the scaffold platform is properly
Fall form height erected with "Safe to use" tag.
6) Ensure castor wheels are locked and out rigger
in place.
Falling objects 7) Hand tools must be secured/tethered
8)Work materials strictly not allowed to be stored
Operatives/Staff/ on platform except for working tools
Installation of 9) Always comply with the WLL & man loading Supervisors
Visitors
HVAC Duct using
Others
4 4 16 High capacity 1 4 4 Low Foreman,
Over loading
Mobile tower 10) Ensure unauthorised person not allowed to Site Eng.
Fragile surface
modify the scaffolding and if needed to any
changes then must be modified by trained and
certified scaffolder.
11) Must clean the work area after completion
the job.
12)Ensure safe access to the working platform
Access & egress 13)Scaffold access must be free from obstruction
14) During installation and connection activity ensure
that no body will enter in side Duct for resting or
keeping any food item and no debris will remain inside.
15) Work area must barricade with signage and
watchman must monitor no unauthorised person will
enter inside exclusion zone

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

16) Ensure sufficient illumination in work area.


17) Work area should clean and remove all the debris
end of shift.
18) Ensure that working near fragile surface special
care of body and eye protection with necessary PPE.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) Only light work, off short duration and work in


which the operative can maintain secure hand
and foot hold can be undertaken form a ladder
2) Never try to overreach with any ladders
Falling from height 3) Check the ladder is of suitable quality for
industrial use and is in good condition
4) Maintain a minimum of 3 points of contact
with stepladders at all times (feet/thighs/hands)
If possible avoid the use of stepladders at a
working height of 2 meters and more.
5) Check the ladder legs (and stays) are fully
deployed or locked (depending on type) to
Use of Ladder
maintain maximum base dimensions and the step
During installation Operatives/ Supervisor
Med ladder is orientated to provide maximum stability.
6 of duct Staff/ 3 4 12 1 4 4 Low Site Eng.
accessories Working on Uneven ium 6) Stepladders/ladders has to be used on leveled
Foreman,
ground ground/firm base
7) Ensure that during using ladder from the top 2
step is blocked to avoid climb on that.
8) The ladder securely fixed to prevent slipping
outwards or sideways or securely footed at all
times.
9) Person must hold the ladder while another
operative working on it
Falling objects 8) Materials should not be placed above the
thread of ladders/step ladders
9) Do not carry any materials in one hand while
climbing or getting down from ladder
10) Ensure the area under the ladder is

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

barricaded especially if it is being used in a public


area.
11) Ensure the ladder is electrical insulated
podium type if working in live services

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) All portable electrical equipment must be PAT


tested and color coded. Make sure the test dates
are visible on the equipment.
2) Ensure all power tools are 110 volt and
periodic inspection by qualified electrician.
3) PTW to be obtained, prior to commencing the
task
Damaged cable
4) Damaged industrial sockets and power cables
insulation,
Sockets. must be removed.
Electrocution 5) Ensure the electrical cable is not damaged and
Electric shock has not been repaired with insulating tape or
Short circuit unsuitable connectors.
Use of power
Electric burn 6) Ensure cables from power tools shall be Supervisor
tools such as Operatives Med
7 Trip/Fall 3 4 12 organized so as not to present a tripping hazard 1 4 4 Low Foreman
angel grinder, and staff ium
Noise Site Eng.
Drill machine, 7) Only trained competent operatives to operate
Hearing loss
the power tools.
Vibration
8) Ensure proper and regular maintenance of
Dust
equipment that takes account of noise
9) Ensure proper hearing protection always.
10) Make sure people use the right tool for the
job and are trained to use it correctly
11) Ensure defective tools that require
maintenance is reported for repair or
replacement.
12) Instruct workers to keep their hands warm
and dry, and to not grip a vibrating tool too
tightly. Workers should allow the tool or machine

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

to do the work.
13) Ensuring proper job rotation and limiting
time operatives working with power tools and
hand tools.
14) Ensure adequate earth leakage protections are
provided.
15) Never hang/lift the machine by using its power
cable cord
16) Operator shall ensure the drilling/grinding machine
is fitted low/high speed.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1.Arrange adequate drinking water and rest shelter


2.Drink plenty of water with electrolyte
3.If feel something unusual immediately inform
Heat exhaustion, supervisor and report to site clinic.
Working under Heat stroke, 4.Make shift to operate the routine work
High temperature Dehydration, Site Eng.
Workers 5.Do not allowed alone work
8 Direct sun light Personal injuries 4 4 16 High 1 4 4 Low Supervisors,
6.Frequent breaks
Dusty due to high Foreman
temperature, Burn, 7.Proper supervision available
High wind
Tiredness 8.Correct PPE must use
9.Provide heat stress training
10.Conduct tool box talk
11.Proper signage for drinking water

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) Ensure proper night work permit is obtained


2) Proper lighting system should be in place
3) Ensure proper Communication / Coordination
and close supervision
4) Industrial safe torches to be available for
Poor visibility due to Operatives/staff
emergency situations Site Engr
Working at night darkness / poor Med 5) High visibility Traffic Vest for personnel’s in
9 time 3 4 12 1 4 4 Low Supervisor
illumination night shift
ium Foreman
Lone worker 6) Avoid lone working and always ensure buddy
system while working at night
7) Employees to be trained and understand
McLaren Crises plan.

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


Document Reference
AMC CONCOURSE BRIDGE PROJECT GEMC-MC-A-MST-0012
Rev. No. Rev. Date
00 04/03/02019
Risk Assessment Record Assessed by Title Signature
Activity: Installation of Ducts and accessories Safety
Prabir
Officer

Base Risk Ranking Residual Risk Ranking


CONTROL MEASURES
IDENTIFIED (Without Controls) (With Controls) Person
No ACTIVITY People Involved
HAZARDS/RISKS Risk Risk Risk Risk Responsible
L S L S
Score Rating Score Rating

1) Hand tools should be visually inspected


for defects, prior to use.
2) Never use damaged, blunt or broken
tools to avoid injury.
3) Select right tools for right Job Site engg
4) Ensure no Homemade or makeshift tools Supervisor
Improper selection
to be used at site Foreman
of hand tools.
5) Remove from service any tool that shows
Damaged and
signs of damage or defect
Defective Hand
Use of Hand tools Operatives/Staf 6) Ensure Hand tools are Stored in
tools
and Rivet Gun/ f accordance with the manufacturer’s
Hand injuries Med
10 3 3 9 instructions. 1 3 3 Low
Pop Rivet Pinch point ium 7) Ensure hands are not in direct line of fire
Ergonomics
while working with hand tools
Repetitive strain
8) Ensure appropriate PPE at all times.
injury 9) Ensure work with a pop rivet gun, must
protect your body from possible injuries
10) It is very risky to use a pop rivet gun in the
presence of flammable materials or liquids.
Always operate the tool a safe distance
away from combustible liquid.
11) Always be careful about the placement of
the pop rivet gun. Keep your fingers and
body away from the line of fire

Approved By: Name Position __________ Signature _________ ___________

SAF-010 (UAE) 03/18 Rev D SPECIFIC RISK ASSESSMENT RECORD


RISK ASSESSMENT & CONTROL GUIDELINES

1. Executing Steps:
1.1. Planning
a) Construction and HSE team must ensure that hazard identification is complete.
b) Construction and HSE team must prioritize the hazard issues, which are of significant in nature. (It means that risks have well
established legal requirements, potentially high risks).
c) Construction and HSE team to prepare the risk assessment plan for the priorities identified hazards for these potential high
risks.

1.2. Risk Assessment


Risk is the probability of an event occurring in a given set of circumstances. The ‘event’ is an exposure to hazard. The hazard is the
potential to cause harm. The risk assessment is the technique of evaluating not just the likelihood of an event occurring, but also the
outcome will be in terms of injury, loss, damage or harm.
1.3. Risk Assessment Process
The process of carrying out a risk assessment should be as follows.
1. Identify the hazards.
2. Identify who might be harmed and how.
3. Evaluate the risk and implement the control measures.
4. Record the significant findings.
5. Review the assessment and update if necessary.

1.4. Examination of the Hazards and Risk Associated


 Competent staff must be used in examining the risk associated with the identified hazard.
 Competent staff should examine following aspect to determine the risk involved:
o Examine the existing control measures in place.
o Identify employees at risk.
o Likelihood of risk.
o Severity
o Risk level and their tolerability.

1.5. Evaluating the risk:


Once the necessary information has been obtained on the hazards encountered by work activities, next stage is to access the risks.
1.5.1. Risk Rating Score
Risk rating score is a combination of two factors.
 The severity of the risk that could injure persons or cause damage to plant.
 The likelihood of the risk that it could happen (Probability).

RISK RATING = LIKELIHOOD X SEVERITY


NOTE: Each activity has to be assessed for the risk value for determining the level of Severity and likelihood are mentioned in the table
below.
No Injury Minor Moderate Major
Catastrophic (5)
(1) Injury (2) Injury (3) Injury (4)
1 2 3 4 5
Rarely (1)
Unlikely (2) 2 4 6 8 10
LIKELIHOOD Possible (3) 3 6 9 12 15

Likely (4) 4 8 12 16 20
Almost
5 10 15 20 25
RISK LEVEL: Certain (5)

Low Medium High

SAF-010 (UAE) 03/18 Rev C SPECIFIC RISK ASSESSMENT RECORD