BILL OF QUANTITY STP BIOTECH
No. Uraian spek teknis Sat Vol Remark
*) Tangki STP Biotech , Material : Fibreglass ( FRP ) unit 1 Dibuat dengan
System : Aerobic Biofiltration With Biomedia m3 150 Hellical Fillament
23600 x 2500 x 2750 mm Winding Machine
Thickness/Tebal : 7-10 mm(Avg) ASTM D 3299
Weight / Berat : 6000 kg ( Avg )
Including accesories system
*) Screen - Anoxic chamber & Equalization chamber m3 31.25
Perporated Bar Screen
Type : Fine dan Coarse Screen
Head material : Fibreglass
Distance Bar : 10 mm dan 20 mm
*) Anaerobic chamber : contact media BioCell m3 46.88
*) Aeration chamber : contact media PVC sheet m3 50.00
Air Seal Diffuser
Merk : Airflex, Ssi ex.USA / setara
Type : Coarse dan Fine Bubble
Model : Disc
Kapasitas : 10 m3/jam / pcs
Efficiency : 70 - 80 %
Type : Non Clogging
Material : EPDM
*) Sedimentation chamber m3 12.50
Terdiri dari : Scum Buffle, Overflow Weir
*) Effluent chamber m3 9.38
Chamber Volume = Q x RT
= 160 m3/day x 5 hour x 1day
24 jam
= 31.25 m3
b. Anaerobic Chamber
BOD Inlet = 300.00 mg / L
Efficiency = 60.00 %
BOD Output = 120.00 mg / L
BOD Volumetric loading = 1.78 kg/m3.day
Dimension of chamber
Length, L = 7.38 m
Width, W = 2.50 m
Depth of Media = 1.38 m
= 25.35
46.88
= 54.08 %
Calculate Sludge Production
Sludge Retention Time , SRT = 10 day
c Aerobic Chamber
BOD Inlet = 120.00 mg / L
Efficiency = 83.00 %
BOD Output = 20.00 mg / L
BOD Volumetric loading = 0.85 kg/m3.day
Dimension of chamber
Length, L = 6.88 m
Width, W = 2.50 m
Depth of Media = 1.24 m
Chamber Volume = Q x RT
= 160 m3/day 8 hour x 1 day
24 jam
= 50.00 m3
= 22.68
50.00
= 45.36 %
O2 required = Amount BOD Removed
= Efficiency x Inflow BOD Loading
= 83% x 18.00
= 14.94 kg/day
Safety Factor = 1.10
O2 Teoritis = 1.1x 14.94
16.43 kg/day
Assumse Air Temperature = 280 C
Air Density at 280 C = 1.17 kg/m3
Oxygen Content in air = 0.23
Air Required = 16.43
1.17 x 23.2%
= 60.41 m3/day
d. Sedimentation Chamber
Retention Time = 2 hour
Chamber Volume = Q x RT
= 160 m3/day x 2 hour x 1day
24 jam
= 12.50 m3
e. Effluent Chamber
Retention Time = 1.5 hour
Chamber Volume = Q x RT
= 160 m3/day x 1.5 hour x 1day
24 jam
= 9.38 m3