Lean Thinking Banish Waste and Create Wealth in Yo

Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/200657172

Lean Thinking : Banish Waste and Create Wealth in Your Corporation

Book  in  Journal of the Operational Research Society · January 1996


DOI: 10.1038/sj.jors.2600967

CITATIONS READS
2,087 48,277

2 authors, including:

Daniel T. Jones
Independent Researcher
48 PUBLICATIONS   11,413 CITATIONS   

SEE PROFILE

Some of the authors of this publication are also working on these related projects:

International Motor Vehicle Programme View project

All content following this page was uploaded by Daniel T. Jones on 21 May 2014.

The user has requested enhancement of the downloaded file.


Notes on Continuous Process Improvement 28 April 2008

An outline of:

Lean Thinking
Banish Waste and Create Wealth in Your Corporation
By James P. Womack and Daniel T. Jones
New York, NY: Free Press, Simon & Schuster, Inc., 1996, Second Edition, 2003

Preface to the 2003 Edition. Forecasts are always wrong. That is why lean thinkers strive to reduce
order-to-delivery time. During the 2002 meltdown, this 1996 book went back on the Business Week bestseller
list. We have added what we have learned since 1996 in this edition. Lean Thinking is more relevant today. Lean
ideas are the single most powerful tool available for creating value and eliminating waste in any organization.

Part I: Lean Principles

Taiichi Ohno (1912 – 1990), a Toyota executive, identified seven types of waste found in any process:

• Transportation. Unnecessary transport of parts under production.


• Inventory. Stacks of parts waiting to be completed or finished products waiting to be shipped.
• Motion. Unnecessary movement of people working on products.
• Waiting. Unnecessary waiting by people to begin the next step.
• Over-Processing the product with extra steps.
• Over-Production of products not needed.
• Defects in the product.

We have added an eighth waste: goods and services that do not meet the customer’s needs. Other authors have
added: underutilization of people

Lean Thinking is the antidote to waste. There are (5) Lean Principles:

• Specify Value. Value can be defined only by the ultimate customer. Value is distorted by pre-existing
organizations, especially engineers and experts. They add complexity of no interest to the customer.
• Identify the Value Stream. The Value Stream is all the actions needed to bring a product to the
customer. If the melter, forger, machiner, and assembler never talk, duplicate steps will exist.
• Flow. Make the value-creating steps flow. Eliminate departments that execute a single-task process on
large batches.
• Pull. Let the customer pull the product from you. Sell, one. Make one.
• Pursue Perfection. There is no end to the process of reducing time, space, cost and mistakes.

Lean is doing more with less. Use the least amount of effort, energy, equipment, time, facility space, materials,
and capital – while giving customers exactly what they want.

The Prize We Can Grasp Now. Converting a batch-and-queue system to continuous flow, with pull, will:

• Double labor productivity


• Cut throughput time by 90%
• Reduce inventory by 90%
• Cut errors by 50%
• Cut injuries

1
Notes on Continuous Process Improvement 28 April 2008

1: Value
A House or a Hassle-Free Experience? Doyle Wilson Homebuilder found that customers “valued” a hassle-
free design process and on-time delivery. All his processes were then re-aligned to meet this goal.

Define Value in Terms of the Whole Product. As the product flows, each firm defines value differently. Think
of air travel. Each firm – agent, airline, taxi, currency exchange, customs, immigration – defines their own
priorities, duplicates efforts, and works in disharmony with the whole process. The customer is not satisfied.

2: The Value Stream


The View from the Aisle. A value stream “map” identifies every action to design, order, and make a specific
product. Each step is then sorted into three categories: (1) those that add value, (2) those that add no value but
are currently necessary, and (3) those that add no value and can be eliminated. After the third category has been
eliminated, the second category should be addressed through flow, pull, and perfection techniques.

The Value Stream for a Carton of Cola. The British grocery chain Tesco retails products with thousands of
value streams. In the canned cola value stream, three hours of value-added activity take 319 days to perform.

3: Flow
The World of Batch-and-Queue. Five-sixths of home-building is waiting for the next set of specialists or
rework. Flow principles typically cut half the effort and the time required.

The Techniques of Flow. The 1st step is to maintain focus on the product. The 2nd step is to ignore job
boundaries and departments IOT remove impediments to continuous flow of the specific product. The 3rd step
is to rethink work practices to eliminate backflow, scrap, and stoppages IOT make the product continuously.

• Takt time synchronizes the rate of production to the rate of sales. (48) bikes per day sold divided by (8)
hours of production = (6) bikes and hour, or (1) bike every ten minutes.
• Flow requires all workers and machines to be capable at all times. This requires cross-training.
• Flow requires workers to know the status of production at all times. This requires visual controls.
• All activities can flow. Concentrate on the value stream for a specific product, eliminate organizational
barriers, and relocate and right-size tools.

4: Pull
Pull means that no one upstream should produce anything until the customer downstream asks for it. “Don’t
make anything until it is needed, then make it very quickly.” “Sell one, buy one.” “Ship one, make one.”

The Bad Old Days of Production. The Toyota bumper replacement system suffered long lead times. The
ability to get parts quickly from the next upstream producer enabled re-orders in small amounts. This is the
secret to reducing inventory. Cut lead times and inventories. Demand should instantly generate new supply.

5: Perfection
The Incremental Path. Freudenberg-NOK, a gasket manufacturer, improved a single process six times in three
years. “Why didn’t they get is right the first time?” Because perfection is continuous.

Continuous Radical and Incremental Improvement. If you are spending capital, you are doing it wrong.
Once leaders understand the first four lean principles – value specification, value stream identification, flow, and
2
Notes on Continuous Process Improvement 28 April 2008

pull – their perfection step starts with policy: a vision of the ideal process, and the step-wise goals and projects
to get there. Transparency is everything. Everyone must know what you are attempting to achieve and what area
is the first priority. The force behind this is the leader known as the change agent.

Part II: From Thinking to Action: The Lean Leap

6: The Simple Case


Lantech manufacturers stretch wrap machines. “Process Villages” – Sawing department, Machining
department, Welding department, Painting department, and Sub-assembly department – all generated long lead
times. Batches of ten were manufactured to ship one. Inventory overwhelmed the factory. Order changes created
havoc in the plant. “The more inventory you have, the less likely you will have the part you need.”

• The Lean Revolution. Ron Hicks leaned Lantech. He created four cells, one for each product. He
defined standard work: on time, on spec, every time. Takt time was introduced: number of products
needed per day divided by number of hours (8/8 = 1 hour). He right-sized machines to fit inside work
cells. He implemented quick changeover to make multiple different parts with little machine downtime.
• Result. Lantech cut 30% excess space, doubled product output, cut defects from 8 per product to 0.8 per
product, and cut lead time from sixteen weeks to fourteen hours. On-time shipping rose from 20 to 90%.

7: A Harder Case
The Change Agent. Art Byrne was hired as CEO of Wiremold in 1991. “CEOs are timid to change the shop
floor.” Byrne led lean training using a manual he wrote himself. He led tours of the plant to observe waste that
his managers were now able to see.

• Improvements Must be Fast. Three days was Byrne’s standard.


• Post a Scorecard for Each Product Team. Wiremold tracked: Productivity – sales per employee,
Service – percent delivered on-time, Inventory – turns, and Quality – mistakes.
• Teach People How to See. Create a lean training function. Teach all employees the five principles of
lean: Value, Value Stream, Flow, Pull, and Perfection. Teach all employees lean techniques: standard
work, takt time, visual control, pull scheduling, and single-piece flow.
• Results. Wiremold freed 50% factory floor space, eliminated a warehouse, and converted $11M of
inventory into $24M in sales. Lead time fell from four weeks to two days.

8: The Acid Test


Pratt & Whitney (P&W). In 1991, CEO Karl Krapek and cost-cutter Mark Coran leaned P&W.

• Jet Engines. Founded in 1860, P&W led the aircraft engine business by 1929. When they abandoned
piston engines to gamble on jets in 1946, business soared. Production inefficiencies were overlooked.
• Overcapacity. Faced with competition in the 1980s, P&W rationalized plant layout and addressed
development costs. They needed lower production costs and flexibility to react to customer needs. Why
did P&W need so much space, tools, inventory and people to get so little done? Daily output of engines
and spare parts could fit inside CEO’s office. Failure to manage assets. P&W cut people, cut managers,
and overhauled their entire production culture and processes.
• The Monument of all Monuments. A “monument” is a machine or process too big to be moved and
whose scale requires operating in batch mode. Monuments are evil, generating huge amounts of waste.
P&W had an $80M grinding system, representing obsolete thinking. Although speeding up grinding
from 75 minutes to 3 minutes and eliminating multiple manual grinding jobs, in actuality grinding jobs

3
Notes on Continuous Process Improvement 28 April 2008

took longer (due to eight-hour changeovers and batch scheduling), and required more people (22
computer technicians). P&W retired the $80M monument, returned to 75-minute production.

9: Lean Thinking versus German Technik


Porche. Chairman Wendelin Wiedeking introduced lean thinking to Porche. In 1994, the first-ever Porsche
rolled off the line with nothing wrong with it.

• Engineers. Porche is led by engineers, intrigued with unique solutions that are difficult to manufacture.
Workers are craftsmen. Unfortunately, much craftsmanship is waste. Tinkering with the product –
repairing and polishing raw materials, troubleshooting, re-assembling elements, repainting and re-fitting
– were thought to be necessary activities to produce a high-quality product.
• Crisis. 1986 was the boom year. 1992 was the crash. Porche products were too expensive. Costs and
throughput time had to be slashed. New quality focus: “Stop fixing mistakes that should never have
been made.” Reduction in inventory: “Where is the factory? This is the warehouse!”
• Just-in-Time (JIT) Game. Porche asked all their suppliers to play a simulation to learn lean concepts.
Lean concepts were critical across all firms contributing to the Porche value stream.
• The Remarkable Lean Transition at Porche. In five years, through 1997, Porch doubled its
productivity, cut manufacturing space in half, cut lead time for a finished vehicle from six weeks to
three days, cut supplier defects 90%, cut inventories 90%, and cut first-time-through errors by 55%.
• The German Tradition. The Germans need to stop prioritizing the engineer’s definition of value,
“voice of the engineer,” over the customer’s definition of value, “voice of the customer.” A German
weakness is a fondness for monster machines that produce large batches: paint booths are an example.
• Variety and Refinement Cost. Volkswagen makes four exterior mirrors, nineteen parts each, in
seventeen colors. Nissan has four-part mirrors in four colors. Excess variety often exceeds the ability of
the customer to notice, and his willingness to pay.

10: Mighty Toyota; Tiny Showa


Showa has been transformed by its relationship with Toyota. Showa, a radiator manufacturer, had “Process
villages” for casting, cleaning, stamping, welding, painting and assembly. Each was run in batch mode with long
intervals between tool changes. Mountains of parts were transported and stored between steps.

• The Initial Struggle. Taiichi Ohno, lean advisor, promised to reduce three months of inventory to three
days, double labor productivity, and halve plant space for zero capital investment. This he did.
• The Final Element: Rethinking Order-Taking and Scheduling. Showa then leaned order-taking by
scheduling backwards, working to takt time, to synchronize orders with production slots, exactly four
days before shipment time. Orders with incorrect information were never passed along.
• “…The Advantage of a Defiant Attitude.” Two basic lean concepts in production – automatic line
stopping when a mistake is made so no bad parts are passed forward, and a pull system to trigger the
fabrication of only those parts that are actually needed – were developed at Toyota in the 1920s and
1930s. When Taiichi Ohno led Toyota Motor engine works in1948, he had three insights. First, people
spent their time watching machines. Machines with error triggers freed up people to operate many
machines. Second, “when you have lots of inventory, you are always one part short,” so parts should
only be made if the next step needs them. Third, machines should be moved away from process villages
and into horse-shoe-shaped cells, in the exact sequence needed. Thus focus is on the product and not the
machines and their maintenance. Ohno’s favorite saying was “common sense is almost always wrong.”
• Toyota Today. Lesson: high-tech automation only works if the plant can run at 100 percent output and
if the cost of indirect technical support and high-tech tools is less than the cost of direct labor saved.

4
Notes on Continuous Process Improvement 28 April 2008

11: An Action Plan


Getting Started [Months 1 – 6]

• Find a Change Agent with ability and authority.


• Get the Knowledge through an advisor.
• Seize a Crisis or create one. Focus on fixing an obvious problem. Small wins. Don’t spend money.
• Map your current value streams.
• Begin as soon as possible with an important, visible activity. Convert managers with hand-on activity.
• Demand Immediate Results. Everyone should see results which create psychological momentum. One
week: less planning, more doing. Identify waste and remove it. Communicate with your people by
showing results at the scene of action.
• Expand Your Scope. Move from flow to pull.

Creating an Organization to Channel Your Streams [Months 6 – 24]

• Reorganize Your Firm by product and value streams. Put a Change Agent in charge of each product.
• Create a Lean Promotion Team.
• Deal with Excess People Early.
• Devise a Growth Strategy.
• Remove the Anchor Draggers.
• When You’ve Fixed Something, Fix It Again.

Install Business Systems to Encourage Lean Thinking [Months 24 – 48]

• Create new ways to keep score.


• Create new ways to reward people.
• Make everything transparent so everyone can see progress.
• Teach lean. Learn lean.
• Right-size Your Tools to insert directly into the value stream. Large and fast is more efficient but less
effective. This wrong assumption is the cornerstone of batch-and-queue thinking.
• Pay a bonus. Tie bonus amounts to the profitability of the firm.

Completing the Transformation [Months 48 – 60] Convert to bottom-up initiatives. Lean ideas are
democratic and not top-down. Layers of management can be stripped away.

The Inevitable Results of a Five-Year Commitment

Part III: Lean Enterprise

12: A Channel for the Stream; a Valley for the Channel


The Lean Enterprise. No one watches the performance of the whole value stream. Identify all actions to bring
a product to the customer, across all firms. There is no privacy. Each firm’s costs become transparent.

13: Dreaming About Perfection


Long-Distance Travel. Each organization ignores the role of the other parties. The time, cost, and comfort of
the total trip are key performance measures. What would travel times be without queues?

5
Notes on Continuous Process Improvement 28 April 2008

Medical Care is queues. Providers organize by function. What if patient time and comfort were the key
performance measures? Medical cells with right-sized equipment would flow patients. Some right-sized
equipment has already gone home with the patient, just like most office equipment has now shifted to the home.

Construction. 80% of home building is hurry-up and wait, then re-working the construction errors.

The Prize We Can Grasp Right Now. Lean thinking can boost productivity while reducing errors, inventories,
accidents, space requirements, production lead times, and costs in general. Lean thinking requires little capital.

Part IV: Epilogue

14: A Steady Advance of Lean Thinking


This chapter an updated review of Wiremold, Toyota, Porsche, Lantech, and Pratt & Whitney.

15: Institutionalizing the Revolution


An Enhanced Action Plan is the 2003 update to the 1996 plan from Chapter 11.

Getting Started [Months 1 – 6]

• Find a Change Agent with ability and authority.


• Get the Knowledge through an advisor. Start at the big picture before addressing small steps.
• Seize a Crisis or create one. Focus on fixing an obvious problem. Small wins. Don’t spend money.
• Map your current value streams. Managers need to see. Map also the flow of information going
upstream to create a closed circuit. See Rother and Shook, Leaning to See, 1998.
• Analyze each step of the Current State. Does this step create value? Is this step capable, available,
flexible? Is capacity sufficient? Excessive? Does the information flow from the customer smoothly?
Every process has a box score: total lead time, value creating time, changeover time, uptime,
rework, inventory, every part made every x minutes. If this step went away, what would happen?
• Envision the Future State. Draw it.

• Begin as soon as possible with an important, visible activity. Convert managers with hand-on activity.
• Demand Immediate Results. Everyone should see results which create psychological momentum. One
week: less planning, more doing. Identify the waste and remove it. Communicate with your people by
showing results at the scene of action.
• Expand Your Scope. Move from flow to pull.

Creating an Organization to Channel Your Streams [Months 6 – 24]

• Reorganize Your Firm by product and value streams. Put a Change Agent in charge of each product.
• Create a Lean Promotion Team.
• Deal with Excess People Early.
• Devise a Growth Strategy.
• Remove the Anchor Draggers.
• When You’ve Fixed Something, Fix It Again.

• New: Convince Your Suppliers and Customers to Take the Steps Just Described.

Install Business Systems to Encourage Lean Thinking [Months 24 – 48]

6
Notes on Continuous Process Improvement 28 April 2008

• Create new ways to keep score.


• Create new ways to reward people.
• Make everything transparent so everyone can see progress.
• Teach lean. Learn lean.
• Right-size Your Tools to insert directly into the value stream. Large and fast is more efficient but less
effective. This wrong assumption is the cornerstone of batch-and-queue thinking.
• Pay a bonus. Tie bonus amount to the profitability of the firm.

Completing the Transformation [Months 48 – 60] Convert to bottom-up initiatives. Lean ideas are
democratic and not top-down. Layers of management can be stripped away.

New: Convert From Top-Down Leadership to Bottom-Up Initiatives. Toyota gets brilliant results from
average managers using brilliant procedures. Competitors get mediocre results from brilliant managers using
mediocre procedures. Don’t search for brilliant managers. Perfect your processes.

The Inevitable Results of a Five-Year Commitment

Afterword: The Lean Network www.lean.org


Individuals and Organizations Who Helped

Glossary
batch-and-queue Making large lots, then sending the lot to wait in queue for the next operation.
cells The layout of machines in a tight U-shaped sequence, permitting single piece flow and
multi-machine working. Contrast with process villages.
just-in-time Producing and delivering just the right item at the right time in the right amount. Flow, pull,
and standard work are the pre-requisites.
kaizen Continuous, incremental improvement.
lead time The total time a customer must wait to receive a product after placing an order. If the order
can start production immediately, then production time and lead time are the same.
monument Any design, schedule, or technology with scale requirements necessitating that products be
brought there to wait in a queue for processing.
muda Waste. Any activity that consumes resources but creates no value.

multi-machine working
Training employees to operate multiple machines. This is essential to creating production
cells where each worker uses many machines.
process villages Grouping machines and people by type of operation performed. Contrast with cells.
queue time The time a product spends in a line awaiting the next step.
right-sized tool A design that can be fitted directly into a production cell and permit the flow of products so
the products do not need to be transported to a monument and wait in a queue.
seven muda Ohno’s original seven types of waste found in production: Transportation, Inventory,
Motion, Waiting, Over-Processing, Over-Production, and Defects
standard work A precise description of each work activity, specifying cycle time, takt time, sequence,
inventory, and standards.

Notes
Bibliography
Index

7
Notes on Continuous Process Improvement 28 April 2008

Reviewer’s Comments
In 1988 James Womack first described Toyota as a “lean” corporation. Womack and co-writer Daniel Jones
described the Toyota Production System (TPS) in The Machine That Changed the World. In 1990, the two
toured companies in Europe, North American, and Japan presenting ideas on how to convert mass production
practices to lean practices. Lean Thinking, first published in 1996, is a survey of the lean movement. It clearly
describes the waste found in mass production, explains the five principles of lean thinking, and then draws
lessons from real companies who have successfully implemented lean ideas. Lean Thinking is not a technical
how-to text on production, but an enlightened overview of top-level lean ideas and applications. This updated
edition includes lessons that the authors have collected between 1996 and 2003, especially the concept of a lean
enterprise – a collection of companies working lean together to produce a single product with the least wasted
effort and capital. The book is well-written, researched, and organized, and the authors make a strong case that
lean is universal and will benefit any organization in any endeavor. Lean thinking and practices are the single
most powerful tool for eliminating waste in any organization.

Prepared by: LtCol Brendan B. McBreen, 1st RTBn, RTR, MCRD PISC, 843-228-2467, [email protected]

View publication stats