Job Safety Analysis

For
Back Filling for TCF area
Doc. No. PTJ.JSA.001

Rev. 0 Date : August,20,2018


Project Name: Alhawiya Gas plant – TCF area
Department / Section Originating JSA : HSE DEPT., Job Performers : Reda Ramzy

Normal Approvals Name Signature Date GENERAL JOB REQUIREMENT


SA CM/Representative 1. Permit to Work.
Construction 2. HSE Induction for all.
3. PPE as per Project Standard.
SA HSE Representative 4. Daily TBT before starting the daily activities.
5. Adequate supervision and HSSE coverage.
SA Construction 6. Strictly no smoking. Smoking only in designated area.
Superintendent 7. For Emergency – First Aiders at Site, Ambulance Standby in
lay down with Male nurse. Emergency Number Displayed.
8. Welfare - Drinking Water, Food& Rest & Smoking Shelter, and
JSA Members Name Signature Date Porta Toilet & Transport available.
9. SAUDI ARAMCO REQUIREMENT /STANDARD AND
Saipem Construction PROCEDURES.
 GI 2.100 Work Permit System
Saipem HSE  GI 2.714 Environmental Protection Policy Implementation
 GI 430.001 Waste Management
 Saudi Aramco Safety Handbook
Sub-con Construction
Khaled Mosad  SA Construction Safety Manual
Manager

Sub-con supervisor Reda ramzy

Sub-con Safety Salah A Dayem

All work activities shall comply with the requirements of all applicable SA General Instructions Standards and Procedures.
Contractor ensures that all work is in full compliance with the requirement of Saudi Aramco Construction Safety Manual (CSM) and with the
provision of Saudi Aramco certification applicable. Changing Conditions and Emergency Procedures: Stop Work, Switch off all equipment,
Supervisors must direct all personnel to the nearest Emergency Exit and Assembly point.

Page 1 of 5
Job Safety Analysis
For
Back Filling for TCF area
Doc. No. PTJ.JSA.001

Name of Procedure or Operation: JSA for Back Filling at TCF area

Job Number: N/A

Location: Alhawia , KSA

Written by: S.A. ElDayem Subcontractor Name (if applicable): PETROJET/ Al aqeeel

Reviewed by: Date Created/Last Reviewed:

Tools/Equipment Required Materials Personal Protective Equipment


 Shovel  Hard hat
 Loader truck  Miscellaneous  Steel toed boots
 Pay Loader  Safety glasses
 Grader  High visibility vest
 Dump trucks  Work Gloves
 Dust musk

Page 2 of 5
Job Safety Analysis
For
Back Filling for TCF area
Doc. No. PTJ.JSA.001

Sr.No Job steps Potential hazards Recommendations Responsibility


 Working without permit.
 Obtain the work permit as per assigned task and fully comply with the requirements. Supervisor
 Not comply with ARAMCO
HSSE Officer
1 Work site preparation requirements.  Ensure all crew involved are briefed about activities & hazards, complete JSA prior to every shift.
Permit receiver
 No JSA  Fire resistant coverall shall be recommended for brown field. Workers
 No tool box talk
 Wrong area to be back filled–
damage to underground utilities,
spill, and electrocution.
 Identify correct area to be backfilled. Supervisor
Prepare area or trench to  Existing hazards on the surface HSSE Officer
2 of area to be back filled –  Remove or mitigate any existing hazards that may exist on the surface of the area to be back filled.
be back filled Operator
contact with overhead lines,  Visually identify above ground services/lines in area that may be damaged or create an overhead hazard. Workers
damage to surface
equipment/lines, surface items
falling into the trenches.
 Unauthorized and/or unintentional
entrance to excavation – fall into
excavation.
 Potential hazard of both worker  Completely barricade the entire area to be back filled.
and mobile equipment falling in
 Use signage and/or tags to indicate purpose of barricading.
open holes or trenches.
Barricade area to be  Have traffic re-route plan when necessary to safely re-route traffic. Supervisor
3  Traffic may have to be re-routed –
back filled.  Barricades to be clearly lit during darkness with warning lights. HSSE Officer
create other hazard (identify
 Make eye contact with drivers in vehicles to avoid being missed and struck. Wear high visibility vests in Workers
here).
 Motor vehicle crashes and injuries traffic areas. Establish walkways for workers to avoid moving vehicles.
to occupants as barriers not
visible especially during darkness.
 Struck by moving vehicle at site.

Page 3 of 5
Job Safety Analysis
For
Back Filling for TCF area
Doc. No. PTJ.JSA.001

Sr.No Job steps Potential hazards Recommendations Responsibility


 Flag man to coordinate the equipment movement.
 Assign licensed and experienced operators.
 Removing of temporary supports
 Install adequate safety signs.
or reinforcement Supervisor
 Wearing of the required PPE’s .
 Slip and trip of workers HSSE Officer
5 Back filling activities  Pump water out when necessary.
 Fall of workers and equipment Scaffolders
 Workers to use proper tools when using hand tools for back filling. Workers
 Workers to take regular breaks (specify time based on work conditions). Flag Man
 Workers to drink fluids, take breaks when working in warmer weather -.frequency based on conditions. Evaluate
need to provide shaded break area.
 Approved extended work permit to be obtained prior to start of work, Close supervision required.
 Unauthorized extended  Wear clear safety glasses.
 Welfare facilities, Transportation facilities, HSE coverage to be available. Foreman/ Supervisor
work.
6 Extended work if required Safety person
 Poor visibility due to  Proper lighting in all work areas, access areas, lighting preparation to be done prior start of work. All concern persons
inadequate lighting  No equipment moving in poor illuminated area.
 Dedicated electrician, maintenance personnel to be available at night.
 Slip, trip, Fall  Watch your steps. Foreman/ Supervisor
7 Closing the work  Poor housekeeping  Keep all material in designated place. Safety person
 Do the housekeeping before leaving the work place. All concern persons
 TCF field area in case of emergency inform immediately the HSE and construction representatives. Foreman/ Supervisor
 Unawareness of
8 Emergency  Personal must know the procedure of emergency evacuation. Safety person
Emergency Procedure.
 In case of any emergency, permit will be cancelled automatically,. All concern persons

 Move the injured personnel to the nearest “Rest Shelter”. Foreman/ Supervisor
9
Working during daily  Heat Stress Emergency  While waiting for the medical response team, provide cold drink water. Safety person
hours Cases
 Remove clothes and cool the injured person by fan, until medical response team arrives. All concern persons

 EMERGENCY CONTACT NOS.

 PERTROJET.
 Salah A Dayem (HSE) – 0547055154
 Khaled Mosad (const.MGR) – 0547287205
 Mohamed Mamdouh ( project MGR)- 0539086838

Page 4 of 5
Job Safety Analysis
For
Back Filling for TCF area
Doc. No. PTJ.JSA.001

JSA TALK ATTENDANCE SHEET Date:

By Signing this attendance sheet, I confirm that I have attended the JSA Briefing by my
Job Supervisor & I understand in my own language the content of this Job Safety Analysis
(JSA).
Sr. No. Name Trade ID Badge # Signature

Page 5 of 5