Project Profile On Electronic Gate Security Systems
Project Profile On Electronic Gate Security Systems
Project Profile On Electronic Gate Security Systems
Introduction :
Electronic product of safety device as an alarm while any person crosses through a gate of any big residence or
any building enclosures. Security system of main gate of any big residential building, restricted commercial
complex, establishment has been additionally strengthened through sophisticated electronic devices and
gadgets. As such, enterpreneurs taking up this project will reap good profit and also make quick return of
investment
Process of Manufacture: The electrical and electronic components as detailed under the column of raw materials
requirement are produced and inspected as a routine quality control inspection. As details in the technical aspects column,
suitable PCBs are to be soldered to accommodate all the components in two segments as transmitter and receiver as listed
under the raw materials column and to be conneted as per the circuity narrated earlier. The assembled PCBs alogwith
separate 9 Volt batteries supply and the alarm with speaker are to be mounted on three separate study insulated bases and
terminals for external link may be brought out. All are housed inside their respective moulded PVC bases and screwed
properly. The final product is tested and checked. The product is finally packed inside an attractive carton pack with
guarantee and card & users manual.
a
1 Name of the Product : Electronic Gate Security System
2 Project Cost :
a Capital Expenditure
Land : Own
Workshed in Sq.m on rent 100 Rs. 30,000.00
Equipment : Rs. 150,000.00
Portable drilling machine-1, IC Tester Kit-1, Test bench with instrument is fitted on Board -1, Work
bench fittes with electrical power sockets-4, Digital multimeter 3-1/2 digit LCD Display AC/DC V/A/Ohm
& transistor check features-3, Hand operated DC 500 V Meggar-2, 0-200 micro ohm to 2000 ohm
Digital mulli-ohm meter-1, Electrification & installation charges @ 10% cost of m/c equip. cost office
furniture typewriter work bench shelves racks.
15 Cost Analysis
Sr.No. Particulars Capacity Utilization(Rs in '000)
100% 60% 70% 80%
1 Fixed Cost 346.20 207.72 242.34 276.96
2 Variable Cost 760.00 456.00 532.00 608.00
3 Cost of Production 1106.20 663.72 774.34 808.96
4 Projected Sales 1400.00 840.00 980.00 1120.00
5 Gross Surplus 293.80 176.28 205.66 235.04
6 Expected Net Surplus 277.00 160.00 189.00 219.00
Note : 1. All figures mentioned above are only indicative.
2. If the investment on Building is replaced by Rental then
a. Total Cost of Project will be reduced.
b. Profitability will be increased.
c. Interest on C.E.will be reduced.