Contractor : Client :

TESTING & COMMISSIONING AIR BALANCING WORKS


Project Title : Childcare Centre, Kuala Lumpur City Centre for Petroliam Nasional Berhad
Ref. Drawing No. : Ref No. :
Location:
Date :
Subcontractor: Sunline Technical Services Sdn Bhd
Equipment / Ref.: Manufacturer:SMARTECH Model: Serial No.

AHU / FAN / FCU


Reading
Item Location Design Volume (CFM) Remarks
Final (CFM)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Total Airflow rate
Remarks:

STATUS OF INSPECTION
I / We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document
Conducted By Sub- Checked By Witness & Verified By Acknowledged By
Contractor Main-Contractor Client's Consultant
Signature
Name
Company
Date
Page 1 of 4
Contractor : Client :
TESTING & COMMISSIONING AIR BALANCING WORKS
Project Title : IPKB (PACKAGE A)
Ref. Drawing No. : Ref No. :
Location: BLOCK D1-B,
Date :
Subcontractor: Sunline Technical Services Sdn Bhd
Equipment / Ref.: Manufacturer:SMARTECH Model: Serial No.

AHU / FAN / FCU


Reading
Item Location Design Volume (CFM) Remarks
Initial (CFM) Final (CFM)
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Total Airflow rate
Remarks:

STATUS OF INSPECTION
I / We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document
Conducted By Sub- Checked By Witness & Verified By Acknowledged By
Contractor Main-Contractor Client's Consultant ER/ERA
Signature
Name
Company
Date
Page 2 of 4
Contractor : Client :
TESTING & COMMISSIONING AIR BALANCING WORKS
Project Title : IPKB (PACKAGE A)
Ref. Drawing No. : Ref No. :
Location: BLOCK D1-B,
Date :
Subcontractor: Sunline Technical Services Sdn Bhd
Equipment / Ref.: Manufacturer:SMARTECH Model: Serial No.

AHU / FAN / FCU


Reading
Item Location Design Volume (CFM) Remarks
Initial (CFM) Final (CFM)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
Total Airflow rate
Remarks:

STATUS OF INSPECTION
I / We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document
Conducted By Sub- Checked By Witness & Verified By Acknowledged By
Contractor Main-Contractor Client's Consultant ER/ERA
Signature
Name
Company
Date
Page 3 of 4
Contractor : Client :
TESTING & COMMISSIONING AIR BALANCING WORKS
Project Title : IPKB (PACKAGE A)
Ref. Drawing No. : Ref No. :
Location: BLOCK D1-B,
Date :
Subcontractor: Sunline Technical Services Sdn Bhd
Equipment / Ref.: Manufacturer:SMARTECH Model: Serial No.

AHU / FAN / FCU


Reading
Item Location Design Volume (CFM) Remarks
Initial (CFM) Final (CFM)
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
Total Airflow rate
Remarks:

STATUS OF INSPECTION
I / We have carried out all necessary inspections and verify that the above items/activities conform to the contract
specifications/document
Conducted By Sub- Checked By Witness & Verified By Acknowledged By
Contractor Main-Contractor Client's Consultant ER/ERA
Signature
Name
Company
Date