01 Resume David Changwon Park

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

DAVID CHANGWON PARK

ADDRESS 111-323 Parkland Dr., Halifax, NS B3S1L6 MOBILE +1(902)210-3751 EMAIL [email protected]
WEBSITE http://davidcwpark.weebly.com

QUALIFICATIONS
INSTITUTION
The Ontario Association of  Associate member No. 898681
Certified Engineering ( Jan, 2017 ~ Dec, 2017 )
Technicians and Technologists

Human Resources  Engineer Civil Engineering(License No.95202110076H, Jun 12, 1995)


Development Service of Korea
 Engineer Construction Material Testing(License No.95204110207O, Aug 21, 1995)

PROFESSIONAL EXPERIENCE

COMPANY Saman Corporation (http://www.samaneng.com)


(SEOUL/ SOUTH KOREA) Period of Services: May 13, 1996. ~ November 17, 2014.

Metro / Light Railway Transit / Magnetic Levitation Train / Overseas Metro


CAREER FIELDS (a) Interfaced and managed (civil, Architecture, E&M, and System) Metro Project.
DETAIL SKILLS (b) Calculated alignment using a cubic parabola and Clothoid curve.
(c) Analyzed subway & LRT structural using a program (Sap2000).
(underground concrete box and elevated bridge structure)
(d) Reviewed section and arrangement of bar for the reinforced concrete.
(e) Created master plan
(f) Estimated cost
(g) Drafted CAD & Calculated quantity

SOFTWARE SKILLS  AUTOCAD(2D&3D), Civil 3D, SAP2000, EXCAVE, K-ERA, Mathcad


 MS WORD, EXCEL, POWER POINT, PHOTOSHOP.

AZERBAIJAN EXPERIENCE  Master Plan, Basic and Detail Design, Shop Drawing for Baku Metro.
(May 5, 2009. ~ November 17, 2014.) (a) (e) (g)

KOREAN EXPERIENCE  Master Plan for Goyang LRT. (June, 2006. ~ January, 2007.) (b) (c) (g)
 Master Plan for Kimpo LRT. (October, 2007. ~ October, 2009.) (f) (c) (g)
 Master Plan for Seoul Urban LRT. 7 Lines. (July, 2006. ~ August, 2007.) (b) (c)
 Master Plan for Seoul Sangam DMC. (October, 2005. ~ May, 2006.) (e) (f) (g)
 Master Plan for Gwangju Line No 2. (November, 2003. ~ July, 2005.) (a) (e)
 Detail Design for Construction of Double Electrified Railway from Ori to Suwon
(Youngtong~Bangjook). (December, 2002. ~ December, 2003.) (c) (g)
 Detail Design for Busan Subway Line No.3 (Minam ~ Bansong) Section 2.
(October, 2001. ~ October, 2003.) (c) (g)
KOREAN EXPERIENCE  Detail Design for Daejeon Subway Line No. 1, Section 2-14, 2-15.
(Continued) (December, 1997. ~ February, 2001.) (c) (g)
 Detail design and construction supervision for Seoul subway line No. 7, section 7-
24 & 7-26. (December, 1996. ~ December, 1998.) (d) (g)

EDUCATION
CIVIL ENGINEERING NIAGARA Collage, Welland, Ontario, Canada (Sep 3, 2015. ~ June 23, 2017.)
TECHNICIAN PROGRAM Diploma(Niagara Scholar Award)

YONSEI University, Seoul, South Korea (Mar 2, 2007 ~ Aug 28, 2009.)
MASTER’S PROGRAM
Civil Engineering in the Graduate School of Engineering.
Dissertation: Study on the effect on bridge behavior caused by horizontally arranged
member of steel girder bridge for straddle-type monorail

BACHELOR OF CIVIL CATHOLIC KWANDONG University, Gangneung-si, Gangwon-do, South Korea


ENGINEERING (Mar 2, 1989 ~ Feb 23, 1996.)

TRAINING
In the Niagara College Civil Engineering Technician program.
RADIATION SAFETY TRAIINNG
Training for CIVL 1356- MaterialsⅡ
November, 2016

NIAGARA CONSTRUCTION ASSOCIATION


CONFINED SPACE TRAINING In the Niagara College Civil Engineering Technician program.
March, 2017

You might also like