PROJECTS HANDLED

SUPERVISION
Sr. Year Company PROJECT NAME & CLIENT Location MAIN CONTRACTOR Scope of Works Designation Status
CONCULTANT

Implementation of Fully MEP System. HVAC


System : Supply and
installation Chilled water System Total Capacity 957 TR .
Supply and installation One (1) set of Chilled water pumps (2 duty+ 1standby ) of
capacity 205 GPM @ 18m head , one (1) set each of chilled water pumps (1 duty+
1standby ) of capacity 56 GPM @ 25m head and 28GPM @ 28m head , four (4)
FAHU’s of capacities 113 kw, 169kw, 63kw, 32kw , ninety five (95) Fan coil units
and all related chilled water piping and valves for Main villa , Majlis tent and Garden
Majlis. Supply and installation ventilation (
Supply & Exhaust Fans ) Including Ducting Works.
Implementation of internal & External Drainage networks & Water Services
networks Systems including water treatment & filtration system as the wollowing.
Cold water system : one (1) set of transfer pump (1duty+ 1standby) 2.5 L/S @ 16m
Jan-2016 up ALKHOR head at basement ,one (1) set booster pump (1duty+ 1standby) of capacity 4.0L/S MEP Project
1 ALKHOR FARM PALACE UCC ERGA QATAR On progress
to date QATAR @ 16m head at roof, one (1) GRP insulated roof water tank of capacity 20.28m3 and its Manager
related valves, connections and piping.
Hot Water System : one (1) boiler of capacity 1000 liters 36 kw, one (1) set of hot
water circulating pumps (1duty + 1standby) of capacity 0.15 L/s @ 3.0 M head , one
(1) set of hot water return circulating pump (1duty + 1standby) of capacity 0.5 L/s @
16.0 M head and all related valves and piping.
Water Treatment System : one (1) automatic multimedia filter of capacity 4.7m3/hr.,
one (1) automatic water softener of capacity 4.7m3/hr ., three (3) sediment filters of
capacity 4.7m3/hr.; one (1) automatic softener of capacity 4.7m3/h , three (3)
automatic chemical dosing of capacity 4lph , RCC water tank and related valves and
piping.
Radiant Engineering
Enterprises Co Implementation all Electrical systems lighting & Power System - ELV , CCTV,
Telephone & data system & Home Automation System completely.

Implementation of Fully MEP System. HVAC


System : Supply and installation VRF System 45 Nos of VRF indoor units (SAMSUNG )
Make interfaced with 3 Outdoor Units Total capacity: 500 Kw = 150 TR . Supply and
KCT installation Fresh Air AHU Total capacity : 30 TR with kitchen hood , Toilet & Car parking
Jan- 2015 up KHAYYAT Private Villa + MAJLES Doha New
2 KHAYYAT Contracting & ERGA QATAR ventilation ( Supply & Exhaust Fans ) Including Ducting Works.
to date Project area : 5450 m² ALRAYYAN
Trading Co. Implementation of internal & External Drainage networks & Water Services networks
Systems including water treatment & filtration system . Implementation all
Electrical systems lighting & Power System - ELV , CCTV, Telephone & data system &
Home Automation System completely.

Implementation of Fully MEP System. HVAC


System : Supply and installation VRF System 61 Nos of VRF indoor units (SAMSUNG )
Make interfaced with 4 Outdoor Units Total capacity: 580 Kw = 165 TR . Supply and
GHANIM ALQUBASSY Private Complex Villas +
KCT installation Fresh Air AHU Total capacity : 35 TR with kitchen hood , Toilet & Car parking
Jan- 2015 up Majles Total Doha MEP Project
3 KHAYYAT Contracting & ERGA QATAR ventilation ( Supply & Exhaust Fans ) Including Ducting Works. On progress
to date Project area : 13000 m² Total ALDUHAIL Manager
Trading Co. Implementation of internal & External Drainage networks & Water Services networks
Project building area : 8000 m²
Systems including water treatment & filtration system . Implementation all
Electrical systems lighting & Power System - ELV , CCTV, Telephone & data system &
Home Automation System completely.
SUPERVISION
Sr. Year Company PROJECT NAME & CLIENT Location MAIN CONTRACTOR Scope of Works Designation Status
CONCULTANT

Implementation of Fully MEP System. HVAC


System : Supply and installation 20 Nos of roof top package unites & 17 Nos of Ducted
split units Various capacity Total capacity: 240 TR . with kitchen hood , Toilet & Car
SALAH AL ALI PALACE KCT
July -2015 up Doha parking ventilation system ( Supply & Exhaust Fans ) Including Ducting Works. MEP Project
4 Total Project area :8000 m² Total KHAYYAT Contracting & PVG On progress
todate ALDUHAIL Implementation of internal & External Drainage networks & Water Services networks Manager
Project building area : 2850 m² Trading Co.
Systems with Do including water treatment & filtration system .
Implementation all Electrical systems lighting & Power System - ELV , CCTV, Telephone &
data system & Home Automation System completely.

Radiant Engineering Implementation of Fully MEP System. HVAC


Enterprises Co System : 15 Nos of AHU Various capacity with 6 Nos of kitchen hood ventilation ( Supply
Jan- 2015 up Doha & Exhaust Fans ) system double skin type Including Ducting Work. with Implementation of
Palm EZDAN Caffe & MOKARABIA Restutant MEP Project
5 to March EZDAN Hotel EHAF Drainage & Water Service System. Finished
Project area : 1500 m ² Manager
2016 Tower 1 Implementation of Fire Fighting Protection Sprinkler System & Fire Alarm System .
Implementation of Electrical System. lighting and Power - ELV , CCTV, Sund System
,Telephone & data system completely

Mechanical Construction Manager for back of house - replaced,Rectification and


modification all Vacuum system , Air compressor system , steam system , HVAC System, MEP Construction
6 Sep-14 Renovation of Doha Sheraton project · Doha UCC Jayn,Shaker , Ehafe Finished
Water Supply & drainage system for laundry & Kitchen area , replaced all submersible Manager
Pumps in the project.

Supply and installation of HVAC System : 570 TR For al Shahaniy & 420 TR For al
shamall of package unite PETRA type with Ducting Work. completeely with Drainage &
AL SHAHANIYA & AL SHAMAL SECONDARY AL REDCO Senior HVAC &
CEG - INTERNATIONAL Water Service System., Fire Fighting Protection System:32 NOS of Hose reel System ,
7 2013 GIRLS SCHOOL Client / Public Work SHAHANIYA CONSTRUCTION AL- Mechanical Finished
DOHA- QATAR 8 Nos of Fire hydrant including piping network (2 NOS of horizontal split case Duty Elec &
Authority ( PWA) ASHGAL - Building affaire & AL SHAMAL MANA DOHA- QATAR Engineer.
QATAR ELECTRO Diesel fire pump set ,Capacity:750 GPM @ 111 psi ,with 2 NOS of vertical in line jockey
MECHANICAL fire pump Capacity : 75 @ 122 psi )
GROUP (QEMG)
AL- MANA
DOHA- QATAR COMPLETION OF THE REMAINING
CONTRACT WORK OF DEVELOPMENT OF REDCO Rectification ,Testing & commissioning for Mechanical system for 2 Building (Multi
(ACE) Arab Consulting Senior HVAC &
DOHA RACING AND EQUESTRIAN CLUB CONSTRUCTION AL- Purpose & Club Hous Building ) HVAC System : 30 Nos of Packege Unit ,69 Nos of
8 2013- 2014 AL RYAAN Engineers -Moharram - Mechanical Finished
(PHASE-2 PACKAGE-B) Clinte / MANA DOHA- Ducted split A/C,12 Nos of AHU,8 Nos of FCU Different Capacity (Carrier & York type )
Bakhoum DOHA- QATAR Engineer.
RACING & EQUESTRIAN CLUB QATAR .,Water Service & Drainage System. ,LPG SYSTEM .

Supply and installation of AC & MECHANICAL VENTILATION System : 200 TR of


Ducted Split AC unite Diken type with Ducting Work. JET Fan for car parking
PROPOSED 2B G+M+5 OFFICES ROYAL ABJER TRAD ALSHAHEEN
FREEJ BIN VENTILATION System . Fire Fighting Protection Sprinklers System: 792 NOS of Mechanical Project
9 2010:2012 BUILDING Clinte .&CONT ENGINEERING Finished
EMRAN Sprinklers System ,9 NOS of Hose reel Systemt including piping network(500 GPM @ 155 manager.
/HAWA'A ABD ALRAHMAN AL- MANSOOR PLANNING GROUP Doha - Qatar.
psi horizontal split case Duty Elec & Standby Diesel firepump set with 1NOS 50 @ 155 psi
vertical in line jockey fire pump )

TAWIZA SMART Supply and installation of Fire Fighting Protection . Water


MEP SOLUTION Mist System 280 GPM @ 120 Par including impulsion manifold , FILLING TANK
SYSTEMS stainless steel,HIGH PRESSURE STAINLESS STEEL PIPING
NETWORK,HIGH PRESSURE STAINLESS STEEL OPEN NOZZLE NOVEC SYSTEM
including Gas Suppression cylinder, ERW GI A53 pipe network Detection System &
QATAR ASTAD Project Mechanical Project
10 2011-2012 MV3 Mezza Data center HARINSA QATAR Master actuation Package -Solenoid Valve 1 Liberary . Finished
FOUNDATION Management Manager
Vesda System; including control panel, pipework, controls and accessories

Car park & Mechanical Ventilation system


11 Proposed Tourist Apartment Bld. (B+G+M+5) Bin Mahmoud Al Tabadol Supply & Installation (Jet & Exhaust Fans) includind ducting work & all Accessories
AEBARAB ENGINEERING
New Vision Co. BUREAU Doha - Qatar. HVAC, Mechanical
2006 Finished
(DOHA QATAR Site Engineer
SUPERVISION
Sr. Year Company PROJECT NAME & CLIENT Location MAIN CONTRACTOR Scope of Works Designation Status
CONCULTANT
(DOHA-QATAR Site Engineer
12 Al Wajba Palace Al Wajba Supply and Installation of 2No. Circulating Water Pump for Fountain-5.5KW with all
Accessories

Shk. Ahmed Bin Suheim Al Thani (48 James Cubit & Partners Sub - Contractor (from LG) Supply and Installation of Duct Split Unit, Different Capacity ,
13 Al Saad RAMCO Doha - Qatar
Appartment B+G+7) Engineering Consultancy. includind ducting work & all Accessories

Shk. Hessa Saef Ahmed Al Thani (66 James Cubit & Partners Sub - Contractor (from LG) Supply and Installation of Duct Split Unit, Different Capacity ,
14 Al Saad RAMCO Doha - Qatar
Appartment B+G+6) Engineering Consultancy. includind ducting work & all Accessories
Gernas Air
Shk. Khalid Al Misnad - Commercial & Sub - Contractor (fromTADMUR) Supply and Installation of DAIKEN Duct Split Unit &
15 Conditioning Co Bin Omran TADMUR Doha - Qatar MZ
2004 -2006 Residential Compoound (Al Maha Centre) Package Unit different Capacity , includind ducting work & all Accessories. HVAC Site Engineer Finished
(GTC). (DOHA-
QATAR. Sub - Contractor (fromTADMUR) Supply and Installation of DAIKEN Duct Split Unit
16 Qatar Royal Hotel Al Asmakh TADMUR Doha - Qatar
different Capacity , includind ducting work & all Accessories.

Gulf Engineering
Al Wajba Sub - Contractor (from LG) Supply and Installation of Duct Split Unit, Different Capacity ,
17 Shk. Ahmed Bin Jassim Al Thani Palace LG Doha - Qatar &Industrial
Shahaneea includind ducting work & all Accessories
Consultancy,Doha-Qatar
Marina Trading Contracting Co.
P.O. Box: 15534
Tel.: (+974) 4322250 PROJECT HANDLED
Fax: (+974) 4325708

Sr Year PROJECT NAME / CLIENT LOCATION MAIN CONTRACTOR SUPERVISION CONCULTANT SCOPE OF WORKS STATUS

Administration & New


Training Center for Al ASAS Engineering United Consultants. HVAC : Supply and installation 650TR of package unite carreir type with Ducting Work. completeely with Drainage System ,Water Service
1 2007 Bin Omran Finished
Jazeera Channel / Al Doha-Qatar Doha-Qatar System & Fire Fighting Protection, Sprinkler System.
Jazeera Satellite Net Work

Gulf Engineering &Industrial Electro Mechanical Work


Al Hassan Consultancy,Doha-Qatar
Islamic Institute./ Ministry
International Trading Client Representative
2 2007-2008 of AWQAF and Islamic Al Waab Finished
& Contr. Co. W.L.L :ASHGHAL Building Affairs 1- HVAC :Re-design Supply and Installation 400 TR Roof Top Package Unit York Type completeely with ducting work & accessories
Affairs
Doha-Qatar Public Work Authority.
2- Supply and installation of drainage system.
Doha-Qatar
3- Supply and installation of Water Service System.

Electro Mechanical Sub Contractor. HVAC Chilled Water System


QACC Contractor-
Parcel PA-09, PA-05, Pearl Pearl Qatar, 1- Installation of FCU, AHU with Ducting Work .
3 2008 Qatar Arabian Dar Al Handasa Finished
Qatar Porto Arabia 2- Installation of Chilled Water Pipe System with Valve and Fittings
Construction Co.
3- Drainage System & Water Services System
1-Fire Fighting Protection, Sprinkler System
Installation of fire fighting sprinkler system for car parking area around (12270.7 m²)
coverd by sprinkler system with 21 NOS fire hose rell Cabent completeely with
steel Piping work with & Accessories.
• Supply and Installation of fire pump set with complete accesores .
Fire Pump Capcity : ELEC Pump Q= 1000 GPM @ 10.9 Par Haed
Diesl Pump Q= 1000 GPM @ 10 Par Haed
Commercial Development Jocy Pump Q= 100 GPM @ 10.13 Par Haed
Markiya AEBARAB ENGINEERING
4 2008-2009 (B+G+M+1) (Markiya Mall DORA CRC 2- Plumbing System Finished
South BUREAU Doha - Qatar.
) Supply and installation of Domestic water supply system with complete (PPR)
Piping system with Accessories.
Supply and installation of Domestic water lifting & Poster Pump Set .
LIFTING Pump Capcity : Q= 6.0 L/SEC @ 4 Par Haed , with 300 L
Pressure Vessel.
• Supply & installation 2NOS of Domestic & fire water Sectional tank
For Domestic water capacitr : 144 m ³ - for fire capacity : 231 m³
3- Drainage System
• Supply & installation UPVC Pipe for Drainage System complete with Accessories .
• Supply & installation 2NOS of sump pit pump -Capcity: (5 L/SEC @ 10M HAED).
1- HVAC & Mechanical ventilation system

• Supply and installation 3 NOS of Air Cooled Chiller


(240 TR Capacity each TOTAL 720 TR) Manufacturer (CARRIER ) .
• Supply and installation 14 NOS of AHU & 188 NOS of FCU (Total Capacity TR)
completeely with Ducting & cilled Piping work with all Accessories .
• Supply and installation 4 NOS of Horizonal Centrifugal Chilled water pump set .
Capacity ( 576 GPM @ 180 Head ) Manufacturer (ITT BELL & GOSSET ) .
• Supply and installation of 4 NOS of Centreifugal In Line Exhaust Fan
Capacity 8000 CFM each & 4000 CFM For Frish Air Fan 4 NOS
for Car Parking Ventilation System completeely with Ducting work
3- Plumbing System
Proposed Hotel SEC (Shanon
Air Port DRA Engineering Conslltant • Supply and installation of Domestic water supply system with complete (PPR)
5 2009 ( 2B + G + M + 7 ) Engineering Co Finished
Road Doha - Qatar. Piping system with Accessories.
QIB ( Qatar Islamic Bank ) Doha-Qatar
• Supply and installation of Domestic water lifting & Poster Pump Set .
• Supply & installation 2NOS of Central Water Heater Capacity ( 500 GAL )
82 KW each Manufacturer (O.A .THMES ) With Circulation Pump set
Capacity 1.5 L/ S @ 10 Head
• Installation of LIFTING Pump set Capcity (5.3 L/S @ 70 M Head )
• Installation of Roof Pressur Pump set Capcity (5 L/S @ 20 M Head )
• Supply & installation 2NOS of Domestic water Sectional tank Capacitr : 35 m ³
• Installation of fire fighting Concret water tank complete with full accessors .
4- Drainage System

• Supply & installation UPVC Pipe for Drainage System complete with
Accessories .
• Supply & installation 2NOS of sump pit pump
Capcity: (5 L/SEC @ 10M HAED).