Choose 6 Piles
The factor 1.05 It takes into consideration the pile cap own weight.
The spacing between piles usually taken (2.5Ø to 3Ø) i.e. in this
example use spacing of 2.0 m
The distance from the centerline of the pile to the edge is taken (0.8Ø to
1Ø) Use 0.8 m
The pile cap depth is assumed to be 1.40 m
Example (Design of Pile Cap )
Traditional Method
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Own weight of pile cap (Service) = 2.5 x 5.6 x 3.6 x 1.40 = 70.56 ton
700 70.56
128.43 cm < 135 ok
6
Example (Design of Pile Cap )
Traditional Method
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Step 2 : Check for Shear
One way shear
Factored load of column Factored O.W of pile cap
Factored Load of pile
6
1050 1.2 70.56
Factored load of pile 189.11 ton
6
d 140 7 1 132 cm
The critical section is at d from the column face as shown in the following
figure
Section 1-1
The pile load should be reduced depending on the location of the critical
section pile Width at critical section 48 0.60
pile diameter 80
The critical section is at d/2 from the column face as shown in the
figure
a1 c1 d 120 132 252 2.52 m
b1 c2 2 d 60 132 192 1.92 m
U 2(a1 b2 ) 2 2.52 1.92 8.88 m
The punching load equals to the column load + own weight of pile
cap in punching area minus the parts of the piles loads located in
the punching area
36
Reduced Farctored load of pile 189.11 85.10 ton
80
Vu = P column + O.W of pile cap within area – 2 x reduced pile load
2
Vc 0.75 0.53 (1 ) 300 888 132 /1000 1614.04 ton Vu ok
2
Example (Design of Pile Cap )
Traditional Method
ــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Check Punching shear for individual pile
As /m = 156.82/3.6 =43.56
use 9Ø25 mm / m
Section 2
Mu = Moment of (3 piles ) - moment due to O.W of hatched pile cap
Section 2
1.52
M u (3 189.11 0.7) (1.2 5.6 1.4 2.5 423.59 ton
2
As /m = 243.94/5.6 =43.56
use 9Ø25 mm / m
HW Problem
ـــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــــ
Design and give complete detailing of the pile cap that
constitutes a part of deep foundations system. (Using two
piles configurations)
The design data are as follows: