Haulage Capacity Wag-7

Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

TECHNICAL CIRCULAR NO.

ELRS/TC/0086 (Rev 0)

No. No. El/3.1.39 / 1 Dated 28-10-05

CHIEF ELECTRICAL ENGINEER,

1. Central Railway, Mumbai, CST-400 001.


2. East Central Railway, Hazipur-844101.
3. East Coast Railway, Chandrashekharpur, Bhubaneshwar-751016.
4. Eastern Railway, Fairlie Place, Calcutta-700001.
5. North Central Railway, Hastings Road, Allahabad- 211001.
6. Northern Railway, Baroda House, New Delhi-110001.
7. South Central Railway, Secunderabad-500 071.
8. South East Central Railway, Bilaspur-495004.
9. South Eastern Railway, Garden Reach, Calcutta-700 043.
10. Southern Railway, Park Town, Chennai-600 003.
11. West Central Railway, Jabalpur-482001.
12. Western Railway, Churchgate, Mumbai-400 020.
13. South Western Railway, Hubli.
14. Chittaranjan Locomotive Works, Chittaranjan-713 331 (WB).

15. Director, IRIEEN, Post Box No.233, Nasik Road, Nasik – 422 101

Sub: Haulage capacity of WAG7 Locomotive with 16:65 Gear Ratio in Run through
conditions on different gradients with CC+6 (5062 t) and CC+10 (5294 t) loading of 58
BOXN.

The haulage of 4700 t load with WAG7 locomotive with 16:65 gear ratio on different
gradients have been issued by RDSO vide EL/3.1.39/1 dt 01-06-98 (Technical Circular No. 22).
Railway Board have permitted the loading of Box N wagon with CC+6 vide letter no. 2004/CE-
II/TS/2 dt 4-5-2005 and CC+10 vide letter no. 2003/CE-II/TS/5 Vol. I dt 4-5-2005. 58 Box N
train with CC+6 (5062 t) and CC+10 (5294 t) cannot be started by single WAG7 locomotive on
1:200 up-gradients, 1:150 up-gradients or 1:100 up-gradients. However, such stretches can be
negotiated in run through condition. WAG7 locomotive can negotiate 1:200 up gradient with
5062 t (CC+6) Box’N’ load in run through condition with speed more than 20 kmph. For other
gradients and loads the lengths of stretches which can be negotiated at various attacking speed,
have been arrived at by computer simulation and are given as under –
Table-1
Negotiable Length on 1:150 Compensated up gradient in Run Through Conditions
For Load – 5062 t (CC+6)

Attacking Speed Max. length of 1:150 section which Exit Speed


(kmph) can be negotiated (km.) (kmph)
25 1.00 16.0
30 1.25 22.5
40 2.00 27.0
50 3.00 31.0
60 4.00 33.5
70 5.00 35.0

Table-2
Negotiable Length on 1:100 Compensated up gradient in Run Through Conditions
For Load – 5062 t (CC+6)

Attacking Speed Max. length of 1:100 section which Exit Speed


(kmph) can be negotiated (km.) (kmph)
Upto 25 Not recommended -
30 0.5 18.50
40 0.75 27.00
50 1.25 30.00
60 1.75 33.50
70 2.00 41.00

Table-3
Negotiable Length on 1:200 Compensated up gradient in Run Through Conditions
For Load – 5294 t (CC+10)

Attacking Speed Max. length of 1:200 section which Exit Speed


(kmph) can be negotiated (km.) (kmph)
20 3.0 16.0
30 4.5 24.0
40 5.5 28.5
50 6.5 36.0
60 8.0 37.5
70 8.5 40.0
Table-4
Negotiable Length on 1:150 Compensated up gradient in Run Through Conditions
For Load – 5294 t (CC+10)

Attacking Speed Max. length of 1:150 section which Exit Speed


(kmph) can be negotiated (km.) (kmph)

Upto 25 Not recommended -


30 1.00 21.5
40 2.00 25.0
50 2.50 32.5
60 3.50 34.5
70 4.50 36.0

Table-5
Negotiable Length on 1:100 Compensated up gradient in Run Through Conditions
For Load – 5294 t (CC+10)

Attacking Speed Max. length of 1:100 section which Exit Speed


(kmph) can be negotiated (km.) (kmph)
Upto 30 Not recommended -
30 0.50 17.5
40 0.75 26.0
50 1.25 28.5
60 1.75 32.0
70 2.00 40.0

2. Railways are requested to conduct field trials on the above guidelines in different
sections. Based on such trials. you may issue guidelines to Drivers to enable them negotiate such
stretches successfully without causing stalling and overloading of electrical equipments. RDSO
may be kept apprised of the developments.

(I. C. Sharma)
Sr. Executive Director Std/Elect
For Director General Std/Elect

Encl.: Nil.
Copy to:
1. Secretary (Electrical) Railway Board, Rail Bhawan, New Delhi-110001.
2. Sr. Divl. Electrical Engineer ( Operation )
- Central Railway, DRM office, Mumbai CST-400 001
- Central Railway, DRM office. Bhusawal (Maharashtra)

- Eastern Railway, DRM office, Howrah


- Eastern Railway, DRM office, Asansol
- East Central Railway, DRM office, Dhanbad.
- East Central Railway, DRM office, Mughalsarai.

- East Coast Railway, DRM Office, Khurda Road.


- East Coast Railway, DRM Office, Sambalpur.
- East Coast Railway, DRM Office, Waltair.

- Northern Railway, DRM office, Delhi


- North Central Railway, DRM office, Allahabad.
- North Central Railway, DRM office, Jhansi, (U.P.).
- North Central Railway, DRM office, Agra.

- Southern Railway, DRM office, Chennai

- South Central Railway, DRM office, Vijayawada


- South Central Railway, DRM office, Secunderabad

- South Eastern Railway, DRM office, Kharagpur


- South Eastern Railway, DRM office, Chakradharpur
- South East Central Railway, DRM office, Bilaspur.
- South East Central Railway, DRM office, Nagpur
- South East Central Railway, DRM office, Raipur.

- South Western Railway, DRM office, Bangalore.


- South Western Railway, DRM office, Hubli.
- South Western Railway, DRM office, Mysore.
- Western Railway, DRM office, Vadodara
- Western Railway, DRM office, Ratlam
- Western Railway, DRM office, Mumbai Central.
- West Central Railway, DRM office, Bhopal, (M.P.).
- West Central Railway, DRM office, Jabalpur, (M.P.).
- West Central Railway, DRM office, Kota.

(I. C. Sharma)
Sr. Executive Director Std/Elect
For Director General Std/Elect
Telex : 0535 - 2424 RDSO -IN Hkkjr ljdkj & jsy ea=ky;
Fax : 91 - 0522 - 2450374 vuqla/kku vfHkdYi vkSj ekud laxBu
Telephone : 2450374 & 2451200 y[kuÅ & 226011
Telegram : ‘RAILMANAK’, Lucknow Government of India - Ministry of
e-mail : [email protected] lR;eso Railways
t;rs Research, Designs & Standards
Organization, LUCKNOW - 226011

bZ-,y@3-1-39@1 fnukad% 28-10-2005


VsfDudy ljdqyj la- bZ,yvkj,l@Vhlh@0086 la"kks 0
eq[; fo|qr bathfu;j
1- e/; jsyos] eqEckbZ lh-,l-Vh & 400001-
2- mRrj jsyos] cM+ksnk gkml] u;h fnYyh & 110001-
3- mRrj e/; jsyos] gsfLVa’k jksM] bykgkckn & 211001-
4- if’Pke e/; jsyos] tcyiqj & 482001-
5- nf{k.k iwoZ e/; jsyos] fcykliqj & 495004-
6- if’Pke jsyos] ppZxsV] eqEckbZ & 400020-
7- iwoZ e/; jsyo] gthiqj] fcgkj & 844101-
8- funs’kd] Hkkjrh; jsyos fo|qr bathfu;j laLFkku] ukfld jksM & 422101-

fo"k;% Haulage capacity of WAG7 Locomotive with 16:65 Gear Ratio in Run through
conditions on different gradients with CC+6 (5062 t) and CC+10 (5294 t) loading
of 58 BOXN -

lanHkZ% jsyos cksMZ dk fnukad 4-5-2005 dk i= la 2003@lhbZ&II@Vh,l@5 okY;we & I

mijksDr of.kZr VsfDudy ljdqyj dh ,d izfr vko’;d dk;Zokgh gsrq layXu gSaA

jke izdk’k
d`rs egkfuns’kd@fo|qr
layXud% ;FkksDr

izfr izsf"kr% esfyaxfyLV ds vuqlkj

-------------------------------------

-------------------------------------

------------------------------------- jke izdk’k


d`rs egkfuns’kd@fo|qr

You might also like