Commissioning Schedule 01
Commissioning Schedule 01
Commissioning Schedule 01
and pipings
PAPERS LIMITED
Chennai EBAA0700
CV/ FE 's to
Cleaning Flushing be removed Hydrotesting
while flushing
Completed on 26-10-2016
Remarks: Leaks found at
EVP-WBL-0002-100-CS2 DV 003 Target Date: 31-10-2016
welding, gaskets at WBLFT I/L Completed on 31-10-2016
and attended
Status: Pending.
Completed on 26-10-2016.
EVP-WBL-0005-250-CS3 Target Date: 09-11-2016
Remarks:
Status: Pending.
Completed on 26-10-2016.
EVP-WBL-0010-250-CS3 Target Date: 09-11-2016
Remarks:
Completed on 27-10-2016.
EVP-WBL-0015-250-CS3
Completed on 27-10-2016.
EVP-WBL-0020-250-CS3
2nd effect
6 body, vapor
seperator
Completed on 27-10-2016.
EVP-WBL-0025-250-CS3
IB effect body,
7 vapor
seperator
Completed on 27-10-2016.
EVP-WBL-0032-300-CS3
LV 015A
IA effect body,
8 vapor
seperator
Completed on 27-10-2016.
EVP-WBL-0038-300-CS3
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700
Status: Pending.
Surface
10 EVP-SYC-0294-040-CS2 Target Date: 04-11-2016 Target Date: 05-11-2016
Condenser Completed on 31-10-2016
FE-025,
Orifice to be
removed and Status: Pending.
LIVE STEAM
11 EVP-LPS-01510250-CS6 orifice holes Target Date: 03-11-2016
LINE to be flushed
along with
line flushing
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700
FV-0025, BY
PASS valve
CAN BE
OPENED
Evaporator
16 vacuum leak
test
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700
17 Evaporator BL
water boiling
Evaporator BL
intake
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700
Requirements
Vacuum testing
Status: Pending
Target Date: 10-11-
water connection at WBL I/L
2016
Remarks:
Status: Pending
Target Date: 10-11-
2016
Remarks:
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700
Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:
Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:
Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:
Status: Pending
Target Date: 10-11- Pump 007,008,009 should be ready
2016
Remarks:
Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:
Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:
Status: Pending
Target Date: 10-11- Liquor sampling lines shall be flushed
2016 along with body flushing
Remarks:
Calendria to be hydroetsted
Status: Pending
Target Date: 10-11- pressure guage of hydroetsting and
2016 gaskets for leaking joints
Remarks:
Status: Pending.
Target Date: 10-11-
2016
Status: Pending.
Target Date: 10-11-
2016
EAPL Method and Schedule for flushing, hydrotesting and vacuum testing for Evaporator bodies, tanks, lineRUCHIRA
and pipings
PAPERS LIMITED
Chennai EBAA0700
Status: Pending.
Target Date: 14-11-2016
Status: Pending.
Target Date: 15-11-2016
ENMAS ANDRITZ PVT LTD RUCHIRA PAPERS LIMITED
Chennai Tentative Commissioning Schedule for 40 TPH NEW EVAPORATOR EBAA0700
10/29/2016
10/30/2016
10/31/2016
11/10/2016
11/11/2016
11/12/2016
11/1/2016
11/2/2016
11/3/2016
11/4/2016
11/5/2016
11/6/2016
11/7/2016
11/8/2016
11/9/2016
Sno Area Description
1 Process
Cleaning
Flushing
Water Circulation
Hydrotesting
Vacuum leak testing
water boiling
BL intake
2 Electrical
Motor no load Completed
Load Trial
3 Instrumentation
Loop Checking from Field to marshalling panel
Power on DCS.
Loop Checking from DCS to Field
Calibration of all instruments
Checking sequence logics
checking Auxillary Interlocks
Checking Auto Control loops
Date: 05-11-2016
ENMAS ANDRITZ PVT LTD RUCHIRA PAPERS LIMITED
Chennai Tentative Commissioning Schedule for 40 TPH NEW EVAPORATOR EBAA0700
11/13/2016
11/14/2016
11/15/2016
Remarks
Insulation to be done
Pumps vendors to be
called
Yokogawa Engineer to
be called
Date: 05-11-2016