Curra Community Complex Concept Design
Curra Community Complex Concept Design
Curra Community Complex Concept Design
60.5m
Existing Wetland
Proposed
Volleyball
Court
Proposed
Community Proposed
Garden Grandstand
Seating
61m
Proposed ‘Outdoor
Hall Room’
60.75m
Ground
61.5m
61m
David Drive
Proposed
61.25m Opportunity Playground Proposed Public
for Future Amenities
61.5m Expansion
Proposed
Bus Set Proposed
Down Storage
Facility
Proposed
Country BBQ Facilities
Club
61.75m
61.5m
East Boundary
SD.01
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
The development of the scheme into
Concept Design involves a constant
refinement of the ideas described by
Sports Oval the Site Analysis and the feedback and
Playground views expressed by the community
BBQ Area at the Stakeholder Workshop held by
Bark in May. As the Concept Design
develops in detail, the project will
continually refer back to the initial
Brief to ensure that the design retains
the strengths of the early analysis
and responds to the wishes of the
Pa
community.
no
Cooling North
ra
East Breezes Design Considerations
m
ic
No
s
iew
• Simplicity, functionality and
r th
n V flexibility
er
her
n
or t
Vi
N • Protection from western sun and
ew
c
Winter mi harsh summer sun
ora
s
Sunset n
Pa • Cross ventilation for maximum
advantage of breezes
‘Outdoor Winter
Room’ Sunrise • Connection to surrounding areas
SD.02
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
High Level Summer Sun Shaded
by Roof Overhangs & Awnings
Natural ground
line
SD.03
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Section A-A
SD.05
Proposed Playground,
BBQ Area and Amenities
‘Outdoor Room’
18 x 11.1m
Up Up
Roof dotted overhead Roof dotted overhead
Seat Step
Seat Step
Nook 3.6 x 18.1
3.6 x 3.6m
Servery
Servery
Hall designed with
future expansion
in mind
Kitchen
3.6 x 3.6m Whirlybirds
F
Above
Up
Main Entry
Eastern Covered
Line of trusses
Up
WC and SE
Shower Seating Nook
2.3 x 3.5m 3.6 x 3.7m
WC
1.1x
2.45m
2 x 22.5kL
Above
Ground
Tanks
Optional Southern
Access Stairs
Up Existing Path to
Country Club
A
SD.04
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Twinwall polycarbonate Exposed timber Whirlybirds Roof pitches towards north capturing
cladding to south facade trusses extract hot air desired sunlight and views
SD.05
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Lower pitch roof to west Roller door servery provides Whirlybirds Custom Orb corrugated steel roof sheeting Exposed timber Timber entry ramp providing access
service bay - potential functional connection between extract hot air referencing ‘rural vernacular’ trusses for all members of the community
location for future solar hall interior and kitchen
Storeroom with floor to ceiling Plywood sheet flooring Views to landscape and Opal polycarbonate cladding with exposed
shelves and open space for the 2400 x 1200 sports field studs and steel cross-bracing
storage of tables, shelters, chairs
and equipment
SD.06
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Lightweight and efficient construction Timeless and memorable character instantly recognisable upon entry
Future Wallum Clearly defined entry Hall and immediate landscape celebrates and
landscape planting from car park encourages community activity
SD.07
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Wide and shaded verandahs Proposed playground in close
proximity to hall
Large sliding door at entry Connection to landscape and Timber clad seating provides an intimate
sports field beyond space for small groups to gather
SD.08
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Hopper windows on south Exposed timber Kitchen services both Tall, single Tilt doors allow internal
allow cross-ventilation and trusses hall and verandah storey volume space to be connected with
connection to tennis court the exterior effortlessly
Large, open space provides Kitchen is functional and Plywood sheet flooring Opal Twinwall Polycarbonate shelters from
flexibility for various types of provides enough space for the 2400 x 1200 the elements whilst providing a visual
gathering catering of events connection to exterior
SD.09
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Well lit internal space, utilising Northwest seating ‘nook’ is sheltered, ‘Outdoor Room’ captures landscape and
natural light intimate and functional provides a usable, functional space for
informal and formal gathering
SD.10
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Visual connection to Club House Designed with community activities in mind Northwest seating ‘nook’ protected from
western sun with timber batten screen
Occupiable edge with visual ‘Captured landscape’ extends the hall’s functional footprint
connection to playground and
bbq area
SD.11
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Trusses create defining visual identity Roof ‘folds’ and ‘wraps’ the western
for the hall service bay
SD.12
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Material palette responds and reflects Custom orb cladding shields Hall becomes impromptu ‘viewing Timber batten hoppers open southeast Timber ramp entry
surrounding native bushland service bay from western sun and platform’ for tennis games seating ‘nook’ to breezes and views from carpark
references rural vernacular
SD.13
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Mode 1: Dinner Event Mode 2: Audience Rows
Formally seats 128 people Formally seats 173 people with 4
additional wheelchair spaces
SD.14
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Corrugated Zincalume Custom Orb Lightweight Construction Plywood Panel Flooring Eucalyptus Trees Native Existing Bushland
Exposed Timber Trusses Timber Decking Polycarbonate Cladding & Hopper Windows
Folded Deck Seating Hardwood Batten Screening Opal Twinwall Polycarbonate Timeless Colours Inspired by Landscape
SD.15
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Old Shire Hall, Pine Rivers Rainbow Beach Community Hall Owens Creek Hall
Woodside Community Centre, Moreton Bay Newrybar Hall Maroochy Arts and Ecology Centre
SD.16
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Bark Mini Bus Shelter Bark Noosa Visitor Information Centre Bark Mission Beach Community Arts Centre
Bark Spoonbill House Bark Mission Beach Community Arts Centre Bark Mission Beach Community Arts Centre Bark Maleny House
SD.17
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.
Integration of Stakeholder Requirements
Curra Community Stakeholder Workshop was held on 17 May 2016 at Curra Country Club.
Throughout the design process, feedback and outcomes from the Stakeholder Workshop
were addressed in our concept design. Key stakeholder requirements were considered as
follows:
6. Accessibility
General stair and ramp access has been considered to ensure hall is accessible to everyone in
the community and compliant with AS.1428.1-2009.
7. Stage
Rather than incorporating a fixed stage into the design, the floor plan will remain more flexible if
portable stage platforms are utilised when required and then stored away.
2. In house PA System and AV
Installation of the wiring suitable for future PA System integration and user brought AV
equipment has been included in budget. Equipment not included.
3. Storage - Lockable
One lockable storage room, incorporating shelving has been created with dual access, both
internal and external to accommodate tables, chairs and hall supplies. See Plan SD.04.
Independent lockable storage solutions can be purchased and kept in the storage room for
each group if required. Not included in budget.
SD.18
These drawings are Concept Design drawings only. The information is subject to
Design Development, Structural and Service Engineering input, BCA Compli-
ance and Planning Assessment. These designs, drawings, specifications and the
copyright thereof are the property of Bark Design Pty Ltd and must not be used,
retained or copied without the written authority of Bark Design Pty Ltd.