Appendix 16.a Example - Grass Channel
Appendix 16.a Example - Grass Channel
Appendix 16.a Example - Grass Channel
: MSMA
Section : MASMA (APPENDIX 16.A EXAMPLE) Sheet no./rev.
Cal. By Date Chk'd by Date App'd by Date
WAN 17/3/2015 IR AZMAN IR AZMAN
1 PROBLEM
Determine the size of a grassed channel at the downstream end of a proposed 150 hectare
residential area (link and terrace house) in Ipoh, Perak based on the following assumptions:
• the engineered channel is to be designed to carry the 100-year ARI flow;
• the post-development time of concentration tc is estimated to be 100 minutes; and
• the engineered channel will be well maintained with an estimated design Manning’s roughness
coefficient of 0.035.
EQN. 2.2
pg 2-3
Where,
i = Rainfall Intensity (mm/hr)
T = Average Recurrence Interval (year) 100 yr-ARI TABLE 1.1
d = Storm Duration (hr) 100 min pg 1-2
λ, K, θ, η = fitting constants dependent on the raingauge location
0.164
I= 70.238 x 100 = 83.321 83.32 mm/hr
0.872
1.6667 + 0.288
Q= CiA / 360
Page 1 of 4
Project : GRASSED CHANNEL Job Ref. : MSMA
Section : MASMA (APPENDIX 16.A EXAMPLE) Sheet no./rev.
Cal. By Date Chk'd by Date App'd by Date
WAN 17/3/2015 IR AZMAN IR AZMAN
0.3439
I= 62.932 x 0.25 = 23.686 23.69 mm/hr
0.8229
1.6667 + 0.17
Assuming:
Channel longitudinal slope 0.80 % (I in 125)
Width, B 2.50 m
Side slope, Z 3
Page 2 of 4
Project : GRASSED CHANNEL Job Ref. : MSMA
Section : MASMA (APPENDIX 16.A EXAMPLE) Sheet no./rev.
Cal. By Date Chk'd by Date App'd by Date
WAN 17/3/2015 IR AZMAN IR AZMAN
Q= vxA
Where ,
Check flow velocity for lined drain. (0.6 < v < 2 m/s) OK
Page 3 of 4
Project : GRASSED CHANNEL Job Ref. : MSMA
Section : MASMA (APPENDIX 16.A EXAMPLE) Sheet no./rev.
Cal. By Date Chk'd by Date App'd by Date
WAN 17/3/2015 IR AZMAN IR AZMAN
Section
6 Check Froude Number for grassed channel: 16.7.2
pg 16-11
35.59 2
√
= 22 0.771 < 0.8
9.81 16.848 3 Subcritical flow
Page 4 of 4