TECHNICAL SPECIFICATION

FOR
TRAVELLING TRIPPER

Page 1
1.0 INTRODUCTION

As a part of mechanization of the material handling system, travelling


tripper is proposed to be provided. This technical specification has been
prepared for the purpose of procurement of travelling tripper.

PROJECT DATA

SITE DATA
1 General Information

1.1 Name of the Customer :

1.2 Name of the Project :

1.3 Location of the Plant :

Location and plant site


2 :
data
2.1-a Altitude (AMSL) Mtr
2.1-b Latitude / Longitude

2.2 Barometric pressure mmHg

2.3 Wind direction


Max. wind velocity for
2.4 Km/hr
design
2.5 Temperature Conditions :
Maximum Ambient
2.5.1 ºC
temperature
Minimum Ambient
2.5.2 ºC
temperature
Ambient temperature for
2.5.3 ºC
design
2.6 Temperature of water
Temperature of plant
2.6.4 supply water for ºC
design(wet bulb temp)
2.7. Rain fall

2.7.1 Yearly rain fall - Average Mm

2.8 Humidity
Maximum relative
%
Humidity
2.9 Soil type :

Page 2
2.10 Seismic data :

3.0 SCOPE OF WORK:


 The scope of work of the Tenderer shall include design, engineering,
manufacture, fabrication, assembly, testing and inspection, packing,
dispatch, transportation, delivery for purchaser's site, unloading,
handling and storage at site, insurance during storage, erection
supervision, testing, inspection, commissioning, guarantee testing and
handing over to the client including all electrics and standard accessories of
Travelling /Trippers & Bunker Sealing Arrangement, as covered under this
specification.

The scope of the Tenderer shall be deemed to include all such items
which although are not specifically mentioned in the specification, but are
needed to make the equipment complete in all respect for its safe,
reliable, efficient and trouble free operation.
 The scope of supply and services of the Tenderer shall include the following:
a) Mechanical

- Each equipment shall be complete in all respect including, its


drive units, cables, safety switches, structural, mechanical and
other standard accessories.

- Provision of necessary fixtures, supporting angles and brackets


required for mounting and supporting the equipment and feed
chute.

b) Electricals and controls including current collecting angles e.g.


CRD or festoon trolley as per specification's requirement.

 Two years maintenance spares.

 Commissioning spares as required during testing and commissioning.

 Insurance spares.

Page 3
 Required quantity of initial fill of oil, grease, lubricants, hydraulic fluid etc.
and other consumables which are necessary for cleaning/ flushing including
erection, testing and commissioning the equipment shall be in the scope of
supply of the Tenderer.
Necessary tools and tackles for each equipment required for maintenance, testing or
inspection of the equipment.

 Statutory approval wherever required shall be taken by the Tenderer for


the equipment being supplied by them from relevant state/ central
authorities.
The scope of work shall stand supplemented by such details as are given in this
specification, tender drawing, and instruction to the Tenderer, General Conditions of
Contract (GCC), or any other part of the document.

Page 4
Page 5
4.0 Technical Specification
1. The tripper shall be designed as per IS: 14386-1996.

2. Travel drive of trippers shall be individual wheel drive, independent of the


main conveyor drive and shall be through electric motor, helical gear box
etc. Chain drive/ open gearing shall not be used. Tripper shall be provided
with A.C Hydraulic thruster brakes for stopping the same at desired
location. Travel speed of trippers shall not exceed 0.5 m/sec.

3. The traveling tripper shall consist of belt scrapper with adjustable rubber
strip, rubber lagged head and bend pulleys complete with shaft bearings,
chutes, stops and limit switches, brakes etc. The tripper shall have two-way
discharge chute or three way chute with flap gate as per application which
shall be capable of discharging material into the bunker openings.

4. Traveling trippers shall be of adequate length with proper slope of


conveyor idlers to match with the flow properties of material being
handled. The maximum inclination of the conveyor belt on the tripper
shall not be more than 14°.
5. Vertical and horizontal guide rollers shall be provided to control sway and
uplift of the belt in unloaded condition. The tripper shall run on standard
flat bottom Indian Rails at least of CR 60. Wheels shall be double flanged
with parallel tread running on anti-friction bearings and shall have min
hardness of 350 BHN. Material of wheel shall be forged steel / cast steel.

6. Traveling trippers shall be equipped with manually operated rail clamps


and rail cleaners and jacking pads.

7. Diverter gates on two way or three way chutes shall be electrically operated.

8. Power supply to the tripper shall be given through motorized cable reeling
drum with trailing cables, cable trays for resting the trailing cables and end
limit switches for protection against over travel of the tripper. The cable
reeling drum and trailing cable of each tripper shall be suitable for the
Page 6
entire length of the bunker bay. The cables shall have copper conductors,
proper insulating material and braided armoring in accordance with IS:
691.
9. Position indicators shall be provided as per requirement of control logic.
Operating push buttons for local control and emergency stop shall be
within easy reach of the operator on the main conveyor walk way.

10. All stipulation regarding belt pulley, belt scraper, idlers, safety guards,
wind guard, access for maintenance etc. specified for belt conveyors,
diverter gates and discharge chutes shall be applicable for the traveling
tripper.

11. The rating of tripper travel motor shall be adequate to move the tripper
smoothly either in forward or opposite direction to belt direction under
fully loaded conditions. Coefficient of friction shall be taken as maximum
0.15.

12. Minimum two drive axles shall be provided for tripper travel. Arrangement
shall be provided at the starting point of the tripper to avoid folding of
belt.

13. Provision shall be kept for automatic tripping of bunker bay conveyor in
event of travelling tripper getting dragged (.i.e. travel speed in excess of
rated speed).

14. The supporting structures for the rails with necessary end stops shall also
be supplied under this specification. Suitable belt hold down guide pulley
shall be provided over the concave curve of belt over tripper.

15. Suitable bunker sealing arrangement with conveyor belting shall keep the
bunkers sealed and prevent dust emission.

16. Separate openings shall be provided on the bunker floor of each bunker to
measure level of material in the bunker. Hinged door/ flaps shall be
provided on these openings.

17. Suitable gratings are to be provided in between bunkers in the tripper


Page 7
travel zone. Opening size shall be decided during the detail engineering
stage.
18. Suitable dust cover shall be provided over tripper head pulley. Serrated
rubber seal shall be provided at open side to prevent dust nuisance.
Suitable dust tight access doors shall be provided. Counter weighted type
belt cleaner shall be provided below the tripper head pulley to cleaning the
carrying side of the belt.
19. Suitable access platform of Chequered plate with ladders, hand railings and
walkways on both sides shall be provided for access / maintenance of
equipment on tripper. Also crossover platform shall be provided with
Tripper so that operator can cross the belt through the same. Continuous
deck plates shall be provided below carrying idlers on the tripper.

5.0 DOCUMENTATION

1. Drawings / document to be supplied by the Tenderer

a) General arrangement drawing of Mobile Tripper showing overall


dimension, profile, idler spacing, LT drive arrangement, motor kW etc.
along with chutes, scrapper, skirt boards, switches, wheel load, wheel
spacing, wheel diameters, power supply arrangement for travel drive
etc.

b) Details of bought-out items & component list.

c) List of commissioning spares proposed by the Tenderer.

d) List of recommended spares for two years maintenance of the equipment.

Page 8
e) Duly filled up questionnaire given below.

2. Drawings / documents to be supplied by the successful bidder for


approval.

a) For approval:

General arrangement drawing showing the following:


I. Constructional feature.
II. All dimensions and technical parameters as per technical specification.
III. LT drive & their arrangement
i. Motor ratings.
a. Speeds.
b. Maintenance and repair provision.
c. Operating weight.
IV. Any other information for making the GA drawing complete.

b) For reference I records:

i. Major sub-assembly drawings of drives, safety


features, lubrication arrangement etc.

ii. List of spares, consumables, special tools & tackles.

iii. Operation & maintenance manuals.

6.0 QUESTIONNAIRE (To be filled by Tenderer)

The Tenderer shall also furnish the following questionnaire and submit
with his offer. This data shall form a part of the contract with Successful
Tenderer.
Sl.
No. Description

1 Name and address of the Tenderer


2 Previous experience of the Tenderer

Page 9
3 List of similar equipment supplied
4 Tripper Details
5 Sealing details
6 List of drgs / Literatures enclosed with the offer.

7 Drive details

a)Motors
1) KW rating
2) RPM
3) Type
4) Bearing make
5) Expected life in(hrs)
b) Gear Box
i) Make
ii)Type
iii) Reduction ratio
1.Torque rating (kg-m)
2.Overall efficiency
3.Wt. of Gear box (kg)

c) Couplings
1. Make and type of high speed couplings
2. Make and type of low speed couplings
3. Weight (kg)
8 Belt cleaners -type
- Weight (kg)