Quotation SM Infraa JCB

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

19/07/2018

TO,
JCB INDIA LTD,
Plot no A & B Talegaon Floriculture & Industrial park,
Talegaon Dabhade-410507 (Maharashtra)

Kindly Attention – Mr. Challappan Kannan Sir

Work : Fabrication & Erection of Structres at JCB


(Strengthening of shot blast machine EOT Girders)

Dear Sir,

THANK YOU VERY MUCH For giving us chance to quote your job.

This is with reference our Meeting dated on 17/07/2018and subsequent


discussion withYou,we are submitting our lowest possible quotation, Most competitive
offer for your kind consideration. Hope will find this offer in order and you will give us
chance to serve you.

A waiting Hopeful Reply at the earliest.

Thanking you and assuring our best service always.


QUOTATION FOR FABRICATION & ERECTION WORK

Sr
Description Unit Qty Rate Amount
No
P/F Structural support with all fabrication & Erection work
etc complete as per the drawings & instructions with all
tools, tackles and labour as per design or as directed
including a coat of primer of approved quality and painting
1 the exposed surface with two coats of synthetic enamel MT 32.5
paint of approved quality and colour etc., all complete along
with all steel staging and steel walk way / plotforms required
to complete the works in all aspects. (Make - Jindal/Tata/Sail
1,20,000.00/-
39,00,000.00/-
)
Hire charges for Cherry picker with fuel complete (Works is
2 to be carried on weekends only) Months 2.0 1,15,000.00/- 2,30,000.00/-
Hire Charges for Farana with fuel complete (Works is to be
3 carried on weekends only)
Months 2.0 1,30,000.00/- 2,60,000.00/-
P/F white cloth as fire resisitant cloth with fixing around
4 welding work ,using cherrypicker ,binding to exisitng Sqm 175.0 2,80,000.00/-
members etc complete during fabrication works 1,600.00/-
Temporary hard barigation work with temporary arrangemnt
of steel column , round pipe, sheet ,etc complete weekend
5 work ,as removing & refixing work ,transporation etc Nos 18.0
complete (Area 40 sqm)
Modification works in monorail structure, ladder, platform
6 with all necessary temporary arrangements complete. LS 1.0
(Exclusion of any work in crane) 70,000.00/- 70,000.00/-
7 Sub Amount 47,40,000.00/-
8 GST @ 18% 8,53,200.00/-
9 Total Amount 55,93,200.00/-
Terms & Conditions
1) Water and electricity supply Will BE Provided by you at free of cost on site
2) Fabrication will be done at our work shop
3) Taxes extra as applicable.
4) Payment Terms
A) 30% Advance
B) 50% After Fabricated Material reached to company premises
C) 20% After completion of work
5) Pl release the work order

REGARDS

FOR S M INFRA PROJECTS