132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 1/8
Note:
1.) Instrument transformers ratios shall be verified at site, before setting the analog channels during
commissioning.
2.) Overvoltage setting can be modified as per customer practice.
3.) The O/C and E/F settings given here are only provisional. Based on the customer practice and/or the
operating time delay adopted in downstream / upstream relays, the settings should be corrected at site to
ensure proper coordination.
4.) Settings proposed must be tested at site before taking relay into service.
REVISION NOTE
Description
Reviewed by
132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 2/8
Description
Reviewed by
132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 3/8
It is important to adjust the setting of load encroachment resistance RLd in Phase selection with load
encroachment to the value equal to or less than the calculated value of RLdInFw in power swing.
Description
Reviewed by
132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 4/8
The directional earthfault setting is 20% of IBase value. The reset is instantaneous.
IBase = 400A
Pickup set = 20%
Operating value in primary = 80A
TMS = 0.50 shall be used.
This function is set based on the unsymmetry current which is relation between the difference of the minimum and
maximum phase current to the maximum phase current. Typical setting is 50%. Note that it must be set to avoid
problem with unsymmetry under minimum operating conditions. Set the time delay of 5 sec.
Parameter Setting
U1 > 110% is set for trip after 5 sec.
U2 > 140% is set for trip with 0.1 sec.
NOTE: Over Voltage protection settings can be modified as per customer practice. Both stages should be configured
for trip.
Description
Reviewed by
132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 5/8
Zero sequence
The fuse failure supervision (SDDRFUF) function can be set in five different modes by setting the parameter OpMode.
The zero sequence function continuously measures the internal currents and voltages in all three phases and
calculates:
• the zero-sequence voltage 3U0
• the zero-sequence current 3I0.
The measured signals are compared with their respective set values 3U0< and 3I0>. The function enable the internal
signal fuseFailDetected if the measured zero sequence voltage is higher than the set value 3U0>, the measured zero
sequence current is below the set value 3I0< and the operation mode selector (OpMode is set to 2 (zero sequence
mode). This will activate the output signal BLKU, intended to block voltage related protection functions in the IED.
Negative sequence
The negative sequence operates in the same way as the zero sequence, but it calculates the negative sequence
component of current and voltage.
• the negative sequence current 3I2
• the negative sequence voltage 3U2
The function enable the internal signal fuseFailDetected if the measured negative sequence voltage is higher than the
set value 3U2>, the measured negative sequence current is below the value 3I2< and the operation mode selector
(OpMode) is set to 1 (negative sequence mode).
The function block includes synchronism, synchro check function and the energizing function (to allow closing when one
side of the breaker is dead).
Synchrocheck
The main purpose of the synchrocheck function is to provide control over the closing of circuit breakers in power
networks in order to prevent closing if conditions for synchronism are not detected. The synchrocheck function
measures the conditions across the circuit breaker and compares them to set limits. Output is only generated when all
measured conditions are within their set limits simultaneously.
A time delay is available to ensure that the conditions are fulfilled for a minimum period of time.
Description
Reviewed by
132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 6/8
Energizing check
The main purpose of the energizing check function is to facilitate the controlled reconnection of disconnected lines and
buses to energized lines and buses. The energizing check function measures the bus and line voltages and compares
them to both high and low threshold values. The output is only given when the actual measured conditions match the
set conditions. The energizing operation can operate in the dead line live bus (DLLB) direction, dead bus live line (DBLL)
direction or in both directions over the circuit breaker. Energizing from different directions can be different for
automatic reclosing and manual closing of the circuit breaker. For manual closing it is also possible to allow closing when
both sides of the breaker are dead, Dead Bus Dead Line (DBDL).
The equipment is considered energized if the voltage is above a set value, e.g. 80% of the base voltage, and non-
energized if it is below a set value, e.g. 30% of the base voltage. A disconnected line can have a considerable potential
because of factors such as induction from a line running in parallel, or feeding via extinguishing capacitors in the circuit
breakers. This voltage can be as high as 50% or more of the base voltage of the line. When the energizing direction
corresponds to the settings, the situation has to remain constant for a certain period of time before the close signal is
permitted. The purpose of the delayed operate time is to ensure that the dead side remains de-energized and that the
condition is not due to temporary interference.
Description
Reviewed by
132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 7/8
The Dir OC relay is set to operate as back up to zone-2 and zone-3 of Distance relay provided in 132kV line. The
directional overcurrent setting is 120% of max line loading. The reset is instantaneous.
CT primary = 400A
Pickup set = 120% (311A)
Operating value in primary = 373.2A
Setting value = 373.2 / 400 = 0.93 x In
For a 3-phase fault at remote end 132kV bus, maximum current from 132kV bus is 3.5kA (assumed).
For a minimum operating time of 0.9 sec and fault current of 3500A, TMS (k) = 0.29.
The directional earthfault setting is 20% of CT primary value. The reset is instantaneous.
Base value = 400A = CT primary
Pickup set = 20%
Operating value in primary = 80A
Setting value = 80 / 400 = 0.20 x In
Fault current in case of L-G bus fault at 132kV remote end bus is 3500A (assumed).
For a minimum operating time of 0.9 sec and fault current of 3500A, TMS (k) = 0.50.
Description
Reviewed by
132kV PAONTA-GIRINAGAR LINE BAY RELAY SETTING CALCULATION
ABB Order Ref Rev Sheet
Prepared by PARAMESWARAN. S
3100077469 0 8/8
MiCOM S1 Agile
Document No. YN1M303029 -PNN, Rev-0 Page 32Page:
of 33 2
Settings File Report
Substation: AA1
File: 000.set
Model Number: P141?1NA6?0510J Printed on: 09/08/2018 16:19:44
MiCOM S1 Agile
Document No. YN1M303029 -PNN, Rev-0 Page 33Page:
of 33 3
Settings File Report
Substation: AA1
File: 000.set
Model Number: P141?1NA6?0510J Printed on: 09/08/2018 16:19:44
MiCOM S1 Agile