Pembangunan Multistorey Multitenant & Landlord
Pembangunan Multistorey Multitenant & Landlord
Pembangunan Multistorey Multitenant & Landlord
OBJECTIVES
2
PLANNING AND
DESIGN CRITERIA SUPPLY SCHEMES
If taking bulk supply, it shall be the responsibility of the owner / developer of the
multi tenanted premises to obtain independent distribution license from Energy
Commission.
The design, installation and operating of such electrical system shall comply with
requirements of all the relevant authorities including the Energy Commission’s
and TNB’s.
3
PLANNING AND
DESIGN CRITERIA SUPPLY SCHEMES
2. Water pump load is connected from tenant MSB to comply to legal requirement
for landlord to have a 2nd account (to mitigate the risk of NTL)
5. Landlord meter is installed at Outdoor Meter Panel / Kiosk (for customer without
substation)
4
PLANNING AND
DESIGN CRITERIA SUPPLY SCHEMES
6
1B. Multitenant buildings (< 5 storey) with Substation
TNB SUBSTATION
M(landlord)
TN B
1. CT (landlord) installed at TNB transformer tail
2. Meter (landlord) installed at Meter Room in PE TNB
with meter kiosk
To tenant units
PLANNING AND
DESIGN CRITERIA SUPPLY SCHEMES
9
2B. Multitenant buildings with Substation (Landlord & Tenant
takes LV supply)
M(landlord)
TNB
M1 m m m
Tenant Vertical Riser
M2 m m m To tenant
Supply to Landlord units
M3 m m m
VCB (B2)
With slot for
M(Landlord) M(Tenant)
metering CT
TNB
TO LANDLORD
TO TENANT
TNB
Note:
Connection scheme 2E was withdrawn in the ESAH addendum.
o risk of operation personnel safety and complicate operational
processes, involved additional requirement of PTW issuance
by the premise charge-man. 13
2E. Multitenant buildings with Substation: Landlord (LV) &
tenants (group > 1MVA):
Revised scheme
Discontinued scheme
Thank you