UEP-HL Stop Cards Feb - 2017

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 59
At a glance
Powered by AI
The document reports daily safety observations from different oil and gas work sites. It tracks incident type, location, date and safety topic discussed.

The most frequently reported incidents are related to procedures and orderlines (20.65%), maintenance (13.04%), and slip/trip/fall (5.80%).

Most incidents are reported from Hilong and UEP sites based on the frequency of mentions.

Daily SOC / STOP car

Reported By: Kashif/Shakeel

S# Date Position Company

1 1-Feb-17 HSE UEP

2 1-Feb-17 TP UEP

3 1-Feb-17 Driller UEP

4 1-Feb-17 RM UEP

5 1-Feb-17 AD UEP

6 1-Feb-17 FM Hilong

7 1-Feb-17 AD Hilong

8 1-Feb-17 RA Hilong

9 1-Feb-17 DM Hilong

10 1-Feb-17 FM Hilong

11 1-Feb-17 AD Hilong

12 1-Feb-17 HSE Hilong

13 1-Feb-17 FM Hilong

14 1-Feb-17 FM Hilong

15 1-Feb-17 RA Hilong

16 2-Feb-17 TP UEP

17 2-Feb-17 HSE UEP

18 2-Feb-17 AD UEP

19 2-Feb-17 HSE UEP

20 2-Feb-17 FM Hilong

21 2-Feb-17 FM Hilong
22 2-Feb-17 FM Hilong

23 2-Feb-17 AD Hilong

24 2-Feb-17 RA Hilong

25 2-Feb-17 DM HILONG

26 2-Feb-17 RA HILONG

27 2-Feb-17 RA HILONG

28 2-Feb-17 FM HILONG

29 2-Feb-17 RA HILONG

30 2-Feb-17 Crane Opt. HILONG

31 2-Feb-17 Crane Opt. HILONG

32 3-Feb-17 HSE UEP

33 3-Feb-17 Driller UEP

34 3-Feb-17 HSE UEP

35 3-Feb-17 HSE UEP

36 3-Feb-17 HSE UEP

37 3-Feb-17 AD Hilong

38 3-Feb-17 TP Hilong

39 3-Feb-17 MECH Hilong

40 3-Feb-17 AD Hilong

41 3-Feb-17 FM Hilong

42 4-Feb-17 TP

43 4-Feb-17 HSE UEP

44 4-Feb-17 HSE UEP

45 4-Feb-17 HSE Hilong

46 4-Feb-17 HSE Hilong


47 4-Feb-17 DM Hilong

48 4-Feb-17 HSE Hilong

49 4-Feb-17 HSE Hilong

50 5-Feb-17 AD UEP

51 5-Feb-17 HSE UEP

52 5-Feb-17 DM UEP

53 5-Feb-17 DM UEP

54 5-Feb-17 Driller UEP

55 5-Feb-17 AD UEP

56 5-Feb-17 TP UEP

57 5-Feb-17 HSE UEP

58 5-Feb-17 HSE UEP

59 5-Feb-17 AD Hilong

60 5-Feb-17 MECH Hilong

61 5-Feb-17 MATERIALMAN Hilong

62 5-Feb-17 RA Hilong

63 5-Feb-17 TP Hilong

64 5-Feb-17 TP Hilong

65 5-Feb-17 AD Hilong

66 5-Feb-17 FM Hilong

67 5-Feb-17 MECH Hilong

68 5-Feb-17 AD Hilong
69 5-Feb-17 HSE Hilong

70 5-Feb-17 AD Hilong

71 6-Feb-17 ELECT UEP

72 6-Feb-17 ELECT UEP

73 6-Feb-17 HSE UEP

74 6-Feb-17 AD UEP

75 6-Feb-17 TP UEP

76 6-Feb-17 ELECT UEP

77 6-Feb-17 AD UEP

78 6-Feb-17 ELECT UEP

79 6-Feb-17 ELECT UEP

80 6-Feb-17 MATERIALMAN UEP

81 6-Feb-17 TP UEP

82 6-Feb-17 AD Hilong

83 6-Feb-17 HSE Hilong

84 6-Feb-17 DM Hilong

85 6-Feb-17 RUTLEDGE Hilong

86 6-Feb-17 HSE Hilong

87 6-Feb-17 HSE Hilong

88 6-Feb-17 TP Hilong

89 6-Feb-17 CREW Hilong

90 6-Feb-17 TP Hilong

91 6-Feb-17 C MECH Hilong

92 6-Feb-17 MATERIALMAN Hilong

93 7-Feb-17 DM UEP
94 7-Feb-17 RA UEP

95 7-Feb-17 HSE UEP

96 7-Feb-17 DM UEP

97 7-Feb-17 C ELECT UEP

98 7-Feb-17 AD UEP

99 7-Feb-17 HSE UEP

100 7-Feb-17 AD UEP

101 7-Feb-17 AD Hilong

102 7-Feb-17 DM Hilong

103 7-Feb-17 C BOSS Hilong

104 7-Feb-17 RA Hilong

105 7-Feb-17 HSE Hilong

106 7-Feb-17 MECH Hilong

107 7-Feb-17 DM Hilong

108 7-Feb-17 TP Hilong

109 7-Feb-17 HSE Hilong

110 7-Feb-17 HSE Hilong

111 7-Feb-17 DRILLER Hilong

112 7-Feb-17 AD Hilong

113 7-Feb-17 TP Hilong

114 7-Feb-17 HSE Hilong


115 7-Feb-17 TP Hilong

116 8-Feb-17 HSE UEP

117 8-Feb-17 AD UEP

118 8-Feb-17 TP UEP

119 8-Feb-17 TP UEP

120 8-Feb-17 DM UEP

121 8-Feb-17 TP UEP

122 8-Feb-17 HSE UEP

123 8-Feb-17 AD Hilong

124 8-Feb-17 AD Hilong

125 8-Feb-17 MATERIALMAN Hilong

126 8-Feb-17 C ELECT Hilong

127 8-Feb-17 HSE Hilong

128 8-Feb-17 C MECH Hilong

129 8-Feb-17 AD Hilong

130 8-Feb-17 FM Hilong

131 8-Feb-17 RA Hilong

132 8-Feb-17 HSE Hilong

133 8-Feb-17 RA Hilong

134 9-Feb-17 ELECT UEP

135 9-Feb-17 HSE UEP

136 9-Feb-17 DM UEP

137 9-Feb-17 ELECT UEP

138 9-Feb-17 AD UEP


139 9-Feb-17 DM UEP

140 9-Feb-17 TP UEP

141 9-Feb-17 HSE UEP

142 9-Feb-17 AD UEP

143 9-Feb-17 TP Hilong

144 9-Feb-17 FM Hilong

145 9-Feb-17 CREW Hilong

146 9-Feb-17 FM Hilong

147 9-Feb-17 C ELECT Hilong

148 9-Feb-17 HSE Hilong

149 9-Feb-17 TP Hilong

150 9-Feb-17 FM Hilong

151 9-Feb-17 FM Hilong

152 9-Feb-17 HSE Hilong

153 9-Feb-17 HSE Hilong

154 10-Feb-17 TP UEP

155 10-Feb-17 DM UEP

156 10-Feb-17 FM UEP

157 10-Feb-17 HSE Hilong

158 10-Feb-17 DM Hilong

159 10-Feb-17 HSE Hilong

160 10-Feb-17 HSE Hilong

161 11-Feb-17 TP UEP

162 11-Feb-17 TDS ENGG UEP

163 11-Feb-17 AD UEP


164 11-Feb-17 HSE Hilong

165 11-Feb-17 DM Hilong

166 11-Feb-17 AD Hilong

167 11-Feb-17 FM Hilong

168 12-Feb-17 TP UEP

169 12-Feb-17 TP UEP

170 12-Feb-17 DM UEP

171 12-Feb-17 AD UEP

172 12-Feb-17 HSE UEP

173 12-Feb-17 HSE UEP

174 12-Feb-17 HSE UEP

175 12-Feb-17 TP UEP

176 12-Feb-17 AD UEP

177 12-Feb-17 AD UEP

178 12-Feb-17 HSE Hilong

179 12-Feb-17 FM Hilong

180 12-Feb-17 FM Hilong

181 12-Feb-17 AD Hilong

182 12-Feb-17 AD Hilong

183 12-Feb-17 HSE Hilong

184 12-Feb-17 TP Hilong

185 12-Feb-17 DR Hilong

186 12-Feb-17 DR Hilong

187 12-Feb-17 HSE Hilong

188 12-Feb-17 HSE Hilong


189 13-Feb-17 TP UEP

190 13-Feb-17 AD UEP

191 13-Feb-17 HSE UEP

192 13-Feb-17 C ELECT UEP

193 13-Feb-17 HSE UEP

194 13-Feb-17 DM UEP

195 13-Feb-17 TP Hilong

196 13-Feb-17 FM Hilong

197 13-Feb-17 AD Hilong

198 13-Feb-17 AD Hilong

199 13-Feb-17 CREW Hilong

200 13-Feb-17 C BOSS Hilong

201 13-Feb-17 FM Hilong

202 13-Feb-17 FM Hilong

203 13-Feb-17 TP Hilong

204 13-Feb-17 DWM Hilong

205 13-Feb-17 HSE Hilong

206 14-Feb-17 AD UEP

207 14-Feb-17 HSE UEP

208 14-Feb-17 AD UEP

209 14-Feb-17 TP UEP

210 14-Feb-17 HSE UEP

211 14-Feb-17 HSE UEP

212 14-Feb-17 DM UEP

213 14-Feb-17 AD UEP


214 14-Feb-17 HSE UEP

215 14-Feb-17 HSE UEP

216 14-Feb-17 FM Hilong

217 14-Feb-17 FM Hilong

218 14-Feb-17 FM Hilong

219 14-Feb-17 FM Hilong

220 14-Feb-17 AD Hilong

221 14-Feb-17 TP Hilong

222 14-Feb-17 LABOR Hilong

223 14-Feb-17 C BOSS Hilong

224 14-Feb-17 HSE Hilong

225 14-Feb-17 DR Hilong

226 15-Feb-17 HSE UEP

227 15-Feb-17 AD UEP

228 15-Feb-17 AD UEP

229 15-Feb-17 TP UEP

230 15-Feb-17 AD UEP

231 15-Feb-17 DM UEP

232 15-Feb-17 FM Hilong

233 15-Feb-17 MATERIALMAN Hilong

234 15-Feb-17 DM Hilong

235 15-Feb-17 HALLIBURTON Hilong

236 15-Feb-17 MUD ENGG Hilong


237 15-Feb-17 FM Hilong

238 15-Feb-17 FM Hilong

239 15-Feb-17 LABOR Hilong

240 15-Feb-17 FM Hilong

241 15-Feb-17 RA Hilong

242 16-Feb-17 HSE UEP

243 16-Feb-17 AD UEP

244 16-Feb-17 DM UEP

245 16-Feb-17 DM UEP

246 16-Feb-17 AD UEP

247 16-Feb-17 ELECT UEP

248 16-Feb-17 TP UEP

249 16-Feb-17 FM Hilong

250 16-Feb-17 FM Hilong

251 16-Feb-17 AD Hilong

252 16-Feb-17 HSE Hilong

253 16-Feb-17 HSE Hilong

254 16-Feb-17 FM Hilong

255 16-Feb-17 TP Hilong

256 16-Feb-17 HSE Hilong

257 16-Feb-17 TP Hilong

258 16-Feb-17 HSE Hilong

259 16-Feb-17 HSE Hilong

260 16-Feb-17 HSE Hilong

261 16-Feb-17 AD Hilong


262 17-Feb-17 AD UEP

263 17-Feb-17 TP UEP

264 17-Feb-17 HSE UEP

265 17-Feb-17 TP UEP

266 17-Feb-17 MECH UEP

267 17-Feb-17 ELECT UEP

268 17-Feb-17 DM UEP

269 17-Feb-17 HSE UEP

270 17-Feb-17 FM Hilong

271 17-Feb-17 DM Hilong

272 17-Feb-17 HSE Hilong

273 17-Feb-17 FM Hilong

274 17-Feb-17 HSE Hilong

275 17-Feb-17 MUD ENGG Hilong

276 17-Feb-17 C BOSS Hilong

277 17-Feb-17 MATERIALMAN Hilong

278 17-Feb-17 HSE Hilong

279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
S# Category Cards Quantity
Confined Space
1 Entry
0
Cost Saving
2 Opportunity
1
3 Driving Safety 4
4 Dropped Objects 16
5 Energy Isolation 11
Environmental
6 Hazards
7

7 Ground Disturbance 5
8 Health Hazards 10
9 Housekeeping 25
10 HSE Suggestion 8
11 Lifting Operations 6
Management of
12 Change
3
13 Maintenance 36
14 Permit to Work 1
15 PPE 23
Procedures &
16 Orderlines
57
17 Appreciation 20
18 Slip/Trip/Fall 16
19 Tools & Equipment 15

20 Working at Heights 4
21 Manual lifting 0
22 Pinch Point 8
Total 276
Daily SOC / STOP card sheet

RIG Name: Hilong 05 Well Name: Rajani-7


Location
of
Description Category Status
Observati
on
Rig floor escape route was blocked by the WFD tools, instruct them to Procedures &
Rig Site Closed
clear the route at all time. Orderlines
Observed that the banksman not wear the banksman vest, stopped & Procedures &
Rig Site Closed
told him to use vest .he agreed & followed Orderlines
Remind all the rig floor crew about to cover the hole while picking up the HSE
Rig Site Closed
next joint. Suggestion
Observed that the roustabout latching the sling to casing joint
Appreciation Rig Site Closed
appropriately.
Observed that the roustabout was working on the catwalk without using
PPE Rig Site Closed
safety glasses, remind him about his PPE's
Tools &
Safety lock was missing from the stabbing board pin,installed it properly Rig Site Closed
Equipment
Tools were every where at the time of rig up WFD ,instruct the rig floor
Slip/Trip/Fall Rig Site Closed
crew to maintained housekeeping & reduce the tripping hazards
STOP card box was full of used gloves on the mud tank, performed
Housekeeping Rig Site Closed
housekeeping.
Emergency control valve, like pump bleed off & surface lines valves
HSE
should be checked & lubricated on frequent basis. Discuss with the Rig Site Closed
Suggestion
mechanic
While picking up the casing joint from the air winch the RA was standing
Lifting
near to the catwalk, stopped the winch & told him to stay at a safe Rig Site Closed
Operations
distance
Good communication notice while running casing between rig floor crew
Appreciation Rig Site Closed
& weather ford crew
Observed that cementing unit handrail was not open, discuss with their Tools &
Rig Site Closed
supervisor & he opened it Equipment
Smoking traces found near living quarters , please discuss in meeting to Procedures &
Rig Site Closed
smoke at designated place Orderlines
Weatherford crew held a safety meeting before RIH casing good safety
Appreciation Rig Site Closed
attitude
Observed that one of our crew hand cross the green lane but forget to
PPE Rig Site Closed
put hard hat on ,stopped & remind him about his hard hat.

When entering the work zone everyone shall be using PPE as required,
PPE Rig Site Closed
observe one FM and inform to use correct PPE while at rig site

Truck helper was standing on the truck while loading equipment with Lifting
Rig Site Closed
forklift, stopped & removed helper from the truck Operations
Work permit was prepared before rigging up the cementing equipment, Procedures &
Rig Site Closed
informed supervisor & they prepared work permit Orderlines
Procedures &
After finishing the work permit should be submit into the HSE office Rig Site Closed
Orderlines
Air winch was not working properly while picking up the elevator,
Maintenance Rig Site Closed
informed mechanic & he fixed it
During cementing job a person was standing near to the high pressure Procedures &
Rig Site Closed
lines, stopped & removed him Orderlines
Observed that the service company person was working near to the v- Dropped
Rig Site Closed
door & at that time v-door was open, stopped him ,close the gate. Objects
After finishing the casing job hole was not covered & a person was doing Procedures &
Rig Site Closed
hammering job near by, I covered the hole properly Orderlines
I was visually inspecting the casing sling time to time for the drop Procedures &
Rig Site Closed
prevention Orderlines
Procedures &
Wind sock on the mud system was not working ,checked & correct it Rig Site Closed
Orderliness
Rubber boots were not placed at proper area, found it & placed at proper
PPE Rig Site Closed
area on the mud tank
Observed that third party person was working without gloves, stopped &
PPE Rig Site Closed
told him to use gloves.
Emergency shower was leaking, inform to the concern & fixed it leakage. Maintenance Rig Site Closed
Observed that third party person was passing from the high pressure Procedures &
Rig Site Closed
area, stopped & briefed him about the hazards, he agreed Orderliness
HSE
Need to maintained good housekeeping standard at all time Rig Site Closed
Suggestion
Third party person was working at height without using fall arrestor, Working at
Rig Site Closed
stopped him & told him the safe system of work. Heights
While lay down DP the RA follow safe body & hand placement good
Appreciation Rig Site Closed
attitude

DP were torqued so driller use manul tong anf FM was in danger zone
Pinch Point Rig Site Closed
so driller tell him to get away to safe place as tong might slip and hit him

Rig floor shower station access was blocked by waste drum so infrom AD
Housekeeping Rig Site Closed
to remove it
Some material in basket was not safely stacked as it can fall out or down
Dropped
whnever its moved so infrom AD and he with fork lift arrange in safe Rig Site Closed
Objects
manner
No stand by person present during work inside confined space so inform Procedures &
Rig Site Closed
TP to check when ever such work is on going Orderlines
Elect. Extension board was left over on Mud tanks after work is finished
Housekeeping Rig Site Closed
which is not good practice
During inspection at Mud tanks found two safety pins of hand railing
Maintenance Rig Site Closed
loose so adjusted them
Welding work shop area was cleaned by welder after cutting and
Housekeeping Rig Site Closed
grinding work good attitude
Chemical drum was placed un safely as it could have rolled on any
Slip/Trip/Fall Rig Site Closed
perosn feet so place it up right
Lifting belt after use was thrown near water tanks which is not good Tools &
Rig Site Closed
practice Equipment
DP stands were made but FM not use rope for handling DP while pick up Procedures &
Rig Site Closed
unsafe act Orderlines
DP protector was thrown from rig floor to ground level which is unsafe act Dropped
Rig Site Closed
so inform AD to rectify and stop any unsafe act Objects
Not using safety galss is becoming a habit so discuss in meeting to
PPE Rig Site Closed
follow hse rules and implemet for self safety
While moving DP from basket to the pipe rack Fork optr. Speed up the
fork due to which the DP got un balance near to fall so infrom fork optr to Driving Safety Rig Site Closed
follow speed limits 5 km/ph
Color code not found on lifting devices informed to TP/AD in meeting for Procedures &
Rig Site Closed
color code marking (BLUE) Orderlines
Water hose after use not closed and water was wasted at pits area so
Procedures &
inform DWM supervisor to check the equipt. Properly after work is Rig Site Closed
Orderlines
finished

Discuss the incident & fatality of person while fuel tank cleaning , refresh HSE
Rig Site Closed
the crew on confnied space entry and follow all procedures in meeting Suggestion

while lifting the HLB unit HLB crew not use tag line and stand near to
Lifting
lifted load so stop work and inform correct and safe procedures and Rig Site Closed
Operations
commenced work again

During FIT job a person by passed high pressure area so HSE stopped
Permit to Work Rig Site Closed
him and inform other route and propely closed the area with caution tape

Halliburton crew after FIT job left over the chicksan line and hoses hap
hazardly then informed them to house keep area to avoid tripping Maintenance Rig Site Closed
hazards
Stabbing board fall arrestor was missed so infrom HSE and he placed a
Appreciation Rig Site Closed
new fall arrestor there
One tube light was damaged in mud lab on tanks infrom Elect for
Maintenance Rig Site Closed
rectification
FM not stand in safe place while driller maked DP connection with
Pinch Point Rig Site Closed
manaul tong so driller stop and makes safe position of FM
Catwalk air winch was rusty and not clean so oiled it and make it
Maintenance Rig Site Closed
lubricated for easy use
While normal drilling the V door gate was not closed by FM and cleaning Procedures &
Rig Site Closed
was continued which is unsafe as drop hazard is present Orderlines

H2s siren fixing plate was loose and can injure any one due to minor cut
Pinch Point Rig Site Closed
if some one passes by so inform Rutledge and he corrected the plate

Left over food and fruits were lying inside dog house which is not a
Health Hazards Rig Site Closed
healthy attitude infrom in pre tour meeting to daily house keep areas
While lowering the elevator FM stand in unsafe position as he can be hit
by the moving links or elevator so inform him to stay safe distance form Pinch Point Rig Site Closed
moving equipt

Material basket gate are broken so infrom TP to repair by welder Maintenance Rig Site Closed
Small size shakcles and bolts were placed in material basket so
Housekeeping Rig Site Closed
collected all and transfer to store room for safe keeping
Drill pipe protector was thrown on the ground from floor which is unsafe Dropped
Rig Site Closed
act must infrmo in meeting to stop such acts Objects
People at camp site not comply with shoes policy so informed in meeting Procedures &
Rig Site Closed
to all to make sure the use of shoes is in compliance Orderlines
While cleaning tanks the stand by person left thye RA inside for tea
Procedures &
break which is not safe practice so discuss with AD & crew to follow PTW Rig Site Closed
Orderlines
requiremnts at all time
Escape line door was broken due to high winds so lifted with air winch to Dropped
Rig Site Open
rig floor and infromed TP to weld it at Rig move Objects
Drill pipe were cleaned and buffed but RA not use face shield which is
PPE Rig Site Closed
unsafe so issued him face shield for work
Mud tank suction line was broken so infrom Mech to repair and he did Slip/Trip/Fall Rig Site Closed
Due to sudden changes in PVT the TP informed in meeting to AD to keep Procedures &
Rig Site Closed
close eye on well and must be ready for well control Orderlines
T cards were fully used by crew so infromed all crew to implement safe Procedures &
Rig Site Closed
practice Orderlines
Management of
Color code changed to BLUE at rig site lifting points by Crew Rig Site Closed
Change
If any worker is near mixing area & while chemical is added so other HSE
Rig Site Closed
person shall take safety and use mask as a protection Suggestion

Grounding cable was not attached so repaired it with tank 5/6 Energy Isolation Rig Site Closed

No faceshiled is used when grinder is in operation so AD stop the job &


PPE Rig Site Closed
tell to follow PPE
Crew needed long cable for work so they ask electrician and he arranged Tools &
Rig Site Closed
an extension for safe work Equipment
Barricaded area means that no unathorize person is allowed but ofted Procedures &
Rig Site Closed
seen that crew by pass such warnings which is unsafe act Orderlines
Cable was damaged from between so I observed and made a new joint
Energy Isolation Rig Site Closed
with water proofing tape
One loose tube light was found in security cabin so inform elect. & he
Maintenance Rig Site Closed
repaired it
Extension cord placed near Mud tank and shaker area where too much
Procedures &
water is used for cleaning which is unsafe so removed it from there and Rig Site Closed
Orderlines
place in store
due to expected rain all electrcial panel and junctions were covered with
Appreciation Rig Site Closed
pit liner
Rubber safety shoes not used by RA while cleaning the dithces so
PPE Rig Site Closed
discuss in meeting for choosing correct equipt / PPE for the job
Mech Work shop area was slippery inside as oil and diesel was present
Slip/Trip/Fall Rig Site Closed
on walk way infrom Mech to clean to avoid any incident
Welding cable is damaged and temorary repairs are made on it informed Procedures &
Rig Site Closed
to TP & C Mech to rectify Orderlines
due to high winds barrication aorund pits was brokedn informed UEP Ground
Rig Site Closed
labor and he adjusted Disturbance
Chemical and drums were not covered by Mud Engg which is unsafe Environmental
Rig Site Closed
practice Hazards
H2s drill was conducted and such drills shall be frequently done so all HSE
Rig Site Closed
crew gets more information and use of SCBA is more fast Suggestion
Escape line touch down area was blocked by pallets & boxes so Ground
Rig Site Closed
removed with the help of RA Disturbance
BOP cellar grating was damaged so infrom TP for repair then welder
Maintenance Rig Site Closed
rapired it accordingly

Emergency slide was blocked as the crew placed material infront of it so Ground
Rig Site Closed
inform the AD to clear any emergency exits and slide for easy use Disturbance

Crew complained that low pressure observed in toilet water so its


Maintenance Rig Site Closed
reported to Mech to check and rectify
Cigarette buds found near living room which is not safe practice discuss
Housekeeping Rig Site Closed
in meeting
Minor oil patches observed inside oil storage area inform to Mech to Environmental
Rig Site Closed
clean any spills Hazards
All store material was safely racked and placed & log sheet maintained Procedures &
Rig Site Closed
good attitude Orderlines
While mixing caustic soda the RA not wear face shield so the Mud Enggr
PPE Rig Site Closed
stop him and tell to work safely
Drum catcher safety lock was missed so install it Maintenance Rig Site Closed
Observed many times that crew not use hand railing while using ladders
Slip/Trip/Fall Rig Site Closed
must discuss each time in meeting

DM got tripped while taking sample at the tanks due to unrolled hose
Slip/Trip/Fall Rig Site Closed
pipes discuss the same in meeting with both shifts to clear walk ways

Discussed in meeting not to use direct water on any electrical motor or


Procedures &
switch its unsafe Stopped the job for grinder as the FM not use face Rig Site Closed
Orderlines
shileds
While lifting DP from baskets a RA stand infront of the lifted load so the Dropped
Rig Site Closed
fork optr. Tell him to stand at safe distance Objects
Inform in meeting to all for use of eye protection at rig site PPE Rig Site Closed
AD stopped RA while he was working at height but not hooked up Working at
Rig Site Closed
harness correctly so inform hjim correct procedure Heights
DWM crew stand on upside of auger for cleaning with waterw which is
unsafe so infrom him to stand aside and clean not on top of the Slip/Trip/Fall Rig Site Closed
equipment as he can slip or fall down
Mud tank suction & discharge lines are still filled needs cleaning and
Maintenance Rig Site Closed
lubrication
Out side fence there is too much trash and empty water bottles present
which the crew and security guards throw its bad practice discuss with
Housekeeping Camp Open
Security & crew not to continue same behavior also informed labor to
clean all up
RA working near the tanks were exhausted so the AD supply water to
Appreciation Rig Site Closed
them and inform to take some rest
Smoking traces found near living quarters , please discuss in meeting to Procedures &
Rig Site Closed
smoke at designated place Orderlines
Tools racks was broken from between so the welder repaired it and now
Maintenance Rig Site Closed
ok for use
Some valves on mud tanks need replacement as they are getting rusty Maintenance Rig Site Open
Low light was observed in BOP area so electrician was infomred and Tools &
Rig Site Closed
now he adjusted new lights Equipment

The wasted food is thrown on floor or table in Rig Mess crew must be
Housekeeping Rig Site Closed
infomred for hygiene and helath issues

Tools &
O2 and Actyl cylinders are seperatly stored Rig Site Closed
Equipment

While pick up slips the FM not pay attention to back safety or manual
Health Hazards Rig Site Closed
handling techniques

Pinch Point Rig Site Closed


I observed that one floorman was working with manaual tong he put his hand
in danger and unsafe place I stoped him and told him how to use
Observed that the person was standing at high noise area, instruct him
Health Hazards Rig Site Closed
to use ear plugs or removed from that area.
Procedures &
Color code was missed from the shackles, paint it accordingly. Rig Site Closed
Orderlines
High wind in area so any loose item was removed from the rig floor and Dropped
Rig Site Closed
DM was also informeed to check any loose object at monkey board Objects
Observed that fire hose was used for cleaning BOP so stop the job
Procedures &
informed the crew that safety equipt. Is not for daily use it shall be used Rig Site Closed
Orderlines
in emergency only
Service co. perosn work on possum belly without usig eye protection
PPE Rig Site Closed
which may cause harm so discuss with him for PPE for self safety
Procedures &
Mechanical tools were found on the tanks after use not returned Rig Site Closed
Orderlines
Damaged hammer was used ofr repairing the pumps so stop the job
Maintenance Rig Site Closed
issued new hammer
Labor barricaded the water and cutting pits for safe identification of
Appreciation Rig Site Closed
falling hazards
FM cleaning the floor but waste too much water so inform to use mop Cost Saving
Rig Site Closed
instead of wasting too much water Opportunity
Safety harness were not hanged on the rack so they might get damaged Procedures &
Rig Site Closed
inform crew to take responsibility of safety equipts Orderlines
Fire sand was finished due to high wind so Labor arranged more sand
Appreciation Rig Site Closed
for good effort
Paint boxes were left open after use so infrm AD for proper hand over of
Housekeeping Rig Site Closed
tools & equipts when shift is over
Observed minor oil patches while cleaning of DP so inform crew to clean Environmental
Rig Site Closed
all and sipose in respective drum Hazards
While inspection of Gen Sets the Mech not use ear muffs which is
Health Hazards Rig Site Closed
hazardous for health
Informed to Rutledge team for installation of air line of SABA for Tools &
Rig Site Closed
derrickman also. On monkey board Equipment
Welder informed for using correct and full PPE when working even in
PPE Rig Site Closed
work shop
RA used rubber gloves and apron for mixing which is good safety attitude Appreciation Rig Site Closed
Water bowser over speeded at rig site which is unsafe inform to HSE &
Driving Safety Rig Site Closed
Security to instruct safe driving limits
Air winch shackle safety pin was missing so rectified and install new pin Maintenance Rig Site Closed
Discuss with crew a LLD for isolation /LOTO importance which all shall
Energy Isolation Rig Site Closed
follow when ever working with electric/hydraullic or pneumatic.
Eye wash at Mud tank was cleaned and refilled with new distilled water Procedures &
Rig Site Closed
now ok for use Orderlines
Mud pump area and cable tray are all having slippery water anyone go
Ground
there gets slips as the ditches are full so water cannot pass inform UEP Rig Site Closed
Disturbance
labor for cleaning
Showed the crew how chemical face mask is safely used & its Procedures &
Rig Site Closed
importance Orderlines
Trip tank motor area light was not working and crew operate pump in
Maintenance Rig Site Closed
dark which is unsfe so inform to electrcian for repair and he did
hose pipe is crossed over electrcal cables which can damage the cables
so please discuss in tour meeting not to alter or modify electrcial cables Slip/Trip/Fall Rig Site Closed
or their path
Often the rigger for fork operation comes directly under the fork fingers
which is unsafe so discuss with crew to maintain safe distance always Pinch Point Rig Site Closed
form fork/crane & loads
An spark was seen from a cable so inform electrician and he shut off the
Energy Isolation Rig Site Closed
power and later changed the cable

Often seen that broken hammers or wrench is used instead of hammer Tools &
Rig Site Closed
which is unsafe practice and inform to all to use correct tools for the job Equipment

AD arrange PTW, tools and Locked out the Pump by Elect. For
Appreciation Rig Site Closed
inspection and repair this is good attitude
Chanin tong was dmaged and I took it to welder for repair and he
Maintenance Rig Site Closed
repaired it for use
TP beofre tour start inform to all to check safety pns and dies of slips Procedures &
Rig Site Closed
and tongs Orderlines
Rig site color code job is finished and now camp lifting points are painted Management of
Rig Site Closed
(BLUE) Change
HSE discuss with crew to follow safety signs, requirements and PPE as
Appreciation Rig Site Closed
they are for our own benefit which motivates all crew
Wash down the driller screen as there were many dirty patches of mud
Housekeeping Rig Site Closed
so after its clean driller can easily see clearly
Electrician performed weekly inspections and closed the minor points on Procedures &
Rig Site Closed
spot like lights changing & loose wiring Orderlines
Discuss the importance of PPE specially eye protetcion with crew and
PPE Rig Site Closed
focused them to use at work areas
Discuss with crew that during POOH always be carefull for DP screen Dropped
Rig Site Closed
when DM removes it, may be it can drop and hit the floor Objects
Rotary tabl water passing ditches were cleaned by FM so easliy the
Housekeeping Rig Site Closed
water can pass from floor to pits
Safety life line needs to be installed at A frame as FM go for cleaning job HSE
Rig Site Closed
they use it Suggestion
Informed the crew in meeting that never enter near the crane working
Lifting
radius around 360 degree as its danger zone except for rigger and Rig Site Closed
Operations
signalman when they feel its safe working in that position
Found lifting belts damaged so sent to welder to cut off and diospose Tools &
Rig Site Closed
them as they are unsafe for use Equipment
Observed that oil lubricator pump shut off and not start so inform
Maintenance Rig Site Closed
electrcian and he rectified
Cleaned the drill spool and cover it with plastic to save from water and
Maintenance Rig Site Closed
rust
Power tong oil was leaking so infrom Mech to check and repair and he
Maintenance Rig Site Closed
did in time
T cards were not followed strictly by the crew discuss in meeting for Procedures &
Rig Site Closed
complete compliance Orderlines
After mixing chemical the RA thorweed away the bag on ground which is
Housekeeping Rig Site Closed
not good practice so tell him to collect and dispose in bin

Diesel and oil was used for lubrication of DP but the FM not use rubber
Health Hazards Rig Site Closed
gloves which might damage the skin discussed with them for safety

Pump area was baricated as they are running on high pressure so its not Procedures &
Rig Site Closed
safe working or crossing at that area Orderlines
FM standing upside on Drill pipes on racks for cleaning its unsafe as he
Slip/Trip/Fall Rig Site Closed
might get slip
Inspected the slings on ware house and inform material man to cover the Tools &
Rig Site Closed
sings from plastic to save from dust and weather Equipment
AtaUllah performs duty on shaker with full PPE and handles the system
Appreciation Rig Site Closed
well good skills and hard work
Procedures &
New safety signs are posted across the site for more safety awareness Rig Site Closed
Orderlines
Some bags of chemicals were torn and spilled at chemical area so Environmental
Rig Site Closed
infrom Mud engrr to make sure chemical is cleaned Hazards
First aid box at mud tank was mepty so informed DR to check and refill Health Hazards Rig Site Closed
Handrailing to rig floor ladders was loose nifomred Mech to check and fix Tools &
Rig Site Closed
after Mech tighten the bolts and now ok Equipment
Mud Pump area is barricated to identify high pressure area and danger
Procedures &
zone so all crew is instructed not to go in that area during pump Rig Site Closed
Orderlines
opertaion
Crane optr. Helps and works with drilling crew its good team work from
Appreciation Rig Site Closed
him
Chemiclas were not covered so inform the Mud Engg to cover the Environmental
Rig Site Closed
chemicals from sun light and weather Hazards
Speed limit sign board was posted at the rig site for speed control and
Driving Safety Rig Site Closed
identification
Tool pusher daily assigns job to all crew and check at shift end its good Management of
Rig Site Closed
safety leader ship Change
Water gun was leaking so infrom to Mech to repair as it might get
Energy Isolation Rig Site Closed
damage or person can get electrical shock
Power ting and manual tongs were color coded for safe handling points Maintenance Rig Site Closed
Informed to Plumbing supervisor for water iisue in camp during day and
Maintenance Camp Open
night shifts time so check and rectify
SWL was painted on the air winches at rig floor by FM Appreciation Rig Site Closed
Manual tong handle was repaired as it got broke in rig move time now
Maintenance Rig Site Closed
safley welded and can be used

Pipe stopper was missing on casing racks so instructed welder to make Procedures &
Rig Site Closed
a new pipe stopper & inform crew not to use stopper for any other work Orderlines

When making connection the DP elevator was not jamming and not Tools &
Rig Site Closed
easliy operated by DM so inform Mech to lubricate & check Equipment
Lifting
Rig site all lifitng points of equipments , loads were color coded BLUE Rig Site Closed
Operations

Shakerman was given H2S detector by rutledge for use at shaker PPE Rig Site Closed

Mud pump area is slippery due to water & chemical so infrom RA to


Slip/Trip/Fall Rig Site Closed
clean the area to avoid slipping hazards
Main camp area crew not using shoes at night time which is unsafe
Procedures &
discussed in meeting with crew and inform the hzards forany possible Camp Closed
Orderlines
snake bites
Material baskets were properly kept with loads so the load cannoot fall Dropped
Rig Site Closed
down Objects
Camp side waste bins were over loaded inform the Camp Boss to timely
Housekeeping Camp Closed
dispose the bins
Bed sheets of rooms were not cleaned of crew, Instructed for weekly
Housekeeping Camp Open
cleaning of bed sheets and fumigate rooms
Rig site fumigation was done for insects and anti snake powder also Environmental
Rig Site Closed
used with the fence area Hazards
Drivers were reminded and informd for driving policies and time to follow
Driving Safety Rig Site Closed
no driving allowed after 06 PM & before 06 AM due to fog.
During inspection of Shaker found out one light frame is broken so infrom
Energy Isolation Rig Site Closed
Electrician to repair and adjust
Mud protetcor on Auger is loose and shaky & might slip on some one Dropped
Rig Site Closed
feets so inform DWM to rectify and fix the sheet Objects
Often observed that while working with chemicals crew not use rubber
gloves instead use cloth gloves which are not safe discussed hazards Health Hazards Rig Site Closed
with crew
DWM equipt.was not grounded near pits so infromed Electrician and he
Energy Isolation Rig Site Closed
connected the grounding wire

Water hoses at tanks were causing tripping hazard so inform crew that
Slip/Trip/Fall Rig Site Closed
when evr shift is over must give clean & clear work are to other shift

STOP card box on rig floor was filled with oily rags & gloves so cleaned it Procedures &
Rig Site Closed
and keep at dog house Orderlines
During rig inspection found dried grounding pits so infromed Elect. To
Maintenance Rig Site Closed
check and water tehm daily
One high pressure line was leaked so quickly arranged new hose and
Maintenance Rig Site Closed
installed it was good team effort
While pressure test service co. person by pass barricaded area which is Procedures &
Rig Site Closed
unsafe act infrom him to follow HSE signs for his safety Orderlines
While lifting kelly kock with Fork lift the lifting belt got tangled and the
Dropped
equipt. Got un balance no body was near by so fork optr slowly lowered Rig Site Closed
Objects
kelly kock and released it
AC of junior side rooms in camp not cooling so infrom Elect. To check
Maintenance Rig Site Open
and repair
While playing in camp side the ball go outside the fence in night & a
Procedures &
person opened the fence and took the ball back inside camp which is Rig Site Closed
Orderlines
unsafe for security purpose inform to security perosnnel
Smoke detector in general washroom is not working please check Maintenance Rig Site Closed
All 5" DP were cleaned and lubricated and kept in baskets good team
Appreciation Rig Site Closed
effort by day shift
Minor oil patches near drill pipe baskets so infrm AD to clean with dry Environmental
Rig Site Closed
sand Hazards
DWM unit is not properly lighted so inform the electrician to arrange one Procedures &
Rig Site Closed
light nearn their unit Orderlines
Procedures &
Smoking policy & drug policy discussed with crew for refresher Rig Site Closed
Orderlines
Observed that tools was left unattended and not placed properly. Discuss
Housekeeping Rig Site Closed
with the concern and placed at proper area.
Poor Housekeeping notice at mixing area ,discuss with the concern and
Housekeeping Rig Site Closed
clean that area.
Poor housekeeping observed in the workshop area, discuss with the
Housekeeping Rig Site Closed
concern & fixed this issue.
Observed that the person was standing at high noise area, instruct him
Health Hazards Rig Site Closed
to use ear plugs or removed from that area.
Procedures &
Color code was missed from the shackles, paint it accordingly. Rig Site Closed
Orderlines
Water connection to vacuum degasser was missed, arranged the hose
Maintenance Rig Site Closed
and made a proper connection.
One person was walking on the augers, stopped him and told him about
Slip/Trip/Fall Rig Site Closed
the hazards.

Power tong safety pin was missed ,installed it correctly. Maintenance Rig Site Closed
Fire extinguisher was not placed after completing the task, contact the Procedures &
Rig Site Closed
supervisor & remind him about the procedure. Orderlines
Handover is a very good safety tool to know about the last 12 hrs HSE
Rig Site Closed
worked. Suggestion
During lifting chemical drum, not properly latch it ,stopped the crane Lifting
Rig Site Closed
operator & rearrange the job after corrective actions Operations

There was too much water between the mud pumps, cleaned it properly Housekeeping Rig Site Closed

Site safety induction was given to SLB wire line crew and informed to Procedures &
Rig Site Closed
follow all safety requirements during the job Orderlines
While Rig up the SLB tools one SLB crew not used gloves so SLB
supervisor stop him and informed to use proper PPE for the job its good PPE Rig Site Closed
safety leader ship
while maintenance of pumps the FM not using proper tools he used
Tools &
broken hammer so stoop him and infrom to take new hammer from store Rig Site Closed
Equipment
for work
Fire pump room was not cleaned, oil and water present informed Mech
Housekeeping Rig Site Closed
to clean and daily check the status of pump operation
While off loading fuel the truck driver not use ppe and did not connected
the grounding cable so the labor stop them and infrom to use ppe and Energy Isolation Rig Site Closed
connected bonding cable before offloading starts
Camp site junior mess door was welded as ig got broken due to rough
Maintenance Rig Site Closed
use now ok
Oxygen & Acetylene cylinders were not upright & chained while welding
Procedures &
operation near work shop so inform the welder for correct procedure to Rig Site Closed
Orderlines
keep separate both cylinders
T cards were made up to date & informed crew to properly use T cards Procedures &
Rig Site Closed
for safety Orderlines
DWM crew not perform LOTO on uager and working on auger so
Energy Isolation Rig Site Closed
stopped them and told safe procedure for LOTO and then start work

During cut & slip drill line RA stand near cat walk which is unsafe place Dropped
Rig Site Closed
so indtrcuted to move back and keep eye on any dropped line or tool Objects

Pressure tets on BOP but service co. person come and observe
Pinch Point Rig Site Closed
operation in unsafe place so instrcut to move out
During work at height at BOP the FM not use safety harness so stop Working at
Rig Site Closed
them and give verbal warning for not following safety procedures Heights
Jar was laid down from rig floor but one RA near the catw alk so FM told Dropped
Rig Site Closed
him to keep back due tot drop hazard Objects
No rope used on hammer wrench while BOP job so inform crew to use
Pinch Point Rig Site Closed
safe tools for operation and avoid pinch points
Eye wash was laeking at shaker area inform HSE and thewn we refilled it Maintenance Rig Site Closed
Broken hammers were palced in work shop to install new handles for Tools &
Rig Site Closed
safe work by FM Equipment
Safety galsses were not used while cleaning the shaker area so told the
PPE Rig Site Closed
RA hazards for human eye and msut compliy safety rules
Observed 54 room wash room and exhaust fan not working informm C
Maintenance Rig Site Closed
Boss to rectify
Appreciation for DM and crew who carried out safe procedures during
Appreciation Rig Site Closed
the well operation
Area was barricaded when SLB job was on going so all crew followed it
Appreciation Rig Site Closed
as procedure
While rig down SLB tools the SLB crew stand on cat walk so it was Dropped
Rig Site Closed
unsafe so SLB supervisor instruct their crew to move out Objects
Fork lift was off loading the equipt. Truck helper was near the drop zone Dropped
Rig Site Closed
& in unsafe area so told them to keep away Objects
Halliburton guy while working on the cement unit but not hook up safety Working at
Rig Site Closed
harness so infrom him to use safety equipt. Properly Heights
Observe that third party crew not use gloves and eye protection while
PPE Rig Site Closed
working
While cleaning the chemical area the labor not use face mask which can
Health Hazards Rig Site Closed
cause health problems so infrom them to use proper PPE
Service co. person by mistak came outside of unit and started to go
towards mud tanks without hard hat so stopped him and inform that no PPE Rig Site Closed
PPE and he thanked
Barrication not done during the SLB wire line job so I barricaded the area Procedures &
Rig Site Closed
for safety awareness Orderlines
SLB crew standing on the cat walk while pick up tools from cat walk so Dropped
Rig Site Closed
stop them and told to stand away Objects
SLB crew perosn not use eye protetcion and working at rig floor so inform him for
saefty procedures and he followed
PPE Rig Site Closed
AC was placed on electrical cable tray which can damage the cables inside Procedures &
inform Mech to remove it and place other place
Rig Site Closed
Orderlines
Hose pipe was not rolled after cleaning job so inform the FM to roll back
Slip/Trip/Fall Rig Site Closed
hose pipe and clear area
Helper with the welder was not using safety galsses as he is also
PPE Rig Site Closed
exposed to hazardous welding light so inform him to use goggles
BOP area after POOH was slippery so AD instructed the RA to clean
Slip/Trip/Fall Rig Site Closed
area
Mud pumps and tanks were cleaned by RA and it was a good effort Appreciation Rig Site Closed
Rutledge H2S Engg. Trained all guys for safe SCBA donning and ERP Procedures &
Rig Site Closed
proceudre in emergency Orderlines
Used gloves were found at mud tanks,tool box and walk ways enforced
Housekeeping Rig Site Closed
the crew to throw waste in proper bins
Auger near the waste pit was un balance inform DWM crew to check and
Maintenance Rig Site Closed
rectify
Gas detetcor was not usd by RA at trip tank & shaker area so give him Procedures &
Rig Site Closed
h2s detector for safety Orderlines
Safety meeting was held by SLB before TLC job and all possible safety Procedures &
Rig Site Closed
measure and operational condition were discussed Orderlines
Welding cable is damaged and unsafe for use so inform to TP/RM for
Procedures &
new cable and they confirmed that new cable is ordered and will arrive Rig Site Closed
Orderlines
soon
Welding work shop was a mess during inspection no house keeping ,
cables un rolled, tools not in tool box so infrom welder to make good Housekeeping Rig Site Closed
cleaning and maintain work shop
During site visit found a thinner liquid bottle near baskets after paint job Procedures &
Rig Site Closed
left there Orderlines
Eye wash lids are leaking infrom materialman to order new pairs as lids
PPE Rig Site Closed
are not available on rig site
SLB crew make too much mess, empty water bottles, tissues, cloth
pieces are present around there unit infrom SLB crew to clean the area Housekeeping Rig Site Closed
when job is finished
Electrician was inspecting the lights at rig floor but not follow safety rules
with out LOTO or isolation insoection of electrical equipment is not Energy Isolation Rig Site Closed
allowed
General wash room door is not working inform to camp supervisor to
Maintenance Rig Site Closed
check and repair
All crew come to work in welding work shop but after wards leave the
Housekeeping Rig Site Closed
area with out cleaning which is not a good habitt
While cut the drill line area was cordon off and supervised so no un Procedures &
Rig Site Closed
authorized person is exposed to unsa fe condition Orderlines
While cleaning the agitator motor crew not power off the motor its unsafe
Energy Isolation Rig Site Closed
as rotating equipt. Can cause damage to person if trapped
After oil seal change of the agitator the spill over oil was not cleaned by
the Mech and he left his work area discuss in meeting to clean area after Slip/Trip/Fall Rig Site Closed
work
BOP grating was loose and unbalance so with help of AD I arraneg it in Ground
Rig Site Closed
safe manner Disturbance
Always inform the shifts to control the work place slip & trip hazards Slip/Trip/Fall Rig Site Closed
Tool box at rig floor was dirty from inside so inform the crew to clean it up
Housekeeping Rig Site Closed
and throw the trash in proper bins
Gloves after use are often thrown on the work area or walk ways which is
not safe pracrice so informed the crew to motivate each other for a Housekeeping Rig Site Closed
cleaner work place
Eyes are important part of the body so every time I discuss with crew for
PPE Rig Site Closed
eye protection when working at rig site
Halliburton cementing crew using mobile phone near well head which is
Procedures &
unsafe so inform him the safe procedure and area for use of electrcial Rig Site Closed
Orderlines
devices
Safety harness was thrown on the rig floor after using at monkey baord Procedures &
Rig Site Closed
so instrcut all crew to take care of safety items Orderlines
Mud engg appreciated all the crew for safely completing the well with
Appreciation Rig Site Closed
safe procedures followed
Room no 54/56 AC problem waas rectified by electrciuan in time Maintenance Rig Site Closed
Inform the crew to check all hammers for mushrom head before rig move Tools &
Rig Site Closed
and repair all tools needed during rig move Equipment
Friut & food items thrown inside the dog house creating a bad odour and
un healthy condition so its informed to crew to mujst check rest rooms Health Hazards Rig Site Closed
are clean
Rajani-7 February-17

Target
Remarks
Date

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting


NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting


NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA

NA

NA
NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA

NA

NA
NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA
NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting


NA

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting


NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA Closed on 13 feb 2017

NA

NA Discuss in pre tour meeting


NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA
NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting


NA

NA

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA

NA

NA

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA

NA
NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA Discuss in pre tour meeting

NA

NA Discuss in pre tour meeting

NA

NA

NA

NA Discuss in pre tour meeting


While cleaning the chemical area the labor not use face mask which can cause
### HSE UEP
health problems so infrom them to use proper PPE

Service co. person by mistak came outside of unit and started to go towards
### AD UEP mud tanks without hard hat so stopped him and inform that no PPE and he
thanked

Barrication not done during the SLB wire line job so I barricaded the area for
### DM UEP
safety awareness

SLB crew standing on the cat walk while pick up tools from cat walk so stop
### DM UEP
them and told to stand away
SLB crew perosn not use eye protetcion and working at rig floor so inform him for saefty
### AD UEP procedures and he followed

AC was placed on electrical cable tray which can damage the cables inside inform
### ELECT UEP Mech to remove it and place other place

Hose pipe was not rolled after cleaning job so inform the FM to roll back hose
### TP UEP
pipe and clear area

Helper with the welder was not using safety galsses as he is also exposed to
### FM Hilong
hazardous welding light so inform him to use goggles

### FM Hilong BOP area after POOH was slippery so AD instructed the RA to clean area

### AD Hilong Mud pumps and tanks were cleaned by RA and it was a good effort
Rutledge H2S Engg. Trained all guys for safe SCBA donning and ERP
### HSE Hilong
proceudre in emergency
Used gloves were found at mud tanks,tool box and walk ways enforced the
### HSE Hilong
crew to throw waste in proper bins

Auger near the waste pit was un balance inform DWM crew to check and
### FM Hilong
rectify

Gas detetcor was not usd by RA at trip tank & shaker area so give him h2s
### TP Hilong
detector for safety
Safety meeting was held by SLB before TLC job and all possible safety
### HSE Hilong
measure and operational condition were discussed
Welding cable is damaged and unsafe for use so inform to TP/RM for new
### TP Hilong
cable and they confirmed that new cable is ordered and will arrive soon
Welding work shop was a mess during inspection no house keeping , cables
### HSE Hilong un rolled, tools not in tool box so infrom welder to make good cleaning and
maintain work shop
During site visit found a thinner liquid bottle near baskets after paint job left
### HSE Hilong
there

Eye wash lids are leaking infrom materialman to order new pairs as lids are not
### HSE Hilong
available on rig site
SLB crew make too much mess, empty water bottles, tissues, cloth pieces are
### AD Hilong present around there unit infrom SLB crew to clean the area when job is
finished

2 PTW cold ( TLC SLB / Repair Agitator 16 ) Drop inspect / soc = 7 - stp
13=20
Health Hazards Rig Site Closed

PPE Rig Site Closed

Procedures &
Rig Site Closed
Orderlines

Dropped
Rig Site Closed
Objects

PPE Rig Site Closed

Procedures &
Rig Site Closed
Orderlines

Slip/Trip/Fall Rig Site Closed

PPE Rig Site Closed

Slip/Trip/Fall Rig Site Closed

Appreciation Rig Site Closed


Procedures &
Rig Site Closed
Orderlines

Housekeeping Rig Site Closed

Maintenance Rig Site Closed

Procedures &
Rig Site Closed
Orderlines
Procedures &
Rig Site Closed
Orderlines
Procedures &
Rig Site Closed
Orderlines

Housekeeping Rig Site Closed

Procedures &
Rig Site Closed
Orderlines

PPE Rig Site Closed


Housekeeping Rig Site Closed
Maintenance
Maintenance
Maintenance
Procedures &
Orderlines
Housekeeping
Health Hazards
Procedures &
Orderlines
Slip/Trip/Fall
Tools &
Equipment
Appreciation
Procedures &
Orderlines
Environmental
Hazards
Health Hazards
Tools &
Equipment
Procedures &
Orderlines
Appreciation
Environmental
Hazards
Driving Safety
Management of
Change
Energy Isolation

Maintenance
Maintenance
Appreciation
Maintenance
Procedures &
Orderlines
Tools &
Equipment
Lifting
Operations
PPE
Slip/Trip/Fall
Procedures &
Orderlines
Dropped
Objects
Housekeeping
Housekeeping
Environmental
Hazards
Driving Safety

Energy Isolation
Dropped
Objects
Health Hazards

Energy Isolation

Slip/Trip/Fall
Procedures &
Orderlines
Maintenance
Maintenance
Procedures &
Orderlines
Dropped
Objects
Maintenance
Procedures &
Orderlines
Maintenance
Appreciation
Environmental
Hazards
Procedures &
Orderlines
Procedures &
Orderlines
Housekeeping
Housekeeping
Housekeeping
Health Hazards
Procedures &
Orderlines
Maintenance
Slip/Trip/Fall
Maintenance
Procedures &
Orderlines
HSE Suggestion
Lifting
Operations
Housekeeping
Procedures &
Orderlines
PPE
Tools &
Equipment
Housekeeping
Energy Isolation

Maintenance
Procedures &
Orderlines
Procedures &
Orderlines
Energy Isolation
Dropped
Objects
Pinch Point
Working at
Heights
Dropped
Objects
Pinch Point
Maintenance
Tools &
Equipment
PPE
Maintenance
Appreciation
Appreciation
Dropped
Objects
Dropped
Objects
Working at
Heights
PPE
Health Hazards
PPE
Procedures &
Orderlines
Dropped
Objects
PPE
Procedures &
Orderlines
Slip/Trip/Fall
PPE
Slip/Trip/Fall
Appreciation
Procedures &
Orderlines
Housekeeping
Maintenance
Procedures &
Orderlines
Procedures &
Orderlines
Procedures &
Orderlines
Housekeeping
Procedures &
Orderlines
PPE
Housekeeping
1 UNSAFE ACT 不安全行为 256
2 SAFE ACT安全行为 20
7.25%

92.75%

Sl i p/Tri p/Fal l 16; 5.80%


Working at Heights 4; Pinch Point 8; 2.90% Cost Saving Opportunity Driving Safet
1.45% 1; 0.36%
Appreci ation 20; 7.25%
Tools & Equipmen
5.43%
Procedures & Orderlin
57; 20.65%
PPE 23; 8.33% Permit to Work 1; 0.36%
Confined Spa ce Entry 0 Cost Savi ng Opportuni ty 1 Driving Sa
Ground Di sturbance 5 Hea l th Hazards 10 Hous ekee
Mai ntena nce 36 Permi t to Work 1 PPE 23
Tools & Equi pment 15 Worki ng at Hei ghts 4 Ma nual li
7.25%

UNSAFE ACT 不安全行为


SAFE ACT 安全行为

92.75%

Fal l 16; 5.80%


ving Opportunity HSE Suggestion 8; 2.90%
Driving Safety 4; 1.45%
%7.25% Lifting Operations 6;
Dropped
2.17%Objects 16;
Tools & Equipment 15;
5.80% Hous ekeepi ng 25; 9.06%
5.43%
Procedures & Orderlines Management of Change
Energy 3; 11;
Isolation
57; 20.65% 1.09% 3.99%
3% Permit to Work 1; 0.36% Health36;
Hazards
Maintenance 13.04%10; 3.62%
Environmental Hazards 7;
2.54%

Ground Disturbance 5;
1.81%
Ground Disturbance 5;
1.81%

ng Opportuni ty 1 Driving Safety 4 Dropped Objects 16 Energy Is olation 11 Envi ronmental Haza rds 7
azards 10 Hous ekeepi ng 25 HSE Suggestion 8 Li fting Operations 6 Ma nagement of Change 3
Work 1 PPE 23 Procedures & Orderl i nes 57 Appreciation 20 Sl i p/Tri p/Fal l 16
at Hei ghts 4 Ma nual li fti ng 0 Pi nch Poi nt 8
3

You might also like