Standard Request For Proposals (RFP), RFP No. Sh/rfp/ofl/001/2018-2019

Download as pdf or txt
Download as pdf or txt
You are on page 1of 53

STANDARD REQUEST FOR PROPOSALS (RFP)

REPUBLIC OF KENYA

OFFICE OF THE PRESIDENT

STATE HOUSE

RFP NO. SH/RFP/OFL/001/2018-2019

PROVISION OF CONSULTANCY SERVICES

FOR THE

CONSULTANCY TO SUPPORT IMPLEMENTATION OF THE FIRST


LADY’S

PROGRAMMES AND INITIATIVES

RFP CLOSING DATE: TUESDAY, 23RD, OCTOBER 2018 AT 10.00AM.

1
TABLE OF CONTENTS

INTRODUCTION ............................................................................................... 3
SECTION I - LETTER OF INVITATION ........................................................... 4
SECTION II – INFORMATION TO CONSULTANTS (ITC) ...................................... 5
Appendix of information to consultants ................................................................ 15
EVALUATION CRITERIA .............................................................................. 18
SECTION III: - TECHNICAL PROPOSAL........................................................... 20
Notes on the preparation of the Technical Proposals ................................................. 20
Table of Contents .............................................................................................. 21
1. TECHNICAL PROPOSAL SUBMISSION FORM .............................................. 21
2. FIRM’S REFERENCES ............................................................................... 23
3. COMMENTS AND SUGGESTIONS OF CONSULTANTS ON THE TERMS OF
REFERENCE AND ON DATA, SERVICES AND FACILITIES TO BE PROVIDED BY
THE CLIENT ................................................................................................ 24
5. TEAM COMPOSITION AND TASK ASSIGNMENTS ........................................ 26
6. FORMAT OF CURRICULUM VITAE (CV) FOR PROPOSED PROFESSIONAL STAFF
.................................................................................................................. 27
7. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL .................................... 29
8. ACTIVITY (WORK) SCHEDULE ................................................................. 30
SECTION IV: - FINANCIAL PROPOSAL ........................................................... 31
SECTION IV - FINANCIAL PROPOSAL STANDARD FORMS ............................. 32
1. FINANCIAL PROPOSAL SUBMISSION FORM ............................................... 33
2. SUMMARY OF COSTS .............................................................................. 34
3. BREAKDOWN OF PRICE PER ACTIVITY ..................................................... 35
4. BREAKDOWN OF REMUNERATION PER ACTIVITY ..................................... 36
5. REIMBURSABLES PER ACTIVITY .............................................................. 37
6. MISCELLANEOUS EXPENSES ................................................................... 38
SECTION V: - TERMS OF REFERENCE ............................................................ 39
SECTION VI: ................................................................................................... 40
STANDARD FORMS OF CONTRACT ............................................................... 40
CONTRACT ................................................................................................. 41
LETTER OF NOTIFICATION OF AWARD ......................................................... 47
FORM RB 1 ................................................................................................. 48
TENDER-SECURING DECLARATION .............................................................. 49
APPENDIX A .................................................................................................. 51
TERMS OF REFERENCE ................................................................................ 51

2
INTRODUCTION

1. This Standard Request for Proposals (SRFP) has been prepared for use by
public entities in Kenya in the procurement of consultancy services and
selection of consultants.

2. The SRFP includes Standard form of Contract for Large Assignments and
small assignment which are for lump sum or time based payments.

3. A separate SRFP has been provided for selection of individual professional


consultants.

4. The General Conditions of Contract should not be modified and instead the
Special Conditions of Contract should be used to reflect the unique
circumstances of the particular assignment. Similarly the information to
consultants should only be clarified or amended through the Appendix to
information to Consultants.

5. This SRFP document shall be used where a shortlist of consultancy firms


already exist or has been obtained through a shortlist after an advertisement
of Expression of Interest for Consultancy required.

3
SECTION I - LETTER OF INVITATION

TO: Date

Dear Sir/Madam,
RE: Consultancy to Support Implementation of the First Lady’s Programmes and
Initiatives
1.1 The STATE HOUSE invites proposals for the following consultancy services to support
the implementation of the First Lady’s Programmes and Initiatives that include and are
not limited to Beyond Zero Initiative, Cancer awareness, Preventive Programmes and
First Lady’s Half-Marathon. The overall objective of this assignment will be provision of
technical advice and support towards implementation of the First Lady’s Strategic
Framework as per the terms of reference.

1.2 The request for proposals (RFP) includes the following documents:
Section I - Letter of invitation
Section II - Information to consultants
Appendix to Consultants information
Section III - Terms of Reference
Section IV - Technical proposals
Section V - Financial proposal
1.2 Section VI - Standard Contract Form
1.3 A complete set of proposal documents may be obtained by interested candidates
free of charge from the State House website: www.president.go.ke and IFMIS
portal atsupplier.treasury.go.ke. All the candidates who download the proposal
document MUST register with the procurement office.
1.4 Completed Request for Proposal documents are to be enclosed in plain sealed
envelopes, marked with the proposal number and be deposited in the tender box
provided at the Supply Chain Management Office, State House Nairobi, or be
addressed and posted to:
The Comptroller of State House,
P. O. Box 40530 - 00100
Nairobi.
So as to reach him on or before Tuesday 23rd , October 2018 at 10.30am.

1.5 Request for Proposals will be opened immediately thereafter in the presence of
the candidates representatives who choose to attend at the State House
Boardroom.
1.6 Prices quoted should be net inclusive of all taxes and delivery costs, must be
expressed in Kenya shillings and shall remain valid for a period of ninety (90)
days from the closing date of the tender
Yours sincerely

Head Supply Chain Management Services


FOR: COMPTROLLER STATE HOUSE

4
SECTION II – INFORMATION TO CONSULTANTS (ITC)

Table of Contents

Page
2.1 Introduction

2.2 Clarification and amendment of RFP document

2.3 Preparation of Technical Proposal

2.4 Financial proposal

2.5 Submission, Receipt and opening of proposals

2.6 Proposal evaluation general

2.7 Evaluation of Technical proposal

2.8 Public opening and Evaluation of financial proposal

2.9 Negotiations

2.10 Award of Contract

2.11 Confidentiality

2.12 Corrupt or fraudulent practices

5
SECTION II: - INFORMATION TO CONSULTANTS (ITC)

2.1 Introduction

2.1.1 The Client named the Appendix to “ITC” will select a firm among those
invited to submit a proposal, in accordance with the method of selection
detailed in the appendix. The method of selection shall be as indicated by the
procuring entity in the Appendix.

2.1.2 The consultants are invited to submit a Technical Proposal and a Financial
Proposal, or a Technical Proposal only, as specified in the Appendix “ITC”
for consulting services required for the assignment named in the said
Appendix. A Technical Proposal only may be submitted in assignments
where the Client intends to apply standard conditions of engagement and
scales of fees for professional services which are regulated as is the case
with Building and Civil Engineering Consulting services. In such a case the
highest ranked firm of the technical proposal shall be invited to negotiate a
contract on the basis of scale fees. The proposal will be the basis for
Contract negotiations and ultimately for a signed Contract with the selected
firm.

2.1.3 The consultants must familiarize themselves with local conditions and take
them into account in preparing their proposals. To obtain first hand
information on the assignment and on the local conditions, consultants are
encouraged to liase with the Client regarding any information that they may
require before submitting a proposal and to attend a pre-proposal conference
where applicable. Consultants should contact the officials named in the
Appendix “ITC” to arrange for any visit or to obtain additional information
on the pre-proposal conference. Consultants should ensure that these
officials are advised of the visit in adequate time to allow them to make
appropriate arrangements.

2.1.4 The Procuring entity will provide the inputs specified in the Appendix
“ITC”, assist the firm in obtaining licenses and permits needed to carry out
the services and make available relevant project data and reports.

2.1.5 Please note that (i) the costs of preparing the proposal and of negotiating the
Contract, including any visit to the Client are not reimbursable as a direct
cost of the assignment; and (ii) the Client is not bound to accept any of the
proposals submitted.

6
2.1.6 The procuring entity’s employees, committee members, board members and
their relative (spouse and children) are not eligible to participate.

2.1.7 The price to be changed for the tender document shall not exceed
Kshs.5,000/=

2.1.8 The procuring entity shall allow the tenderer to review the tender document
free of charge before purchase.

2.2 Clarification and Amendment of RFP Documents


2.2.1 Consultants may request a clarification of any of the RFP documents only up
to seven [7] days before the proposal submission date. Any request for
clarification must be sent in writing by paper mail, cable, telex, facsimile or
electronic mail to the Client’s address indicated in the Appendix “ITC”. The
Client will respond by cable, telex, facsimile or electronic mail to such
requests and will send written copies of the response (including an
explanation of the query but without identifying the source of inquiry) to all
invited consultants who intend to submit proposals.

2.2.2 At any time before the submission of proposals, the Client may for any
reason, whether at his own initiative or in response to a clarification
requested by an invited firm, amend the RFP. Any amendment shall be
issued in writing through addenda. Addenda shall be sent by mail, cable,
telex or facsimile to all invited consultants and will be binding on them. The
Client may at his discretion extend the deadline for the submission of
proposals.

2.3 Preparation of Technical Proposal

2.3.1 The Consultants proposal shall be written in English language

2.3.2 In preparing the Technical Proposal, consultants are expected to examine the
documents constituting this RFP in detail. Material deficiencies in providing
the information requested may result in rejection of a proposal.

2.3.3 While preparing the Technical Proposal, consultants must give particular
attention to the following:

(i) If a firm considers that it does not have all the expertise for the
assignment, it may obtain a full range of expertise by associating

7
with individual consultant(s) and/or other firms or entities in a joint
venture or sub-consultancy as appropriate. Consultants shall not
associate with the other consultants invited for this assignment. Any
firms associating in contravention of this requirement shall
automatically be disqualified.

(ii) For assignments on a staff-time basis, the estimated number of


professional staff-time is given in the Appendix. The proposal shall
however be based on the number of professional staff-time estimated
by the firm.

(iii) It is desirable that the majority of the key professional staff proposed
be permanent employees of the firm or has an extended and stable
working relationship with it.

(iv) Proposed professional staff must as a minimum, have the experience


indicated in Appendix, preferably working under conditions similar to
those prevailing in Kenya.

(v) Alternative professional staff shall not be proposed and only one
Curriculum Vitae (CV) may be submitted for each position.

2.3.4 The Technical Proposal shall provide the following information using the
attached Standard Forms;

(i) A brief description of the firm’s organization and an outline of recent


experience on assignments of a similar nature. For each assignment
the outline should indicate inter alia, the profiles of the staff
proposed, duration of the assignment, contract amount and firm’s
involvement.

(ii) Any comments or suggestions on the Terms of Reference, a list of


services and facilities to be provided by the Client.

(iii) A description of the methodology and work plan for performing the
assignment.

(iv) The list of the proposed staff team by specialty, the tasks that would
be assigned to each staff team member and their timing.

(v) CVs recently signed by the proposed professional staff and the
authorized representative submitting the proposal. Key information
should include number of years working for the firm/entity and degree

8
of responsibility held in various assignments during the last ten (10)
years.

(vi) Estimates of the total staff input (professional and support staff staff-
time) needed to carry out the assignment supported by bar chart
diagrams showing the time proposed for each professional staff team
member.

(vii) A detailed description of the proposed methodology, staffing and


monitoring of training, if Appendix “A” specifies training as a major
component of the assignment.

(viii) Any additional information requested in Appendix “A”.

2.3.5 The Technical Proposal shall not include any financial information.

2.4 Preparation of Financial Proposal

2.4.1 In preparing the Financial Proposal, consultants are expected to take into
account the requirements and conditions outlined in the RFP documents.
The Financial Proposal should follow Standard Forms (Section D). It lists
all costs associated with the assignment including; (a) remuneration for staff
(in the field and at headquarters), and; (b) reimbursable expenses such as
subsistence (per diem, housing), transportation (international and local, for
mobilization and demobilization), services and equipment (vehicles, office
equipment, furniture, and supplies), office rent, insurance, printing of
documents, surveys, and training, if it is a major component of the
assignment. If appropriate these costs should be broken down by activity.

2.4.2 The Financial Proposal should clearly identify as a separate amount, the
local taxes, duties, fees, levies and other charges imposed under the law on
the consultants, the sub-consultants and their personnel, unless Appendix
“A” specifies otherwise.

2.4.3 Consultants shall express the price of their services in Kenya Shillings.

2.4.4 Commissions and gratuities, if any, paid or to be paid by consultants and


related to the assignment will be listed in the Financial Proposal submission
Form.

9
2.4.5 The Proposal must remain valid for 90 days after the submission date.
During this period, the consultant is expected to keep available, at his own
cost, the professional staff proposed for the assignment. The Client will
make his best effort to complete negotiations within this period. If the
Client wishes to extend the validity period of the proposals, the consultants
shall agree to the extension.

2.5 Submission, Receipt, and Opening of Proposals

2.5.1 The original proposal (Technical Proposal and, if required, Financial


Proposal; see para. 1.2) shall be prepared in indelible ink. It shall contain no
interlineations or overwriting, except as necessary to correct errors made by
the firm itself. Any such corrections must be initialed by the persons or
person authorised to sign the proposals.

2.5.2 For each proposal, the consultants shall prepare the number of copies
indicated in Appendix “A”. Each Technical Proposal and Financial Proposal
shall be marked “ORIGINAL” or “COPY” as appropriate. If there are any
discrepancies between the original and the copies of the proposal, the
original shall govern.

2.5.3 The original and one copy of the Technical Proposal shall be placed in a
sealed envelope clearly marked “TECHNICAL PROPOSAL,” and the
original and one copy of the Financial Proposal in a sealed envelope clearly
marked “FINANCIAL PROPOSAL” and warning: “DO NOT OPEN
WITH THE TECHNICAL PROPOSAL”. Both envelopes shall be placed
into an outer envelope and sealed. This outer envelope shall bear the
submission address and other information indicated in the Appendix “ITC”
and be clearly marked, “DO NOT OPEN, EXCEPT IN PRESENCE OF
THE OPENING COMMITTEE.”

2.5.4 The completed Technical and Financial Proposals must be delivered at the
submission address on or before the time and date stated in the Appendix
“ITC”. Any proposal received after the closing time for submission of
proposals shall be returned to the respective consultant unopened.

2.5.5 After the deadline for submission of proposals, the Technical Proposal shall
be opened immediately by the opening committee. The Financial Proposal
shall remain sealed and deposited with a responsible officer of the client
department up to the time for public opening of financial proposals.

10
2.6 Proposal Evaluation General

2.6.1 From the time the bids are opened to the time the Contract is awarded, if any
consultant wishes to contact the Client on any matter related to his proposal,
he should do so in writing at the address indicated in the Appendix “ITC”.
Any effort by the firm to influence the Client in the proposal evaluation,
proposal comparison or Contract award decisions may result in the rejection
of the consultant’s proposal.

2.6.2 Evaluators of Technical Proposals shall have no access to the Financial


Proposals until the technical evaluation is concluded.

2.7 Evaluation of Technical Proposal

2.7.1 The evaluation committee appointed by the Client shall evaluate the
proposals on the basis of their responsiveness to the Terms of Reference,
applying the evaluation criteria as follows

a) Specific experience of the consultant related to the assignment


b) adequacy of the proposed work plan and methodology in responding to the terms
of reference
c) Qualifications and competence of the key staff for the assignment
d) Suitability to the transfer of Technology Programme (Training)

Each responsive proposal will be given a technical score (St). A proposal shall be
rejected at this stage if it does not respond to important aspects of the Terms of
Reference or if it fails to achieve the minimum technical score indicated in the
Appendix “ITC”.

2.8 Public Opening and Evaluation of Financial Proposal

2.8.1 After Technical Proposal evaluation, the Client shall notify those consultants
whose proposals did not meet the minimum qualifying mark or were
considered
Non-responsive to the RFP and Terms of Reference, indicating that their
Financial Proposals will be returned after completing the selection process.
The Client shall simultaneously notify the consultants who have secured the
minimum qualifying mark, indicating the date and time set for opening the
Financial Proposals and stating that the opening ceremony is open to those
consultants who choose to attend. The opening date shall not be sooner than

11
seven (7) days after the notification date. The notification may be sent by
registered letter, cable, telex, facsimile or electronic mail.

2.8.2 The Financial Proposals shall be opened publicly in the presence of the
consultants’ representatives who choose to attend. The name of the
consultant, the technical. Scores and the proposed prices shall be read aloud
and recorded when the Financial Proposals are opened. The Client shall
prepare minutes of the public opening.

2.8.3 The evaluation committee will determine whether the financial proposals are
complete (i.e. whether the consultant has costed all the items of the
corresponding Technical Proposal and correct any computational errors.
The cost of any unpriced items shall be assumed to be included in other
costs in the proposal. In all cases, the total price of the Financial Proposal as
submitted shall prevail.

2.8.4 While comparing proposal prices between local and foreign firms
participating in a selection process in financial evaluation of Proposals, firms
incorporated in Kenya where indigenous Kenyans own 51% or more of the
share capital shall be allowed a 10% preferential bias in proposal prices.
However, there shall be no such preference in the technical evaluation of the
tenders. Proof of local incorporation and citizenship shall be required before
the provisions of this sub-clause are applied. Details of such proof shall be
attached by the Consultant in the financial proposal.

2.8.5 The formulae for determining the Financial Score (Sf) shall, unless an
alternative formulae is indicated in the Appendix “ITC”, be as follows:-
Sf = 100 X FM/F where Sf is the financial score; Fm is the lowest priced
financial proposal and F is the price of the proposal under consideration.
Proposals will be ranked according to their combined technical (St) and
financial (Sf) scores using the weights (T=the weight given to the Technical
Proposal: P = the weight given to the Financial Proposal; T + p = I)
indicated in the Appendix. The combined technical and financial score, S, is
calculated as follows:- S = St x T % + Sf x P %. The firm achieving the
highest combined technical and financial score will be invited for
negotiations.
2.8.6 The tender evaluation committee shall evaluate the tender within 30 days of
from the date of opening the tender.

2.8.7 Contract price variations shall not be allowed for contracts not exceeding
one year (12 months).

12
2.8.8 Where contract price variation is allowed, the variation shall not exceed 10%
of the original contract price

2.8.9 Price variation requests shall be processed by the procuring entity within 30
days of receiving the request.

2.9 Negotiations

2.9.1 Negotiations will be held at the same address as “address to send


information to the Client” indicated in the Appendix “ITC”. The aim is to
reach agreement on all points and sign a contract.

2.9.2 Negotiations will include a discussion of the Technical Proposal, the


proposed methodology (work plan), staffing and any suggestions made by
the firm to improve the Terms of Reference. The Client and firm will then
work out final Terms of Reference, staffing and bar charts indicating
activities, staff periods in the field and in the head office, staff-months,
logistics and reporting. The agreed work plan and final Terms of Reference
will then be incorporated in the “Description of Services” and form part of
the Contract. Special attention will be paid to getting the most the firm can
offer within the available budget and to clearly defining the inputs required
from the Client to ensure satisfactory implementation of the assignment.

2.9.3 Unless there are exceptional reasons, the financial negotiations will not
involve the remuneration rates for staff (no breakdown of fees).

2.9.4 Having selected the firm on the basis of, among other things, an evaluation
of proposed key professional staff, the Client expects to negotiate a contract
on the basis of the experts named in the proposal. Before contract
negotiations, the Client will require assurances that the experts will be
actually available. The Client will not consider substitutions during contract
negotiations unless both parties agree that undue delay in the selection
process makes such substitution unavoidable or that such changes are critical
to meet the objectives of the assignment. If this is not the case and if it is
established that key staff were offered in the proposal without confirming
their availability, the firm may be disqualified.

2.9.5 The negotiations will conclude with a review of the draft form of the
Contract. To complete negotiations the Client and the selected firm will
initial the agreed Contract. If negotiations fail, the Client will invite the
firm whose proposal received the second highest score to negotiate a
contract.

13
2.9.6 The procuring entity shall appoint a team for the purpose of the negotiations.

2.10 Award of Contract

2.10.1The Contract will be awarded following negotiations. After negotiations are


completed, the Client will promptly notify other consultants on the shortlist
that they were unsuccessful and return the Financial Proposals of those
consultants who did not pass the technical evaluation.

2.10.2The selected firm is expected to commence the assignment on the date and at
the location specified in Appendix “A”.

2.10.3 The parties to the contract shall have it signed within 30 days from the date
of notification of contract award unless there is an administrative review
request.

2.10.4 The procuring entity may at any time terminate procurement proceedings
before contract award and shall not be liable to any person for the
termination.

2.10.5 The procuring entity shall give prompt notice of the termination to the
tenderers and on request give its reasons for termination within 14 days of
receiving the request from any tenderer.

2.10.6 To qualify for contract awards, the tenderer shall have the following:
(a) Necessary qualifications, capability experience, services, equipment and
facilities to provide what is being procured.
(b) Legal capacity to enter into a contract for procurement
(c) Shall not be insolvent, in receivership, bankrupt or in the process of
being wound up and is not the subject of legal proceedings relating to
the foregoing.
(d) Shall not be debarred from participating in public procurement.

2.11 Confidentiality

2.11.1Information relating to evaluation of proposals and recommendations


concerning awards shall not be disclosed to the consultants who submitted
the proposals or to other persons not officially concerned with the process,
until the winning firm has been notified that it has been awarded the
Contract.

14
2.12 Corrupt or fraudulent practices

2.12.1The procuring entity requires that the consultants observe the highest
standards of ethics during the selection and award of the consultancy
contract and also during the performance of the assignment. The tenderer
shall sign a declaration that he has not and will not be involved in corrupt or
fraudulent practices.

2.12.2 The procuring entity will reject a proposal for award if it determines that the
consultant recommended for award has engaged in corrupt or fraudulent
practices in competing for the contract in question.

2.12.3 Further a consultant who is found to have indulged in corrupt or fraudulent


practices risks being debarred from participating in public procurement in
Kenya.

Appendix of information to consultants

Note on the Appendix to Information to Consultants

1. The Appendix to information to consultant is intended to assist the procuring


entity in providing specific information in relation to corresponding claims
in the information to consultants included in Section II and the appendix has
to be prepared for each specific consultancy.

2. The Procuring entity should specify in the appendix information and


requirements specific to the circumstances of the procuring entity, the
assignment of the consultancy and the proposals evaluation criteria that will
apply to the RFP Consultancy.

3. In preparing the appendix the following aspects should be taken into


consideration.

(a) The information that specifies or complements provisions of


Section II to be incorporated.

(b) Amendments of Section II as necessitated by the circumstances of


the specific consultancy to be also incorporated

(c) Section II should remain unchanged and any changes or


amendments should be introduced through the appendix.

15
Appendix to Information to Consultants

The following information for procurement of consultancy services and


selection of
consultants shall complement or amend the provisions of the information to
consultants, wherever there is a conflict between the provisions of the
information
and to consultants and the provisions of the appendix, the provisions of the
appendix herein shall prevail over those of the information to consultants.

16
Clause Appendix to Information to Consultants
R
e
f
e
r
e
n
c
e
Paragraph 2.1 The name of the Client is:
Paragraph 2.1.1 The method of selection is:Request for Proposal
Paragraph 2.1.2 Technical and Financial Proposals are requested: Yes
The objective of this
assignment will be provision of
technical advice and support
towards implementation of the
First Lady’s Strategic
Framework as per the terms of
reference.
Paragraph 2.1.3 A pre-proposal conference will
not be required.
The name(s), address (es) and telephone numbers of the Client’s
official(s) are:
The Comptroller State House
P.O Box 40530-00100
Nairobi
Tel: +254-0202224941
Paragraph 2.1.4 The Client will provide the following inputs: working office
Paragraph2.1.5 The estimated number of
professional staff months
required for the assignment is
four (4 No.)
The minimum required experience of proposed professional staff is five
years for the lead consultant and two for other professionals in the
specific field.
Paragraph2.1.6 Training is a specific component of this assignment:
Yes____ No _______[If yes, provide
appropriate information)
(viii) Additional information in the Technical Proposal
includes:____________________________________________
Paragraph2.1.7 Taxes the price quoted should be inclusive of all taxes
Paragraph 2.5.2 Consultants must submit an original and one additional copies of each
proposal.
Paragraph 2.5.3 The proposal submission address is the tender box provided at the Supply
Chain Management17Office, State House Nairobi, or be addressed and
posted to:
The Comptroller of State House,
Paragraph 2.5.4 Proposals must be submitted no later than the following 19th October,
2018 at 10.00A.M
Paragraph 2.6.1 The address to send information to the Client is: The Comptroller State
House, P.O Box 40530-00100 Nairobi
Paragraph 2.6.3 The minimum technical score required to pass is eighty (80) points.
Paragraph 2.7.1 Alternative formulae for determining the financial scores is the
following:______________________________________________

The weights given to the Technical and Financial Proposals are:


T= 80
P= 20

Paragraph 2.9.2 The assignment is expected to commence upon contract signing.

(Amend as necessary)

EVALUATION CRITERIA

The evaluation of the tenders shall be carried out through the following stages:

AREA SUB-AREA RATING/SCORES


Preliminary evaluation Compliance evaluation Elimination
Technical Evaluation Technical proposal 80
(80%)
Financial (20%) Financial proposal 20
Total 100
2.6 STAGE 1-PRELIMINARY (MANDATORY) EVALUATION

At this stage, the bidder is required to provide the following;


1. Copies of certificate of incorporation
2. Valid tax compliance certificate.
3. Tender security of Kenya shillings Fifty thousand from a bank or approved
Insurance Company and or signed tender security declaration form in case of
AGPO.
4. Declaration statement that bidder is not involved in fraudulent practices
5. Declaration statement that bidder is not debarred by Public Procurement
Regulatory Authority.
18
6. Serialization of the proposal document and submission of the document
while intact.
7. Duly filled technical submission form.
The above parameters are mandatory and failure in any one of
them leads to disqualification from further evaluation.

2.7 STAGE 2-TECHNICAL EVALUATION


The evaluation shall be carried out as per section 2.7.1 of the ITC
The pass mark in this stage is 80 points.

The technical evaluation shall be based on the criteria as indicated below:

No. Criteria Score (%)


1 Demonstrate Experience and successful track 15
record in delivery of similar assignment in the
past 3 years. (Documented evidence-each year 5
marks.)
2 Details of at least 4 recent clientele of similar 20
nature of work contact person and year of
service provided (using format provided in the
Technical Proposal)
3. Academic Qualification and competence of 40
Lead Consultant and key staff as per the term of
reference. (Attach assigned CV using the format
provided in the Technical Proposal)
4. Strong demonstration of a good understanding 25
of the requirements of this assignment by
demonstrating adequacy and clarity of the
proposed work plan and methodology in
responding to the terms of reference and to
deliver on the requirements.

A tender shall be rejected at this stage if it fails to achieve the above minimum

2.8 STAGE 3-FINANCIAL EVALUATION CRITERIA


The financial score will be 20 points

Provide a financial proposal of consultancy fees, costs and estimate of expenses


which will be evaluated as follows:-
Financial score (FS) =100xFM/F
19
 FM is the lowest fees quoted and
 F is the fees of the proposal under consideration.

STAGE 4-OVERALL TOTAL COMBINED SCORE

The consultants proposals will be ranked according to their combined technical


score (ts)
and financial score (fs) using the weights as follows:-

 Technical scores weight(T)=80%


 Financial score weight(P)=20%

S=TS+FS
Where:
S is the total combined scores of technical and financial scores.
TS is the technical scores.
FS is the financial scores.
T is the weight given to the technical proposal and
P is the weight given to the financial technical proposal

SECTION III: - TECHNICAL PROPOSAL

Notes on the preparation of the Technical Proposals

3.1 In preparing the technical proposals the consultant is expected to examine all
terms and information included in the RFP. Failure to provide all requested
information shall be at the consultants own risk and may result in rejection
of the consultant’s proposal.

3.2 The technical proposal shall provide all required information and any
necessary additional information and shall be prepared using the standard
forms provided in this Section.

3.3 The Technical proposal shall not include any financial information unless it
is allowed in the Appendix to information to the consultants or the Special
Conditions of contract.

20
SECTION III - TECHNICAL PROPOSAL

Table of Contents

Page
1. Technical proposal submission form

2. Firms references

3. Comments and suggestions of consultants on the


Terms of reference and on data, services and
facilities to be provided by the procuring entity

4. Description of the methodology and work plan


for performing the assignment

5. Team composition and Task assignments

6. Format of curriculum vitae (CV) for proposed


Professional staff

7. Time schedule for professional personnel

8. Activity (work schedule)

1. TECHNICAL PROPOSAL SUBMISSION FORM

[_______________ Date]

To:______________________[Name and address of Client)

Ladies/Gentlemen:

We, the undersigned, offer to provide the consulting services for


__________________

21
_______________________________[Title of consulting services] in accordance
with your Request for Proposal dated ______________________[Date] and our
Proposal. We are hereby submitting our Proposal, which includes this Technical
Proposal, [and a Financial Proposal sealed under a separate envelope-where
applicable].

We understand you are not bound to accept any Proposal that you receive.

We remain,

Yours sincerely,

_______________________________[Authorized Signature]:

________________________________[Name and Title of Signatory]


:
_________________________________[Name of Firm]
:
_________________________________[Address:]

22
2. FIRM’S REFERENCES

Relevant Services Carried Out in the Last Five Years


That Best Illustrate Qualifications

Using the format below, provide information on each assignment for which your
firm either individually, as a corporate entity or in association, was legally
contracted.

Assignment Name: Country

Location within Country: Professional Staff provided by Your

Firm/Entity(profiles):
Name of Client: Clients contact person for the
assignment.

Address:
No of Staff-Months; Duration of
Assignment:
Start Date (Month/Year): Completion Date Approx. Value of Services (Kshs)
(Month/Year):

Name of Associated Consultants. If any:


No of Months of Professional
Staff provided by Associated
Consultants:
Name of Senior Staff (Project Director/Coordinator, Team Leader) Involved and
Functions Performed:
Narrative Description of project:

Description of Actual Services Provided by Your Staff:

Firm’s Name: ___________________________________

Name and title of signatory; ________________________

(May be amended as necessary)


23
3. COMMENTS AND SUGGESTIONS OF CONSULTANTS ON THE
TERMS OF REFERENCE AND ON DATA, SERVICES AND FACILITIES
TO BE PROVIDED BY THE CLIENT

On the Terms of Reference:

1.

2.

3.

4.

5.

On the data, services and facilities to be provided by the Client:

1.

2.

3.

4.

5.

24
14. DESCRIPTION OF THE METHODOLOGY AND WORK PLAN
FOR PERFORMING THE ASSIGNMENT

25
5. TEAM COMPOSITION AND TASK ASSIGNMENTS

1. Technical/Managerial Staff

Name Position Task

2. Support Staff

Name Position Task

26
6. FORMAT OF CURRICULUM VITAE (CV) FOR PROPOSED
PROFESSIONAL STAFF

Proposed Position:
_____________________________________________________________

Name of Firm:
_________________________________________________________________

Name of Staff:
__________________________________________________________________

Profession:
__________________________________________________________________
___

Date of Birth:
__________________________________________________________________

Years with Firm: ___________________________ Nationality:


______________________

Membership in Professional Societies:


__________________________________________

Detailed Tasks Assigned:


_______________________________________________________

Key Qualifications:

[Give an outline of staff member’s experience and training most pertinent to tasks
on assignment. Describe degree of responsibility held by staff member on relevant
previous assignments and give dates and locations].

Education:

27
[Summarize college/university and other specialized education of staff member,
giving names of schools, dates attended and degree[s] obtained.]

Employment Record:

[Starting with present position, list in reverse order every employment held. List
all positions held by staff member since graduation, giving dates, names of
employing organizations, titles of positions held, and locations of assignments.]

Certification:

I, the undersigned, certify that these data correctly describe me, my qualifications,
and my experience.

_________________________________________________________ Date:
________________
[Signature of staff member]
__________________________________________________________________
_ Date; ______________
[Signature of authorised representative of the firm]

Full name of staff member:


_____________________________________________________

Full name of authorized representative:


_________________________________________

28
7. TIME SCHEDULE FOR PROFESSIONAL PERSONNEL

Months (in the Form of a Bar Chart)


Name Position Reports Number
Due/ 1 2 3 4 5 6 7 8 9 10 11 12 of
Activities months

Reports Due: _________

Activities Duration: _________

Signature: ________________________
(Authorized representative)

Full Name: ________________________

Title: ______________________________

Address: ___________________________

29
8. ACTIVITY (WORK) SCHEDULE

(a). Field Investigation and Study Items

[1st,2nd,etc, are months from the start of assignment)


1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th

Activity (Work)

(b). Completion and Submission of Reports

Reports Date

1. Inception Report

4. Interim Progress
Report
(a) First Status Report
(b) Second Status
Report

3. Draft Report

4. Final Report

30
SECTION IV: - FINANCIAL PROPOSAL

Notes on preparation of Financial Proposal

4.1 The Financial proposal prepared by the consultant should list the costs
associated with the assignment. These costs normally cover remuneration
for staff, subsistence, transportation, services and equipment, printing of
documents, surveys etc as may be applicable. The costs should be broken
done to be clearly understood by the procuring entity.
4.2 The financial proposal shall be in Kenya Shillings or any other currency
allowed in the request for proposal and shall take into account the tax
liability and cost of insurances specified in the request for proposal.
4.3 The financial proposal should be prepared using the Standard forms
provided in this part

31
SECTION IV - FINANCIAL PROPOSAL STANDARD FORMS

Table of Contents

Page
1. Financial proposal submission Form

2. Summary of costs

3. Breakdown of price/per activity

4. Breakdown of remuneration per activity

5. Reimbursables per activity

6. Miscellaneous expenses

32
1. FINANCIAL PROPOSAL SUBMISSION FORM

________________[ Date]

To: ______________________________________
______________________________________
______________________________________
[Name and address of Client]

Ladies/Gentlemen:

We, the undersigned, offer to provide the consulting services for (____________)
[Title of consulting services] in accordance with your Request for Proposal dated
(__________________) [Date] and our Proposal. Our attached Financial Proposal
is for the sum of
(_________________________________________________________________)
[Amount in words and figures] inclusive of the taxes.

We remain,

Yours sincerely,

_____________________________[Authorized Signature]
:
_____________________ [Name and Title of Signatory]:

_______________________ [Name of Firm]

______________________ [Address]

33
2. SUMMARY OF COSTS
Costs Currency(ies) Amount(s)

Subtotal

Taxes

Total Amount of Financial Proposal __________________

34
3. BREAKDOWN OF PRICE PER ACTIVITY

Activity NO.: Description:_________________________


_______________________

Price Component Amount(s)

Remuneration

Reimbursables

Miscellaneous Expenses

Subtotal _______________________________

35
4. BREAKDOWN OF REMUNERATION PER ACTIVITY
Activity No. _________________________________
Name:_______________________

Names Position Input(Staff months, Remuneration Amount


days or hours Rate
as appropriate.)

Regular staff

(i)
(ii)

Consultants

Grand Total
______________

36
5. REIMBURSABLES PER ACTIVITY

Activity No: ________________________________


Name:______________________

No. Description Unit Quantity Unit Total Amount


Price
1. Air travel Trip

2 Road travel Kms

3. Rail travel Kms


____________
4. Subsistence Day
Allowance

Grand Total

37
6. MISCELLANEOUS EXPENSES

Activity No. ______________________________ Activity Name:


_______________________

No. Description Unit Quantity Unit Price Total Amount

1. Communication costs____
______________________
(telephone, telegram, telex)

2. Drafting, reproduction of
reports

3. Equipment: computers etc.

4. Software

Grand Total ____________

38
SECTION V: - TERMS OF REFERENCE

5.1 Terms of Reference are the initial statement to the consultant of the services
to be performed and should therefore be clear and precise and should contain
the following sections:

(a) Background,

(b) Objectives of the assignment,

(c) Scope of the Services,

(d) Training (where appropriate),

(e) Reports and Time Schedule,

(f) Data Services, Personnel and Facilities to be provided by the Client, and

(g) Terms of Payment.

5.2 This Section should be prepared very carefully by the procuring entity to
ensure that the consultancy assignment is well understood by the
consultants.

39
SECTION VI:

STANDARD FORMS OF CONTRACT

a. ANNEX I – LARGE ASSIGNMENTS (LUMP-SUM PAYMENTS)

b. ANNEX II – LARGE AND SMALL ASSIGNMENTS (TIME -BASED


PAYMENTS)

c. ANNEX III – SMALL ASSIGNMENTS (LUMP-SUM


PAYMENTS)

NOTES

1. LARGE ASSIGNMENT_____Exceeding Ksh 5,000,000

2. SMALL ASSIGNMENT _____Not exceeding Ksh. 5,000,000

3. TIME BASED PAYMENT ___Time based fixed fee Exact duration of


contract not fixed

4. LUMP-SUM PAYMENT _____Stated fixed contract sum.

40
CONTRACT

This Agreement [hereinafter called “the Contract”) is entered into this


_____________ [Insert starting date of assignment], by and between
___________________________________________________
[Insert Client’s name] of [or whose registered office is situated at]
__________________________________________________[insert Client’s
address](hereinafter called “the Client”) of the one part AND

_____________________________________ [Insert Consultant’s name] of[or


whose registered office is situated
at]__________________________________________[insert Consultant’s
address](hereinafter called “the Consultant”) of the other part.

WHEREAS, the Client wishes to have the Consultant perform the Services
[hereinafter referred to as “the Services”, and

WHEREAS, the Consultant is willing to perform the said Services,

NOW THEREFORE THE PARTIES hereby agree as follows:

1. Services (i) The Consultant shall perform the Services specified in


Appendix A, “Terms of Reference and Scope of
Services,” which is made an integral part of this Contract.

(ii) The Consultant shall provide the reports listed in


Appendix B, “Consultant’s Reporting Obligations,”
within the time periods listed in such Appendix and the
personnel listed in Appendix C, “Cost Estimate of
Services, List of Personnel and Schedule of Rates” to
perform the Services.

2. Term The Consultant shall perform the Services during the period
commencing __________________[Insert start date] and
continuing through to________________[Insert completion
date] or any other period(s) as may be subsequently agreed by
the parties in writing.

3. Payment A. Ceiling

For Services rendered pursuant to Appendix A, the Client


shall pay the Consultant an amount not to exceed a

41
ceiling of _____________ [Insert ceiling amount]. This
amount has been established based on the understanding
that it includes all of the Consultant’s costs and profits as

(i)

well as any tax obligation that may be imposed on the


Consultant. The payments made under the Contract
consist of the Consultant’s remuneration as defined in
sub-paragraph (B) below and of the reimbursable
expenditures as defined in sub-paragraph (C) below.

B. Remuneration

The Client shall pay the Consultant for Services rendered


at the rate(s) per man/month spent (or per day spent or
per hour spent, subject to a maximum of eight hours per
day) in accordance with the rates agreed and specified in
Appendix C, “Cost Estimate of Services, List of
Personnel and Schedule of Rates”.

C. Reimbursables

The Client shall pay the Consultant for reimbursable


expenses which shall consist of and be limited to:

(i) normal and customary expenditures for official


road and air travel, accommodation, printing and
telephone charges; air travel will be reimbursed at
the cost of less than first class travel and will need
to be authorized by the Client’s coordinator;
(ii) such other expenses as approved in advance by the
Client’s coordinator.

D. Payment Conditions.

Payment shall be made in Kenya shillings unless


otherwise specified not later than thirty {30} days
following submission of invoices in duplicate to the
Coordinator designated in Clause 4 here below. If the
Client has delayed payments beyond thirty (30) days
after the date hereof, simple interest shall be paid to the
Consultant for each day of delay at a rate three

42
percentage points above the prevailing Central Bank of
Kenya’s average rate for base lending.

The parties shall use their best efforts to settle amicably


all disputes arising out of or in connection with this
Contract or its interpretation.

4. Project A. Coordinator
Administration
The Client designates _______________________
[Insert name] as Client’s Coordinator; the Coordinator
shall be responsible for the coordination of activities
under the Contract, for receiving and approving invoices
(ii)
for payment and for acceptance of the deliverables by the
Client.

B. Timesheets.
During the course of their work under this Contract,
including field work, the Consultant’s employees

providing services under this Contract may be required to


complete timesheets or any other document used to
identify time spent as well as expenses incurred, as
instructed by the Project Coordinator.

C. Records and Accounts

The Consultant shall keep accurate and systematic


records and accounts in respect of the Services which
will clearly identify all charges and expenses. The Client
reserves the right to audit or to nominate a reputable
accounting firm to audit the Consultant’s records relating
to amounts claimed under this Contract during its term
and any extension and for a period of three months
thereafter.

5. Performance The Consultant undertakes to perform the Services with


Standard the highest standards of professional and ethical
competence and integrity. The Consultant shall promptly
replace any employees assigned under this Contract that
the Client considers unsatisfactory.

43
6. Confidentiality The Consultant shall not, during the term of this Contract
and within two years after its expiration, disclose any
proprietary or confidential information relating to the
Services, this Contract or the Client’s business or
operations without the prior written consent of the Client.

7. Ownership of Any studies, reports or other material, graphic, software


Material or otherwise prepared by the Consultant for the Client
under the Contract shall belong to and remain the
property of the Client. The Consultant may retain a copy
of such documents and software.

8. Consultant Not The Consultant agrees that during the term of this
to be Engaged Contract and after its termination, the Consultant and
in Certain any entity affiliated with the Consultant shall be
Activities disqualified from providing goods, works or services (other
than the Services or any continuation thereof) for any
project resulting from or closely related to the Services.
9. Insurance The Consultant will be responsible for taking out any
appropriate insurance coverage.
(iii)

10. Assignment The Consultant shall not assign this Contract or


Subcontract any portion thereof without the Client’s prior
written consent.

11. Law Governing The Contract shall be governed by the Laws of Kenya
and
Contract and the language of the Contract shall be English Language.
Language

12. Dispute Any dispute arising out of this Contract which cannot be
Resolution amicably settled between the parties, shall be referred by
either party to the arbitration and final decision of a
person to be agreed between the parties. Failing
agreement to concur in the appointment of an Arbitrator,
the Arbitrator shall be appointed by the chairman of the
Chartered Institute of Arbitrators, Kenya branch, on the
request of the applying party.

44
FOR THE CLIENT

Full name; ___________________________

Title: _________________________________

Date;__________________________________

Signature;_____________________________

FOR THE CONSULTANT

Full name:______________________________

Title: _________________________________

Signature_______________________________

Date;__________________________________

(iv)
LIST OF APPENDICES

Appendix A: Terms of Reference and Scope of Services

Appendix B: Consultant’s reporting Obligation

Appendix C: Cost Estimate of Services, List of Personnel and Schedule of


Rates

(v)

APPENDIX C

Cost Estimate of Services, List of Personnel and Schedule of Rates.

(1) Remuneration of Staff

Rate Time
(per spent(number

45
month/day/hour in of month/day/ Total
Name currency) hour) (currency)
(a) Team Leader
(b)
(c)
Sub-Total (1)

(2) Reimbursables

Rate Days Total


(a) Air Travel
(b) Road Transportation
(c) Per Diem
Sub-Total (2)

TOTAL COST ___________________________

Physical Contingency ___________________

CONTRACT CEILING ____________________

46
LETTER OF NOTIFICATION OF AWARD

Address of Procuring Entity


_____________________
_____________________
To:

RE: Tender No.

Tender Name

This is to notify that the contract/s stated below under the above mentioned tender
have been awarded to you.

1. Please acknowledge receipt of this letter of notification signifying your


acceptance.

2. The contract/contracts shall be signed by the parties within 30 days of the


date of this letter but not earlier than 14 days from the date of the letter.

3. You may contact the officer(s) whose particulars appear below on the
subject matter of this letter of notification of award.

(FULL PARTICULARS)

SIGNED FOR ACCOUNTING OFFICER

47
FORM RB 1
REPUBLIC OF KENYA
PUBLIC PROCUREMENT ADMINISTRATIVE REVIEW BOARD
APPLICATION NO…………….OF……….….20……...
BETWEEN
…………………………………………….APPLICANT
AND
…………………………………RESPONDENT (Procuring Entity)
Request for review of the decision of the…………… (Name of the Procuring
Entity) of ……………dated the…day of ………….20……….in the matter of
Tender No………..…of …………..20…
REQUEST FOR REVIEW
I/We……………………………,the above named Applicant(s), of address:
Physical address…………….Fax No……Tel. No……..Email ……………, hereby
request the Public Procurement Administrative Review Board to review the
whole/part of the above mentioned decision on the following grounds , namely:-
1.
2.
etc.
By this memorandum, the Applicant requests the Board for an order/orders that: -
1.
2.
etc
SIGNED ……………….(Applicant)
Dated on…………….day of ……………/…20…
FOR OFFICIAL USE ONLY
Lodged with the Secretary Public Procurement Administrative Review Board on
………… day of ………....20….………

SIGNED
Board Secretary

48
TENDER-SECURING DECLARATION

[The Tenderer shall fill in this Form in accordance with the instructions
indicated.]
Date: [insert date ]
Tender No.: [insert tender number]

To: [insert name of Procuring Entity]


We, the undersigned, declare that:
We understand that, according to your conditions, tenders must be
supported by a Tenders-Securing Declaration.
We accept that we will automatically be suspended from being eligible for
tendering in any contract with the Procuring Entity for the period of time
as determined by the Authority if we are in breach of our obligation(s)
under the tender conditions, because we:
(a) have withdrawn our Tender during the period of Tender validity
specified in the Form of Tender; or
(b) does not accept the Procuring Entity's corrections of arithmetic errors
in accordance with the Instructions to Tenderers; or
(c) having been notified of the acceptance of our Tender by the
Procuring Entity during the period of Tender validity, (i) fail or
refuse to execute the Contract, if required, or (ii) fail or refuse to
furnish the Performance Security, in accordance with the ITT.
We understand this Tender Securing Declaration shall expire if we are not
the successful Tenderer, upon the earlier of (i) our receipt of your
notification to us of the name of the successful Tenderer; or (ii) twenty-
eight (28) days after the expiration of our Tender validity period.
Signed: [insert signature of person whose name and capacity are shown]
Name: [insert complete name of person signing the Tender Securing Declaration]
In the capacity of [insert legal capacity of person signing the Tender Securing
Declaration]
Duly authorized to sign the Tender for and on behalf of: [insert complete
name of Tenderer]
49
Dated on ____________ day of __________________, _______ [insert date of
signing]
Corporate Seal (where appropriate)
[Note: In case of a Joint Venture, the Tender Securing Declaration must be in the
name of all partners to the Joint Venture that submits the tender.]

50
APPENDIX A
TERMS OF REFERENCE
Background
Five (5) years ago, Her Excellency Margaret Kenyatta, the First Lady of the
Republic of Kenya launched her Strategic Framework for Engagement in HIV
Control and Promotion of Maternal, Newborn, and Child Health (MNCH) in
Kenya 2013-2017. The Framework has been the guiding instrument towards
implementing her programmes. It has provided the plan and approach for her
strategic engagement in high-impact catalytic interventions and galvanizing high-
level leadership towards:
1. ending new HIV infections and women and child mortality; ensuring zero
preventable deaths of mothers and children;
2. guaranteeing adequate skilled birth attendants to attend to women and their
babies during pregnancy, delivery, and after birth;
3. expanding HIV testing, prevention and treatment to reduce mother-to-child
transmission of HIV;
4. ensuring universal immunization coverage for all babies against childhood
illness; providing adequate coverage in the use of insecticide-treated
mosquito bed nets;
5. supporting exclusive breastfeeding for all infants for the first six months;
and
6. spreading awareness on cancer prevention and good healthy lifestyles among
the citizens.
On 24th January 2014, Her Excellency launched the Beyond Zero Campaign
against a backdrop of shocking national HIV, maternal, and child heath indicators
in Kenya. Its goal was to advance awareness of the link between good health and a
strong nation, specifically demonstrating the importance of maternal, newborn, and
child health.

In 2013, Kenya was among the ten most dangerous countries globally for a woman
to get pregnant, for a child to be born, and to be an HIV patient

Some key MNCH indicators in Kenya in 2013


Number of women aged 15 and older were living with HIV 820,000
in Kenya 1
Proportion of AIDS-related maternal mortality (%) 2 20
3
Number of AIDS-orphans 1,000,000
4
Number of HIV infections in children 13, 000

1
National AIDS Control Council of Kenya, Kenya AIDS response progress report, 2014
2 National AIDS Control Council of Kenya, 2014, Kenya County HIV profiles
3 National AIDS Control Council of Kenya, Kenya AIDS response progress report, 2014
4 National AIDS Control Council, 2014, Kenya HIV Estimates, www.nascop.or.ke

51
Proportion of HIV+ children on ARV (%) 5 42.5
6
Maternal mortality ratio 540
Number of women dying daily from pregnancy-related 15
complications 7

Since then, Her Excellency has been in the forefront, steering conversations,
partnerships and investment, policy action, as well as public awareness. This has
inspired prioritization and change; and has contributed to significant decline in
maternal & child mortality, reduction in HIV transmission and expanded
investment in MNCH.
The Campaign’s comprehensive and multi-component approach for supporting and
strengthening public health delivery in general has provided the much-needed
momentum for the much-vaunted goal of avoidable zero maternal, child, and HIV
deaths. Her Excellency remains committed in her service to Kenyans and it is her
desire that her engagement and advocacy role remain strategic in order to impact
many more lives.
Objectives of Assignment
State House through the Office of the First Lady seeks to recruit a
Consultant/service provider to support the implementation of the First Lady’s
Programmes and Initiatives that include and are not limited to:
(1) Beyond Zero Initiative
(2) Cancer awareness and Preventive Programmes
(3) First Lady’s Half-Marathon
The overall objective of this assignment will be provision of technical advice and
support towards implementation of the First Lady’s Strategic Framework
(currently under development)
Scope of work
Specifically the Consultant shall be expected to undertake the following:
1. Support the Beyond Zero Secretariat
2. Support the delivery of specific projects within the Office of the First Lady
including the 2ndd Strategic Framework 2018-2022, the Feasibility study for the
Beyond Zero model facility and any other identified projects as the year rolls
out
3. Identify strategic engagements which the First Lady can leverage on for
increased visibility of Beyond Zero Initiative
4. Support the Cancer awareness and Preventive Programmes
5. Support the planning and execution of First Lady’s Half-Marathon

Training (Kindly indicate where appropriate)

5 National AIDS Control Council, 2014, Kenya HIV Estimates, www.nascop.or.ke


6 WHO, Trends in Maternal Mortality: 1990 to 2013 Estimates by WHO, UNICEF, UNFPA, The World Bank
and the United Nations Population Division, 2015.
7 Estimates based on Maternal Mortality Ratio from Kenya Demographic and Health Survey, 2014.

52
Reports and time schedules
The consultant/service provider will produce Quarterly Performance Reports that
will form the based on the activity carried out during the quarter.
Terms of payment.
The payment will be on quarterly basis upon submission of approved invoice of the
service rendered by the client.

Data, services, personnel and facilities to be provided by the client


The client will provide a working space whenever needed

QUALIFICATIONS
The Lead consultants must be a holder of Masters in International affairs, posses
post graduate certificate/diploma in Human Rights, HIV AIDS education, and
information & communication strategies.
Qualification for the special needs/assistant consultants shall be a degree in special
education & a diploma in special needs assessment & diagnostic e.g. Autism,
cerebral palsy, down syndrome etc.

The consultant must demonstrate expertise in Legal, gender and human Right
background, Research analysis and report writing, Baseline surveys and perception
surveys ,Special needs and disability involvement, Community
mobilization,Facilitation and Training ,Social science research,Data collection,
cleaning and analysis, Report writing and design, Financial management
Communication strategy development, Message development and Media
management, Design and Production of infomercials,Strategy development, Policy
analysis and formulation, Advocacy and Lobbying for charitable causes, Resource
mobilization and fundraising, Strategic visioning and institutional building,
Assessments, evaluations and performance management, Conference organizing
and events management.

NB The contract will be for a period of One year commencing from the date of
the contract with an option to renewal based on satisfactory completion.

53

You might also like