Hydrology Potha Cherra

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 4

O/o the Superintending Engineer Date: 9/19/2018 Note No. Hydrology of CD Str.

Planning Circle, PWD(R&B)


Govt. of Tripura By: A Deb Sheet No. 1
'file:///conversion/tmp/scratch/397479826.xls'#$1
[A] Hydrological Analysis
The following pages deals with the Hydrological Analysis of RCC Bridge at Potha cherra at Ch. 0.20 Km on
Manubazar to Srinagar

The stream, Potha cherra is crossing the proposed Road alignment at this location. An SPT bridge of 24.40 m
(approx.) length is exists at this location. This bridge will be replaced by a new RCC Bridge.

There are two different HFL data given on the topographical survey. Therefore in the absence of correct HFL data
difference between HFL & LBL can not be worked out properly.

However, considering the higher HFL, all the hydraulic calculations have been carried out. On that basis HFL-LBL = 4.66 m
Therefore 3 (three) cell Box culvert of (7.0 m x 5.6 m) has been proposed at this location.

Total length of the structure would be = 23.600 m

[B] Salient Data


Proposed Span Configuration (tentative) = 3/7.0 x 5.6 m
Proposed Road formation Level (tentative) = 98.320 m
High Flood Level( HFL) = 96.658 m

[C] Methodology
The calculation of Discharge is carried aout as per the guidelines laid down in IRC: SP - 13, 2004.
The flood discharge is estimated as per Article 5 of IRC: SP - 13, 2004 from the Conveyance Factor
and Slope of the Stream.
O/o the Superintending Engineer Date: 9/19/2018 Note No. Hydrology of CD Str.

Planning Circle, PWD(R&B)

Govt. of Tripura By: A Deb Sheet No. 2


'file:///conversion/tmp/scratch/397479826.xls'#$2

Computation of Longitudinal slope

Long Section of Nallah along Lowest Bed is tabulated below

LEVEL
Points DIST. (m)
(in m)
1 -161.523 92.384
2 -146.471 92.377
3 -123.900 92.361
4 -113.569 92.344
5 -102.561 92.311
6 -81.593 92.297
7 -69.665 92.289
8 -55.370 92.277
9 -46.212 92.268
10 -37.290 92.202
11 -28.852 92.179
12 -20.540 92.140
13 -3.345 92.061
14 0.000 91.995
15 2.006 91.967
16 9.158 91.958
17 32.497 91.920
18 55.766 91.872
19 66.158 91.868
20 72.559 91.820
21 83.652 91.796
22 96.717 91.779
23 124.497 91.700
24 137.022 91.687
25 156.285 91.657
26 172.033 91.580
27 178.903 91.556
28 192.495 91.504
29 205.297 91.501
30 218.486 91.461

93.000

92.500
f(x) = - 0.0026812957x + 92.0429976052

92.000

91.500

91.000
-200.000 -150.000 -100.000 -50.000 0.000 50.000 100.000 150.000 200.000 250.000

Longitudinal Slope = 0.0027


O/o the Superintending Engineer Date: 9/19/2018 Note No. Hydrology of CD Str.
Planning Circle, PWD(R&B)
Govt. of Tripura By: A Deb Sheet No. 3
'file:///conversion/tmp/scratch/397479826.xls'#$3
Bed Profile and Nallah Cross Section

HFL = 96.658 m

CASE : C/S at Bridge Location

R ED U C ED LEVEL OF B ED
Distance Level
Points HFL 96.658
(m) (m)
1 -22.049 97.106 -22.049 96.658
C/S AT Bridge location
2 -17.999 96.658 -17.999 96.658
3 -15.649 95.886 -15.649 96.658
4 -6.355 93.026 -6.355 96.658
5 -1.769 92.072 -1.769 96.658 95.000
6 0.000 91.995 0.000 96.658
7 2.205 92.072 2.205 96.658
8 3.008 92.575 3.008 96.658
9 4.410 94.749 4.410 96.658
10 4.858 96.658 4.858 96.658 91.000
11 8.111 96.921 -24.000
8.111 -18.000
96.658 -12.000 -6.000
H. DISTANCE FROM DATUM 0.000 6.000

CASE : C/S at Bridge Location


Area of
Av. Water Wetted
Level Segment Cross-
Level Distance Depth Perimeter,
POINT Difference Length, L section, A
(m) (m) below HFL P
with HFL (m) (in
(in meters) (in meters)
sq.meters)
1 97.106 -22.049 - - - - -

2 96.658 -17.999 0.000 4.050 - - -

3 95.886 -15.649 0.772 2.350 0.39 2.474 0.907

4 93.026 -6.355 3.632 9.294 2.20 9.724 20.465

5 92.072 -1.769 4.586 4.586 4.11 4.684 18.844

6 91.995 0.000 4.663 1.769 4.62 1.771 8.181

7 92.072 2.205 4.586 2.205 4.62 2.206 10.197

8 92.575 3.008 4.083 0.803 4.33 0.948 3.481

9 94.749 4.410 1.909 1.402 3.00 2.587 4.200

10 96.658 4.858 0.000 0.448 0.95 1.961 0.428

11 96.921 8.111 - 3.253 - - -

TOTAL 26.4 66.7


O/o the Superintending Engineer Date: 9/19/2018 Note No. Hydrology of CD Str.
Planning Circle, PWD(R&B)
Govt. of Tripura By: ADEB Sheet No. 4
'file:///conversion/tmp/scratch/397479826.xls'#$4

CALCULATION OF DISCHARGE BY AREA VELOCITY METHOD


Velocity (V) = 1 R 2/3
S 1/2

n
Discharge (Q) = AV
Rugosity Coefficient
n = = 0.05
(Assumed as per Table: 5.1 of IRC: SP - 13)
Nature of Surface assumed - Winding, some pools and shoals, clean, lower stages, more ineffective
slope and sections
S = Longitudinal Slope = 0.0027
Summary of Area and Wetted Perimeter
Wetted
Area, A
Case At Location Perimeter, P Remarks
(m2)
(m)

1 #REF! 66.7 26.4 -

Summary of Discharge
Velocity,
Wetted Discharge, q =
Area, A V(m/sec)
Perimeter, P R = A/P A*V
(m2) = (1/n).R2/3.S1/2
(m) (m3/sec)
1 66.7 26.4 2.531 1.930 128.7

Discharge at Bridge location = 128.7 m^3/sec


@ 129.0 m^3/sec