Comparative Study On Super Structure of Box Girder Bridge and Cable Stayedbridge With Extra Dosed Bridge
Comparative Study On Super Structure of Box Girder Bridge and Cable Stayedbridge With Extra Dosed Bridge
Comparative Study On Super Structure of Box Girder Bridge and Cable Stayedbridge With Extra Dosed Bridge
Abstract : Bridges Have Been One Of The Most Important Source Of Transportation. Therefore, It Becomes
Compulsory For Designers And Those Related To This Field To Take Special Concern In Regards To Designing
And Maintenance Of Such Heavy Structures. This Review Is Mainly Focused On Extra Dosed Bridge; As It Is A
New Type Of Bridge Engineering Design Concepts.In This Paper Parametric Study Of Superstructure
Extradosed Bridge, Cable Stayed Bridge And Box Girder Bridge Presented. In This Paper Parametric Study
Done For Clear Bridge Span Of 50m To 300 M. From This Study It Was Found That The Girder Bridge Is
Preferable For The Span Up To 50m, While Extradosed Bridge Is Preferable For The Span Of 50m To 300m.
Keywords–Box Girder Bridge, Cable Stayed Bridge, Extra Dosed Bridge, Parametric Study, Transportation
----------------------------------------------------------------------------------------------------------------------------- ----------
Date of Submission: 20-04-2018 Date of acceptance: 05-05-2018
----------------------------------------------------------------------------------------------------------------------------- ----------
I. INTRODUCTION
Bridge Engineering Has Become One Of The Most Important Needs For Today Therefore Getting It
Updated With Technological Trends Is Of Utmost Importance In Order To Provide With Proper Sustenance
Against Future Threats. For Bringing The Term Technology Into Picture It Has Become Very Important To Use
Newer Tools Which Have More Organized Computing Functionalities As In To Get Accurate Results When
Comes To Heavy Load Transfer And Building A Safe Design. In India Mostly Used Bridges Are Girder Bridge
And Cable-Stayed Bridges Although Adding To The Advancements They Have Started Adopting New Bridge
Type I.E. Extradosed Bridge For Construction. There Are Only Four Extra Dosed Bridge In India. Such A
Bridge Is Extradosed Bridge; There Is 4 Extradosed Bridge In India Located At Kolkata, Delhi, Mumbai And
Bharuch. Now A Days Extradosed Bridge Is Preferred For Medium Span. This Type Of Bridge Is Low In Cost,
Fast In Construction And Preferable Nearby Airport Because Of Its Low Pylon Height. To Findout Optimum
Effective Span It Is Necessary To Do Comparative Study Between Presently Used Bridge I.E. Girder Bridge
And Cable Stayed Bridge.
II. DATA
To Do Parametric Study On Superstructure Of Extradosed Bridge, Cable Stayed Bridge And Box
Girder Bridge We Have To Fix Common Parameters Of These Bridges. Fixed Parameter Of Bridge And Data
Taken For Analysis Are As Following:
o Deck Type In These Three Bridge: Box Girder
o Width Of Bridge: 20m [4 Lane]
o Tendon Profile : Parabolic
o Time Variables: Creep And Shrinkage Included.
o Temperature : Variation Between : 5°-45° C
o Quake Zone : Zone-V [IS 1893:2002]
o Wind Load : As Per IS 875 : 1987
o Vehicle Loading : IRC AA-Wheeled Loading [As Per IRC]
o Staged Analysis Done In Cable Stayed Bridge And In Extradosed Bridge
o Bridge Impact Factor : 1 [As Per IRC]
o Concrete : M60
o Steel : Fe500
o Cable : 1.5 N/Mm2
20 meter
www.ijesi.org 21 | Page
Comparative Study on Super Structure of Box Girder Bridge and Cable Stayed Bridge with Extra..
III. ANALYSIS
Analysis Is Done In Computer Aided Software As Per Indian Standards. After Analysing These Three
Bridges For Span Of 50m, 100m, 150m, 200m, 250m And 300m. Forces Are Compared And Estimation Is
Done From Bridge’s Geometry And Member Forces. Parametric Study Of Bridge Forces And Moments Is As
Follows:
Box Girder
0 0 0 9.67E+02 628.45 8.07E+01
Bridge
Extradosed
2670.94 2741.64 2978.96 8.47E+02 4113.24 1.93E+01
Bridge
Cable
9.45
Stayed 2964.74 4551.12 2412.95 1937.74 1.13E+01
E+02
Bridge
Extradosed
5890.79 5694.14 5140.87 1.32E+02 9071.81 0.14
Bridge
Cable
Stayed 8600.55 10534.15 3907.06 2.75E+02 5621.27 0.12
Bridge
www.ijesi.org 22 | Page
Comparative Study on Super Structure of Box Girder Bridge and Cable Stayed Bridge with Extra..
Extradosed 4.51
6487.56 6578.41 6985.24 9990.84 0.30
Bridge E+02
Cable
Stayed 9471.83 12959.46 5029.37 6.67E+03 6190.74 0.24
Bridge
Extradosed
7847.56 7945.54 7823.24 0.10 12085.24 0.07
Bridge
Cable
Stayed 12163.71 17003.45 5319.80 0.1749 7950.14 0.05
Bridge
Extradosed
8690.78 8655.41 8746.68 0.17 13383.80 0.071
Bridge
Cable
Stayed 16251.75 19388.11 5422.94 0.27 10622.06 0.046
Bridge
www.ijesi.org 23 | Page
Comparative Study on Super Structure of Box Girder Bridge and Cable Stayed Bridge with Extra..
Extradosed
9733.66 10273.97 10224.86 0.21 16563.49 0.075
Bridge
Cable
Stayed 15573.85 21575.33 8864.91 0.33 340928.6 0.083
Bridge
IV. CONCLUSION
For 4-Lane Bridge Is Analysed For Box Girder Bridge, Cable Stayed Bridge And Extra Dosed Bridge;
It Is Compared For Different Spans I.E. 50m, 100m, 150m, 200m, 250m And 300m.To Know Which Bridge Is
More Economic For Each Span. Parametric Study Can Be Done From Five Main Parameters; Cable Axial
Force, Pylon Axial Force, Pylon Moment, Deck Axial Force And Deck Moment.
a) Deck Axial Force - Comparison:
1. For 50m Clear Span Bridge: Box Girder Bridge Has Axial Force Of 6.28E+02 Kn. Comparison In Terms
Of %-Percentage; Cable Stayed Bridge Has 2.08E+02%And Extra Dosed Bridge Has 5.54E+02%Higher
Axial Force In Deck.
2. For 100m Clear Span Bridge: Box Girder Bridge Has Axial Force Of 1.31E+03 Kn. Comparison In Terms
Of %-Percentage; Cable Stayed Bridge Has 3.29E+02%And Extra Dosed Bridge Has5.93E+02%Higher
Axial Force In Deck.
3. For 150m Clear Span Bridge: Box Girder Bridge Has Axial Force Of 1.38E+03 Kn. Comparison In Terms
Of %-Percentage; Cable Stayed Bridge Has 3.48E+02% And Extra Dosed Bridge Has 6.23E+02%
4. For 200m Clear Span Bridge: Box Girder Bridge Has Axial Force Of 1.65E+02 Kn. Comparison In Terms
Of %-Percentage; Cable Stayed Bridge Has 3.81E+02%And Extra Dosed Bridge Has 6.31E+02%Higher
Axial Force In Deck.
5. For 250m Clear Span Bridge: Box Girder Bridge Has Axial Force Of 1.82E+02 Kn. Comparison In Terms
Of %-Percentage; Cable Stayed Bridge Has4.84E+02% And Extradosed Bridge Has 6E+02%Higher Axial
Force In Deck.
6. For 300m Clear Span Bridge:Extradosed Bridge Has 1.66E+04 Kn.Comparison Interms Of %-Percentage;
Cable Stayed Bridge Has 19.58% Higher Axial Force In Deck.
www.ijesi.org 24 | Page
Comparative Study on Super Structure of Box Girder Bridge and Cable Stayed Bridge with Extra..
REFERENCES
[1] Jan Bujnaket. Al, "Extradosed Bridge –Theoratical And Experimental Verification" Concrete And Concrete Structures 2013,
Conference, 2013..
[2] Hiroshi Mutsuyoshiet. Al. ―Recent Technology Of Prestressed Concrete Bridges In Japan‖ IABSE-JSCE Joint Conference On
Advances In Bridge Engineering-II, A, 2010.
[3] Vernersstraupe Et.Al. ―Analysis Of Geometrical And Mechanical Properties Of Cable-Stayed Bridge‖ 11th International Conference
On Structures And Techniques, 2013.
[4] Xiangbomeng And Chonghouzhang , "Extradosed And Intradosed Cable-Stayed Bridges With Continuous Cables: Conceptual
Consideration " Journal Of Bridge Engineering, 2013.
[5] C.X. Li Et.Al, "Fatigue Crack Growth Of Cable Steel Wires In A Suspension Bridge: Multiscaling And Mesoscopic Fracture
Mechanics" Theoretical And Applied Fracture Mechanics, 2010.
[6] M.H. El Ouni Et.Al, "Numerical And Experimental Dynamic Analysis And Control Of A Cable Stayed Bridge Under Parametric
Excitation" Engineering Structures, 2010.
[7] S.Uamaguchet. Al. ―Mechanical Behavior Of A Composite Box Bridge Used For 40 Years‖ Procedia Engineering,2011
[8] Project Reference Catalogue-Bridge Services Company: WIECON [Suspension, Cables Stayed And Extradosed Bridges]
[9] Bridge Inspection Manual For PC Extradosed Bridge (Special Bridge) [2014]
[10] Bridge Inspection Manual For PC Extradosed Bridge (Special Bridge) [2014]
[11] Form Finding For Cable-Stayed And Extradosed Bridges [2013]
[12] Vivekananda Bridge [Kolkata]
[13] KDOT Bridge Design Manual
[14] IRC112:2011 ―Code Of Practice For Concrete Road Bridges‖
[15] IRC 6 : 2010―Standard Specifications And Code Of Practice For Road Bridges Section: II Loads And Stresses‖
[16] IRC 18:2000 ―Design Criteria For Prestressed Concrete Road Bridges (Post-Tensioned Concrete)‖
www.ijesi.org 25 | Page
Comparative Study on Super Structure of Box Girder Bridge and Cable Stayed Bridge with Extra..
[17] IRC 21 : 2000 ―Standard Specifications And Code Of Practice For Road Bridges Section: Iii Cement Concrete (Plain And
Reinforced)‖]
[18] IS 1343 : 2012 ―Prestressed Concrete — Code Of Practice‖
Heemika Upadhyay "Comparative Study on Super Structure of Box Girder Bridge and
Cable Stayedbridge with Extra Dosed Bridge "International Journal of Engineering
Science Invention (IJESI), vol. 07, no. 05, 2018, pp 21-26
www.ijesi.org 26 | Page